Government of Odisha

Works Department
***

Office Memorandum

File No.07556900012013- dated'

S u b : R e v is io n o f S c h e d u le of Rates-2014 on G S T .

After careful consideration Government have been pleased to approve the revised
Schedule of Rates-2014 consequent upon implementation of Goods & Services Tax (GST)
with effect from 01.07.2017.

1 The revised Schedule of Rates-2014 is effective from 1sl July, 2017


2. The Works Department Office Memorandum No. 12845/W dt. 10.11.2014 stands
modified accordingly.
3.. This has been concurred in by the Finance Department vide their U.O.R No.56-WF-l
dt.24.08.2017.

Enel; As above

EIC - cum- Secretary to Government

Memo No. \ /w, dated. V ^ ^ \I

Copy forwarded to P. S. to Hon'ble Chief Minister, Odisha for information and


necessary action.

FA - cum- Addi Secretary/to Government

Memo No. /W, dated,


X
Copy forwarded to OSD to Chief Secretary, Odisha / P.S. to Development
Commissioner-cum-Additional Chief Secretary, Odisha / P S. to Principal Secretary, Finance
Deptt. for information and necessary action.

FA - cum- Addl. Secretary to government

<PTO.)
Memo No. 1^ D A/V, dated \ J= - V IV
Copy forwarded to the Principal Accountant General (A&E) Odssha. BhuPaneswar /
Principal Accountant Genera! (E & S R Audit), Odisha Puri Branch, Puri for information and
necessary action,
<j , ^
FA - cum- Addl. Secretary to/Government
Memo No. \ ^ ^ AA/, dated, \
Copy forwarded to All Departments / Managing Director. OB & CC Ltd.
Bhubaneswar / Managing Director. OCC Ltd., Bhubaneswar for information and necessary

aCt' ° n
FA - cum- Addi. Secretary tof Government
Memo No A/V dated. ' V i v
Copy forwarded to EIC (Civil), Odisha I Ail Chief Engineers, Odisha / All
Superintending Engineers / All Executive Engineers (All under Works Department) for
information and wide circulation among subordinate offices. > r »,
} Uyoo
FA - cum- Addl. Secretary to C^fovemment

Memo No. \ ^ ^ / w .dated. ^ ^


Copy forwarded to the M/S Luminous Infoways Pvt. Ltd.. DCB-615/616/617 6lh Floor
DLF, Cyber City, Chandaka Industrial Estate, Bhubaneswar-751024 for information and
necessary action.
They are requested to upload it in the web-site of Works Department

FA - cum- Addl. Secretary to Government


Memo No. V^ A/V, dated, \ U ^ \ I ^
Copy forwarded to the Director. Printing Stationary & Publication. Odisha. Cuttack
for information and necessary action.
He is requested to publish this amendment in the next issue of Odisha Gazette.

FA - cum- Addl, Secretary to Government


Memo No. \% , A/V, dated, , q ,j
Copy forwarded to A/C-l Section / A/C-l! Section / Road Section / Plan Section /
Building Section / Budget Section / N.Hs. Section / FC & AA Section / P P P Cell / EAP Cell
Works Department for information and necessary action

FA - cum- Addl. Secretary to Government


G O V E R N M E N T OF O D ISH A

BASIC RATE OF MATERIALS FOR


THIRTEEN UN-DIVIDED DISTRICTS,
RATE OF LABOUR, CONVEYANCE AND
SERVICE CONTRACT FOR PLANTS AND
MACHINERIES

FOR -2014 (POST GST)

WORKS DEPARTMENT
CONTENTS

Chapter Description Page

1-12
1. B a sic R ates of Materials

II. R a te of Labour 13-14

III. R a te s for C o n veyan ce of Materials 15-20

IV. S e rvice Contract for Plants & M achineries 21-26

XXV. M iscellaneous Items 27-44


1 CHAPTER I

P O S T G S T B A S IC RA TE OF M A T E R IA L S FO R 2014 (F O R T H IR T E E N U N - O IV ID E D D IS T R IC T S )

1
■M*
E fc.

Sundargarh

Dhenkanal
v IQ 3

Kalahandi

Phulbani
Koraput
Keonjhar
Cuttack
SI. SI Q. O' £
o -C

Puri
V) (9 1 (TJ
No Nam e of items Unit IV 9 •S J2 C*
> E n fZ
a fC n CO 13
£ in
1 2 3 4 5 6 7 8 9 10 ii 12 13 14 15 16
Well burnt clamp burnt bricks (25 Cm. x 12Cm. x 8Cm.)
1 having crushing strength not less than 35 Kg./Cm2 with 1000 Nos 3089.36 3148.94 3229.79 3021,28 2778,72 2877,45 2736 17 2877.45 2757.45 2621.28 3014.47 2867.23 3014.47
dimensional tolerance ± 8 percent
Well burnt clamp burnt bricks (23 Cm. x llC m . x 8Cm.)
2 having crushing strength not less than 35 Kg./Cm2 with 1000 Nos 2780.43 2893-62 2906.38 2906,38 2561.70 2617,87 2480.85 2617.87 2510.64 2852.77 2852.77 2726.81 2852.77
dimensional tolerance ± 8 percent.
K.B. bricks (25 Cm x 12Cm x 8Cm) having crushing
3 strength not less than 75 Kg./Cm2 with dimensional 1000 Nos 4844.26 4638.30 4844,26 4446.81 3659.57 3680.00 3500-43 3680.00 3523.40 3420.43 3932,77 3754.04 3932.77
tolerance ± 8 oercent.
K.B. bricks (23 Cm. x llC m . x 8Cm.) having crushing
4 strength not less than 75 Kg,/Cm2 with dimensional 1000 Nos 4119,15 4042.55 4297.87 4306.38 3229,79 3327,66 3148.94 3327.66 3310.64 3462.98 3355.74 3359.15 3462.98
tolerance ± 8 percent.
Fiy ash bricks of 25 Cm. x 12 Cm. x 8 Cm. size having
5 crushing strength not less than 75 Kg,/Cm2 with 1000 Nos 4144.68 3914.39 4502.13 4178,72 4042,55 3574.47 3872.34 3936.17 3906.38 3557.45 3936.17 4091.06 3913.19
dimensional tolerance ± 2 %
Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm. sue having
6 crushing strength not less than 75 Kg./Cm2 with 1000 NOS 3529.36 3787.23 3948.09 3982.98 3659.57 3404.26 3506.38 3550.64 3506.38 3404.26 3483.40 3495.32 3501.28
dimensional tolerance ± 2 %
Fly ash blocks oF 30 Cm. x 20 Cm. x 15 Cm, size having
7 crushing strength not less than 75 Kg./Cm2 with Each 12.77 13.62 13.62 13.62 14.47 14.47 13.62 14.47 14.47 11.06 11.91 11.91 11.91
dimensional tolerance ± 2 %
Cement concrete solid Block machine mixed and
8 Hydraulic compressed having crushing strength not less
than 75kq/cm2
3. 400mm x 200mm x 200mm size Each 22,05 22.05 22.05 22.05 24.41 24.41 23.62 23.62 23.62 19,69 22.05 22.05 22.05
0. 400mm x 150mm x 200mm size Each 17.32 18.11 18.11 18,11 18.11 18.11 17.32 18.11 17.32 15 75 18,11 18,1! 18.11
c. 400mm x lOOmm x 150mm size Each 11.61 12.60 12.60 12.60 13.39 13.39 13.39 13.39 13.39 11.G2 12.60 12.60 12.60
(J. 300mm x 200mm x 150mm size Each 13.39 12.60 13.39 13.39 14.96 14.96 14,96 14,96 14.96 14,17 15.75 15.75 15.75
e. 300mm x 150mm x 150mm size Each 11.02 11,02 11.02 11.02 12.60 12.60 12-60 12 60 11,81 10.24 11.02 11.02 11.02
f. 300mm x lOOmm x 150mm size Each 9.45 9.45 9,45 9.45 9.45 9,45 9.45 9.45 9.45 8.66 9.45 9.45 9.45
Cement concrete Hollow Blocks machine mixed and
9 Hydraulic compressed having crushing strength not less
than 70ka/cm2
a. 400mm x 200mm x 200mm size Each 19.69 20.47 20,47 20.47 20.47 18.90 19.69 20.47 19.69 18.90 21.26 21.26 21.26
b. 400mm x 150mm x 200mm size Each 14.96 15.75 15.75 15.75 15,75 14.96 15.75 15.75 15.75 12.60 14.17 14.17 14.17

