ISE500 Fall 2018

Assignment 11

Due on 11/12/18 11:59 P.M. Team Assignment

1. Do Problems 16.29, 16.34 (0.25 points each)

Also create the items (0.03 defective) and the sample. Did you accept the
sample?
2. Create a permanent production lot of 2500 items with process capability 3.000
average and .004 standard deviation and determine the percent defectives.
Design an acceptance plan for an AQL of 2% and an LTPD of 10%. What is the
expected probability of accepting a lot? The sample size? The maximum
allowable defectives in a sample? Perform a hundred sets of samples and
compare the acceptance rate to the expected rate. The specification for the part
is 2.998 +/- .010. As a user of the part, are you satisfied with the performance of
your plan? Why or why not? (0.5 Points)
3. Imagine that you are the producer of the part in problem 3 and you do use
SPC. Design your control chart based on the production of your first hundred
parts produced separately from the production run in problem 3. Make
appropriate assumptions of all the required parameters for the chart and your
V-mask. Sample your production run and show 5 separate control charts with
run length 20. Describe the results and any actions that you might take as a
result. (0.5 points)