MATERIAL TESTING/TRIAL PITS/AUGER

BORE HOLE REPORT


FOR
PREPARATION OF DETAILED PROJECT REPORT FOR
DEVELOPMENT OF ECONOMIC CORRIDOR, INTER CORRIDOR
AND FEEDER ROUTES TO IMPROVE THE EFFICIENCY OF
FREIGHT MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3)
IN THE STATE OF PUNJAB.
SECTION – PHAGWARA TO HOSHIARPUR ROAD (NH-344B).
SECTION – JAGADHARI TO HIMACHAL PRADESH BORDER (NH-907).
SECTION – KAITHAL TO KAHANAURI ROAD (NH-152A).

SUBMITTED TO

M/S RITES LIMITED.


HIGHWAY DIVISION,
RITES Bhawan, (4th Floor, Right Wing),
Plot-1, Sector-29, Gurgaon – 122001.

PROJECT NO - 1787

September – 2019-Final

BY

SAI GEOTECHNICAL ENGINEERS PVT. LTD.


(AN ISO 9001-2015 CERTIFED COMPANY)
(MoRTH EMPANELLED COMPANY)
22, INDRAPRASTH APPTT, 826 SHALIMAR GARDEN EXT-1
SAHIBABAD, GHAZIABAD- 201005 (UP)
PHONE: 0120-2649279, 9811522331
e-mail address: saigeotech@gmail.com
website : www.saigeotechnical.com
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

MATERIAL TESTING/TRIAL PITS/AUGER


BORE HOLES REPORT
FOR
SECTION – PHAGWARA-HOSHIARPUR ROAD SECTION
(NH-344 B).
SECTION - JAGADHARI TO HIMACHAL PRADESH
BORDER (NH-907).
SECTION - KAITHAL TO KHANAURI ROAD (NH 152A).
CONTENTS
SL. No. CHAPTER PAGE NO.

1.0 Introduction 4
2.0 Details of site 4-6
3.0 Scope of work 7-8
4.0 Recommendation 9
5.0 Disclaimer 9
6.0 Closure 9
Section 1: Phagwara to Hoshiarpur Road Section (NH-344 B).
A. Material Lab Test Results/Location/rates Detail/Location Map 1-13
B. Soil Material Test Lab Data 14
C. Soil CBR Test Results 15
D. Water Chemical Test Report 16
E. Auger Bore Hole Profile 17-19
F. Trial Pit Lab Test Results 20
G. Trial Pit CBR Test Results 21
H. Trial Pit DCPT Test Results 22-25

1
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

I. Trial Pit Sand Replacement Tests Results 26


Annexure for Soil Material Tests & Soil CBR Tests
Chainage - 5+000
a) Grain Size Analysis 27
b) MDD and OMC Graphs 28
c) CBR Graphs (Soaked/Unsoaked) 29-30
d) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 30-32
Chainage – 16+900
a) Grain Size Analysis 33
b) MDD and OMC Graphs 34
c) CBR Graphs (Soaked/Unsoaked) 35-36
d) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 37-38
Chainage – 30+100
a) Grain Size Analysis 39
b) MDD and OMC Graphs 40
c) CBR Graphs (Soaked/Unsoaked) 41-42
d) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 43-44
Annexure for Auger Bore Holes
Chainage – 8+000
a) Grain Size Analysis 45
b) Shear Tests Graphs 46
c) Consolidation Graphs 47-48
Chainage – 18+500
a) Grain Size Analysis 49
b) Shear Tests Graphs 50
c) Consolidation Graphs 51-52
Chainage – 25+000
a) Grain Size Analysis 53
b) Shear Tests Graphs 54
c) Consolidation Graphs 55-56
Annexure for Trial Lab Test, CBR Test & DCPT Tests
Existing Alignments Trial Pits
Chainage – 3+427
a) MDD and OMC Graphs 57
b) CBR Graphs (Soaked/Unsoaked) 58-59
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 60-61
d) DCPT Curve 62-63
e) Sub-soil Profile 64

2
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

Chainage – 6+000
a) MDD and OMC Graphs 65
b) CBR Graphs (Soaked/Unsoaked) 66-67
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 68-69
d) DCPT Curve 70-71
e) Sub-soil Profile 72
Chainage – 11+700
a) MDD and OMC Graphs 73
b) CBR Graphs (Soaked/Unsoaked) 74-75
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 76-77
d) DCPT Curve 78-79
e) Sub-soil Profile 80
Chainage – 31+000
a) MDD and OMC Graphs 81
b) CBR Graphs (Soaked/Unsoaked) 82-83
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 84-85
d) DCPT Curve 86-87
e) Sub-soil Profile 88
New Alignments Trial Pits
Chainage – 8+250
a) MDD and OMC Graphs 89
b) CBR Graphs (Soaked/Unsoaked) 90-91
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 92-93
Chainage – 15+460
a) MDD and OMC Graphs 94
b) CBR Graphs (Soaked/Unsoaked) 95-96
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 97-98
Chainage – 21+700
a) MDD and OMC Graphs 99
b) CBR Graphs (Soaked/Unsoaked) 100-101
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 102-103
Chainage – 27+960
a) MDD and OMC Graphs 104
b) CBR Graphs (Soaked/Unsoaked) 105-106
c) MDD Vs CBR Graphs (97% MDD) (Soaked/Unsoaked) 107-108

Photographs 109

3
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

MATERIAL TESTING/TRIAL PITS/AUGER


BORE HOLES REPORT
FOR
SECTION – PHAGWARA-HOSHIARPUR ROAD SECTION
(NH-344 B).
SECTION - JAGADHARI TO HIMACHAL PRADESH
BORDER (NH-907).
SECTION - KAITHAL TO KHANAURI ROAD (NH 152A).
1.0 INTRODUCTION:

1.1 This report presented herein deals with the laboratory investigations carried out by us
to access the nature of materials to evaluate the material parameters, Auger bore holes
& Trail pits for Preparation of Detailed project Report for Development of
Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency
of Freight Movement in India (LOT-2/Punjab/Package-3) in The State of Punjab
and Haryana.
1.2 Client’s help is gratefully acknowledged in providing material collection, Auger bore
holes & Trail pits locations, close supervision and checking during sampling and
cooperation and guidance during preparation of report.
1.3 The work of Geotechnical Investigation was awarded to M/s Sai Geotechnical
Engineers Pvt. Ltd., 22, Indraprastha Apartment, 826, Shalimar Garden Ext-1,
Sahibabad, Ghaziabad (U.P.) by M/s RITES Limited.
1.4 This report is based upon the results of laboratory tests conducted on selected material
samples collected from different locations, Auger boreholes and trail pits conducted
for section Phagwara to Hoshiarpur Road Section (NH-344 B), Jagadhari to
Himachal Pradesh Border (NH-907) and Kaithal to Khanauri Road (NH 152A).

2.0 DETAILS OF SITE :

2.1 Details of the location for collecting materials of different size are given in the report
in Annexure1, 2 & 3. Collection of materials were carried out according to as per
instruction given by client. Location of pit and auger are as follows:
4
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

Trial Pit Locations

Trial Pit (1m x l m up to subgrade level) location along the existing alignment
Jagadhari-Himachal Pradesh Border road section (NH-907) Location of Trial pit
i. Km.20.3
ii. Km.26.3
iii. Km.32.4
Phagwara-Hoshiarpur Road Section (NH-344B) Location of Trial pit
i. Km.3.427
ii. Km.6.000
iii. Km.11.700
iv. Km.31.000
Kaithal-Khanauri Road section (NH-152 A) Location of Trial pit
i. Km.3.735
ii. Km.11.995
iii. Km.19.897
iv. Km.25.192
Trial Pit (1m x l m up to subgrade level) location along the new-
alignment/realignment/Bypass
Jagadhrl-Hlmachal Pradesh Border road section (NH-907) Location of Trial pit
i. Km.1.74
ii. Km.5.22
iii. Km.8.66
iv. Km.12.14
v. Km.15.62
Phagwara-Hoshiarpur Road Section (NH-344B) Location of Trial pit
i. Km.8.250
ii. Km.15.460
iii.Km.21.700
iv.Km.27.940
Kaithal-Khanauri Road section (NH-152 A) Location of Trial pit
i. Km.9.155
ii. Km.15.200
iii. Km.28.495

5
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

Auger Locations

(Hand Auger Boring (2.0 m depth) location along the new-alignment /


realignment / Bypass) Jagadhri-Himachal Pradesh Border road section (NH-907)
Location of Hand auger Boring.
i. Km.3.500
ii. Km.7.000
iii. Km.10.500
iv. Km.14.000
Phagwara-Hoshiarpur Road Section (NH-344B) Location of Hand auger Boring
i. Km.8.000
ii. Km.18.500
iii. Km.25.000
Kaithal-Khanauri Road section (NH-152 A) Location of Hand auger Boring
i.Km.15.700

BORROW PIT

Borrow Pit (1m x l m) location

Jagadhari-Himachal Pradesh Border road section (NH-907) Location of Borrow


Pit

i. Km.0.100
ii. Km.21.000
iii. Km.33.800
Phagwara-Hoshiarpur Road Section (NH-344B) Location of Borrow Pit
i. Km.5.000
ii. Km.16.900
iii. Km.30.100
Kaithal-Khanauri Road section (NH-152 A) Location of Borrow Pit
i. Km.2.000
ii. Km.17.800
iii. Km.30.800

6
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

3.0 SCOPE OF WORK:

3.0 The scope of work provided to us for this project was limited to the following:-
3.1 Collecting materials from different site according to instruction given by client.
3.2 Collecting soil sample, water sample, sand sample and stone aggregate sample from
different locations according to instructions given by client.
3.3 Conducting the following laboratory tests as per relevant IS/IRC codes on material
samples are as under:
a) Soil
i. Sieve Analysis -Hydrometer Analysis as per IS: 2720-Part 4.
ii. Atterberg Limit (LL, PL, PI) as per IS 2720-Part-5
iii. Sp Gravity for all the sub-grade samples as per IS: 2720 - Part-3
iv. MOD & OMC (Heavy Compaction) as per IS: 2720-Part-8
v. Swell Index as per IS: 2720 - Part -40
vi. Shrinkage Limit (Volumetric) - IS: 2720 Part-6
vii. CBR (unsoaked & 4 - day soaked) - at Three Energy Levels as per IS: 2720 –
Part 16
b) Stone Aggregate
i. Aggregate Impact Value (AIV) or Aggregate Crushing Value (ACV) as per IS:
2386 – Part-4
ii. Water Absorption as per IS : 2386 - Part - 3
iii. Stripping Value
iv. Los Angeles Abrasion Value (LAAV) as per IS: 2386 - Part - 4
v. Soundness Test (Sodium Sulphate and Magnesium Sulphate) as per IS: 2386 –
Part -5
vi. Alkali Aggregate Reactivity as per IS: 2386 - Part - 7
vii. Polished Stone Value of aggregate as per IS: 2386 - Part – 4
c) Sand

i. Gradation
ii. Bulking of Sand
iii. Fineness Modulus
iv. Deleterious Constituents
7
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

v. Alkali-Silica Reactivity
d) Water
i. NaOH
ii. HCL
iii. Sulphates (S04)
iv. Chloride (Cl)
v. Suspended matter
vi. pH value

3.5 Conducting the following laboratory tests as per relevant IS codes on Trial Pits
and Auger samples are as under:
a) Trail Pit/ Borrow Pit
i. Sieve Analysis -Hydrometer Analysis as per IS: 2720-Part 4.
ii. Atterberg Limit (LL, PL, PI) as per IS 2720-Part-5
iii. Sp Gravity for all the sub-grade samples as per IS: 2720 - Part-3
iv. MOD & OMC (Heavy Compaction) as per IS:2720-Part-8
v. Swell Index as per IS: 2720 - Part -40
vi. Shrinkage Limit (Volumetric) - IS: 2720 Part-6
vii. CBR (unsoaked & 4 - day soaked) - at Three Energy Levels as per IS: 2720 –
Part 16
b) Auger
i. Sieve Analysis -Hydrometer Analysis as per IS: 2720-Part 4.
ii. Natural moisture content as per IS: 2720-Part-2.

iii. Atterberg Limit (LL, PL, PI) as per IS 2720-Part-5

iv. Consolidation as per IS: 2720-Part15.

v. Unconsolidated, Undrained (UU) triaxial test as per IS: 2720

3.6 Preparation and submission of report in three copies.

8
REPORT ON GEOTECHNICAL INVESTIGATION FOR
DETAILED PROJECT REPORT FOR DEVELOPMENT OF
ECONOMIC CORRIDOR, INTER CORRIDOR AND FEEDER
ROUTES TO IMPROVE THE EFFICIENCY OF FREIGHT
MOVEMENT IN INDIA (LOT-2/PUNJAB/PACKAGE-3) IN THE
STATE OF PUNJAB.

