FAT Procedure

The factory acceptance test flow chart outlines the steps for inspecting and testing equipment before dispatch, including: 1) Verifying nameplate information and dimensions against approved drawings, 2) Inspecting for damage and missing parts, 3) Conducting functional checks and mechanical operation tests, 4) Performing insulation resistance tests before and after high voltage tests, 5) Conducting high voltage tests if applicable, and 6) Checking that all test results meet acceptable values before giving dispatch clearance if the equipment passes testing.

Uploaded by

Goyal Sanjai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views1 page

FAT Procedure

The factory acceptance test flow chart outlines the steps for inspecting and testing equipment before dispatch, including: 1) Verifying nameplate information and dimensions against approved drawings, 2) Inspecting for damage and missing parts, 3) Conducting functional checks and mechanical operation tests, 4) Performing insulation resistance tests before and after high voltage tests, 5) Conducting high voltage tests if applicable, and 6) Checking that all test results meet acceptable values before giving dispatch clearance if the equipment passes testing.

Uploaded by

Goyal Sanjai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Flow Chart for Factory Acceptance Test (FAT)

Flow Chart for Factory Acceptance Test (FAT)

Internal Quality control Certificates shall be


reviewed for any components failures and their
Corrections

Incoming Equipment for Factory Tests shall be carried out as per


Inspection/Testing (FAT) Standard, specified procedures

Check for FAT Requirements as per


Contract, Company Standard &
approved ITP (Inspection Test Plan)

STEPS Ok
1) Verify the information (Name Plate)
and dimensions as per approved
drawings not Ok
Corrective action to be taken
Ok by manufacturer to rectify and
2) not Ok repeat the test procedure
Inspect for damages & missing parts

Ok
3) not Ok
Functional check including Mech.
Ok

4) Mechanical Operation Test not Ok


(If Applicable)
Ok

5) Insulation Resistance Test (I.R. V not Ok I.R Value improvement


Test) Before & After HV Test to be done

Ok
6) HV Test/ Dielectric Test not Ok
(If Applicable, Standard to be followed)

Ok
All Tests Results are not Ok
7) Acceptable/Desired Values

Yes

8) Test Passed Equipment- Dispatch


clearance may be given

HV Test/ Dielectric Test 
(If Applicable, Standard to be followed) 
Insulation Resistance Test (I.R. V 
Test) Before & After