Activity Predecessor(s) duration


A --------------- 30
B A 65
C A 60
D C 50
E B 30
F E 01
G D,F 30
H G 20
I H 25
J H 10
K J 01
L I,K 25

Activity on Arrow

B E
F J K

A
G H L

I
C D
Critical Path (1) is shortest path(210)
ACTIVITY1
A B E F G H J K L TOTAL
30 65 30 0.1 30 20 10 0.1 25 210.1

ACTIVITY2
A B E F G H I L TOTAL
30 65 30 0.1 30 20 25 25 225.1
Critical path (3) is longest path(240)
ACTIVITY3
A C D G H I L TOTAL
30 60 50 30 20 25 25 240

ACTIVITY4
A C D G H J K L TOTAL
30 60 50 80 20 10 0.1 25 225.1

Activity of Node

forward

30 B 30 95 E 12.5 12.5 F 125.1 190 J 200 200 K 200.1


44.9 65 109.9 139.9 0.1 140 204 10 214.9 214.9 0.1 215
109.9 30 139.9

ES

0 A 30 EF
140 G 170 170 H 190 215 L 240
0 30 30 140 30 170 170 20 190 215 25 240
LS

30 C 90 90 O 140 190 I 215


30 60 90 Backward 190 25 215
90 30 140