4.0 RECOMMENDATION:

PHAGWARA-HOSHIARPUR ROAD SECTION (NH-344B)


CBR for design can be taken 7 in this section. As per IS 36-2010 sec: 4.4.2 Soil can
be use as fill material. IRC 36-2010 should be followed.
JAGADHARI-HIMACHAL PRADESH BORDER ROAD SECTION (NH-907)
CBR for design can be taken 9 in this section. As per IS 36-2010 sec: 4.4.2 Soil
can be use as fill material. IRC 36-2010 should be followed.

KAITHAL-KHANAURI ROAD SECTION (NH-152 A)


CBR for design can be taken 11 in this section. As per IS 36-2010 sec: 4.4.2 Soil can
be use as fill material. IRC 36-2010 should be followed.
5.0 DISCLAIMER:
For the section Jagadhari to Himachal Pradesh Border ( NH-907), Kaithal to Khanauri
Road (NH 152A) and Phagwara-Hoshiarpur Road Section (NH-344 B) location of Fly
Ash collection points were suggested by the client but thermal power plat authorities
refuse to provide the sample for testing. After that as per client instruction, we
collected soil samples instead of fly ash for lab testing. Stone aggregate and sand
materials were not collected from Taziawal, Haryana, Damtal, Himachal Pradesh
because all stone crushers at that location have been closed and the client was
informed for the same.

6.0 CLOSURE
We appreciate the opportunity given to us to submit this report. This presented report
is based on observations and tests on samples collected from different locations as
decided by the client. In case any difference is noticed in the reported results please
contact us before proceeding with further construction.
For SAI GEOTECHNICAL ENGINEERS PVT. LTD.

NAVIN BIHARI JOHARI


MANAGING DIRECTOR

9
Section 1: Phagwara to Hoshiarpur
Road Section (NH-344 B).
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

PHAGWARA-HOSHIARPUR ROAD SECTION NH-344 B


MATERIAL TEST RESULTS OF 10 MM SIZE

1. PARTICULARS OF SAMPL ES
Material : Stone Aggregate
Size : 10 MM
Location : M/s S.K Stone Crusher, Haryal, Pathankot, Punjab.
Sl. Test Method Standard Value
Test Parameters Test Results Conformity
No. (as per IS:383-2016)
Soundness by (Na2SO4) % IS: 2386- Part-5 12 Max 2.8 Yes
1.
Soundness by (MgSO4) % IS: 2386- Part-5 18 Max 3.1 Yes
2. Aggregate Crushing Value, % IS: 2386- Part-4 For wearing surface 30 Max. 16.1 Yes
Loss Angles Abrasion Value, IS: 2386- Part-4 For wearing surface 30 Max.
3. 19.2 Yes
% For other than wearing surface 50 Max
4. Alkali Aggregate Reactivity (mili mole/ litre)
i. Reduction in Alkalinity IS: 2386- Part-7 -------- 128.96 --------
ii. Dissolve Silica IS: 2386- Part-7 -------- 14.0 --------
iii. Nature of Aggregate IS: 2386- Part-7 Shall be Innocuous Innocuous Yes
5. Water Absorption % IS: 2386- Part-3
6. Stripping Value % IS: 6241 Minimum Retained Coating 95 % 96 Yes
IS: 2386- Part-4 Shall not be less than 55
7. Polished Stone Value ( Requirement as per MoRTH 56 Yes
Specification, V Table 500-18 for
1
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sl. Test Method Standard Value


Test Parameters Test Results Conformity
No. (as per IS:383-2016)
Bituminous Concrete)
MATERIAL TEST RESULTS OF 20 MM SIZE

1. PARTICULARS OF SAMPL ES
Material : Stone Aggregate
Size : 20 MM
Location : M/s S.K Stone Crusher, Haryal, Pathankot, Punjab.
Sl. Test Method Standard Value
Test Parameters Test Results Conformity
No. (as per IS:383-2016)
Soundness by (Na2SO4) % IS: 2386- Part-5 12 Max 2.4 Yes
1.
Soundness by (MgSO4) % IS: 2386- Part-5 18 Max 2.9 Yes
2. Aggregate Crushing Value, % IS: 2386- Part-4 For wearing surface 30 Max. 15.4 Yes
Loss Angles Abrasion Value, IS: 2386- Part-4 For wearing surface 30 Max.
3. 18.8 Yes
% For other than wearing surface 50 Max
4. Alkali Aggregate Reactivity (mili mole/ litre)
i. Reduction in Alkalinity IS: 2386- Part-7 -------- 188.48 --------
ii. Dissolve Silica IS: 2386- Part-7 -------- 12.0 --------
iii. Nature of Aggregate IS: 2386- Part-7 Shall be Innocuous Innocuous Yes
5. Water Absorption % IS: 2386- Part-3
6. Stripping Value % IS: 6241 Minimum Retained Coating 95 % 96 Yes
IS: 2386- Part-4 Shall not be less than 55
7. Polished Stone Value 57 Yes
( Requirement as per MoRTH

2
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sl. Test Method Standard Value


Test Parameters Test Results Conformity
No. (as per IS:383-2016)
Specification, V Table 500-18 for
Bituminous Concrete)

3
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

MATERIAL TEST RESULTS OF FINE AGGREGATE (DUST)

1. PARTICULARS OF SAMPL ES
Material : Fine Aggregate (Dust)
Size : -----
Location : M/s S.K Stone Crusher, Haryal, Pat hankot, Punjab.
Sl. Test Method Standard Value
Test Parameters Test Results Conformity
No. (as per IS:383-2016)
1. Deleterious Material, % by mass
i. Material Finer than 75 Micron IS 2386-Part 2 3.0 Max 2.00 Yes
ii. Clay and lumps IS 2386-Part 2 1.0 Max 0.21 Yes
iii. Coal and lignite IS 2386-Part 2 1.0 Max 0.15 Yes
Total Deleterious Material 5.0 Max 2.36 Yes
2. Fineness Modulus IS 2386-Part 1 ---- 2.97 ----
3. Sieve Analysis
Sieve Size Zone II % Passing
i. 10 mm IS 2386-Part 1 100 100 Yes
ii. 4.75 mm IS 2386-Part 1 90-100 100 Yes
iii. 2.36 mm IS 2386-Part 1 75-100 82.8 Yes
iv. 1.18 mm IS 2386-Part 1 55-90 56.7 Yes
v. 600 micron IS 2386-Part 1 35-59 38.4 Yes
vi. 300 micron IS 2386-Part 1 8-30 16.8 Yes
vii. 150 micron IS 2386-Part 1 0-10 8.4 Yes
4. Alkali Aggregate Reactivity (mili mole/ litre)
i. Reduction in Alkalinity IS 2386-Part 7 ---- 112 ----
ii. Dissolve Silica IS 2386-Part 7 ---- 79.36 ----

4
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sl. Test Method Standard Value


Test Parameters Test Results Conformity
No. (as per IS:383-2016)
iii. Nature of Aggregate IS 2386-Part 7 Shall be Innocuous Innocuous Yes
5. Bulking % IS 2386-Part 3 25-35 26% Yes

5
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

MATERIAL TEST RESULTS OF 10 MM SIZE

1. PARTICULARS OF SAMPL ES
Material : Stone Aggregate
Size : 10 MM
Location : BEE EES Stone Crusher, Dhaki Shada, Mirthal, Himachal .
Sl. Test Method Standard Value
Test Parameters Test Results Conformity
No. (as per IS:383-2016)
Soundness by (Na2SO4) % IS: 2386- Part-5 12 Max 2.9 Yes
1.
Soundness by (MgSO4) % IS: 2386- Part-5 18 Max 3.2 Yes
2. Aggregate Crushing Value, % IS: 2386- Part-4 For wearing surface 30 Max. 17.1 Yes
Loss Angles Abrasion Value, IS: 2386- Part-4 For wearing surface 30 Max.
3. 20.4 Yes
% For other than wearing surface 50 Max
4. Alkali Aggregate Reactivity (mili mole/ litre)
i. Reduction in Alkalinity IS: 2386- Part-7 -------- 124.0 --------
ii. Dissolve Silica IS: 2386- Part-7 -------- 11.5 --------
iii. Nature of Aggregate IS: 2386- Part-7 Shall be Innocuous Innocuous Yes
5. Water Absorption % IS: 2386- Part-3
6. Stripping Value % IS: 6241 Minimum Retained Coating 95 % 97 Yes
IS: 2386- Part-4 Shall not be less than 55
( Requirement as per MoRTH
7. Polished Stone Value 58 Yes
Specification, V Table 500-18 for
Bituminous Concrete)
6
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

MATERIAL TEST RESULTS OF 20 MM SIZE

1. PARTICULARS OF SAMPL ES
Material : Stone Aggregate
Size : 20 MM
Location : BEE EES Stone Crusher, Dhaki Shada, Mirthal, Himachal .
Sl. Test Method Standard Value
Test Parameters Test Results Conformity
No. (as per IS:383-2016)
Soundness by (Na2SO4) % IS: 2386- Part-5 12 Max 3.1 Yes
1.
Soundness by (MgSO4) % IS: 2386- Part-5 18 Max 3.5 Yes
2. Aggregate Crushing Value, % IS: 2386- Part-4 For wearing surface 30 Max. 14.6 Yes
Loss Angles Abrasion Value, IS: 2386- Part-4 For wearing surface 30 Max.
3. 18.7 Yes
% For other than wearing surface 50 Max
4. Alkali Aggregate Reactivity (mili mole/ litre)
i. Reduction in Alkalinity IS: 2386- Part-7 -------- 116.0 --------
ii. Dissolve Silica IS: 2386- Part-7 -------- 11.7 --------
iii. Nature of Aggregate IS: 2386- Part-7 Shall be Innocuous Innocuous Yes
5. Water Absorption % IS: 2386- Part-3
6. Stripping Value % IS: 6241 Minimum Retained Coating 95 % 96 Yes
IS: 2386- Part-4 Shall not be less than 55
( Requirement as per MoRTH
7. Polished Stone Value 57 Yes
Specification, V Table 500-18 for
Bituminous Concrete)
7
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

MATERIAL TEST RESULTS OF FINE AGGREGATE (DUST)

1. PARTICULARS OF SAMPL ES
Material : Fine Aggregate (Dust)
Size : -----
Location : BEE EES Stone Crusher, Dhak i Shada, Mirthal, Himachal .
Sl. Test Method Standard Value
Test Parameters Test Results Conformity
No. (as per IS:383-2016)
1. Deleterious Material, % by mass
i. Material Finer than 75 Micron IS 2386-Part 2 3.0 Max 1.96 Yes
ii. Clay and lumps IS 2386-Part 2 1.0 Max 0.24 Yes
iii. Coal and lignite IS 2386-Part 2 1.0 Max 0.20 Yes
Total Deleterious Material 5.0 Max 2.40 Yes
2. Fineness Modulus IS 2386-Part 1 ---- 2.96 ----
3. Sieve Analysis
Sieve Size Zone II % Passing
i. 10 mm IS 2386-Part 1 100 100 Yes
ii. 4.75 mm IS 2386-Part 1 90-100 96.4 Yes
iii. 2.36 mm IS 2386-Part 1 75-100 78 Yes
iv. 1.18 mm IS 2386-Part 1 55-90 56.8 Yes
v. 600 micron IS 2386-Part 1 35-59 43.6 Yes
vi. 300 micron IS 2386-Part 1 8-30 20.4 Yes
vii. 150 micron IS 2386-Part 1 0-10 9.2 Yes
4. Alkali Aggregate Reactivity (mili mole/ litre)
i. Reduction in Alkalinity IS 2386-Part 7 ---- 112 ----
ii. Dissolve Silica IS 2386-Part 7 ---- 39 ----

8
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sl. Test Method Standard Value


Test Parameters Test Results Conformity
No. (as per IS:383-2016)
iii. Nature of Aggregate IS 2386-Part 7 Shall be Innocuous Innocuous Yes
5. Bulking % IS 2386-Part 3 25-35 28% Yes

9
CRUSHERS CONTACT & RATES DETAIL
Crusher Name M/s S.K Stone Crusher.

Location Haryal, Pathankot, Punjab.