N-l fSJ
c. 400mm x lOOmm x 200mm size Each 11.02 11.02 11.02 11,02 11.02 11.02 11,02 11.02 11.02 12.60 12.60 12.60

o o
d. 300mm x 200mm x 150mm size Each 11.02 11.02 11.02 11.02 9.45 11.02 11.02 11.02 11.02 12.60 12.60 12.60
e. 300mm x 150mm x 150mm size Each 10,24 10,24 10,24 10.24 11.02 9.45 11.02 11.02 11.02 9.45 10.24 10.24 10.24
f. 300mm x lOOmm x 150mm size Each 7.87 7.87 7.87 7.87 9.45 8.66 9.45 9.45 9.45 7.09 7.87 7.87 7.87
10 K.B. bricks Khofl 4 Cm.size 1 Cum 298.72 322.55 322.55 319.15 297.87 297.87 291.91 297,87 285.1 1 294.47 276.60 294.47 294.47
n Clamp burnt brick Khoa 4 cm, size. 1 Cum 257.02 259.57 281.70 281.70 241.70 241,70 228.09 241.70 235.49 240.00 236.60 240.00 240.00
12 Surki of ClamD burnt bricks. I Cum 357.45 348.94 385.53 359.15 369.36 379.57 361.70 372.77 363.40 391.49 372.77 406.81 406.81
13 Surki of Kiln burnt bricks, t Cum 371.06 357.4S 401,70 372,77 4 19 57 419,57 400.00 405.11 400.00 417.02 412.77 424.68 424.68
Screen washed gravel for concrete (12mm. to 20mm.)
14 I Cum 138.10 133.33 143.81 134,29 128.57 114.29 121.90 128.57 123.81 138.10 140.95 140,95 140.95

15 Gravel or moorum I Cum 45,71 45.71 47.62 47.62 47.62 47.62 44.76 47.62 ■7.62 47.62 47.62 47.62 47.62
Stone screened Dust passing through 2 36 mm sieve
16 I Cum 80,95 76,19 83.81 8381 83.81 83,81 80,00 83.81 73.33 96.19 96.19 96.19 96.19
and retained on 0.075 mm sieve
17 River single or Bajn (12mm. to 20mm.': 1 Cum 92.38 90.43 92.38 92.38 98.10 90.48 93.33 98.10 95.24 113.33 112.38 113,33 113-33
18 Screened and washed sharp sand for mortar 1 Cum 48.57 46.57 49 52 1 sf ISr, S2 52.38 52.38 50.48 52.38 52.38 56.19 56.19 r 56.19 56.19
f

.e

M ayurbhanj

Sam balpur

Dhenkanal
L

Kalahandi
Keonjhar
Balasore

Phulbani
n

Koraput
Cuttack

Ganjam
SI. O' n

Puri
c
No Nam e of items Unit JS IU
TJ
■3 C
m 3
U)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16
19 Sand for filling and road blinding 1 Cum 42.86 41.90 44.76 44.76 45.71 4S.71 43.81 45.71 43.81 53.33 53.33 53.33 53.33
Clay mortar for masonry work with admixture of sand­
20 1 Cum 47.62 46.67 48.57 48.57 52.38 49.52 51.43 52.38 50,48 48.57 48.57 48.57 48.57

21 stone lime unslaked. 1 Kq. 13.33 13.33 13.33 13.33 16.19 16.19 16.19 16.19 16.19 16.19 16.19 16.19 16.19
22 Ghootinq lime unslaked. 1 Kq. 18.10 17,14 18,10 18.10 20.00 20.00 20.00 20.00 20,00 20.00 20.00 20.00 20.00
23 Shell lime unslaked, 1 Kg. 16.19 15.24 16.19 16.19 18.10 18.10 18.10 18.10 18.10 18.10 18.10 18.10 18.10
a) Granite broken stone of size not less than 0.0025
2*1 1 Cum. 206.11 200.87 214.85 214.85 221.83 221.83 212.23 221.83 213.97 245.41 245.41 245.41 245.41
Cum. Stacked
b) Granite stone of size not less than 0.0025 Cum.
1 Cum, 179.91 174-67 187,77 187.77 201.75 201.75 192.14 201.75 192.14 200.87 200.87 200.87 200.87
uicked up.
Stone other than granite quarried, broken and staked
25 1 Cum. 184.76 181.90 192.38 192.38 197.14 197.14 188.57 197.14 190.48 188.57 188.57 188.57 188.57
0,0015 Cum to 0.003 Cum
Stone other than granite picked up and staked 0.0015.
26 1 Cum. 161.90 158.10 168.57 168.57 173.33 173.33 163.81 173.33 166,67 185.71 185.71 185.71 185.71
Cum. to 0.003 Cunt
Stone other than granite quarried, broken and staked
2/ 1 Cum. 173.33 166.67 180.00 180.00 182,86 182,86 171.43 182.86 176.19 184.76 184.76 184.76 184.76
above 0,003 Cum
Stone other than granite picked up, broken and staked
28 1 Cum. 161.90 158.1.0 168.57 168.57 178.10 178.10 166.67 178.10 171.43 186.67 186.67 186.67 186.67
above 0.003 Cum
Granite Stone broken meta! 63mm. size Passing
29 through 90mm, Sieve and retained on 53 mm sieve.

a) Crusher broken. 1 Cum. 611.43 61905 650-48 650.48 664,76 664,76 623.81 660.95 638.10 690.48 708,57 677.14 708.57
bl Hand broken. 1 Cum. 492,38 493.33 517.14 517.14 517,14 517,14 480.95 517.14 495.24 538.10 538.10 538.10 538.10
Granite Stone broken metal 45mm. size (Passing
30
throuqh 53mm sieve & retained on 26.5mm sieve)
a) Crusher broken. 1 Cum, 633 33 63905 674.29 657.14 686,67 686.67 650.48 686.67 638.10 742.86 742.86 700.95 742.86
b) Hand broken. 1 Cum, 491.43 489.52 520,00 520.00 535.43 531.43 507.62 531.43 509.52 563.81 563.81 515.24 563.81
31 Granite Stone broken metal 40mm. size
a) Crusher broken. 1 Cum. 709.52 706.67 746.67 685.71 742.86 742.86 704.76 742.86 709.52 752.38 767.62 724.76 767.62
b) Hand hroken. 1 Cum, 566.67 564,76 595.24 595.24 603.81 603,81 566.67 603.81 580.95 614.29 614.29 580.00 654.29
Granite Stone broken metal 26.5mm. size (Passing
32
throuoh 45mm sieve & retained on 22.4mm sieve)
a) Crusher broken. 1 Cum 747.62 758.10 794.29 757.14 764.76 764.76 723.81 764.76 733,33 809.52 815.24 815.24 815.24
b) Hand broken. 1 Cum 569.52 573.33 601.90 595.24 608.57 529.52 576.19 608.57 580.95 623.81 623.81 623.81 623,81
Granite Stone broken metal 25mm, size (Passing
33
throuah 40mm sieve & retained on 20mm sieve)
a) Crusher broken. 1 Cum. 761.90 770-48 806.67 795.24 789.52 789,52 750,48 789.52 757,14 836.19 836.19 836.19 836.19
b) Hand broken. 1 Cum, 580.95 585.71 614,29 609-52 644.76 560.95 609.52 644.76 614.29 669.52 669.52 669.52 669.52
Granite Stone broken metal 22.4mm. size (Passing
34 through 26.5mm sieve & retained on 11.2mm sieve)

a) Crusher broken, 1 Cum. 790.48 789.52 830.48 814.29 812.38 812.38 761.90 812.38 776.19 857.14 872.38 872.38 872.38
b)H and broken. 1 Cum. 605.71 587.62 638.10 638.10 665.71 579.05 609.52 665.71 .338.10 701.90 701.90 701.90 701.90
Granite Stone broken chips 20mm. size (Minimum 6 5 %
by Wt. Passing through 19mm sieve & retained on
35
13.2mm sieve but whole should pass through 26.Smm
sieve}
a) Crusher broken. l Cum. 1000.00 1007.62 1060.00 1060.00 1084.76 1076.19 1028,57 1066,67 1038.10 1092,38 1092,38 1046.67 1092.38
b) Hand broken. 1 Cum. 784,76 763-81 823.81 : ■ ■.81 894.29 778.10 840.95 880.00 852.38 884-76 884.76 876.19 884.76
Granite Stone broken chips 13.2mm, Size (Passing
36 through 22,4mm sieve: S retained on 11,2mm sieve)

a) Crusher broken 1 Cum, 1 1033.33 1 0 2 4 ,7 6 1 0 8 3 .8 ?- If f f e 8 1 1090,48 1090.48 1036.19 1090.48 1047.86 ! 100.00 1100.00 1050.48 1100.00

' - % -
M ayurbhanj

Sundargarh

Dhenkanal
3 u

Kalahandi
a;

Keonjhar

Phulbani
i-

Koraput
Q.

