DPU30D-N06A1 & DBU20B-N12A1 Distributed Power System Quick Guide PDF
DPU30D-N06A1 & DBU20B-N12A1 Distributed Power System Quick Guide PDF
Quick Guide
Issue: 06
Part Number: 31507367
Date: 2016-06-02
Copyright © Huawei Technologies Co., Ltd. 2016. All rights reserved.
1 Overview
Indicator Colour Status Meaning
Power supply unit (PSU) Lithium battery
DPU30D-N06A1 DBU20B-N12A1 Off No power input or module fault
Run indicator Green Blinking slowly (0.5Hz) Normal communication
Blinking fast (4Hz) Abnormal communication
Steady on Module alarm
Alarm indicator Yellow Abnormal communication (This state
Blinking slowly (0.5Hz) does not apply to lithium batteries.)
Fault indicator Red Steady on Module fault
Installation Installation Max. Capacity/Layer Max. System
Scenario Method Configuration
Small pole Side 2 PSUs + 2 lithium batteries or 3 4 PSUs + 5 lithium
mounting lithium batteries (Install the first lithium batteries
battery against the small pole, install
the second lithium battery on its left, NOTICE
and install the third lithium battery or If the system
two PSUs on its right.)
configuration exceeds
the maximum
Small pole, Flush 1 PSU + 1 lithium battery or 2 PSUs capacity/layer, install
wall, large pole, mounting
channel steel, the devices on
(Unit: mm) (Unit: mm) angle steel different layers.
Install the lithium battery to Install the PSU to the lithium battery.
the pole.
(Unit: mm)
1
2.2 Side Mounting on a Small Pole: 2 PSUs + 1 Lithium Battery (Pole Diameter: 60–114 mm)
Connecting kit Hanging kit Install the pole mounting kit. Assemble the PSUs.
x1 x1
Install the hanging kit. Install the lithium battery to Install the PSUs to the pole.
the pole.
(Unit: mm)
2.3 Flush Mounting on a Small Pole: 1 PSU + 1 Lithium Battery (Pole Diameter: 60–114 mm)
Install the pole mounting Remove the hanging kit from the
kit. rear of the lithium battery and
Connecting install the kit on its left side.
kit x 1
Install the connecting Install the lithium battery to Install the PSU to the lithium
kit to the lithium the pole. battery.
battery.
(Unit: mm)
2
2.4 Flush Mounting on a Small Pole: 2 PSUs + 1 Lithium Battery (Pole Diameter: 60–114 mm)
Space Planning Required Accessories Installation Procedure
Connecting kit Hanging kit Install the pole mounting kits. Assemble the PSUs and install
x1 x1 the PSU hanging kit.
Install the PSUs to the Remove the hanging kit Install the lithium
pole. from the rear of the lithium battery to the pole.
battery and install the kit
on its right side.
(Unit: mm)
(Unit: mm)
Remove the hanging Install the connecting Install the lithium battery to Install the PSU to the
kit from the rear of kit. the wall. lithium battery.
the lithium battery
and install the kit on
its left side.
3
2.6 Flush Mounting on a Wall: 2 PSUs + 1 Lithium Battery
(Unit: mm)
Remove the Install the lithium Assemble the PSUs and Install the PSUs to the wall.
hanging kit from battery to the wall. install the PSU hanging kit.
the rear of the
lithium battery and
install the kit on its
right side.
2.7 Flush Mounting on a Large Pole: 2 PSUs + 1 Lithium Battery (Pole Diameter: 114–400 mm)
Assemble the PSUs Install the PSUs to Remove the Install the lithium
and install the PSU the large pole. hanging kit from battery to the
hanging kit. the rear of the large pole.
lithium battery
and install the
kit on its right
side.
4
2.8 Flush Mounting on a Large Pole: 1 PSU + 1 Lithium Battery (Pole Diameter: 114–400 mm)
Space Planning Required Accessories Installation Procedure
(Unit: mm) Large pole mounting Connecting Assemble the large pole Secure the pole mounting kits
kit x 1 sets kit x 1 mounting kits. to the large pole.
Remove the Install the Install the lithium Install the PSU to
hanging kit from connecting kit to battery to the large the lithium battery.
the rear of the the lithium battery. pole.
lithium battery and
install the kit on its
left side.
(Unit: mm) Connecting Install the connecting Remove the hook on Install the PSU to the RRU.
kit x 1 kit to the RRU. the left of the PSU.
NOTE
Channel steel size As shown in the left figures,
and installation when the narrow edge size of
method channel steel is less than 40
mm, only installation methods
a and b are supported.
When channel or angle steel
is used for installation, each
Angle steel size layer supports a maximum of
and installation 1 PSU + 1 lithium battery or 2
method PSUs. Refer to the procedure
for flush mounting on a small
pole.
5
3 Installing an AC SPM (SPM60A)
NOTICE
If the SPM is not configured, you do not need to install the SPM and its cables.
It is recommended that the SPM be installed under the PSU on the same pole or wall.
3.1 Pole-Mounting the SPM (Small Pole Diameter: 60–114 mm; Large Pole Diameter: 114–400 mm)
Space Planning Required Accessories Installation Procedure
(Unit: mm) Fastener x 1 Install the fastener onto Secure the SPM onto the pole using the
the SPM. pole mounting kit.
Pole mounting
kit x 1
(Unit: mm)
6
4 Installing Cables
4.1 Installing Ground Cables
SPM
(Unit: mm)
Cable tie
Waterproof tape Insulation tape Cable tie Load cable Ground cable
7
4.3 Installing Power Cables and Communications Cables
1 PSU + 1 Lithium Battery + 1 SPM
DB15 Female Connector Definition
NOTICE
The system does not simultaneously support AC input and DC input.
If the SPM is not configured, connect the AC input power cable to the
input port of the PSU.
SPM
NOTICE
If the SPM is configured when AC input is used, each PSU should be connected to the SPM.
A maximum of four PSUs can be cascaded. If multiple PSUs are configured, they can be cascaded by connecting BAT and LOAD ports or
by interconnecting LOAD ports. It is recommended that DC loads be equally distributed on the PSUs.
A maximum of five lithium batteries can be cascaded. If multiple lithium batteries are configured, they should be cascaded by
interconnecting BAT ports.
Monitoring
device
AC/DC DC DC AC/DC DC DC DC AC/DC DC DC DC AC/DC DC DC
input load load input load load load input load load load input load load
Lithium battery 1 Lithium battery 2 Lithium battery 3 Lithium battery 4 Lithium battery 5
8
5 Verifying the Installation
1. Check that the mounting kits are reliably installed and all screws are tightened.
2. Check that all cables are reliably connected with correct polarity and there is no short circuit.
6 Power-On Commissioning
1. Measure the PSU input voltage. Ensure that AC input voltage is in the range of 85–300 V AC and the HVDC input voltage is in the range
of 85–400 V DC.
2. Check the PSU and lithium battery indicators. Ensure that the green indicators are blinking slowly and that the yellow and red indicators
are off.
3. Measure the DC output voltage at each load port. Ensure that the value is in the range from -42 V DC to -58 V DC.
4. Observe the power system for about 15 minutes. If no alarm indicator is on, the system is running properly.
9