Section Phagwara-Hoshiarpur Road Section NH-344 B

Contact Person Mr. Ajay Sharma

Contact Number Mobile No. - 9988701671

Material (10 mm Stone Aggregate)


Basic Cost of Material (Approx.) Rs. 9 per ft3

Taxes (GST) 5%

Material (20 mm Stone Aggregate)


Basic Cost of Material (Approx.) Rs. 9 per ft3

Taxes (GST) 5%

Material (Fine Aggregate - Dust)


Basic Cost of Material (Approx.) Rs. 8.50 per ft3

Taxes (GST) 5%

Crusher Name M/s BEE EES Stone Crusher.


Location Dhaki Shada, Mirthal, Himachal.
Section Phagwara-Hoshiarpur Road Section NH-344 B
Contact Person ---
Contact Number Mobile No. – 9815207280, 9814090980
Material (10 mm Stone Aggregate)
Basic Cost of Material (Approx.) Rs. 8.50 per ft3
Taxes (GST) 5%
Material (20 mm Stone Aggregate)
Basic Cost of Material (Approx.) Rs. 8.00 per ft3
Taxes (GST) 5%
Material (Fine Aggregate - Dust)
Basic Cost of Material (Approx.) Rs. 9.00 per ft3
Taxes (GST) 5%

10
12.70 KM

Haryal Pathankot
NH-154
Crusher
Zone

2.00 KM
Pathankot
NH-20 KM-101.93
2.80 KM

NH-1A

98.50 KM

Mirthal Mirthal

Crusher
Zone
86.93 KM

Mukerian
68.32 KM
NH-1A

Uasuya
Dasuya Tanda Road

53.15 KM

Jalandhar Road

37.05 KM

SH-22
Umar Tanda
5.15 KM
NH-70

2.90 KM

Hoshiarpur Bypass
T-Point

KM-0.00
Quarry Map
r

Singriwala
rpu

Phagwara-Hoshiarpur
Phagwara-Hoshiarpur
shia

Alignment End at Ch-32+600


Section
Ho
-
Roa gwara
d
Pha

Page No. - 13
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder
Routes to Improve the Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

FREE SWELL INDEX


SPECIFIC GRAVITY
Grain size analysis Atterberg Limits Heavy Compaction

SHRINKAGE LIMIT
Sl. No.

LIQUID LIMIT
IS

PLASTICITY
CHAINAGE LOCATION DESCRIPTION

Gravel (%)

LIMIT (%)

INDEX (%)
CLASSIFICATION

Sand (%)

OMC (%)
Clay (%)

PLASTIC
Silt (%)

(gm/cc )
M.D.D.
(%)

%
Phagwara-
Hoshiarpur Road Light Brown Sandy Silt of
1 5+000
Section NH-344
ML-CL 2 21 70 7 26.20 20.10 6.1 2.65 19.53 16.52 12.20 1.98
Low Plasticity
B

Phagwara-
Hoshiarpur Road
2 16+900
Section NH-344
Light Brown Sandy Silt CL 0 25 65 10 32.10 21.50 10.6 2.67 26.23 19.26 12.50 1.95
B

Phagwara-
Hoshiarpur Road Light Brown Sandy Silt of
3 30+100
Section NH-344
ML-CL 0 38 57 5 23.60 17.70 5.9 2.65 18.98 17.53 10.60 1.90
Low Plasticity
B

14
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and
Feeder Routes to Improve the Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)


Soaked Unsoaked
Sl. No.

IS

97 % MDD

97 % MDD
CBR Value

CBR Value
CHAINAGE LOCATION DESCRIPTION

10 Blows

35 Blows

65 Blows

10 Blows

35 Blows

65 Blows
CLASSIFICATION

Phagwara-Hoshiarpur
Light Brown Sandy Silt of
1 5+000 Road Section NH-344 ML-CL 3.8 7.7 11.2 1.92 9.9 9.7 15.1 20.2 1.92 19.0
B
Low Plasticity

Phagwara-Hoshiarpur
2 16+900 Road Section NH-344 Light Brown Sandy Silt CL 3.6 6.8 10.2 1.89 9.1 7.2 13.6 22.2 1.89 19.2
B

Phagwara-Hoshiarpur
Light Brown Sandy Silt of
3 30+100 Road Section NH-344 ML-CL 5.2 9.8 14.5 1.84 13.2 9.2 14.3 19.3 1.84 17.5
Low Plasticity
B

15
GEOTECHNICAL INVESTIGATION
PROJECT: Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight
movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

CHEMICAL TEST RESULTS OF WATER SAMPLE


1. PARTICULARS OF SAMPL ES
Material : Water
Alignment : (Phagwara - Hoshiarpur Road NH344B).

Sl. IS456-2000 Test Results


Test Parameters Unit
No. : Requirement S1 (Mehtiana) S2 (Phagwara) S3 (Hoshiarpur)
Volume of 0.02N HCL
required to neutralize 100
1. 25.0 (Max.) (ml) 21.20 21.30 21.60
ml sample using Methyl
Orange indicator (ml).
Volume of 0.02N NaOH
required to neutralize 100
2. 5.00 (Max.) (ml) 4.00 4.10 4.40
ml sample using
phenolphthalein (ml).
3. Sulphates as SO4 400 (Max.) (mg/L) 52.0 58.0 85.0
2000 (Max.) for
Concrete not
containing
4. Chlorides as CI embedded steel (mg/L) 28.4 28.6 85.2
and 500 (Max.)
for reinforced
concrete work.
5. Suspended matter 2000 (Max.) (mg/L) Negligible Negligible Negligible
pH not less than
6. pH 7.50 7.60 7.50
6.00
16
BOREHOLE NO. : 1 SHEET NO : 17
PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of
Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
REDUCED LEVEL OF B/HOLE : 100.000 m Section Phagwara to Hoshiarpur Road (NH-344B) DATE STARTED :05/05/2019
CHAINAGE(km) : 8+000 DATE COMPLETED :05/05/2019
FIELD TEST RESULTS LABORATORY TEST RESULTS
SHEAR STRENGTH CONSOLIDATION
DEPTH OF SAMPLE BELOW
DEPTH IN METERS BELOW

WITH I.S. CLASSIFICATION


GRAIN SIZE ANALYSIS

MOISTURE CONTENT (%)


SPT TEST RESULTS
LEVEL OF WATER TABLE /
SAMPLE REFERENCE NO.

CHARACTERISTICS PARAMETERS

BULK DENSITY (t / cum.)


DESCRIPTION OF SOIL
ELEVATION IN METERS

NATURE OF SAMPLING

DIA. OF CASING USED


N, VALUE ( Corrected )
N, VALUE ( Recorded )

DRY DENSITY (t/cum)


REFERENCE LEVEL

PENETRATION (CM)

SPECIFIC GRAVITY
(%)

PLASTIC LIMIT (%)


REPRESENTATION
DEPTH IN METERS

(%)
(%)
(%)

LIQUID LIMIT (%)

Angle of friction
NO. OF BLOWS

TYPE OF TEST
REFERENCE

Cohesion, C,
Cc eo

SYMBOLIC

(Degrees)
(kg/sqcm)
GRAVEL

SAND
( MM)
L.W.L

CLAY
SILT
100.00 0.0 DS 0.00 1 0.00 - 0.50 25.6 18.5

99.50 0.5 UDS 0.50 1 0.50 - 0.90 0.0 19.0 73.0 8.0 1.69 1.54 9.6
Not met

Light Brown Sany Silt of

150
99.00 1.0 UDS 1.00 2 1.00 - 1.40 Low Plasticity 1.76 1.58 11.2 2.68 UUT 0.55 9 0.696 0.128
(ML-CL)
98.60 1.4 DS 1.40 2 1.40 - 1.80 26.3 20.1

98.00 2.0 UDS 2.00 3 2.00 - 2.40 0.0 21.0 73.0 6.0 1.83 1.62 13.2

NOTE : 1. CLASSIFICATION OF SOIL AS PER IS : 1498

2. ABBREVATION USED : DS = DISTURBED SAMPLE UDS = UNDISTURBED SAMPLE UU = UNCONSOLIDATED UNDRAINED DST = DIRECT SHEAR TEST

BORE LOG CHART AND DATA SHEET


BOREHOLE NO. : 2 SHEET NO : 18
PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of
Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
REDUCED LEVEL OF B/HOLE : 100.000 m Section Phagwara to Hoshiarpur Road (NH-344B) DATE STARTED :05/05/2019
CHAINAGE(km) : 18+500 DATE COMPLETED :05/05/2019
FIELD TEST RESULTS LABORATORY TEST RESULTS
SHEAR STRENGTH CONSOLIDATION
DEPTH OF SAMPLE BELOW
DEPTH IN METERS BELOW

WITH I.S. CLASSIFICATION


GRAIN SIZE ANALYSIS

MOISTURE CONTENT (%)


SPT TEST RESULTS
LEVEL OF WATER TABLE /
SAMPLE REFERENCE NO.

CHARACTERISTICS PARAMETERS

BULK DENSITY (t / cum.)


