1. Contractor should use this form for all drawing/document submittals to MARAFIQ for review.
2. All drawings/documents in a design submittal (except final) shall generally be given the same status. Each dwg/doc of a final design submittal
may be assigned an individual status.
3. Status of design drawings/documents to be assigned in the appropriate column as follows: X = Acceptale, NX = Not acceptable.
4. Status of Shop Drawings: A = Work May Proceed – No Comments; B = Work May Proceed – Minor Comments; C = Work May Proceed Except
as noted (Resubmittal required); D = Disapproved – Work May Not Proceed (Resubmittal required).