DAFTAR P

NO SKET GAMBAR

1 Potongan A
L= 43.20 1. Galian Tanah
0.00

0.70

2. Pasangan Batu Kali


0.30

0.70

3. Siaran
1.61

4. Plesteran
0.40
0.69

7. Pipa Pvc
26.00
26.00

8. Pembatas Jalan (Tholo


0.50

9. Pengecatan
0.69
DAFTAR P

NO SKET GAMBAR

1 Potongan B Potongan B
L B-B1= 6.28 1. Galian Tanah
B 0.20
B1 0.40

Volume
0.08

2. Pasangan Batu Kali


B 0.30

0.40

B1 0.30

0.40

Volume
0.33

2 Potongan B1
3. Siaran
1.30

4. Plesteran
0.30
0.10
DAFTAR PERHITUNGAN VOLUME
VOLUME
PERHITUNGAN
Galian Pasangan Siaran

+ 0.70
x 2.00 x 43.20 = 30.24
2.00

x 0.70 x 43.20 = 21.17


51.41 M3 51.41
n Batu Kali
+ 0.70
x 1.71 x 43.20 = 36.94
2.00

x 0.70 x 43.20 = 21.17


58.10 M3 58.10

x 43.20 = 69.55 M2 69.55

x 43.20 = 17.28
x 13.00 = 8.97
26.25 M2

x 0.60 = 15.60
x 0.80 = 20.80
36.40 M

s Jalan (Tholo)
x 0.30 x 13.00 = 1.95 M3 1.95

x 13.00 = 8.97 M2
SUB TOTAL 51.41 60.05 69.55
DAFTAR PERHITUNGAN VOLUME

PERHITUNGAN VOLUME
Galian Pasangan Siaran

x 0.40 = 0.08 m2
x 0.50 = 0.20 m2

+ 0.20
x 6.28 x 2 = 1.76 m3 1.76
2.00

n Batu Kali
+ 0.40
x 0.70 = 0.25
2.00

x 0.20 = 0.08
0.33 m2

+ 0.40
x 1.40 = 0.49
2.00

x 0.50 = 0.20
0.69 m2

+ 0.69
x 6.28 x 2 = 6.37 m3 6.37
2.00

+ 0.60
x 6.28 x 2 = 11.93 m2 11.93
2.00

x 6.28 x 2 = 3.77
x 6.28 x 2 = 1.26
5.02 m2
SUB TOTAL 1.76 6.37 11.93
VOLUME
Plestrn Pipa PVC Cat

26.25

36.40

8.97
26.25 36.40 8.97
VOLUME
Plestrn Pipa PVC Cat

5.02
5.02 0.00 0.00
ANALISA KEBUTUHAN BAHAN DAN UPAH

PEKERJAAN : PEMBANGUNAN TALUD JL.REKSOGUNO BAKALAN


LOKASI : RT03 RW01 BAKALAN DESA TAJUG KEC.SIMAN, KAB.PONOROGO
TH. ANGGARAN : 2018
VOLUME : 43.2 M1

HARGA SATUAN
NO URAIAN ANALISA VOLUME KEBUTUHAN
( Rp. )

I Galian Tanah
1 Pekerja 0.75 53.17 40 OH 65,000

II Pasangan Batu Kali 1: 4


1 Batu Belah 1.200 66.43 80 M3 235,000
2 Pasir Pasang 0.520 66.43 35 M3 234,300
3 Semen (PC) 3.260 66.43 217 zak 70,000
4 Pekerja 1.800 66.43 120 OH 65,000
5 Tukang Batu 0.900 66.43 60 OH 75,000

III Plesteran 1 : 3
1 Pasir Pasang 0.016 31.27 1 M3 234,300
2 Semen (PC) 0.117 31.27 4 zak 70,000
3 Pekerja 0.300 31.27 9 OH 65,000
4 Tukang Batu 0.150 31.27 5 OH 75,000

IV Siaran 1 : 2
1 Pasir Pasang 0.012 81.48 1 M3 234,300
2 Semen (PC) 0.127 81.48 10 zak 70,000
3 Pekerja 0.300 81.48 24 OH 65,000
4 Tukang Batu 0.150 81.48 12 OH 75,000

