2. Work Methodology
1.1 After removed over installed anchor bolt, blow out the dust from the drilled –
hole with blow-out pump
1.2 Inject the FIS EM Plus mortar into the clean drilled-hole by using the dispenser
1.3 Insert anchor rod by turning it into the filled hole
1.4 Allow sufficient time for the mortar to be fully cured (5 – 10 hours)
1.5 Remove excess chemical.
1.6 Place the base plate over the chemical anchor
1.7 Tighten the nut to the required torque
3. Clean up
1.1 Work area is cleared and materials disposed of, reused or recycled in
accordance with legislation, regulations, codes of practice and job specification.
1.2 Plant, tools and equipment are cleaned, checked, maintained and stored in
accordance with manufacturer recommendations and standard work practices.