Ganjam
SI. U c Cl
IS ffl

Puri
c
No Nam e o f item s Unit re A iq
3 IU E 'ra
u CQ ID CO

1 2 3 4 5 6 7 8 9 10 ii 12 13 14 15 16
b) Hand broken. 1 Cum. 797.14 800.95 842.86 842,86 900.95 783.81 845.71 900,95 861.90 899.05 899.05 882.86 899.05
Granite Stone broken chips 12mm. size (Minimum 6 5 %
by Wt. Passing through 13.2mm sieve & retained on
37
9.50mm sieve but whole should pass through 19mm
sieve 1 . .
a) Crusher broken. 1 Cum. 1048.57 1047.62 1096.19 1096.19 1112.38 1095.24 1045.71 1103.81 1066.67 1128,57 1128.57 1063.81 1128.57
b) Hand broken. 1 Cum. 810,48 811,43 855.24 855,24 911.43 793.33 857.14 911.43 871.43 913,33 913.33 889,52 913.33
Granite Stone broken chips 11.2mm. size (Passing
38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
through 13.2mm sieve & retained on 5.6mm sieve)
a) Crusher broken 1 Cum. 1072.38 1049.52 1107.62 1107.62 1140.95 1095.24 1079.05 1117.14 1090.48 1186.67 1186.67 1091.43 1186.67
b) Hand broken, 1 Cum. 828.57 838.10 879.05 879.05 920.95 800.95 869.52 920.95 880.95 929.52 929.52 897.14 929.52
Granite Stone broken chips 10mm. size (Minimum 6 5 %
by Wt. Passing through 9,5mm sieve & retained on
39
6.3mm sieve but whole should pass through 13.2mm
sieve)
a) Crusher broken. 1 Cum. 1071,43 1066.67 1120.00 1120.00 1157,14 1095.24 1090.48 1148,57 1109,52 1194.29 1194.29 1095.24 1194.29
bl Hand broken. 1 Cum. 823.8! 838.10 879.05 879.05 920.95 800.95 869,52 920.95 880.95 929.52 929.52 897,14 929.52
Granite Stone broken chips 6,7mm size (Passing through
(A) 1 Cum. 716.19 704.76 739.05 752.38 772.38 761.90 728 57 772.38 738.10 752,38 775,24 775,24 775.24
11.2mm sieve & retained on 2.8mm sieve)
Granite Stone screening (Passing through 2.36mm sieve
(B) 1 Cum. 628.57 628 57 661.90 661.90 684.76 571.43 642.86 684,76 657. S4 666.67 695,24 692,38 699.05
& retained on 180 micron sieve)
Granite stone broken chips.of 4.7 mm size passing
40 through 6.7 mm sieve (crusher broken.) and retained on 1 Cum. 647.G2 638.10 674.29 674.29 706.67 706.67 664.76 706.67 676.19 690.48 709.52 713.33 718.10
2.36 mm sieve.
41 Stone other than granite broken to 5cm. size 1 Cum. 241,90 238.10 252.38 252.38 265.71 231.43 247.62 265.71 257 14 276.19 276.19 276.19 276.19
42 Stone other than qranitc broken to 4 cm. size. 1 Cum. 247.62 244 76 258.10 258.10 278.10 241.90 260.00 278.10 .'66.67 288.57 288.57 288.57 288.57
43 Stone other than qramte broken to 2 cm. size. 1 Cum. 264.76 260.95 276.19 276.19 307.62 267.62 285.7! 307.62 294.29 295.24 312.38 312.38 312.38
44 Stone other than qramte broken to 1cm. size. 1 Cum. 276.19 274,29 288.57 257.14 317,14 276.19 295.24 317.14 303.81 314.29 337.14 337.14 337.14
Stone boulder 15cm. & above size granite picked up and
45 1 Cum. 143.81 141 90 149.52 149.52 133.33 133.33 126.67 133.33 128,57 132.38 132.38 132.38 132.38
nullah boulders.
Soiling stone boulder ISCm, & above size picked up
46 1 Cum. 149.52 144.76 156.19 156.19 150.48 150,48 140.95 150,48 144.76 156.19 156.19 156.19 156.19
nullah boulders broken
Stone boulder IScm . & above Si2e other than granite or
47 1 Cum. 115.24 114.29 120.00 120.00 12S.71 125,71 115.24 125.71 120.95 126.67 12G.67 126.67 126.67
laterite picked up and nullah boulders.
Soiling stone boulder 15Cm, & above size other than
43 granite or laterite picked up. nullah boutders broken. 1 Cum. 126.67 125,71 132.38 132.38 135.24 135.24 126.67 135.24 129.52 140.95 140.95 140,95 140.95

Soling stone boulders 10 Cm. size picked up other than


49 1 Cum. 115.24 113.33 * 120,00 120.00 124.76 124.76 117.14 124.76 119.05 128.57 128.57 128.57 128.57
oramte.
Hard broken soling stone other than granite (40mm. to
50 1 Cum. 184.76 181.90 192.38 192.38 197.14 171.43 185.71 197,14 188.57 204.76 204.76 204.76 204.76
90mm.)
51 I.R.C. Grade I (90mm 45 mm.) 1 Cum. 599.05 597.14 625.71 619.05 614.29 614.29 573.33 614.29 587.62 638.10 638,10 638,10 638,10
52 I.R.C. Grade 11 (63mm. to 45mm.) 1 Cum. 668.57 661.90 698.10 698.10 676.19 676.19 636.19 676.19 647.62 706.67 679.05 706.67 706.67
53 I.R.C.Grade III (53mm. to 22,4mm.) 1 Cum. 714.29 704 76 746.67 719.05 732.38 732.38 679.05 732.38 700.00 764.76 764.76 764.76 764.76
54 Laterite solinq stone 23Cm. size 1 Cum. 97.14 95.24 100.95 100.00 98.10 89.52 94.29 102.86 98.10 107.62 107.62 107.62 107.62
55 laterite Stone rouqh dressed 1 Cum. 538.10 544.76 578.10 542.86 531,43 482.86 504,76 551.43 533.33 609.52 611,43 611.43 611.43
56 Bamboo mat or talai. 1 Sqm. 100.41 97.93 104.56 97.93 110 37 110.37 102.07 110.37 106,22 112,03 112.03 112.03 107.05
Bamboo 1ST class 7Cm, to lOCm. dia & above 6m, long.
57 Each 110.37 106.22 115.35 115.35 122.82 122.82 114.52 122.82 117.84 130.29 130.29 130.29 122.82

a) Betongi Bomboo 7,51 Cm. to 4Cm. dia & above 5m.


58 Each 24.90 24.90 25 73 25.73 22.4! 22.41 2!,58 22.41 21.58 21,58 21.58 21,58 20.75
lonq.
b) Belonqi Roimboo above 4,Cm. dia & up td 7Cm, dia S
Each 33.20 32.37 34.02 3 jf i^ .O ? 33.20 33.20 31 54 33.20 32.37 33,20 33.20 33,20 31.54
above 5m. lonn.
M ayurbhanj

Sundargarh
Sam bafpur

Dhenkanal

Kalahandi
Keonjhar
Balan gir

Phulbani
Salaso re

Koraput
Cuttack

Ganjam
SI.