VI Pemasangan Pipa PVC


1 Pipa PVC 1" 1.200 36.40 42 m 10,417
4 Pekerja 0.054 36.40 2 OH 65,000

VII Pengecatan
1 Cat 0.18 8.97 2 Kg 24,000
2 Pekerja 0.03 8.97 1 OH 65,000
VIII Sewa Alat
1 Molen 1.00 13.00 13 Hari 50,000

IX Alat Bantu
1 Benang Ls 1.00 2 Bh 2,750
2 Cikrak Bambu Ls 1.00 2 Bh 15,000
3 Ember Ls 1.00 2 Bh 8,000

TOTAL
HAN DAN UPAH

ONOROGO

BAHAN UPAH TOTAL


( Rp. ) ( Rp. ) ( Rp. )

2,600,000 2,600,000

18,800,000 18,800,000
8,251,200 8,251,200
15,190,000 15,190,000
7,800,000 7,800,000
4,500,000 4,500,000

234,300 234,300
280,000 280,000
585,000 585,000
375,000 375,000

234,300 234,300
700,000 700,000
1,560,000 1,560,000
900,000 900,000

437,500 437,500
130,000 130,000

48,000 48,000
65,000 65,000
650,000 650,000

5,500 5,500
30,000 30,000
16,000 16,000

44,876,800.00 18,515,000.00 63,391,800.00


REALISASI ANGGARAN PELAKSANAAN
( RAP )

PEKERJAAN : PEMBANGUNAN TALUD JL.REKSOGUNO BAKALAN


LOKASI : RT03 RW01 BAKALAN DESA TAJUG KEC.SIMAN, KAB.PONOROGO
TH. ANGGARAN : 2018
VOLUME : 43.2 M1

Harga Satuan
No Jenis Pekerjaan Volume Sat.
(Rp)
1 2 3 4 5
I PERSIAPAN
a. Honor Kegiatan 1.00 Paket 2,300,000.00
b. Papan Nama Proyek + Prasasti 1.00 Paket 350,000.00
c. Gambar Proyek 1.00 Paket 500,000.00
d. Dokumentasi / Foto Proyek 1.00 Paket 98,200.00

Jumlah I
II UPAH
a. Tukang Batu 77.00 OH 75,000.00
b. Pekerja 196.00 OH 65,000.00

Jumlah II
III PENGADAAN BAHAN / MATERIAL
1. Batu Belah 80.00 M3 235,000.00
2. Pasir Pasang 37.22 M3 234,300.00
3. Semen Portland 50kg 228.00 Zak 70,000.00
4. Cat 2.00 Kg 24,000.00
5. Pipa PVC 1" 7.00 Ljr 62,500.00

Jumlah III
IV SEWA ALAT
1. Molen 13.00 Hari 50,000.00

Jumlah IV
V ALAT BANTU
1. Benang 2.00 Rol 2,750.00
2. Cikrak Bambu 2.00 Bh 15,000.00
3. Ember 2.00 Bh 8,000.00

Jumlah V
Jumlah I - V
REKAPITULASI RAP

PEKERJAAN : PEMBANGUNAN TALUD JL.REKSOGUNO BAKALAN


LOKASI : RT03 RW01 BAKALAN DESA TAJUG KEC.SIMAN, KAB.PONOROGO
TH. ANGGARAN : 2018
VOLUME : 43.2 M1

No URAIAN JUMLAH

I PERSIAPAN Rp
II UPAH Rp
III PENGADAAN BAHAN / MATERIAL Rp
IV SEWA ALAT Rp
V ALAT BANTU Rp

Jumlah Rp
Terbilang :
Enam puluh enam juta empat ratus tiga puluh ribu rupiah

Tajug, .............................. 2018


Telah Di Verifikasi Oleh Pelaksana Kegiatan
Sekertaris Desa Tajug

TOHIRIN ...........................................
Sekertaris Pelaksana

Mengetahui
Kepala Desa Tajug

SAMURI
Kepala Desa
NAAN

AN, KAB.PONOROGO

Jumlah (Rp)

6 = (3 x 5)

2,300,000.00
350,000.00
500,000.00
98,200.00

3,248,200.00

5,775,000.00
12,740,000.00

18,515,000.00

18,800,000.00
8,719,800.00
15,960,000.00
48,000.00
437,500.00

43,965,300.00

650,000.00

650,000.00

5,500.00
30,000.00
16,000.00

51,500.00
66,430,000.00
AN, KAB.PONOROGO

JUMLAH

3,248,200.00
18,515,000.00
43,965,300.00
650,000.00
51,500.00

66,430,000.00