Document Title:
AUTHORIZATION PAGE
______________________________________________________________
Controlled Copy
Page 2 of 4
CONTRACT NO.: N/A
PROJECT TITLE: GENERIC
1.0 Purpose
The purpose of this procedure is to provide for a system and instructions and
to assign responsibilities for the maintenance of equipment, machines and
tools needed to achieve conformity to product quality.
2.0 Application
3.0 Responsibility
4.0 Procedure
Engineering Manager
The MD/CEO
Approves Budget
______________________________________________________________
Controlled Copy
Page 3 of 4
CONTRACT NO.: N/A
PROJECT TITLE: GENERIC
Engineering Manager
Requests for spare parts and other materials required for the
scheduled maintenance from the store.
Assigns personnel for the performance of the scheduled maintenance.
Engineering Manager
Engineering Manager
Date of maintenance
Description of what was done
Record of replaced parts and/or supplies used