Professional Documents
Culture Documents
II KAYU
1 Kayu 5/10 sinso M³ 0.00
2 Kayu 5/7 Sinso M³ 0.00
3 Kayu 4/6 Sinso M³ 0.00
4 Papan Sinso M³ 0.00
5 Golong-golong Btg 0.00
6 Kayu Cerocok Ubar Btg 0.00
7 Triplek 4 mm Lbr 0.00
8 Triplek 12 mm Lbr 0.00
9 Seng Lbr 0.00
III PERALATAN
1 Gerobak Sorong Unit 0.00
2 Gunting Besi Besar Unit 0.00
3 Gunting Besi Kecil Unit 0.00
4 Pompa air sanyo Unit 0.00
5 Cangkul Bh 0.00
6 Sekop Bh 0.00
7 Dodos Unit 0.00
8 Sepatu Booth Pasang 0.00
9 Helm Bh 0.00
VI CAT
1 Cat air interior (Jotun) Kg 0.00
2 Cat air exterior (Jotun) Kg 0.00
3 Cat Minyak (Jotun) Kg 0.00
4 Thinner (Cap laba-laba) Ltr 0.00
5 Kuas rol Bh 0.00
6 Kuas Biasa Bh 0.00
VII KERAMIK
Keramik 40 x 40 cm Ikad atau Setara box 0.00
Tepung Keramik Bks 0.00
JUMLAH TOTAL
B UJUNG BATU
- ROHUL
1,800,000.00 -
1,800,001.00 -
1,800,002.00 -
1,800,003.00 -
9,000.00 -
9,000.00 -
68,000.00 -
165,000.00 -
45,000.00 -
465,000.00 -
135,000.00 -
100,000.00 -
430,000.00 -
60,000.00 -
70,000.00 -
40,000.00 -
70,000.00 -
35,000.00 -
-
-
-
65,000.00 -
400,000.00 -
400,000.00 -
400,000.00 -
400,000.00 -
400,000.00 -
300.00 -
-
150,000.00 -
-
-
-
-
-
-
-
-
44,000.00 -
25,000.00 -
18,000.00 -
-
15,000.00 -
15,000.00 -
15,000.00 -
20,000.00 -
20,000.00 -
50,000.00 -
-
-
-
-
-
-
-
65,000.00 -
13,000.00 -
-
-
-
-
-
-
-
420,000.00 -
300,000.00 -
200,000.00 -
150,000.00 -
-
65,000.00 -