Puri
No Name of item s Unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Sal bullahs 7Smm. to 120mm. mean dia up to 5.5m
59 IMtr 83.82 82.99 87.14 82.99 86.33 86.31 80.50 86.31 82.99 89.63 88.80 89.63 84.65
lonq.
Sal bullahs 150mm. to 200mm. mean dia up to 5.5m.
60 IMtr 93.78 89,63 97.93 89,63 92,12 92.12 85.48 92.12 88.80 98.76 98.76 98.76 92.95
lonq.
Sal bullahs above 200mm. & up to 250mm. mean dia &
61 ICum. 7264.73 7296,27 7642.32 7058.09 8019.92 7074.69 7421.58 7985.06 7672.20 7824.07 7735.27 7800.83 7394.19
ud to 2.75m. Iona.
Sal bullahs above 200mm. & up to 250mm. mean dia
62 iCum. 8234.02 8215.77 8608.30 7726,97 8829.88 8829,88 8390.04 8787.55 8446,47 9019.92 8743.57 9080.50 8527.80
above 2.75m. lonq & up to 4.75m. lonq.
Sal bullahs above 200mm. & up to 250mm. mean dia
63 ICum. 9235.68 9211.62 9868.05 8900.41 10190.04 10190.04 9672.20 9853.11 9746.89 10427.39 10121.99 9726.14 9809,96
above 4.75m, lonq
Sal bullahs above 250mm. & up to 380mm. mean dia &
64 ICum. 10594.19 10522.82 11074.69 10124.48 11456.43 11456.43 10853.94 11288.80 10958.51 11592.53 11409.13 10843.98 10903,73
ud to 2,75m. Iona
Sal bullahs above 250mm. & up to 380mm, mean dia &
65 ICum. 13154.36 13062,24 13751.87 12248,96 14078,84 14078.84 13326,14 13580.08 13467,22 14391.70 14176.76 13733.61 13604.98
above 2.75m. Iona up to 4.75m. Iona
Sal bullahs above 250mm. & up to 380mm, mean dia &
66 ICum. 14131,95 14507,88 15184.23 13838,17 15917.84 15922.82 15049.79 15292.12 15232.37 15648.13 15373.44 14585.06 14788.38
above 4,75m. lonq.
67 Non-sal bullahs 75mm. mean dia of any lenqth. IMtr. 39.83 39,83 41.49 41.49 41.49 40.66 39.83 41.49 39.83 43.15 43.15 43.15 41.49
68 Non-sal bullahs 100mm. mean dia of any lenqth. IMtr. 52.28 51.45 53.94 53.94 49.79 49.79 48.13 49,79 4813 53.94 53.94 53.94 51.45
69 Non-sal bullahs 125mm. mean dia of any lenqth. IMtr. 60.58 58.09 62.24 62.24 64.73 62.24 59.75 64.73 62.24 67.22 51.45 67.22 63.90
Non-Sal bullahs 150mm..to 200mm. mean dia of any
70 IMtr. 73.86 73.03 78.01 78.01 78.01 74.69 73.03 78.01 74,69 83.82 83.82 82,16 78.84
lenqth,
Non-Sal bullahs above 200mm, & up to 250mm. mean
71 ICum. 5199.17 5136.93 5458.92 4875.52 5316.18 5311.20 4892.12 5115.35 5085.48 5331.12 5242.32 5305,39 5039,83
dia up to 2.5m. Iona.
Non-Sal bullahs above 200mm. & up to 250mm. mean
72 ICum. 5774.27 5770.95 6035.68 S288.80 5786.72 5643.15 5361.00 5672.20 5535.27 5799.17 5837,34 5655,60 5482.16
dia above 2.5m, lonq,
Seasoned rough dressed sawn Sal wood having
73 minimum dimension 50mm, ta 150mm. & up to 2.75m. ICum. 27212.45 2 7087.14 28448.96 26514,52 31304.56 31.304.56 29232,37 31304.56 29943.57 29211.62 28671.37 27120.33 27506.22
lonq.
Seasoned rough dressed sawn Sal wood having
73 minimum dimension 50mm. to 150mm. & above 2,75m, lCurn. 29702.0 7 29601.66 31051.45 28878,01 34283.82 34283.82 31435.68 34283.82 32793.36 31037.34 30278.84 28803.32 29182.57
lonq.
Seasoned Sal wood beam of cross sectional area not
75 less than LSOSq.cm. & least lateral dimension 100mm. & ICum. 29952.70 29543.57 31313.69 29336.93 34110.37 34110.37 31809.96 34110.37 32627.39 31369.29 30428.22 29158.51 29675.52
above 2.75m. Iona,
Seasoned Sal wood planks not more than 75mm. thick &
76 ICum. 26698 76 26663,90 27912.03 26576,76 31163.49 31163.49 28907.05 31163.49 29809.13 28547.72 28264,73 26578.42 27013.28
not less than 200mm. width.
77 Seasoned Piasal wood planks for shutters. ICum. 43079.67 42489.63 45037.34 41309.54 48822.41 48822.41 45200 00 48822-41 46701.24 45228.22 43376,76 42039.00 42787.55
78 Seasoned Teak wood planks for shutters. ICum. 56688,80 56240.66 59265,56 55879 67 67194.19 67194.19 61303,73 67194,19 64273.86 63900.41 61373.44 59325.31 60434.85
Non Sal wood scantling & plants(Tentera, Kasi, Gamhari,
79 ICum. 16421,58 16298,76 17167.63 15620.75 17665.56 16307.05 16172.61 17665.56 16897,93 17261.41 17079.67 16342.74 16365.98
Kuaima)
80 Non-Sal reapers. ICum, 9987.55 9958.51 10349,38 9919.50 11252.28 11203.32 10130.29 11252.28 10763.49 11452.28 11547.72 10709.54 10844.81
81 Fire wood lOntl 424.00 409.00 442.00 442.00 477.00 475.00 430.00 477.00 456.00 500.00 499.00 491.00 472.00
82 IS t class Raniqani or Manqalore pattern tiles, 100 Nos 714.96 710.24 746.46 688.98 793.70 722.05 431.50 829.92 793.70 834.65 808.66 793.70 800.00
83 Ridqes of Raniqanj or Manqatore parttern tiles. 100 Nos. 1126.77 1111.81 1177.95 1048.03 1205.51 1096.06 1133.86 1193.70 1205.51 1299.21 1322.05 1242.52 1264.57
84 Flat tilesfMCm. xM Cm.x lCm, ) 1000 Nos. 228.35 211.02 238.58 214.17 260.63 237.01 233.86 272.44 260,63 255.91 258.27 250.39 248.03
85 Flat tiles fl-5Cm xlSCmx 1.2 Cm ) 1000 Nos. 245.67 244.09 256.69 223.62 283.46 257.48 259.06 296.06 283.46 275.59 278.74 271.65 266.93
86 Flat tiles (30Cm. x 15 Cm.x 2.5 Cm. ) 1000 Nos. 962,99 959.84 1006.30 875,59 1122.83 1020.47 1029.13 1112.60 1122.05 1165.35 1116.54 1088.98 1114.96
57 Flat tiles {30Cm. x 30 Cm.x 2.5 Cm. ) 1000 Nos. 1124.41 1111.81 1174.80 1022.05 1318.90 ! 197.64 1211.81 1377.17 1318.90 1337.01 1273.23 1230.71 1279.53
8S Pan tiles 1000 Nos. 240.94 236.22 251.18 218.90 263.78 239.37 245.67 249.61 262.99 274.80 274.80 274.80 262.99
89 Nuria ti!es(20Cm. to 25Cm,'; 1000 Nos, 503,15 494.49 525.98 457,48 624.41 624.41 579.53 614.17 598.43 614.17 626.77 595.28 600.00
90 Nuria tilos(25Cm. to' 30Cm.) 1000 Nos. 593 70 590.55 619.69 539.37 728.35 751.97 700.00 751.97 719.69 748.03 730.71 731.50 722.05
91 Ridqe tiles 1000 Nos. 730.71 740.94 780.31 693.70 801.57 858.27 795.28 858.27 821.26 846.46 819.69 805.51 822.83
& of 10
-------------------
c
i ■E
m T 1

Sam bafpur

Dhenkanal

Keonjhar
C

Phulbani
TO

Balangir
Balasore

Koraput
Ol

Cuttack

Ganjam
JZ
a
i— ■IS
E

Puri
Nam e of items Unit 3
> ■Tca
O
m
IQ 3 *■5
I U) XL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
92 Marble Tiles of minimum 16 mm thick, dunguri Variety.

