Paper Slitting:
No of Machine No Of Workers Production
3- Automatic 2 As per demand
1- Manual 1 As per demand
L.V Winding:
No of machine No of workers Production
13 2 per machine 7 L.V per machine
H.V Winding:
No of machine No of Workers Production
35 1 per machine 7 H.V per machine
BCT(L.V,H.V):
No of machines No of worker Production
6 3-4 Depend on the production of
L.V and H.V.
Storage Area:
Storage is depent on the production of L.V and H.V winding.
Core Section
Slitting of coils:
No of machine No of worker Production
1-automatic 3 4 sheets
Nothing:
No of machine No of worker Production
9 9 5000 per machine
Assembly Section
Stack:
Stack from windind and core section.
Insulating Cutting:
2 worker.
H.T/L.V Connection:
No of worker Time Taken Production
1 80min 4 pcs
25kva 6pcs
BCT:
Production: 40-50 average.
Baking:
No of Worker Time taken Production
2 45 min 80
Pre Tanking:
No Worker Time Taken Production
1 30min 12-14
ACT:
No of Worker Production
2 Depend on demand.
Tanking:
No of Worker Time Taken Production
3 15-20min (1pcs) 100
Oil Filling:
Time Taken Production
1 hour 100kva (6pcs)
200kva (6pcs)
25kva (8pcs)
50kva (8pcs)
10kva (8pcs)
Resting:
5 workers.
Electric Testing:
No of Worker Time Taken
18 30 min
IR & PD section:
Time Taken: 10-12 hours.
Dispatch:
Depends on demand.
Thanks