BASIC LOADING
Unit Weight of Materials
{As per I.S.: 875 (Part 12)-1987}
Reinforced Cement Concete = 2500 kg/m2
Plain Cement Concete = 2400 kg/m2
Brick Masonry = 1920 kg/m2
Mortar = 2080 kg/m2
Brick Bat Coba = 2000 kg/m2
Floor Finish = 2200 kg/m2
Cinder Filling = 800 kg/m2

SLAB LOADING (Dead Load)

110th. Floor Slab

1) 110mm th. RCC Slab 0.110 * 2500 = 275.00


2) 50mm th. Floor Finish 0.050 * 2200 = 110.00
3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
397.48 kg/m2
say 0.40 t/m2

125th. Floor Slab

1) 125mm th. RCC Slab 0.125 * 2500 = 312.50


2) 50mm th. Floor Finish 0.050 * 2200 = 110.00
3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
434.98 kg/m2
say 0.44 t/m2

150th. Floor Slab in Extended Basement Area (Without Fire Tender)

1) 150th. RCC Slab 0.150 * 2500 = 375.00


3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
387.48 kg/m2
say 0.40 t/m2

200th. Floor Slab in Extended Basement Area (With Fire Tender)

1) 200th. RCC Slab 0.200 * 2500 = 500.00


3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
512.48 kg/m2
say 0.52 t/m2

110th. 40 Sunken Slab

1) 110mm th. RCC Slab 0.110 * 2500 = 275.00


2) 28 mm filling 0.028 * 2200 = 61.60
3) 50mm th. Floor Finish 0.050 * 2200 = 110.00
4) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
459.08 kg/m2
say 0.46 t/m2

125th. 40 Sunken Slab

1) 125mm th. RCC Slab 0.125 * 2500 = 312.50


2) 28 mm filling 0.028 * 2200 = 61.60
3) 50mm th. Floor Finish 0.050 * 2200 = 110.00
4) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
496.58 kg/m2
say 0.50 t/m2

125th. 80 Sunken Slab

1) 125mm th. RCC Slab 0.125 * 2500 = 312.50


2) 68 mm filling 0.068 * 2200 = 149.60
3) 50mm th. Floor Finish 0.050 * 2200 = 110.00
4) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
584.58 kg/m2
say 0.59 t/m2

125th. 325 Sunken Slab

1) 125mm th. RCC Slab 0.125 * 2500 = 312.50


2) 313 mm filling 0.313 * 2000 = 626.00
3) 50mm th. Floor Finish 0.050 * 2200 = 110.00
4) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
1060.98 kg/m2
say 1.10 t/m2
Sunrise Homes, Kathmandu Loading

110th. Terrace Slab

1) 110mm th. RCC Slab 0.100 * 2500 = 250.00


2) 150mm th. Av. Brick Bat Coba 0.150 * 2000 = 300.00
3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
562.48 kg/m2
say 0.57 t/m2

125th. Terrace Slab

1) 125mm th. RCC Slab 0.125 * 2500 = 312.50


2) 150mm th. Av. Brick Bat Coba 0.150 * 2000 = 300.00
3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
624.98 kg/m2
say 0.63 t/m2

150th. Terrace Slab

1) 150th. RCC Slab 0.150 * 2500 = 375.00


2) 150mm th. Av. Brick Bat Coba 0.150 * 2000 = 300.00
3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
687.48 kg/m2
say 0.69 t/m2

200th. Machine Room Slab

1) 200th. RCC Slab 0.200 * 2500 = 500.00


2) 50mm th. Floor Finish 0.050 * 2200 = 110.00
3) 6mm th. Ceiling Plaster 0.006 * 2080 = 12.48
622.48 kg/m2
say 0.63 t/m2

SLAB LOADING (Imposed Load)

{As per I.S.: 875 (Part 2)-1987}

1) All Rooms and Kitchen 0.200 t/m2

2) Toilets and Bathrooms 0.200 t/m2

3) Store 0.300 t/m2

5) Corridors, Passages, Lobbies and Staircase 0.300 t/m2

6) Accesssable Roof 0.150 t/m2

7) Inaccesssable Roof 0.075 t/m2

CUPBOARD DL LL
FLOOR
WALL HEIGHT 1.3375
POINT LOAD FOR 230 WALL 0.55x1.3375 0.736
UDL 0.55*0.44+0.2+01.3375 1.780 0.165

ROOF
POINT LOAD FOR 230 WALL 0.55x0.5 0.275
UDL 0.55*0.63+0.5 0.847 0.083

BALCONY 50 SUNK
FLOOR
POINT LOAD FOR RAILING 1.05x0.3 0.315 1.760 0.528
UDL 1.05*0.5+0.3 0.825 0.315

ROOF
POINT LOAD FOR 230 WALL 1.05x0.5 0.525 1.050 0.525
UDL 1.05*0.63+0.5 1.162 0.158

BALCONY 80 SUNK
FLOOR
POINT LOAD FOR 230 WALL 1.05x0.3 0.315 1.050 0.315
UDL 1.05*0.59+0.3 0.920 0.315

ROOF
POINT LOAD FOR 230 WALL 1.05x0.5 0.525 1.050 0.525
UDL 1.05*0.63+0.5 1.162 0.158

BALCONY 80 SUNK
FLOOR
POINT LOAD FOR 230 WALL 0.5x0.3 0.150 1.050 0.315
UDL 0.5*0.59+0.3 0.595 0.315

ROOF
POINT LOAD FOR 230 WALL 1.05x0.5 0.525 1.050 0.525
Sunrise Homes, Kathmandu Loading

UDL 1.05*0.63+0.5 1.162 0.158


Sunrise Homes, Kathmandu Loading

MASONRY LOADING

230th. Brick Masonry Wall

1) 230mm th. Brick masonry 0.230 * 1920 = 441.60


2) 15mm +12 mm Plaster 0.027 * 2080 = 56.16
497.76 kg/m2
say 0.50 t/m2

Typical Floor

Floor. To Floor Height (m) = 2.80

Total Ht. Beam Depth Wall Ht. Wall load


(m) (m) (m) (t/m)
90 75 50
4.30 0.45 3.85 1.925 1.733 1.444 0.963
3.30 0.45 2.85 1.425 1.283 1.069 0.713
2.80 0.45 2.35 1.175 1.058 0.881 0.588

Terrace Wall load


(t/m)
Parapet Height (m) = 1.00
18TH FLOOR 1.75
19TH FLOOR 2.65

Total Ht. Beam Depth Wall Ht. Wall load


(m) (m) (m) (t/m)

1.00 0.00 1.00 0.50


1.75 0.45 1.30 0.65
2.65 0.45 2.20 1.10

115th. Brick Masonry Wall

1) 115mm th. Brick masonry 0.115 * 1920 = 220.80


2) 15mm +12 mm Plaster 0.027 * 2080 = 56.16
276.96 kg/m2
say 0.28 t/m2
Typical Floor

Floor. To Floor Height (m) 2.89


Railing Height (m) = 1.00

Total Ht. Beam Depth Wall Ht. Wall load


(m) (m) (m) (t/m)
90 75 50
3.50 0.45 3.05 0.854 0.769 0.641 0.427
2.80 0.45 2.35 0.658 0.592 0.494 0.329
2.80 0.45 2.35 0.658 0.592 0.494 0.329