DESCRIPTION OF SOIL
ELEVATION IN METERS

NATURE OF SAMPLING

DIA. OF CASING USED


N, VALUE ( Corrected )
N, VALUE ( Recorded )

DRY DENSITY (t/cum)


REFERENCE LEVEL

PENETRATION (CM)

SPECIFIC GRAVITY
(%)

PLASTIC LIMIT (%)


REPRESENTATION
DEPTH IN METERS

(%)
(%)
(%)

LIQUID LIMIT (%)

Angle of friction
NO. OF BLOWS

TYPE OF TEST
REFERENCE

Cohesion, C,
Cc eo

SYMBOLIC

(Degrees)
(kg/sqcm)
GRAVEL

SAND
( MM)
L.W.L

CLAY
SILT
100.00 0.0 DS 0.00 1 0.00 - 0.50 0.0 23.0 70.0 7.0

99.50 0.5 UDS 0.50 1 0.50 - 0.90 25.5 18.6 1.71 1.55 10.5
Not met

Light Brown Sany Silt of

150
99.00 1.0 UDS 1.00 2 1.00 - 1.40 Low Plasticity 1.76 1.58 11.1 2.67 UUT 0.55 11 0.690 0.126
(ML-CL)
98.60 1.4 DS 1.40 2 1.40 - 1.80 0.0 18.0 76.0 6.0

98.00 2.0 UDS 2.00 3 2.00 - 2.40 25.1 18.7 1.80 1.61 11.6 2.66

NOTE : 1. CLASSIFICATION OF SOIL AS PER IS : 1498

2. ABBREVATION USED : DS = DISTURBED SAMPLE UDS = UNDISTURBED SAMPLE UU = UNCONSOLIDATED UNDRAINED DST = DIRECT SHEAR TEST

BORE LOG CHART AND DATA SHEET


BOREHOLE NO. : 3 SHEET NO : 19
PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of
Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
REDUCED LEVEL OF B/HOLE : 100.000 m Section Phagwara to Hoshiarpur Road (NH-344B) DATE STARTED :03/05/2019
CHAINAGE(km) : 25+000 DATE COMPLETED :03/05/2019
FIELD TEST RESULTS LABORATORY TEST RESULTS
SHEAR STRENGTH CONSOLIDATION
DEPTH OF SAMPLE BELOW
DEPTH IN METERS BELOW

WITH I.S. CLASSIFICATION


GRAIN SIZE ANALYSIS

MOISTURE CONTENT (%)


SPT TEST RESULTS
LEVEL OF WATER TABLE /
SAMPLE REFERENCE NO.

CHARACTERISTICS PARAMETERS

BULK DENSITY (t / cum.)


DESCRIPTION OF SOIL
ELEVATION IN METERS

NATURE OF SAMPLING

DIA. OF CASING USED


N, VALUE ( Corrected )
N, VALUE ( Recorded )

DRY DENSITY (t/cum)


REFERENCE LEVEL

PENETRATION (CM)

SPECIFIC GRAVITY
(%)

PLASTIC LIMIT (%)


REPRESENTATION
DEPTH IN METERS

(%)
(%)
(%)

LIQUID LIMIT (%)

Angle of friction
NO. OF BLOWS

TYPE OF TEST
REFERENCE

Cohesion, C,
Cc eo

SYMBOLIC

(Degrees)
(kg/sqcm)
GRAVEL

SAND
( MM)
L.W.L

CLAY
SILT
100.00 0.0 DS 0.00 1 0.00 - 0.50 32.3 21.5

99.50 0.5 UDS 0.50 1 0.50 - 0.90 0.0 15.0 75.0 10.0 1.70 1.53 11.2
Light Grey Sandy Silt of
2.00m

150
99.00 1.0 UDS 1.00 2 1.00 - 1.40 Low Plasticity 1.75 1.55 12.6 2.67 UUT 0.55 10 0.723 0.136
(CL)
98.60 1.4 DS 1.40 2 1.40 - 1.80 30.4 20.5

98.00 2.0 UDS 2.00 3 2.00 - 2.40 0.0 12.0 79.0 9.0 1.78 1.58 12.9 2.67

NOTE : 1. CLASSIFICATION OF SOIL AS PER IS : 1498

2. ABBREVATION USED : DS = DISTURBED SAMPLE UDS = UNDISTURBED SAMPLE UU = UNCONSOLIDATED UNDRAINED DST = DIRECT SHEAR TEST

BORE LOG CHART AND DATA SHEET


PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to
Improve the Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Trial pit of Phagwara-Hoshiarpur Road Section (NH-344 B)
Grain size analysis Attetberg Limits Heavy
Compaction

SPECIFIC GRAVITY

SHRINKAGE LIMIT
UNSOAKED CBR

UNSOAKED CBR

UNSOAKED CBR
IS
Sl. No.

CHANEGE SAMPLE

SWELL INDEX
M.D.D.(gm/cc )

SOAKED CBR

SOAKED CBR

SOAKED CBR
DESCRIPTION CLASSIFIC
( Km. ) No.

10 BLOWS

10 BLOWS

35 BLOWS

65 BLOWS
35 BLOWS

65 BLOWS
ATION

Gravel (%)

Sand (%)

OMC (%)
Clay (%)
Silt (%)
LL PL PI

Existing Alignment Trial Pits

1 3+427 TP-1 Light grey sandy silt ML-CL 2 35 57 6 24.1 17.6 6.5 11.5 1.99 12.3 4.8 18.2 8.6 24.8 13.2 2.66 21.26 18.20

2 6+000 TP-1 Light grey sandy silt CL 0 18 71 11 30.2 21.1 9.1 13.1 1.93 9.2 4.1 14.3 7.7 18.3 11.5 2.68 29.56 20.10

3 11+700 TP-1 Light grey clayey silt CI 0 13 77 10 38.5 22.8 15.7 14.8 1.87 8.2 2.8 11.6 6.2 15.6 10.1 2.70 32.12 21.20

4 31+000 TP-1 Light grey sandy silt ML-CL 0 32 60 8 24.2 17.3 6.9 11.6 1.98 12.5 4.6 18.6 8.4 24.4 13.0 2.66 21.62 18.60

New Alignment Trial Pits

5 8+250 TP-1 Light grey clayey silt CI 0 3 78 19 39.6 23.1 16.5 14.5 1.86 8.5 2.6 12.3 5.8 16.5 9.3 2.69 33.12 20.24

6 15+460 TP-1 Light grey silty sand SM 0 51 49 0 N P - 10.8 1.93 11.2 5.8 18.5 10.8 24.5 16.5 2.63 - -

7 21+700 TP-1 Light grey sandy silt ML-CL 0 25 69 6 25.1 18.9 6.2 11.3 2.02 9.2 4.1 14.6 8.6 23.5 13.5 2.67 20.13 17.20

8 27+960 TP-1 Light grey silty sand SM 0 65 35 0 N P - 10.8 1.91 11.6 3.9 16.8 9.1 24.6 15.1 2.64 - -

20
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight Movement in India (LOT-2/
Punjab/ Package-3) in The State of Punjab.
Unsoaked Soaked
IS
Sl. No.

CHAINAG
LOCATION DESCRIPTION CLASSIFICATIO

10 Blows

35 Blows

65 Blows

10 Blows

35 Blows

65 Blows
E
N

Value

Value
MDD

MDD
97 %

97 %
CBR

CBR
Existing Alignment Trial Pits
Phagwara-
Hoshiarpur Road
1 3+427 Light grey sandy silt ML-CL 12.3 18.2 24.8 1.93 24.1 4.8 8.6 13.2 1.93 12.6
Section NH-344
B

Phagwara-
Hoshiarpur Road
2 6.000 Light grey sandy silt CL 9.2 14.3 18.3 1.87 16.5 4.1 7.7 11.5 1.87 10.0
Section NH-344
B

Phagwara-
Hoshiarpur Road
3 11+700 Light grey clayey silt CI 8.2 11.6 15.6 1.81 9.5 2.8 6.2 10.1 1.81 8.1
Section NH-344
B

Phagwara-
Hoshiarpur Road
4 31+000 Light grey sandy silt ML-CL 12.5 18.6 24.4 1.92 23.9 4.6 8.4 13.0 1.92 11.9
Section NH-344
B

New Alignment Trial Pits

Phagwara-
Hoshiarpur Road
1 8+250 Light grey clayey silt CI 8.5 12.3 16.5 1.80 9.9 2.6 5.8 9.3 1.80 7.1
Section NH-344
B

Phagwara-
Hoshiarpur Road
2 15+460 Light grey silty sand SM 11.2 18.5 24.5 1.87 21.1 5.8 10.8 16.5 1.87 13.8
Section NH-344
B

Phagwara-
Hoshiarpur Road
3 21+700 Light grey sandy silt ML-CL 9.2 14.6 23.5 1.96 21.2 4.1 8.6 13.5 1.96 12.7
Section NH-344
B

Phagwara-
Hoshiarpur Road
4 27+940 Light grey silty sand SM 11.6 16.8 24.6 1.85 22.4 3.9 9.1 15.1 1.85 13.4
Section NH-344
B

21
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Project:
Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of
Punjab.
Location: 3+427 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 04-05-2019 Weight of hammer (kg): 8 kg

Penetration Cumulative CBR Cumulative


No. of
Reading (cm) Between Readings Hammer Factor DCP Index mm/Blow Penetration Value Penetration
Blows
(mm) (mm) (%) (cm)
0 5 0 ----- ----- 0 5
1 9 40 1 40 40 4.7 9
2 12.4 34 1 34 74 6.0 12.4
3 15.2 28 1 28 102 7.0 15.2
4 18.2 30 1 30 132 6.0 18.2
5 22 38 1 38 170 5.0 22
6 25.1 31 1 31 201 6.0 25.1
7 28.2 31 1 31 232 6.0 28.2
8 31.5 33 1 33 265 6.0 31.5
9 34.5 30 1 30 295 6.0 34.5
10 37.3 28 1 28 323 7.0 37.3
11 40.5 32 1 32 355 6.0 40.5
12 43.8 33 1 33 388 6.0 43.8
13 47.3 35 1 35 423 5.0 47.3
14 51 37 1 37 460 5.0 51
15 54.4 34 1 34 494 6.0 54.4
16 57.5 31 1 31 525 6.0 57.5
17 60.2 27 1 27 552 7.0 60.2
18 63.2 30 1 30 582 6.0 63.2
19 66 28 1 28 610 7.0 66
20 68.5 25 1 25 635 8.0 68.5
21 70.8 23 1 23 658 9.0 70.8
22 73 22 1 22 680 9.0 73
23 75.1 21 1 21 701 10.0 75.1
24 76.7 16 1 16 717 13.0 76.7
25 78.7 20 1 20 737 10.0 78.7
26 80.8 21 1 21 758 10.0 80.8
27 82.5 17 1 17 775 12.0 82.5
28 84.5 20 1 20 795 10.0 84.5
29 86.4 19 1 19 814 11.0 86.4
30 88 16 1 16 830 14.0 88
31 89.8 18 1 18 848 12.0 89.8
32 91.4 16 1 16 864 13.0 91.4
33 92.8 14 1 14 878 16.0 92.8
34 94.4 16 1 16 894 13.0 94.4
35 95.6 12 1 12 906 20.0 95.6
36 97 14 1 14 920 15.0 97
37 98.5 15 1 15 935 14.0 98.5

22
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Project:
Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of
Punjab.
Location: 6+000 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 04-05-2019 Weight of hammer (kg): 8 kg

Penetration Cumulative CBR Cumulative


No. of
Reading (cm) Between Readings Hammer Factor DCP Index mm/Blow Penetration Value Penetration
Blows
(mm) (mm) (%) (cm)
0 3.8 0 ----- ----- 0 3.8
1 6.2 24 1 24 24 8.0 6.2
2 8.4 22 1 22 46 9.0 8.4
3 10.2 18 1 18 64 12.0 10.2
4 11.8 16 1 16 80 13.0 11.8
5 13.7 19 1 19 99 11.0 13.7
6 15.6 19 1 19 118 11.0 15.6
7 17.8 22 1 22 140 9.0 17.8
8 20 22 1 22 162 10.0 20
9 22.4 24 1 24 186 9.0 22.4
10 25 26 1 26 212 8.0 25
11 28.4 34 1 34 246 6.0 28.4
12 32.4 40 1 40 286 4.7 32.4
13 38.7 63 1 63 349 2.8 38.7
14 45.8 71 1 71 420 2.5 45.8
15 53 72 1 72 492 2.4 53
16 64 110 1 110 602 1.5 64
17 75.4 114 1 114 716 1.5 75.4
18 82.1 67 1 67 783 2.7 82.1
19 86 39 1 39 822 4.8 86
20 89.2 32 1 32 854 6.0 89.2
21 92.4 32 1 32 886 6.0 92.4
22 95.8 34 1 34 920 6.0 95.8