(a ) Up to 0.10 Sqm. 1 Sqm. 428.35 424.41 428.35 428.35 428.35 428.35 428.35 428.35 428.35 393.70 428.35 428.35 428.35
(b) Above 0.10 Sqm. to 0.40 Sqm. 1 Sqm. 523.62 518.90 522.83 523.62 523.62 523.62 518.11 523.62 523.62 523.62 523.62 523.62 523.62
( c) Above 0.4 Som. to 1.0Q Sqm. 1 Sqm, 590.55 581.10 589.76 581.89 590.55 590.55 582.68 590.55 590.55 590.55 590,55 586.61 590.55
93 Kota Tiles of minimum Ifi mm thirk
(a) Up to 0.10 Sqm, 1 Sqm, 316.54 313,39 316.54 316.54 316.54 316.54 313.39 316.54 316.54 288.19 316.54 316.54 316.54
fb) Above 0.10 Sqm. 1 Sqm. 386.61 379.53 386-61 386.61 386.61 386.61 381.89 386.61 387,40 354.33 386.61 386.61 386.61
94 Khandolites (Up to 0.06 Sqm.) 1 Sqm. 248.03 244.09 248 03 248 03 248,03 248.03 242,52 248.03 248.03 248.03 248-03 248.03 248.03
95 Granite Tiles
(a) Up to 0.10 Sqm. (10mm thirk) 1 Sqm, 923.62 916.54 923.62 923.62 923.62 923.62 915.75 923.62 923.62 840.16 923.62 923.62 923,62
b) Above 0.10 Sqm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(i)Above 0.10 Sqm & up to 0.4 sqm (10mm. thick) 1 Sqm. 1048.03 1039.37 1048,03 1048.03 1048.03 1048.03 1041.73 1048.03 1048.03 929.13 1048.03 1032.28 1048.03
ii) Above 0.40 sqm. (20mrri thick) 1 Sqm. 1645.67 1637.80 1645 67 1559 06 1645,67 1645.67 1645,67 1645-67 1645 67 1322.83 1645,67 1610.24 1645.67
96 Kodappa Tiles of 10 mm thick
(a) Above 0.1 Sqm a Up to 0.40 Sqm 1 Sqm. 237.HO 236.22 237.80 237.80 237.80 237.80 236.22 237.80 237.80 237.80 237,80 237.80 237.80
(b) Above 0.40 Sqm. 1 Sqm. 285.83 277.17 285.83 285.83 285.83 285.83 277.95 285.83 285.83 285.83 285.83 285.83 285,83
"9? Qholpuri Stone Tiles. 1 Sqm. 314.17 307.87 314.17 298.43 314.17 285.83 314.17 314.17 314.17 314 17 314.17 157.48 314.17
98 Tiles up lo-
(a) 20cmx30cm / 20cm x 20cm special plain /printed
series ceramic wall tiles of premium grade having
1 Sqm. 304.72 300.00 304.72 301.57 304.72 304.72 299.21 304.72 304.72 277.17 304,72 304.72 304.72
thickness 6.5mm to 6.7mm confirming to IS 13753

(b ) 30cni x 30cm / 40cm x 40cm special plain / printed


series ceramic floor tiies of premium grade having
! Sqm. 326.77 329.13 337.80 325,20 337.80 337.80 334.65 337.80 337.HO 314.96 337,80 337.80 337.80
thickness 7mm to 8mm confirming to IS 13755

(c) Polished Vitrified floor tiles of premium grade having


thickness 8 mm to 10mm confirming to IS 15622:2006
fGronr>-B la's of following sizes
(I) Vitrified Tile 600mmx600mm Plain (Ivory) 1 Sqm. 514.17 476.38 523.62 523.62 523.62 523.62 522.05 523.62 523.62 476.38 523,62 523.62 523.62
( II) Vitrified Tile 600mmx600mm Coloured / Printed
1 Sqm. 559.06 519.69 571.65 555.12 571.65 571,65 562.99 571.65 57;.65 571.65 571.65 571.65 571.65
seriesf Homogeneous)
(d ) Vitrified industrial floor Tile of premium grade having
thickness 8mm to 10mm confirming to IS 445? of size ! Sqm. 467.72 433.07 476,38 468.50 476.38 4 76 38 472.44 476.38 476,38 433.07 476.38 476.38 476,38
300mmx30r>mm
99 Chequred Tiles. 1 Sqm. 170.87 163.78 170.87 170.87 170.8? 170.87 170.87 170,87 170,87 170.87 170.87 170.87 170.87
HI!: Terra/o f iles. 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0,00 0.00 0.00
(a) With qrey cement. I Sqm. 195.28 184.25 194.49 181.89 195.28 177.95 192.91 195.28 195.28 195.28 195.28 195.28 195.28
£b) With white cement t Sqm. 231,50 225.20 230 71 214.96 231.50 211.02 230.71 231.50 231.50 231.50 231.50 23150 231.50
101 Red oxide Primer 1 Litre 101.57 96,06 101.57 96.85 101.57 101 57 97.64 101.57 101.57 101.57 101.57 101 5? 101.57
10/ Wood Primer 1 Litre 114 17 109.45 114.96 114.17 114.96 114 96 112.60 114.96 114.17 114,96 114.96 114.96 114.96
103 Wood Shine Paint I Litre 125-20 118.11 125.20 121.26 125.20 125.20 122.05 125.20 125.20 125,20 125.20 125.20 125.20
104 ’ lastic Emulsion paint 1 Litre 196.06 187.40 196 06 186,61 196.06 196.06 196.06 196.06 196.06 196.06 196.06 196.06 196 06
105 Enamel paint 1 Litre 149.61 149,61 151 97 150 39 151.97 151.97 151.97 151.97 151.97 151.97 151.97 151.97 151.97
106 Distemper I Kg 51,97 51.18 51 97 51 97 51.97 51 97 51.97 51.97 51.97 51.97 51.97 51.97 51,97
107 Cement paint 1 Kq 36.22 34.65 36 22 36.22 33.86 27 56 36.22 36.22 36.22 35.43 36.22 36.22 36,22
108 ^ed oxide powder 1 Kq . 90.55 H8.98 91 34 91 34 91 34 91.34 88.98 91.34 91 34 91 34 91 34 91.34 91-34
109 French polish I Litre 129.92 126.77 129.13 124.41 129.92 ii8 i ; 128.35 129.92 129.92 129-92 129,92 129.92 129-92
110 Varnish 1 Litre 125.20 122.05 125 20 118,90 125.20 125.20 124.41 125.20 117.32 125,20 125,20 125.20 125.20
i n J lastcr of caris 1 Kq 9,45 9.45 9 45 9.45 9.45 9.45 9.45 9.45 9 45 9.45 9.45 9.45 9.45
u
1 Coal 1jr 1 Ka 37.45 36.60 37 45 37 45 37.45 37 45 37.45 37 -15 37 45 37 45 37.45 37 45 j 37.45
Enf
- S '-
c

Sundargarh
Sam balpur

Dhenkanal
ra

Kalahandi
Keonjhar
Balasore

Phulbani
Balangir

Koraput
Cuttack
■E

Ganjam
SI. n

Puri
No Nam e of items Unit 3
>•
tz
£
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
G.C.I. Sheet
113

a ) 0.30mm thick 1 Sqm 239.15 240.85 242.55 236.60 243.40 195.74 238.30 240.85 243.40 243.40 243.40 243,40 243.40
b) 0.40mm thick 1 Sqm 240.85 246.81 247.66 244.26 248.51 204.26 246.81 248.51 248.51 248.51 248.51 248.51 248.51
114 A.C. Sheet 1 Sqm. 146,46 151.97 157.48 157.48 157.48 143.31 157.48 157.48 157.48 157.48 157,48 157.48 157.48
115 A.C. ridqes 1 pair 148.03 141.73 148.03 146.46 148.03 148.03 141.73 148.03 148.03 148.03 148.03 148.03 148.03
116 6mm. Thick Plain A.C. Sheet 1 Sqm 181.89 176.38 181.89 177.17 181.89 165.35 181.10 181.89 181 89 181.89 181,89 181,89 181.89
11/ Tar Paper 1 Sqm 14.47 14.47 14.47 14.47 14.47 14.47 14.47 14.47 14.47 14.47 14.47 14.47 14.47
118 Putty (Wood) 1 Kq. 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22,05
119 Putty (Iron) 1 Kq. 77,95 76.38 77.95 77 95 77.95 70.87 77.95 77.95 77.95 77.95 77.95 77.95 77.95
120 Wire Nails IK g . 51.06 50.21 51,06 51,06 51.06 51.06 51.06 51.06 51.06 51.06 51.06 51.06 51.06
121 M.S. Anqle 1 Qntl
122 M.S. Channel 1 Qntl,
123 Bait, Nut & Washers 1 Kq. 60.63 58.27 60.63 59.06 60.63 51.18 60.63 60,63 60.63 60.63 60.63 60.63 59.84
Holding down bolts minimum 60 Cm. long with 15Cm. x
124 1 Kg. 58.27 57.48 58.27 58.27 58.27 51.18 58.27 58.27 58.27 58.27 58.27 58.27 57.48
15 Cm. x 6mm. size washer olate
125 Bmdino Wire. 1 Kq. 67.23 65.53 67.23 65.53 62.13 63.83 67.23 67.23 67.23 67.23 67.23 67.23 66.38
126 Coir String 1 Kg 43.40 42.45 43.40 43.40 43.40 37.74 41.51 43.40 43.40 43.40 43.40 43.40 42.45

