Basis of ACE Installations Dropped Object Analysis

Drop Scenario Identifier Object Category

1 Combined PRIS / wye structure

2 Separate PRIS structure

3 Separate wye structure

4 Representative Anchor

5 Representative Container

6 Representative Spoolpiece (Lightest)


6 Representative Spoolpiece (Lightest)

7 Representative Spoolpiece (Heaviest)

8 Gas wye structure

9 Representative Mattress

10 Representative Crossing Support

11 Representative Line Pipe Spool (Heaviest) - Oil & PW

Water depth at CA-CWP 130


Water Depth as EA 150
Dimensions Weight Drop Height
L (m) W (m) / DiamH (m) (kg) (m)
28.5 19.2 6 392000 (in air) Sea Level
439000 (flooded) 10m above seabed
3m above seabed

15.3 10.9 5.3 109000 (in air) Sea Level


10m above seabed
3m above seabed

HOLD HOLD HOLD HOLD Sea Level

10m above seabed


3m above seabed

5 4 2 18000 Sea Level

6 2.5 2.5 6000 Sea Level

12.5 0.5588 13 14500 Sea Level


10m above seabed
12.5 0.5588 13 14500

3m above seabed

60 0.762 84600 Sea Level


10m above seabed
3m above seabed

22.7 11.52 4.74 169000 (in air) Sea Level


10m above seabed
3m above seabed

6.07 3.45 0.3 7540 (in air) Sea Level


10m above seabed
3m above seabed

16 3.5 2.93 35200(in air) Sea Level

10m above seabed


3m above seabed
12.5 0.762 10000 Sea Level
10m above seabed
3m above seabed

m
m
DNV Drop Cone Object Category

HOLD

3
3

3
Pipeline Targets at Risk at CA-CWP / CA-PDQ

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

[HOLD]

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA
Power Telecom Cable to EA
30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA

Power Telecom Cable to EA


30" (Phase 2) Oil Export from EA
16" Water Injection (WI-1) to ACE vto EA
16" Water Injection (WI-2) to ACE via EA Subsea
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift to EA
22" (Phase 2) Gas Export from EA
Pipeline Targets at Risk at EA

Power Telecom Cable from CA-CWP


16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP

Power Telecom Cable from CA-CWP


16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP

Power Telecom Cable from CA-CWP


16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP
Power Telecom Cable from CA-CWP
16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP

Power Telecom Cable from CA-CWP


16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP

Power Telecom Cable from CA-CWP


16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP

Power Telecom Cable from CA-CWP


16" Water Injection (WI-2) from CA-CWP
16" Water Injection (WI-1) from CA-CWP
14" Produced Water to CA-CWP
6" (Phase 2) Gas Lift from CA-CWP
Reference

BR-6J50ZZ-PL-GAS-2304-000, Rev D01


BR-6J50ZZ-PL-GAS-2303-000, Rev D01
BR-6J50ZZ-PL-GAS-2302-000, Rev D01
BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01

BR-6J50ZZ-PL-GAS-2402-000, Rev X01

[HOLD]

18 t delta flipper anchors typical

20ft standard container, 4.150te empty but with circa 2te of contents being lifted)

BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01


D01, BR-6JSSZZ-PL-LAY-1010-000, D01
BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01
D01, BR-6JSSZZ-PL-LAY-1010-000, D01

E-mail from Stefi Hooft Van Huysduynen (BP) to Liam Briody ( Atkins), 30/05/2019, ACE information for dropped object stud
Drawing Ref: OPW-SP8-CA (30" oil spool)
BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01
D01, BR-6JSSZZ-PL-LAY-1010-000, D01

BR-6J50ZZ-PL-GAS-3302-000, Rev D01


BR-6J50ZZ-PL-GAS-3305-000, Rev D01

BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01


BR-6JSSZZ-PL-GAS-1018-000, Rev D01

BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01


D01, BR-6JSSZZ-PL-LAY-1010-000, D01
Oil Crossing Support Details used as these are heaviest (Crossing Support Structural Design Report, BR-6J50ZZ-PL-REP-1032

E-mail from Stefi Hooft Van Huysduynen (BP) to Liam Briody ( Atkins), 30/05/2019, ACE information for dropped object stud
BR-6JSSZZ-PL-LAY-1011-000, D01, BR-6JSSZZ-PL-LAY-1012-000, D01
Terminal Velocity Calc Method

FEA to be performed
FEA to be performed
FEA to be performed

Terminal Velocity Calcs Using DO Model


Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs to be Performed using Mathcad

Terminal Velocity Calcs Using DO Model

Terminal Velocity Calcs to be Performed using Mathcad


Terminal Velocity Calcs to be Performed using Mathcad

Terminal Velocity Calcs Using DO Model

Terminal Velocity Calcs Using DO Model

Terminal Velocity Calcs Using DO Model


Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs to be Performed using Mathcad

Terminal Velocity Calcs Using DO Model


Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs to be Performed using Mathcad

Terminal Velocity Calcs Using DO Model


Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs to be Performed using Mathcad

Terminal Velocity Calcs Using DO Model


Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs to be Performed using Mathcad

Terminal Velocity Calcs Using DO Model

Terminal Velocity Calcs to be Performed using Mathcad


Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs Using DO Model
Terminal Velocity Calcs to be Performed using Mathcad
Terminal Velocity Calcs to be Performed using Mathcad