Lifter type SJU (select)
Tension bar n16 750 (select)
Panel thickness 150 mm
Panel weight 4.8 t
Edge distance (if < 450mm) mm
Anchor spacing (if < 900mm) mm
Distance to closest grout tube (if < 300mm) mm
Grout Tube Diameter
Lifter capacity 10 t
Edge distance reduction factor 1
Anchor spacing reduction factor 1
Grout tube spacing reduction factor (Shear) 1
Grout tube spacing reduction factor (Tension) 1.00
Stripping Stage
Number of lifters used for stripping 2
Concrete strength at stripping 15 MPa
Casting bed suction factor 1.2
Sling factor in yard 1.16
Dynamic factor in yard 1.2
Capacity checks
Shear load on each lifter 1.44 t
Shear capacity 2.30 t OK
Tension load on each lifter 3.34 t
Tension capacity 9.40 t OK
Placement Stage
Number of lifters used for placement 2
Concrete strength at placement 25 MPa
Sling factor on site 1.16
Dynamic factor on site 1.2
Capacity checks Typical site placement for panels with 4 edge
unless we advise otherwise
Tension load on each lifter 3.34 t
Tension capacity 10.00 t OK
Edge Spacing
3Dx 420 840 100
SJL 300 700 125
SJS 420 840 150
SJU 450 900 175
cal site placement for panels with 4 edge lifters, 200
unless we advise otherwise
20t 20v 25t 25v 32t 32v 40t 40v
20MPa 25MPa 32MPa 40MPa
T V T V T V T V
2.7 1.35 3 1.4 3 1.45 3 1.5