12?
Empty Cement bags (H O PE) by lot & not shorted out 100 nos 313.01 308.94 313.01 288.62 295.06 284.55 300.81 238.21 292.68 284.55 313,01 313.01 307.32
•a)
Empty Cement gunny bags by lot & not.shorted out
b) 100 nos 313.01 284,55 313.01 284,55 291.06 268.29 300.81 238.21 292.68 284.55 313.01 313.01 307.32

c) Fmpty Bitumen Drum Each 107.32 97.56 107.32 97 56 107.32 107.32 107.32 102.44 107.32 107.32 107.32 107.32 105.69
d) Empty Bitumen Emulsion Drum Each 205.69 186.99 205.69 186.99 204.07 162.60 205.69 196.75 205.69 205.69 199.19 205.69 201.63
128 Straw in Bundle 100 nos 223.58 200.00 223.58 209.76 223.58 202 44 223.58 223.58 223.58 223.58 223.58 223.58 219.51
124 Marble Chips. lqntl 528.38 515.28 528.38 484.72 528.38 480.35 524.02 509.17 528.38 436.68 528.38 528-38 518.78
130 Marble Powder lqntl 307.42 300.44 307.42 296.94 307.42 279.48 303.93 306.55 307.42 307.42 307.42 307 42 302.18
131 Cement
a) 33 Grade
0) 43 Grade lqntl Average factory price ol three manufactures of cement isicle the State
c) 53 Grade
132 White Cement, lqntl 1515.75 1496.06 1514.96 1400.00 1515.75 1358.27 1413.39 1515.75 1515.75 1515 75 1515.75 1515.75 1515.75
13 5 Steel
a ) Mild Steel lqntl
b) HYSD (FE-415) /(FE500) lqntl
134 Z" type Steel Sheet Piles . lqntl 4699.57 4680.85 4698.72 4302.13 4697.87 3914.89 4510.64 2349.79 1699.57 4699.57 4699,57 4699.5? 4699.57
135 Bentonite powder lqntl 257 64 254.15 257.64 241.92 254.15 257,64 253.28 129.26 257.64 257,64 257.64 257.64 257.64
Oxidized mild steel fittmqs (1:S.I.)
1 it Butt hinges (I.S . I.)
a) 50x3 7x1.50mm Each 4.72 4,72 4.72 4.72 4,72 4.72 4.72 4.72 4,72 4.72 4.72 4 72 4.72
bl 75x47x0.70mm Each 6.30 6,30 6.30 6.30 6.30 6.30 6.30 6 30 6,30 6.30 6,30 4 72 4.72
0 I00x58x 1,90mm Each 11.02 11.02 11.02 11 02 11.02 11.02 11.02 11.02 11.02 11.02 11.02 11.02 11.02
d) 125x65x2.12 mm Each 17.32 17.32 17.32 17 32 17.32 17.32 17.32 17.32 17.32 17,32 17.32 17.32 17.32
137 M.S. aldroo (I.S .I.) 0.00 0.00 0.00 0 00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00
a) 250x16mm Each 72.44 71.65 72.44 68 50 72.44 72.44 70.87 72.44 70 87 70.87 72 44 72.44 72.44
t» 300x16mm Each 77.95 77.17 77.95 73.23 77.95 77.95 76.38 77.95 77.95 77.95 77.95 77.95 77.95
138 M.S. handle (1.5.1.)
a! 100mm Each 11,02 11.02 II, 02 11 02 11.02 11.02 11.02 11.02 11.02 11 02 11 02 11.02 11.02
h) 125mm Each 12.60 12.60 12.60 1.2 60 12,60 12,60 12.60 12,60 12,60 12.60 12 60 12 60 12.60
) 150mm Each 15.75 15.75 15.75 15.75 15,75 15,75 15.75 15,75 15.-7S 15.75 15.75 15.75 15.75
i ' 1 b tower bolt (1 S.: ....
lOOxlOmm Each 13.39 12.60 13,39 6 j ! it " 13 39 13.39 13 39 13.39 13.39 13 39 13 39 13 39 13.39