23
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Project:
Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of
Punjab.
Location: 11+700 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 05-05-2019 Weight of hammer (kg): 8 kg

Penetration Cumulative CBR Cumulative


No. of
Reading (cm) Between Readings Hammer Factor DCP Index mm/Blow Penetration Value Penetration
Blows
(mm) (mm) (%) (cm)
0 5.00 0 ----- ----- 0 5
1 7.00 20 1 20 20 10.0 7
2 8.40 14 1 14 34 15.0 8.4
3 9.80 14 1 14 48 15.0 9.8
4 10.80 10 1 10 58 20.0 10.8
5 12.00 12 1 12 70 20.0 12
6 13.40 14 1 14 84 15.0 13.4
7 14.80 14 1 14 98 15.0 14.8
8 16.20 14 1 14 112 16.0 16.2
9 17.70 15 1 15 127 14.0 17.7
10 19.20 15 1 15 142 14.0 19.2
11 20.80 16 1 16 158 13.0 20.8
12 22.20 14 1 14 172 16.0 22.2
13 23.80 16 1 16 188 13.0 23.8
14 25.20 14 1 14 202 16.0 25.2
15 26.60 14 1 14 216 15.0 26.6
16 28.00 14 1 14 230 16.0 28
17 29.50 15 1 15 245 14.0 29.5
18 30.80 13 1 13 258 16.0 30.8
19 32.00 12 1 12 270 20.0 32
20 33.20 12 1 12 282 18.0 33.2
21 34.50 13 1 13 295 18.0 34.5
22 35.80 13 1 13 308 18.0 35.8
23 37.00 12 1 12 320 18.0 37
24 38.80 18 1 18 338 12.0 38.8
25 40.40 16 1 16 354 13.0 40.4
26 42.40 20 1 20 374 10.0 42.4
27 44.00 16 1 16 390 13.0 44
28 45.60 16 1 16 406 13.0 45.6
29 47.50 19 1 19 425 11.0 47.5
30 49.50 20 1 20 445 10.0 49.5
31 52.00 25 1 25 470 8.0 52
32 54.50 25 1 25 495 8.0 54.5
33 57.50 30 1 30 525 6.0 57.5
34 60.00 25 1 25 550 8.0 60
35 62.50 25 1 25 575 8.0 62.5
36 65.00 25 1 25 600 8.0 65
37 67.80 28 1 28 628 7.0 67.8
38 70.80 30 1 30 658 6.0 70.8
39 73.00 22 1 22 680 9.0 73.0
40 75.80 28 1 28 708 7.0 75.8
41 79.00 32 1 32 740 6.0 79.0
42 82.50 35 1 35 775 5.0 82.5
43 85.80 33 1 33 808 6.0 85.8
44 89.00 32 1 32 840 6.0 89.0
45 92.20 32 1 32 872 6.0 92.2

24
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Project:
Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of
Punjab.
Location: 31+000 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 10-05-2019 Weight of hammer (kg): 8 kg

Penetration Cumulative CBR Cumulative


No. of
Reading (cm) Between Readings Hammer Factor DCP Index mm/Blow Penetration Value Penetration
Blows
(mm) (mm) (%) (cm)
0 4.00 0 ----- ----- 0 4
1 5.80 18 1 18 18 11.0 5.8
2 7.00 12 1 12 30 18.0 7
3 8.00 10 1 10 40 20.0 8
4 9.00 10 1 10 50 20.0 9
5 9.80 8 1 8 58 30.0 9.8
6 10.50 7 1 7 65 40.0 10.5
7 11.40 9 1 9 74 25.0 11.4
8 12.20 8 1 8 82 35.0 12.2
9 13.00 8 1 8 90 30.0 13
10 14.00 10 1 10 100 20.0 14
11 14.80 8 1 8 108 30.0 14.8
12 15.70 9 1 9 117 30.0 15.7
13 16.50 8 1 8 125 30.0 16.5
14 17.50 10 1 10 135 20.0 17.5
15 18.50 10 1 10 145 20.0 18.5
16 19.50 10 1 10 155 20.0 19.5
17 20.70 12 1 12 167 20.0 20.7
18 22.00 13 1 13 180 16.0 22
19 23.00 10 1 10 190 20.0 23
20 24.50 15 1 15 205 14.0 24.5
21 26.00 15 1 15 220 14.0 26
22 27.40 14 1 14 234 16.0 27.4
23 28.80 14 1 14 248 15.0 28.8
24 30.40 16 1 16 264 14.0 30.4
25 31.50 11 1 11 275 20.0 31.5
26 33.00 15 1 15 290 14.0 33
27 34.70 17 1 17 307 12.0 34.7
28 36.40 17 1 17 324 13.0 36.4
29 37.80 14 1 14 338 16.0 37.8
30 39.80 20 1 20 358 10.0 39.8
31 40.50 7 1 7 365 35.0 40.5
32 43.50 30 1 30 395 6.0 43.5
33 45.50 20 1 20 415 10.0 45.5
34 47.50 20 1 20 435 10.0 47.5
35 49.50 20 1 20 455 10.0 49.5
36 51.50 20 1 20 475 10.0 51.5
37 53.50 20 1 20 495 10.0 53.5
38 56.00 25 1 25 520 8.0 56
39 58.00 20 1 20 540 10.0 58.0
40 60.50 25 1 25 565 8.0 60.5
41 63.00 25 1 25 590 8.0 63.0
42 65.20 22 1 22 612 9.0 65.2
43 67.80 26 1 26 638 8.0 67.8
44 70.50 27 1 27 665 7.0 70.5
45 73.40 29 1 29 694 7.0 73.4
46 76.00 26 1 26 720 8.0 76.0
47 79.00 30 1 30 750 6.0 79.0
48 82.50 35 1 35 785 5.0 82.5
49 86.00 35 1 35 820 5.0 86.0
50 89.00 30 1 30 850 6.0 89.0
51 92.40 34 1 34 884 6.0 92.4

25
PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project
Report for Development of Economic Corridor, Inter Corridor and Feeder Routes to
Improve the Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The
State of Punjab.
SAND REPLACEMENT TEST RESULTS (IS 2720 Part-28)
(EXISTING ALIGNMNT)
Section: Phagwara-Hoshiarpur Road Section (NH-344 B)

Chainage Bulk Density Moisture Content Dry Density

3+427 1.58 4.6 1.51

6+000 1.81 5.3 1.72

11+700 1.45 2.94 1.41

31+000 1.44 2.91 1.4

26
Borrow Pit – Chainage – 5+000
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
(BORROW PIT)

GRAIN SIZE ANALYSIS : IS:2720(PART-4)-1985


SAMPLE DETAILS TESTS RESULTS

Sample % % %
CHAINAGE Sample Description % Gravel D60 D10 Cu Cc
Depth, m Sand Silt Clay
Light Brown Sandy Silt of Low
G.L to 1.0
5+000 Plasticity 2.0 21.0 70.0 7.0 0.043 0.002 21.20 1.06
M
(ML-CL)
G.L to 1.0
16+900 Light Brown Sandy Silt (CL) 0.0 25.0 65.0 10.0 0.048 0.002 28.67 1.93
M

G.L to 1.0 Light Brown Sandy Silt of Low


30+100 0.0 38.0 57.0 5.0 0.068 0.003 25.99 1.09
M Plasticity (SM)
Light Brown Silty Sand
30+100 5.00 0.0 61.0 39.0 0.0 0.095 0.040 2.36 1.00
(SM)

GRAIN SIZE GRAPH

GSA -1
100.00

90.00

80.00

70.00

60.00
% Finer by Weight

50.00

40.00

30.00

20.00

10.00 GSA -1

0.00
0.001 0.010 0.100 1.000 10.000
Particle Size, mm

27
SAI GEOTECHNICAL ENGINEERS PVT.
LTD.
MODIFIED PROCTOR COMPACTION TEST
Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)
Location No : 5+000km Maximum Dry Density gm/cc : 1.98
Sample No : BS-01 Optimum Moisture Content(%): 12.20

2.10

2.06

2.02

1.98

1.94
Dry Density, gm/cc

1.90

1.86

1.82

1.78

1.74

1.70

1.66
4 6 8 10 12 14 16 18

Moisture Content, %

28
SAI GEOTECHNIC ENGINEERS PVT. LTD

LABORATORY CALIFORNIA BEARING RATIO SOAKED


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 5+000km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 3.8 7.7 11.2


DEPTH ( M. ) 1 5.0 ( mm ) 3.6 7.5 11.0

28

24

10 BLOWS
35 BLOWS

20 65 blows
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

29
SAI GEOTECHNIC ENGINEERS PVT. LTD

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 5+000km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 9.7 15.1 20.2


DEPTH ( M. ) 1 5.0 ( mm ) 8.9 14.5 19.4

28
10 BLOWS
35 BLOWS
65 blows
24

20
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

30
SAI GEOTECHNICAL ENGINEERS PVT
LTD
CBR SOAKED CH : 5+000 km.
Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.59 3.8 10
1.77 7.7 35
1.92 9.9
1.99 11.2 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

31
SAI GEOTECHNICAL ENGINEERS PVT
LTD
CBR UNSOAKED CH : 5+000 km.
Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.59 9.7 10
1.77 15.1 35
1.92 19
1.99 20.2 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20

15
C B R V A L U E (%)

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

32
Borrow Pit – Chainage – 16+900
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
(BORROW PIT)

GRAIN SIZE ANALYSIS : IS:2720(PART-4)-1985


SAMPLE DETAILS TESTS RESULTS

Sample % % %
CHAINAGE Sample Description % Gravel D60 D10 Cu Cc
Depth, m Sand Silt Clay

G.L to 1.0
16+900 Light Brown Sandy Silt (CL) 0.0 25.0 65.0 10.0 0.048 0.002 28.67 1.93
M

G.L to 1.0
16+900 Light Brown Sandy Silt (CL) 0.0 25.0 65.0 10.0 0.048 0.002 28.67 1.93
M

G.L to 1.0 Light Brown Sandy Silt of Low


30+100 0.0 38.0 57.0 5.0 0.068 0.003 25.99 1.09
M Plasticity (SM)
Light Brown Silty Sand
30+100 5.00 0.0 61.0 39.0 0.0 0.095 0.040 2.36 1.00
(SM)

GRAIN SIZE GRAPH

GSA -1
100.00

90.00

80.00

70.00

60.00
% Finer by Weight

50.00

40.00

30.00

20.00

10.00 GSA -1

0.00
0.001 0.010 0.100 1.000 10.000
Particle Size, mm

33
SAI GEOTECHNICAL ENGINEERS PVT.
LTD.
MODIFIED PROCTOR COMPACTION TEST
Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)
Location No : 16+900km Maximum Dry Density gm/cc : 1.95
Sample No : BS-02 Optimum Moisture Content(%): 12.5

2.03

1.99

1.95

1.91
Dry Density, gm/cc

1.87

1.83

1.79

1.75

1.71

1.67

1.63
4 6 8 10 12 14 16 18

Moisture Content, %

34
SAI GEOTECHNIC ENGINEERS PVT. LTD

LABORATORY CALIFORNIA BEARING RATIO SOAKED


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 16+900km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-02 2.5 ( mm ) 3.6 6.8 10.2


DEPTH ( M. ) 1 5.0 ( mm ) 3.4 6.6 10.0
28

24

10 BLOWS
35 BLOWS

20 65 blows
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

35
SAI GEOTECHNIC ENGINEERS PVT. LTD

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 16+900km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-02 2.5 ( mm ) 7.2 13.6 22.2


DEPTH ( M. ) 1 5.0 ( mm ) 6.8 12.6 20.5
35
10 BLOWS
35 BLOWS
65 blows
30

25
STRESS ( kg / sq cm )

20

15

10

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

36
SAI GEOTECHNICAL ENGINEERS PVT
LTD
CBR SOAKED CH : 16+900 km.
Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.61 3.6 10
1.76 6.8 35
1.89 9.1
1.95 10.2 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

