Flow Chart for Factory Acceptance Test (FAT)

Internal Quality control Certificates shall be


reviewed for any components failures and their
Corrections

Incoming Equipment for Factory Tests shall be carried out as per


Inspection/Testing (FAT) Standard, specified procedures

Check for FAT Requirements as per


Contract, Company Standard &
approved ITP (Inspection Test Plan)

STEPS Ok
1) Verify the information (Name Plate)
and dimensions as per approved
drawings not Ok
Corrective action to be taken
Ok by manufacturer to rectify and
2) not Ok repeat the test procedure
Inspect for damages & missing parts

Ok
3) not Ok
Functional check including Mech.
Ok

4) Mechanical Operation Test not Ok


(If Applicable)
Ok

5) Insulation Resistance Test (I.R. V not Ok I.R Value improvement


Test) Before & After HV Test to be done

Ok
6) HV Test/ Dielectric Test not Ok
(If Applicable, Standard to be followed)

Ok
All Tests Results are not Ok
7) Acceptable/Desired Values

Yes

8) Test Passed Equipment- Dispatch


clearance may be given