_ jQ -
M ayurbhanj

Sundargarh
Sam b alp ur

Dhenkanal
■o

Keonjhar

Phulbani
Balasore

Balangir

Koraput
Cuttack
SI. E c
,ra re

Puri
No Nam e of items Unit IT JZ
ra re
W re
SC
1 2 3 4 5 6 7 S 9 10 11 12 13 14 IS 16
|J> 150x10mm Each 20.47 20.47 20.47 20.47 20.47 20.47 20.47 20.47 20.47 20.47 20.47 20.47 20.47
C) 200x10mm Each 26.77 26.77 26.77 25.20 26.77 26.77 26.77 26.77 26.77 26.77 26.77 26.77 26.77
140 M/S. Screw (I.S .I.)
a) 12x3 mm 100 pcs 22.83 21.26 22.83 22,83 22.83 12.60 22.83 22.83 22.83 22.83 22.83 22.83 22.83
' : 12x4mm 100 pcs 25.98 25.98 25.98 25.98 25,98 14.17 25.98 25.98 25.98 25.98 25.98 25.98 25.98
' ) 20x4mm 100 pcs 29.13 29.13 29.13 29.13 29.13 19.69 29.13 29.13 29.13 29.13 29.13 29.13 29.13
(!) 20x5mm 100 pcs 30.71 30.71 30.71 30.71 30.71 20.47 30.71 30.71 30.71 30.71 30.71 30.71 30.71
e) 25x4mm 100 pcs 32.28 32.28 32.28 32.28 32.28 28.35 31.50 32.28 32.28 32.28 32.28 32.28 32.28
0 25xSmtn 100 pcs 37.01 37.01 37.01 37.01. 37.01 25.20 36.22 37.01 37.01 37.01 37.01 37.01 37.01
p) 30x4mm 100 pcs 38.58 38.58 38.58 38.58 38.58 30.71 37.80 38.58 38.58 38,58 38.58 38.58 38,58
n) 30x5mm 100 pcs 40,16 40.16 40.16 40.16 40,16 31.50 39.37 40.16 40.16 40.16 40.16 40.16 40.16
0 30x6mm 100 pcs 43.31 43.31 43.31 43.31 43.31 36.22 43.31 43.31 43.31 43.31 43.31 43.31 43.31
i) 35x6mm 100 pcs 45.67 45.67 45.67 45.67 45.67 37.01 44.88 45.67 45.67 45.67 45.67 45.67 45.67
k) 35x7mm 100 pcs 48.03 48.03 48.03 48.03 48.03 48.03 48.03 48.03 48.03 48.03 48.03 48.03 48.03
I) 3Sx8tnm too pcs 55.91 55.91 55.91 52.76 55.91 55.91 53.54 55.91 55.91 55.9! 55.91 55.91 55.91
nl) 50x?mm 100 pcs 59.84 61.42 61.42 57.48 61.42 61.42 60.63 61.42 61,42 61.42 61,42 61,42 61.42
n) 50x8mrn 100 pcs 63.78 64,57 64.57 61.42 64.57 64,5? 63.78 64.57 64.57 64.57 64.57 64.57 64.57
141 Steel window stay bar (I.S .I.)
a) 200mm Each 19.69 19.69 19.69 19.69 19.69 19.69 19.69 19.69 19.69 19.69 19.69 19.69 19.69
b) 2S0mm Each 23.62 23.62 23-62 23.62 23.62 23 62 23.62 23,62 23.62 23.62 23.62 23.62 23.62
cj 300 mm Each 29.13 29.13 29.13 29.13 29,13 29,13 28.35 29,13 29.13 29.13 28.35 29.13 29.13
Steel window handle including Nut, bolt & washer
142
(I.S .I.)
a) 100mm Each 15.75 14.96 15.75 L5.75 15.75 15.75 15.75 15.75 15.75 15.75 15.75 15.75 15.75
b) 150mm Each 20.47 20.47 20.47 20.47 20.47 18.90 20.47 20.47 20.47 20.47 20.47 20.47 20.47
143 Welded mesh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo
sl 25mmx25mmxll qauqe 5qm 151.49 160.00 160.85 152.34 160.85 160.85 155.74 160.85 160.85 160.85 160.85 160.85 160.85
b) 25mmx2Smmxl3 qauqe Sqm 141.28 148.09 148.09 137.87 148.09 148.09 142.98 148.09 148.09 147.23 148.09 148.09 148.09
c) 50mmx25mmxl 1 gauqe Sqm 141.28 148.09 148.09 137.87 148.09 135.32 142.98 148 09 I4S.09 148.09 148.09 1 148.09 148.09
rt) 50mmx2Smmxl3 qauqe Sqm 128.51 134.47 135.32 127.66 135.32 123.40 131.91 135.32 135.32 135.32 135.32 135.32 135.32
144 <3.1. "L" & ” J " hook KQ 54.47 46.81 56.17 53.62 56.17 56.17 56.17 56.17 56.17 56 17 56.17 56.17 56.17
!4'; W .l. clamp Kg 58.27 59.06 59.06 56.69 59.06 51.18 59.06 59.06 59.06 59.06 59.06 59.06 59.06
Aluminium fittings (I.S .I.)
140 Butt hinoes (I.S .I.)
.1) 125mnTx75mmx4mm Each 51.97 51 18 51 97 49.61 51.97 51.97 5118 51.97 51.97 51,97 51.97 51,97 51,97
l'! 12 5rnmx63mmx4m m Each 43.31 42.52 43.31 41.73 43,31 39.37 42.52 43,31 43.31 43.31 43.31 43,31 43,31
t) I00mmx75mmx4mm Each 40.16 40.16 40.16 39.37 40 16 40.16 40.16 40.16 40.16 40 16 40.16 40,16 40.16
n) 100mm x63mmx4mm Each 38,58 38.58 38.58 37.80 38,5H 38.58 38.58 38.58 38.58 38.58 38.58 38.58 38.58
e) 75mnix63inmx4mm Each 25.98 25.98 25.98 25.9B 25.98 22.05 25,98 25.98 25.98 25.98 25.98 25,98 25.98
f) 50mmx35mmx3.2mm Each 10,24 10.24 10 24 10,24 10,24 10,24 10,24 10.24 10.24 10.24 10.24 10.24 10.24
14/ Aluminium handle (1.5.i.)
■■■
) 150mm with 175mm x 40mm flat Each 22.05 20.47 22,05 22,05 22,05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 22.05
Hf 125mm with 175mm x 40mm flat Each 22.05 20 47 22,05 22.05 22.05 22.05 22.05 22.05 22.05 22.05 20.47 22.05 22.05
<) 100mm with 150mm x 33m flat Each 21.26 21,26 21.26 21.26 21.26 21.26 21,26 21.26 21.26 21.26 21.26 21.26 21.26
dj 75mm with 118mm x 33mm flat Eacb 20.47 20 47 20.47 20.4 7 20.47 20.47 20.47 20.47 20.47 20.4 7 20.47 20.47 20.47
14H Aluminium tower bolt (Barrel type) (I. S . I.!
ft] lOOmm xiQmm Each 50.39 S i . 18 51 97 51 18 51,97 51 47 51.18 51 97 51.97 51.97 51,97 51.97 51,97
tl) 250mm lGmm Each 47.24 47.24 47.24 47.24 47.24 47.24 47.24 47.24 4 7,24 47 24 47.24 47.24 47,24
cj 200'Tim x 10 mm Each 42.52 43.31 43.31 43 31 43.31 43 31 43 31 | 43.31 43.31 42.52 43.31 43,3! 43.31
<1) 150mm x 10mm Each 36,22 36.22 36.22 36.27 36.22 36.. 36.22 36,22 36.22 36.72 36.22 36 22 36.22
100mm x 10mm Each 29 13 29 53 29 13 29 13 29.13 29 13 29.13 29.13 29.13 29 13 29.13 29.13 29.13
;4‘.‘ Sliding floor holt (Aldrop) fl.S 1 ;
a j 300mm x 16mm Each 170.08 171,65 17323' ■' •- ’>
• 173.2 3 173 ; 168.50 173.23 173.23 17 i .' .' 173.23 173 2 3 173.23

-7
M ayurbhanj

Sundargarh
Sam b alp u r

Dhenkanal

Kalahandi
Keonjhar

Phulbani
Balasore

Balangir

Koraput
Cuttack

Ganjam
SI.

Puri
No Nam e o f item s U n it

1 2 3 4 5 6 7 8 9 10 12 13 14 15 16
' 250mm x 16mm
!J ■ Each 161.42 161.42 164.57 155.91 164.57 164.57 157.48 164.57 164.S7 164.57 164.57 164.57 164.57
Brass fittings{ I.S .I. ) Butt hinges (iight/Ordinary) (I.S .I.)
150

a 125mm x 70mm x '1mm Each 54.47 55.32 56.17 55.32 56.17 56,17 55,32 56,17 56,17 56.17 56.17 56.17 56.17
b 100mm x 70mm x 4mm Each 41.70 41.70 41,70 41.70 41,70 41.70 41.70 41.70 41,70 41.70 41.70 41.70 41.70
c 75mm x 40mm x 2.5mm Each 30.64 30.64 30,64 30.64 30,64 30,64 30.64 30,64 30.64 30.64 30.64 30,64 30.64
d 50mm x 40mm x 2.5mm Each 15.32 14.47 15.32 15.32 15.32 15.32 15.32 15.32 15.32 15.32 15.32 15.32 15,32
151 Brass But hmqes (Heavv type) (I.S .I.)
a 125mm x 85mm x 5.5mm (0.07 kq 1 Each 171.06 170.21 172.77 160,00 172,77 172.77 170.21 172.77 172.77 172.77 172.77 172.77 172.77
b 100rnmx85iinm5.5miT! (0.056Kq) Each 155.74 154.89 155.74 143.83 155.74 155.74 155.74 155.74 155.74 155.74 155.74 155.74 155.74
c 75mmx65mmx4rnm (.02 kq ) Each 65.53 64.68 65.53 65,53 65.53 65.53 65.53 65.53 65,53 65,53 65.53 65.53 65.53
152 Brass tower bolt (Barrel tvbe) (I.S .I.)
fl 250mm x 10-mm Each 167.66 174.47 177.87 164.26 177.87 177,87 172.77 177.87 177.87 177.87 177.87 177.87 177.87
b 200mm x 10mm Each 141.28 146.38 147.23 137.02 147.23 147.23 140.43 147.23 147.23 147.23 147.23 147.23 147.23
c 150mm x 10mm Each 105.53 107.23 109.79 103.83 109.79 109,79 106.38 109.79 109.79 109.79 109.79 109.79 109.79
d lOOmm x 10mm Each 78.30 79.15 80.00 77.45 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00
153 Brass Screws (I.S .I.)
a 50mm 100 Nos 148.94 149.79 150.64 139.57 150.64 150.64 144.68 150.64 150.64 150.64 150.64 150.64 150.64
b 40mm 100 Nos 134.47 136,17 136.17 125.96 136,17 136,17 131.91 136,17 136,17 136,17 136,17 136.17 136.17
c 30mm 100 Nos 114,89 115.74 117.45 108.94 117.45 117.45 114.89 117 45 117.45 117,45 117.45 117.45 117.45
d 25mm 100 Nos 104.68 102.98 104.68 97.02 104.68 104.68 102.13 104,68 104.68 104.68 104.68 104,68 104.68
e 20mm 100 Nos 77.45 57.87 77.45 73.19 77,45 77.45 75.74 77.45 77.45 77.45 77.45 77.45 77.45
Chromium plated fittings (Brass) (I.S.I.)Handle (I.S .I)
154