37
SAI GEOTECHNICAL ENGINEERS PVT
LTD
CBR UNSOAKED CH : 16+900 km.
Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.61 7.2 10
1.76 13.6 35
1.89 19.2
1.95 22.2 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

38
Borrow Pit – Chainage – 30+100
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
(BORROW PIT)

GRAIN SIZE ANALYSIS : IS:2720(PART-4)-1985


SAMPLE DETAILS TESTS RESULTS

Sample % % %
CHAINAGE Sample Description % Gravel D60 D10 Cu Cc
Depth, m Sand Silt Clay

G.L to 1.0 Light Brown Sandy Silt of Low


30+100 0.0 38.0 57.0 5.0 0.068 0.003 25.99 1.09
M Plasticity (SM)

G.L to 1.0
16+900 Light Brown Sandy Silt (CL) 0.0 25.0 65.0 10.0 0.048 0.002 28.67 1.93
M

G.L to 1.0 Light Brown Sandy Silt of Low


30+100 0.0 38.0 57.0 5.0 0.068 0.003 25.99 1.09
M Plasticity (SM)
Light Brown Silty Sand
30+100 5.00 0.0 61.0 39.0 0.0 0.095 0.040 2.36 1.00
(SM)

GRAIN SIZE GRAPH

GSA -1
100.00

90.00

80.00

70.00

60.00
% Finer by Weight

50.00

40.00

30.00

20.00

10.00 GSA -1

0.00
0.001 0.010 0.100 1.000 10.000
Particle Size, mm

39
SAI GEOTECHNICAL ENGINEERS PVT.
LTD.
MODIFIED PROCTOR COMPACTION TEST
Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)
Location No : 30+100km Maximum Dry Density gm/cc : 1.90
Sample No : BS-03 Optimum Moisture Content(%): 10.6

1.98

1.94

1.90

1.86
Dry Density, gm/cc

1.82

1.78

1.74

1.70

1.66

1.62

1.58
4 6 8 10 12 14 16

Moisture Content, %

40
SAI GEOTECHNIC ENGINEERS PVT. LTD

LABORATORY CALIFORNIA BEARING RATIO SOAKED


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 30+100km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-03 2.5 ( mm ) 5.2 9.8 14.5


DEPTH ( M. ) 1 5.0 ( mm ) 5.0 9.6 14.3
36

32

10 BLOWS
28
35 BLOWS
65 blows

24
STRESS ( kg / sq cm )

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

41
SAI GEOTECHNIC ENGINEERS PVT. LTD

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 30+100km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-03 2.5 ( mm ) 9.2 14.3 19.3


DEPTH ( M. ) 1 5.0 ( mm ) 8.9 13.2 18.5

36

32

10 BLOWS
28
35 BLOWS
65 blows

24
STRESS ( kg / sq cm )

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

42
SAI GEOTECHNICAL ENGINEERS PVT
LTD
CBR SOAKED CH : 30+100 km.
Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.62 5.2 10
1.76 9.8 35
1.84 13.2
1.9 14.5 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

43
SAI GEOTECHNICAL ENGINEERS PVT
LTD
CBR UNSOAKED CH : 30+100 km.
Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.62 9.2 10
1.76 14.3 35
1.84 17.5
1.92 19.3 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Project: Phagwara-Hoshiarpur Road Section NH-344 B (BORROW PIT)

44
Auger Bore Hole – Chainage – 8+000
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
(AUGER)

GRAIN SIZE ANALYSIS : IS:2720(PART-4)-1985


SAMPLE DETAILS TESTS RESULTS

Sample % % %
CHAINAGE Sample Description % Gravel D60 D10 Cu Cc
Depth, m Sand Silt Clay

Light Brown Sany Silt of Low


8+000 0.50 0.0 19.0 73.0 8.0 0.043 0.002 22.15 1.46
Plasticity (ML-CL)

Light Brown Sany Silt of Low


8+000 2.00 0.0 21.0 73.0 6.0 0.045 0.002 19.62 1.34
Plasticity (ML-CL)

38+800 2.00 Light Grey Silty Sand (SM) 0.0 62.0 38.0 0.0 0.181 0.041 4.47 0.54

Light Brown Silty Sand


38+800 5.00 0.0 61.0 39.0 0.0 0.095 0.040 2.36 1.00
(SM)

GRAIN SIZE GRAPH

100.00

90.00

80.00

70.00

60.00
% Finer by Weight

50.00

40.00

30.00

20.00

GSA -1
10.00
GSA-2

0.00
0.001 0.010 0.100 1.000 10.000
Particle Size, mm

45
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Project : Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sample Details
Chainage, km : 8+000 Structure : -

Borehole No : Auger BH-1 Sample No: UDS-2

Depth of Sample, m : 1.00 Type of Sample : Sandy silt

Confining Pressure, s0 (kg/cm ) :


2
0.1 0.2 0.3

Intial Diameter, cm : 3.8 3.8 3.8

Initial Length (cm): 7.6 7.6 7.6

Bulk Density, (g/cc) : 1.76 1.76 1.76


Moisture Content (Before Test),
11.2 11.2 11.2
%:
Void Ratio: 0.128 0.128 0.128

As per IS : 2720 (Part - 13) - RA - 1986

Test Results

Cohesion Intercept, c : 0.55 Kg/cm2 Angle of Internal Friction, ø 9 Degree

3.00

2.00
Shear Stress Sff, Kg/cm2

1.00

0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Normal Stress Tff, Kg/cm2

Unconsolidation Undrained Triaxial Test

46
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
CONSOLIDATION TEST RESULTS
(Field Curve from Casagrande's Method)

Borehole No : 1 OCR: 8.30 MOISTURE CONTENT INITIAL


Depth, m : 1.00 cc1 : 0.028 INITIAL FINAL VOID RATIO
Type of soil : Sandy Silt cc2 : 0.131 11.2 18.6 0.696
Chainage: 8+000 (AUGER)

0.95
Pressure Coefficient of Volume e = Initial void ratio
o
Increment compressibility
(kg/cm2) mv,(cm2/kg) Po = Overburden Pressure
0.90
0.049 Pc = Preconsolidation Pressure
0.25 - 0.5 CC1 = Compression Index for stress
0.5 - 1.0 0.039
level less than preconsolidation
0.85 1.0 - 2.0 0.023
...........pressure
2.0 - 4.0 0.012 CC2 = Compression Index for stress level
4.0 - 8.0 0.005 greater than preconsolidation
0.80 ...........pressure

0.75
eo=
0.70
Ratio,e

0.65

Field Curve
0.60
Void

0.55

0.50
Laboratory Curve
0.45
po = 0.07 kg/cm2

pc = 0.60 kg/cm2

0.40

0.35

0.30

0.25
0.1 1.0 10.0 100.0
Applied P r e s s u r e ( kg/cm2 )

PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of
Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

47
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
Dial Reading vs Square Root of Time
Borehole No : 1 Sample No : UDS-2
Depth (m) : 1 Chainage: 8+000 (AUGER)

2470 Pressure kg/cm 2 0.25 Pressure kg/cm 2 0.50


2371 t90 (min) 6.76
t90 (min) 4.00
2460 cv , cm2/s 1.98E-01
cv , cm2/s 3.44E-01
2351
DIAL READING

2450

DIAL READING
k , cm/sec 9.8E-06
k , cm/sec 0.0E+00
2440
2331
2430
2420 2311
2410
2291
2400
2390 2271
- 1 2 3 4 5 6 7 8 - 1 2 3 4 5 6 7 8

t in min t t in min t

2261 2070 Pressure kg/cm 2


Pressure kg/cm 2 1.00 2.00
2241 t90 (min) 16.00 t90 (min) 17.64
cv , cm2/s 8.06E-02 2020 cv , cm2/s 6.97E-02
2221
DIAL READING
DIAL READING

k , cm/sec 3.2E-06 k , cm/sec 1.6E-06


2201
2181 1970

2161
2141 1920
2121
2101 1870
- 1 2 3 4 5 6 7 8 9 10 - 1 2 3 4 5 6 7 8

t in min t t in min t

1840 Pressure kg/cm2 4.00 Pressure kg/cm 2 8.00


t90 (min) 24.01 1609 t90 (min) 25.00
cv , cm2/s 4.89E-02 cv , cm2/s 4.47E-02
1790 k, cm/sec 5.9E-07 k , cm/sec 2.7E-07
DIAL READING

DIAL READING

1559

1740 1509

1690 1459

1640 1409
- 1 2 3 4 5 6 7 8 - 1 2 3 4 5 6 7 8 9 10

t in min t t in min t

CONSOLIDATION TEST RESULTS (Taylor's Method)


PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic
Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in
The State of Punjab.

48
Auger Bore Hole – Chainage – 18+500
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
(AUGER)

GRAIN SIZE ANALYSIS : IS:2720(PART-4)-1985


SAMPLE DETAILS TESTS RESULTS

Sample % % %
CHAINAGE Sample Description % Gravel D60 D10 Cu Cc
Depth, m Sand Silt Clay

Light Brown Sany Silt of Low


18+500 G.L 0.0 23.0 70.0 7.0 0.046 0.002 21.50 1.41
Plasticity (ML-CL)

Light Brown Sany Silt of Low


18+500 1.40 0.0 18.0 76.0 6.0 0.044 0.002 18.99 1.50
Plasticity (ML-CL)

38+800 2.00 Light Grey Silty Sand (SM) 0.0 62.0 38.0 0.0 0.181 0.041 4.47 0.54

Light Brown Silty Sand


38+800 5.00 0.0 61.0 39.0 0.0 0.095 0.040 2.36 1.00
(SM)

GRAIN SIZE GRAPH

100.00

90.00

80.00

70.00

60.00
% Finer by Weight

50.00

40.00

30.00

20.00

GSA -1
10.00
GSA-2

0.00
0.001 0.010 0.100 1.000 10.000
Particle Size, mm

49
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Project : Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sample Details
Chainage, km : 18+500 Structure : -

Borehole No : Auger BH-2 Sample No: UDS-2

Depth of Sample, m : 1.00 Type of Sample : Sandy silt

Confining Pressure, s0 (kg/cm ) :


2
0.1 0.2 0.3

Intial Diameter, cm : 3.8 3.8 3.8

Initial Length (cm): 7.6 7.6 7.6

Bulk Density, (g/cc) : 1.76 1.76 1.76


Moisture Content (Before Test),
11.1 11.1 11.1
%:
Void Ratio: 0.126 0.126 0.126

As per IS : 2720 (Part - 13) - RA - 1986

Test Results

Cohesion Intercept, c : 0.55 Kg/cm2 Angle of Internal Friction, ø 11 Degree

3.00

2.00
Shear Stress Sff, Kg/cm2

1.00

0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Normal Stress Tff, Kg/cm2

Unconsolidation Undrained Triaxial Test

50
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
CONSOLIDATION TEST RESULTS
(Field Curve from Casagrande's Method)

Borehole No : 1 OCR: 8.20 MOISTURE CONTENT INITIAL


Depth, m : 1 cc1 : 0.014 INITIAL FINAL VOID RATIO
Type of soil : Sandy Silt cc2 : 0.135 11.1 18.3 0.690
Chainage: 18+500 (AUGER)

0.95
Pressure Coefficient of Volume e = Initial void ratio
o
Increment compressibility
(kg/cm2) mv,(cm2/kg) Po = Overburden Pressure
0.90
0.049 Pc = Preconsolidation Pressure
0.25 - 0.5 CC1 = Compression Index for stress
0.5 - 1.0 0.039
level less than preconsolidation
0.85 1.0 - 2.0 0.023
...........pressure
2.0 - 4.0 0.012 CC2 = Compression Index for stress level
4.0 - 8.0 0.005 greater than preconsolidation
0.80 ...........pressure

0.75
eo=
0.70
Ratio,e

0.65

Field Curve
0.60
Void

0.55

0.50
Laboratory Curve
0.45
po = 0.07 kg/cm2

pc = 0.60 kg/cm2

0.40

0.35

0.30

0.25
0.1 1.0 10.0 100.0
Applied P r e s s u r e ( kg/cm2 )

PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of
Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

51
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
Dial Reading vs Square Root of Time
Borehole No : 1 Sample No : UDS-2
Depth (m) : 1 Chainage: 18+500 (AUGER)

2631 Pressure kg/cm 2 0.25 Pressure kg/cm 2 0.50


2529 t90 (min) 6.76
2621 t90 (min) 6.25
cv , cm2/s 1.98E-01
2611 cv , cm2/s 2.20E-01
2509
DIAL READING

DIAL READING
k , cm/sec 9.8E-06
k , cm/sec 0.0E+00
2601
2489
2591
2581 2469
2571
2449
2561
2551 2429
- 1 2 3 4 5 6 7 8 - 1 2 3 4 5 6 7 8

t in min t t in min t

2420 2229 Pressure kg/cm 2


Pressure kg/cm 2 1.00 2.00
2400 t90 (min) 20.25 t90 (min) 23.04
2380 cv , cm2/s 6.37E-02 2179 cv , cm2/s 5.34E-02
DIAL READING
DIAL READING

2360 k , cm/sec 2.5E-06 k , cm/sec 1.3E-06


2340
2129
2320
2300
2079
2280
2260
2240 2029
- 1 2 3 4 5 6 7 8 9 10 - 1 2 3 4 5 6 7 8

t in min t t in min t

2000 Pressure kg/cm2 4.00 Pressure kg/cm 2 8.00


t90 (min) 21.16 1767 t90 (min) 17.64
cv , cm2/s 5.54E-02 cv , cm2/s 6.32E-02
1950 k, cm/sec 6.7E-07 k , cm/sec 4.0E-07
DIAL READING

DIAL READING

1717

1900 1667

1850 1617

1800 1567
- 1 2 3 4 5 6 7 8 - 1 2 3 4 5 6 7 8 9 10

t in min t t in min t

CONSOLIDATION TEST RESULTS (Taylor's Method)


PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic
Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in
The State of Punjab.

52
Auger Bore Hole – Chainage – 25+000
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
(AUGER)

GRAIN SIZE ANALYSIS : IS:2720(PART-4)-1985


SAMPLE DETAILS TESTS RESULTS

Sample % % %
CHAINAGE Sample Description % Gravel D60 D10 Cu Cc
Depth, m Sand Silt Clay

Light Grey Sandy Silt of Low


25+000 0.50 0.0 15.0 75.0 10.0 0.041 0.002 24.36 2.48
Plasticity (CL)

Light Grey Sandy Silt of Low


25+000 2.00 0.0 12.0 79.0 9.0 0.042 0.002 21.09 2.67
Plasticity (CL)

38+800 2.00 Light Grey Silty Sand (SM) 0.0 62.0 38.0 0.0 0.181 0.041 4.47 0.54

Light Brown Silty Sand


38+800 5.00 0.0 61.0 39.0 0.0 0.095 0.040 2.36 1.00
(SM)

GRAIN SIZE GRAPH

100.00

90.00

80.00

70.00

60.00
% Finer by Weight

50.00

40.00

30.00

20.00

GSA -1
10.00
GSA-2

0.00
0.001 0.010 0.100 1.000 10.000
Particle Size, mm

53
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Project : Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the
Efficiency of Freight Movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

Sample Details
Chainage, km : 25+000 Structure : -

Borehole No : Auger BH-3 Sample No: UDS-2

Depth of Sample, m : 1.00 Type of Sample : Sandy silt

Confining Pressure, s0 (kg/cm ) :


2
0.1 0.2 0.3

Intial Diameter, cm : 3.8 3.8 3.8

Initial Length (cm): 7.6 7.6 7.6

Bulk Density, (g/cc) : 1.76 1.76 1.76


Moisture Content (Before Test),
12.6 12.6 12.6
%:
Void Ratio: 0.136 0.136 0.136

As per IS : 2720 (Part - 13) - RA - 1986

Test Results

Cohesion Intercept, c : 0.55 Kg/cm2 Angle of Internal Friction, ø 10 Degree

3.00

2.00
Shear Stress Sff, Kg/cm2

1.00

0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Normal Stress Tff, Kg/cm2

Unconsolidation Undrained Triaxial Test

54
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
CONSOLIDATION TEST RESULTS
(Field Curve from Casagrande's Method)

Borehole No : 1 OCR: 9.70 MOISTURE CONTENT INITIAL


Depth, m : 1.00 cc1 : 0.026 INITIAL FINAL VOID RATIO
Type of soil : Clayey Silt cc2 : 0.190 12.6 18.6 0.723
Chainage: 25+000 (AUGER)

0.95
Pressure Coefficient of Volume e = Initial void ratio
o
Increment compressibility
(kg/cm2) mv,(cm2/kg) Po = Overburden Pressure
0.90
0.073 Pc = Preconsolidation Pressure
0.25 - 0.5 CC1 = Compression Index for stress
0.5 - 1.0 0.047
level less than preconsolidation
0.85 1.0 - 2.0 0.031
...........pressure
2.0 - 4.0 0.016 CC2 = Compression Index for stress level
4.0 - 8.0 0.005 greater than preconsolidation
0.80 ...........pressure

0.75 eo= 0.723

0.70
Ratio,e

0.65

0.60
Void

0.55
Field Curve

0.50

0.45 Laboratory Curve


po = 0.07 kg/cm2

0.40
pc = 0.68 kg/cm2

0.35

0.30

0.25
0.1 1.0 10.0 100.0
Applied P r e s s u r e ( kg/cm2 )

PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for
Development of Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of
Freight movement in India (LOT-2/ Punjab/ Package-3) in The State of Punjab.

55
SAI GEOTECHNICAL ENGINEERS
PVT. LTD.
Dial Reading vs Square Root of Time
Borehole No : 1 Sample No : UDS-1
Depth (m) : 1 Chainage: 25+000 (AUGER)

2200 Pressure kg/cm 2 0.50


2286 Pressure kg/cm 2 0.25
t90 (min) 16.00 2180 t90 (min) 24.01
2276 cv , cm2/s 5.53E-02
cv , cm2/s 8.61E-02 2160
DIAL READING

DIAL READING
k , cm/sec 4.1E-06
2266 k , cm/sec 0.0E+00
2140
2256
2120
2246 2100
2236 2080
2226 2060
2216 2040
- 1 2 3 4 5 6 7 8 - 1 2 3 4 5 6 7 8

t in min t t in min t

Pressure kg/cm 2 1.00 Pressure kg/cm 2 2.00


2000 t90 (min) 12.25 1769 t90 (min) 16.00
cv , cm2/s 1.03E-01 cv , cm2/s 7.43E-02
DIAL READING
DIAL READING

1950 k , cm/sec 5.0E-06 1719 k , cm/sec 2.3E-06

1900 1669

1850 1619

1800 1569
- 1 2 3 4 5 6 7 8 9 10 - 1 2 3 4 5 6 7 8

t in min t t in min t

Pressure kg/cm2 4.00 1190 Pressure kg/cm 2 8.00


1488
t90 (min) 12.96 t90 (min) 16.81
cv , cm2/s 8.58E-02 1140 cv , cm2/s 6.20E-02
1438
k, cm/sec 1.5E-06 k , cm/sec 5.1E-07
DIAL READING

DIAL READING

1090
1388
1040
1338
990

1288 940

1238 890
- 1 2 3 4 5 6 7 8 - 1 2 3 4 5 6 7 8 9 10

t in min t t in min t

CONSOLIDATION TEST RESULTS (Taylor's Method)


PROJECT : Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of Economic
Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in India (LOT-2/ Punjab/ Package-3) in
The State of Punjab.

56
Existing Alignment Trial Pit – Chainage
– 3+427
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(EXISTING ALIGNMNT)
Location No : 3+427km Maximum Dry Density gm/cc : 1.99
Sample No : BS-1 Optimum Moisture Content(%): 11.5

2.07

2.03

1.99

1.95
Dry Density, gm/cc

1.91

1.87

1.83

1.79

1.75

1.71

1.67
4 6 8 10 12 14 16 18

Moisture Content, %

57
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 3+427km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 4.8 8.6 13.2


DEPTH ( M. ) 1 5.0 ( mm ) 4.5 8.4 13.0

28

24
10 BLOWS
35 BLOWS
65 blows
20
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

58
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 3+427km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 12.3 18.2 24.8


DEPTH ( M. ) 1 5.0 ( mm ) 12.1 17.9 24.5

64

60

56

52 10 BLOWS
35 BLOWS
48
65 blows
44

40
STRESS ( kg / sq cm )

36

32

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

59
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 3+427 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.60 4.8 10
1.77 8.6 35
1.93 12.6
2.00 13.2 65

25

20
C B R V A L U E (%)

15

10

0
1.55 1.65 1.75 1.85 1.95 2.05

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

60
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 3+427 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.60 12.3 10
1.77 18.2 35
1.93 24.1
2.00 24.8 65

25

20
C B R V A L U E (%)

15

10

0
1.55 1.65 1.75 1.85 1.95 2.05

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

61
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 3+427 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 04-05-2019 Weight of hammer (kg): 8 kg

Variation of CBR with Depth


CBR (%)
1.0 10.0 100.0
0

10

20

30

40
Depth ( cm )

50

60

70

80

90

100

62
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 3+427 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 04-05-2019 Weight of hammer (kg): 8 kg

Cumulative Penetration (cm)


Number of blows
0 5 10 15 20 25 30 35 40
0
5
10
15
20
25
30
DCP penetration (cm)

35
40
45
50
55
60
65
70
75
80
85
90
95
100

63
Trial Pit CH-3+427

11.0 Cm Asfault

23.0 Cm Base Course

31.0 Cm Base Course

14.0 Cm Sub-Grade

Sub-Soil Profile of Trial Pit CH-3+427 of Phagwara-Hoshiarpur Road Section

Page No. - 64
Existing Alignment Trial Pit – Chainage
– 6+000
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(EXISTING ALIGNMNT)
Location No : 6+000km Maximum Dry Density gm/cc : 1.93
Sample No : BS-1 Optimum Moisture Content(%): 13.1

2.01

1.97

1.93

1.89

1.85
Dry Density, gm/cc

1.81

1.77

1.73

1.69

1.65

1.61

1.57
4 6 8 10 12 14 16 18 20 22

Moisture Content, %

65
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 6+000km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 4.1 7.7 11.5


DEPTH ( M. ) 1 5.0 ( mm ) 3.9 7.5 11.3

28

24

10 BLOWS
35 BLOWS

20 65 blows
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

66
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 6+000km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 9.2 14.3 18.3


DEPTH ( M. ) 1 5.0 ( mm ) 9.0 14.1 18.1

56

52

48

10 BLOWS
44
35 BLOWS
40 65 blows

36
STRESS ( kg / sq cm )

32

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

67
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 6+000 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.61 4.1 10
1.75 7.7 35
1.87 10.0
1.94 11.5 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

68
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 6+000 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.61 9.2 10
1.75 14.3 35
1.87 16.5
1.94 18.3 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

69
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 6+000 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 04-05-2019 Weight of hammer (kg): 8 kg

Variation of CBR with Depth


CBR (%)
1.0 10.0 100.0
0

10

20

30

40
Depth ( cm )

50

60

70

80

90

100

70
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 6+000 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 04-05-2019 Weight of hammer (kg): 8 kg

Cumulative Penetration (cm)


Number of blows
0 5 10 15 20
0
5
10
15
20
25
30
DCP penetration (cm)

35
40
45
50
55
60
65
70
75
80
85
90
95
100

71
Trial Pit CH-6+000

12.0 Cm Asfault

25.0 Cm Base Course

20.0 Cm Base Course

12.0 Cm Sub-Grade

Sub-Soil Profile of Trial Pit CH-6+000 of Phagwara-Hoshiarpur Road Section

Page No. - 72
Existing Alignment Trial Pit – Chainage
– 11+700
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(EXISTING ALIGNMNT)
Location No : 11+700km Maximum Dry Density gm/cc : 1.87
Sample No : BS-1 Optimum Moisture Content(%): 14.8

1.95

1.91

1.87
Dry Density, gm/cc

1.83

1.79

1.75

1.71

1.67

1.63
8 10 12 14 16 18 20 22

Moisture Content, %

73
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 11+700km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 2.8 6.2 10.1


DEPTH ( M. ) 1 5.0 ( mm ) 2.6 6.0 9.9

24

20
10 BLOWS
35 BLOWS
65 blows
16
STRESS ( kg / sq cm )

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

74
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 11+700km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 8.2 11.6 15.6


DEPTH ( M. ) 1 5.0 ( mm ) 8.0 11.4 15.4

48

44

40
10 BLOWS
35 BLOWS
36
65 blows

32
STRESS ( kg / sq cm )

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

75
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 11+700 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.55 2.8 10
1.69 6.2 35
1.81 8.1
1.88 10.1 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

76
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 11+700 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.55 8.2 10
1.69 11.6 35
1.81 16.5
1.88 15.6 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

77
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 11+700 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 05-05-2019 Weight of hammer (kg): 8 kg

Variation of CBR with Depth


CBR (%)
1.0 10.0 100.0
0

10

20

30

40
Depth ( cm )

50

60

70

80

90

100

78
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 11+700 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 05-05-2019 Weight of hammer (kg): 8 kg

Cumulative Penetration (cm)


Number of blows
0 5 10 15 20 25 30 35 40 45
0
5
10
15
20
25
30
DCP penetration (cm)

35
40
45
50
55
60
65
70
75
80
85
90
95
100

79
Trial Pit CH-11+700

14.0 Cm Asfault

25.0 Cm Base Course

20.0 Cm Base Course

25.0 Cm Sub-Grade

Sub-Soil Profile of Trial Pit CH-11+700 of Phagwara-Hoshiarpur Road Section

Page No. - 80
Existing Alignment Trial Pit – Chainage
– 31+000
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(EXISTING ALIGNMNT)
Location No : 31+00KM Maximum Dry Density gm/cc : 1.98
Sample No : BS-1 Optimum Moisture Content(%): 11.4

2.07

2.03

1.99

1.95
Dry Density, gm/cc

1.91

1.87

1.83

1.79

1.75

1.71

1.67
4 6 8 10 12 14 16 18

Moisture Content, %

81
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 31+000 PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 4.6 8.4 13.0


DEPTH ( M. ) 1 5.0 ( mm ) 4.3 8.2 13.0

28

24
10 BLOWS
35 BLOWS
65 blows
20
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

82
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 31+000 PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 12.5 18.6 24.4


DEPTH ( M. ) 1 5.0 ( mm ) 12.6 17.6 24.8

64

60

56

52 10 BLOWS
35 BLOWS
48
65 blows
44

40
STRESS ( kg / sq cm )

36

32

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

83
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 31+000 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.60 4.6 10
1.77 8.4 35
1.92 11.9
2.00 13.0 65

25

20
C B R V A L U E (%)

15

10

0
1.55 1.65 1.75 1.85 1.95 2.05

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

84
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 31+000 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.60 12.5 10
1.77 18.6 35
1.92 23.9
2.00 24.4 65

25

20
C B R V A L U E (%)

15

10

0
1.55 1.65 1.75 1.85 1.95 2.05

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (EXISTING ALIGNMNT)

85
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 31+000 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 10-05-2019 Weight of hammer (kg): 8 kg

Variation of CBR with Depth


CBR (%)
1.0 10.0 100.0
0

10

20

30

40
Depth ( cm )

50

60

70

80

90

100

86
SAI GEOTECHNICAL ENGINEERS PVT. LTD.
Dynamic Cone Penitration Test (ASTM-D 6951-03)
Geo-Technical and Material Investigations for preparation of Detailed Project Report for Development of
Project: Economic Corridor, Inter Corridor and Feeder Routes to Improve the Efficiency of Freight movement in
India (LOT-2/ Punjab/ Package-3) in The State of Punjab.
Location: 31+000 (EXISTING ALIGNMNT) Water Table: Not Meet
Date: 10-05-2019 Weight of hammer (kg): 8 kg

Cumulative Penetration (cm)


Number of blows
0 5 10 15 20 25 30 35 40 45 50
0
5
10
15
20
25
30
DCP penetration (cm)

35
40
45
50
55
60
65
70
75
80
85
90
95
100

87
Trial Pit CH-31+000

15.0 Cm Asfault

20.0 Cm Base Course

35.0 Cm Base Course

14.0 Cm Sub-Grade

Sub-Soil Profile of Trial Pit of Phagwara-Hoshiarpur Road Section

Page No. - 88
New Alignment Trial Pit – Chainage –
8+250
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(NEW ALIGNMNT)
Location No : 8+250km Maximum Dry Density gm/cc : 1.86
Sample No : BS-1 Optimum Moisture Content(%): 14.5

1.94

1.90

1.86
Dry Density, gm/cc

1.82

1.78

1.74

1.70

1.66

1.62
8 10 12 14 16 18 20 22

Moisture Content, %

89
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 8+250km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 2.6 5.8 9.3


DEPTH ( M. ) 1 5.0 ( mm ) 2.5 5.6 9.1

20

16 10 BLOWS
35 BLOWS
65 blows
STRESS ( kg / sq cm )

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

90
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 8+250km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 8.5 12.3 16.5


DEPTH ( M. ) 1 5.0 ( mm ) 8.2 12.0 16.2

48

44

40
10 BLOWS
35 BLOWS
36
65 blows

32
STRESS ( kg / sq cm )

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

91
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 8+250 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.55 2.6 10
1.70 5.8 35
1.80 7.1
1.88 9.3 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

92
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 8+250 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.55 8.5 10
1.70 12.3 35
1.80 9.9
1.88 16.5 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

93
New Alignment Trial Pit – Chainage –
15+460
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(NEW ALIGNMNT)
Location No : 15+460km Maximum Dry Density gm/cc : 1.93
Sample No : BS-1 Optimum Moisture Content(%): 10.8

2.01

1.97

1.93

1.89
Dry Density, gm/cc

1.85

1.81

1.77

1.73

1.69

1.65
4 6 8 10 12 14 16 18

Moisture Content, %

94
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 15+460km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 5.8 10.8 16.5


DEPTH ( M. ) 1 5.0 ( mm ) 5.6 10.5 16.2

40

36

32 10 BLOWS
35 BLOWS
65 blows
28
STRESS ( kg / sq cm )

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

95
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 15+460km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 11.2 18.5 24.5


DEPTH ( M. ) 1 5.0 ( mm ) 10.9 18.2 24.3

64

60

56

52 10 BLOWS
35 BLOWS
48
65 blows
44

40
STRESS ( kg / sq cm )

36

32

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

96
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 15+460 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.59 5.8 10
1.76 10.8 35
1.87 13.8
1.98 16.5 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

97
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 15+460 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.59 11.2 10
1.76 18.5 35
1.87 21.1
1.98 24.5 65

30

25
C B R V A L U E (%)

20

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

30

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

98
New Alignment Trial Pit – Chainage –
21+700
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(NEW ALIGNMNT)
Location No : 21+700km Maximum Dry Density gm/cc : 2.02
Sample No : BS-1 Optimum Moisture Content(%): 11.3

2.10

2.06

2.02

1.98

1.94
Dry Density, gm/cc

1.90

1.86

1.82

1.78

1.74

1.70

1.66
4 6 8 10 12 14 16 18

Moisture Content, %

99
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 21+700km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 4.1 8.6 13.5


DEPTH ( M. ) 1 5.0 ( mm ) 3.9 8.4 13.3

32

28
10 BLOWS
35 BLOWS
65 blows
24

20
STRESS ( kg / sq cm )

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

100
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 21+700km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 9.2 14.6 23.5


DEPTH ( M. ) 1 5.0 ( mm ) 9.0 14.4 23.2

64

60

56

52 10 BLOWS
35 BLOWS
48
65 blows
44

40
STRESS ( kg / sq cm )

36

32

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

101
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 21+700 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.64 4.1 10
1.81 8.6 35
1.96 12.7
2.02 13.5 65

25

20
C B R V A L U E (%)

15

10

0
1.60 1.70 1.80 1.90 2.00 2.10

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

102
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 21+700 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.64 9.2 10
1.81 14.6 35
1.96 21.2
2.02 23.5 65

25

20
C B R V A L U E (%)

15

10

0
1.60 1.70 1.80 1.90 2.00 2.10

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

103
New Alignment Trial Pit – Chainage –
27+960
SAI GEOTECHNICAL ENGINEERS PVT
LTD
MODIFIED PROCTOR COMPACTION TEST
(NEW ALIGNMNT)
Location No : 27+960km Maximum Dry Density gm/cc : 1.91
Sample No : BS-1 Optimum Moisture Content(%): 10.8

1.99

1.95

1.91

1.87
Dry Density, gm/cc

1.83

1.79

1.75

1.71

1.67

1.63
4 6 8 10 12 14 16 18

Moisture Content, %

104
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (SOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 27+960km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 3.9 9.1 15.1


DEPTH ( M. ) 1 5.0 ( mm ) 3.6 8.8 14.8

40

36

32 10 BLOWS
35 BLOWS
65 blows
28
STRESS ( kg / sq cm )

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

105
2a

SAI GEOTECHNICAL ENGINEERS PVT. LTD.

LABORATORY CALIFORNIA BEARING RATIO (UNSOAKED)


IS 2720 PART-16

10 BLOWS 35 BLOWS 65 BLOWS


CHAINAGE 27+960km. PENETRATION CBR VALUE CBR VALUE CBR VALUE

SAMPLE No. BS-01 2.5 ( mm ) 11.6 16.8 24.6


DEPTH ( M. ) 1 5.0 ( mm ) 11.4 16.5 24.3

64

60

56

52 10 BLOWS
35 BLOWS
48
65 blows
44

40
STRESS ( kg / sq cm )

36

32

28

24

20

16

12

0
- 2 4 6 8 10 12 14
P E N E T R A T I O N , mm

Project: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

106
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR SOAKED CH : 27+940 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.55 3.9 10
1.71 9.1 35
1.85 13.4
1.92 15.1 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

107
SAI GEOTECHNICAL ENGINEERS PVT. LTD.

CBR UNSOAKED CH : 27+940 km.


Density (gm/cc): CBR Value No of Blows CBR
97% MDD
VALUE
1.55 11.6 10
1.71 16.8 35
1.85 22.4
1.92 24.6 65

25

20
C B R V A L U E (%)

15

10

0
1.50 1.60 1.70 1.80 1.90 2.00

25

20
C B R V A L U E (%)

15

10

0
0 10 20 30 40 50 60 70
NUMBER OF BLOWS

Section: Phagwara-Hoshiarpur Road Section (NH-344 B) (NEW ALIGNMNT)

108
Photograph-1 Trial Pit

Photograph-2 DCPT Test

109
Photograph-3 Sand Replacement Test

Photograph-4 Auger Bore Hole