a. 125mm with 175 x 32mm plate Each 123.40 124.26 125.96 123.40 125,96 125.96 123.40 125,96 125.96 125,96 125.96 125.96 125.96
b. 100mm with 150 x 25mm plate Each 106.38 104.68 107.23 106.38 107.23 107.23 103.83 107.23 107.23 107.23 107.23 107.23 107,23
c. 75mm with 125 x 25mm plate Each 92.77 93.62 94.47 94.47 94.47 94.47 89.36 94.47 94.47 94.47 94.47 94.47 94,47
155 Wall cement primer (I.S .I.)
d) Oil bound 1 Itr 90.55 88.19 92.91 89.76 92.91 92.91 88.98 92.91 92.91 92.91 92.91 92.91 92.91
ii) Water bound 1 Itr 115.75 119.69 121.26 114.17 121.26 121.26 118,11 121.26 121.26 110,24 121,26 121.26 121.26
15b Aluminium paint (I.S .I.) 1 Itr 125.98 128.35 129.92 118.11 129.92 129.92 127.56 129.92 129.92 129.92 129.92 129.92 129.92
157 Weather Coat (I.S .I.) : Itr 146.46 149.61 151.18 137.80 151.18 151.18 151.18 151.18 151.18 151.18 151.18 151.18 151.18
158 Adhesive (I.S .I.) 1 Kq 163.78 171.65 173.23 159.84 1/3.23 173,23 169.29 173.23 173.23 173.23 173.23 173.23 173.23
159 Bitumenous expansion toint board (I.S .I.)
a. 12mm thick Sqm 589.08 600.84 602.52 551,26 602,52 602-52 584.03 602.52 602.52 588.24 598.32 602.52 602.52
b. 16mm thick Sqm 815 13 852.94 856.30 793.28 856.30 856.30 815.13 856-30 856,30 798.32 856,30 856.30 856.30
c. 25mm thick Sqm 1065.55 1096.64 1109.24 1037.82 1109.24 1109.24 1054.62 1109.24 1109.24 1109.24 1109.24 1109.24 1109.24
160 Barbed wire (I.S .I.) Kg 56.17 55.32 56.17 56.17 56.17 55.32 55.32 56.17 56.17 56.17 56.17 56.17 56.17
163 Glass plain (I.S .I.)
a 3mm Sqm 287,66 297.87 299.57 2H0.85 299.57 299.57 297.87 299.57 299.57 280.85 299.57 299.57 299.57
h 4mm Sqm 323,40 340.43 341,28 317,45 341,28 341.28 340.43 332 77 341,28 323.40 341.28 341.28 341.28
c 5mm Sqm 442.55 451.06 453.62 423.83 453.62 453.62 443.40 448.51 453.62 434,04 453.62 453.62 453.62
0 6mm Sqm 497.87 510.64 514.89 472.34 514.89 4 76.60 510.64 514.89 514.89 493.62 514.89 514.89 514,89
G 8mm Sqm 765.96 791.49 795.74 760.85 795.74 765.96 777.02 795.74 723.40 765.96 795.74 795.74 795,74
f 10mm Sqm 960.85 985.53 1001.70 955.74 1001.70 936.17 985.53 1001.70 1001.70 978 72 1001,70 1001.70 1001,70
q 12mm Sqm 1132.77 1176 17 1183.83 1114 89 1183.83 1089.36 1149.79 1183.83 1182.98 1183.83 1183.83 1183.83 1183,83
!67 Glass pin headed ( I.S .I.’
lT.

r--

Sqm 268.09 246.81 259.57 268.09 268 09 267 23 268.09 268.09


SI

a 4mm 267.23 268,09 265.53 268.09


b 5mm Sqm 329.36 334 47 337.02 334.4 7 337.02 306.38 331.06 337.02 336.17 337,02 337.02 337.02 337.02
16 Black glass (I.S .I.) _ ...
3 4mm Sqm 44-4.26 455 32 458.72 429.79 458.72 458.72 449.36 458.72 458.72 ! 458 72 458 72 458 72 458.72
!) Smtn Sqm 526,81 546.38 552.34 514,89 552.34 552.34 539.57 :,52.34 552.34 55? 34 552.34 552 34 552 34
nitim Sqm 636.60 663.83 674.04? JB2.34 h 74 04 S74 04 657.87 [ 674,04 674 04 i 674 04 674 04 674.04 674.04

- 8 -
M ayurbhanj

Sundargarh
Sam balpur

Kalahandi

Phulbani
Balasore

Balangir
03
rce

Cuttack
■n

Ganjam
SI. x: Q.

Puri
No Name o f items Unit J£ c IB
c o i_
w V O
c. X i:
o
1 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16
d 8mm Sqm 1005.96 1047 66 1062.13 1011.06 1062.13 1062.13 1022.98 1062.13 1062.13 1021.28 1062.13 1062.13 1062.13
e 12mm Sqm 1595.74 1663.83 1675.74 1561.70 1675.74 1540.43 1642,55 1646.81 1675.74 1659.57 1675.74 1675.74 1675.74
164 Frosted qlass (I.S .I.)
a 4mm Sqm 437.45 441.70 449.36 428.09 449.36 449.36 442.55 445.96 449.36 425.53 449.36 449.36 449.36
b 5mm Sqm 468.94 470.64 477.45 457.87 477.45 477.45 470.64 477.45 477.45 477.45 477.45 477.45 477.45
165 Wire qlass - 6 mm (I.S .I.) Sqm 537.02 548.09 556.60 527.66 556,60 556.60 548,94 556.60 556.60 536.17 556.60 556.60 556.60
166 Sun-control film (I.S .I.)
a. Reflective Sqm 485.11 485.96 496.17 468.09 496.17 496.17 483.40 496.17 496.17 489,36 496.17 496.17 496.17
b. Non-refiective Sqm 344.68 343.83 355.74 344.68 355.74 355.74 344.68 355.74 355.74 355.74 355,74 355,74 355.74
167 Prelaminated particle board (standard type) (I.S .I.)
A. 9mm Sqm 511.49 468.09 514.89 502.13 514.89 468.09 513.19 514.89 514.89 510,64 514.89 514.89 514.89
b, 12mm Sqm 571.06 536.17 589.79 570.21 589.79 536.17 582.98 589.79 589.79 589.79 589.79 589.79 589.79
c. 18mm Sqm 623.83 595.74 655.32 628.09 655.32 595.74 642.55 646.81 655.32 655.32 655.32 655.32 655.32
a. 25mm Sqm 685.96 706.38 777.02 740.43 777.02 706.38 761.70 777.02 777,02 765.96 777,02 777,02 777.02
168 BW R ply wood (I.S .I.)
a 3mm Sqm 252.77 242,55 252.77 238,30 252,77 252,77 252,77 252.77 252.77 252.77 252.77 252.77 252.77
b 4mm Sqm 285.96 289.36 294,47 275.74 294.47 294.47 293.62 294,47 293.62 294.47 294.47 294.47 294.47
c 6mm Sqm 408.51 410.21 421.28 389.79 421.28 421,28 408.51 421.28 421,28 421.28 421.28 421.28 421.28
0 9mm Sqm 504.68 510.64 519.15 480.85 519.15 519.15 508.94 519.15 519.15 519.15 519.15 519.15 519.15
e 12mm Sqm 655.32 672.34 683.40 628.09 683,40 683.40 663.83 627 23 683.40 680.85 683,40 683.40 683.40
f 16mm Sqm 768.51 801.70 814.47 746.38 814.47 808,51 781.28 814 47 814.47 808.51 814,47 814.47 814.47
9 19mm Sqm 910.64 876.60 954.89 873.19 954,89 1021.28 919.15 954.89 954.89 954.89 954.89 954.89 954.89
h 25mm Sqm 1300.43 1344.68 1366.81 1246.81 1366.81 1361.70 1317.45 1366.81 1366.81 1361 70 1366,81 1366,81 1366.81
If, 9 BW R Block Board (I.S .I.)
a 16mm Sqm 687.66 710.64 720.85 666.38 720.85 720.85 689.36 720.85 720.85 720.85 720.85 720.85 720,85
b 19mm Sqm 774.47 801.70 814.47 751.49 814,47 814.47 778.72 814.47 812,77 814 47 814.47 814.47 814.47
c 25mm Sqm 859.57 919.15 926.81 853.62 926.81 926,81 891.91 926.81 926.81 926.81 926.81 926.81 926.81
cl 32mm Sqm 1081.70 1140.43 1151.49 1057.87 1151.49 1151.49 1099.57 1151,49 1151.49 1151 49 1151.49 1151.49 1151.49
170 Vinyl Flooring (I.S .I.)
(A) Homogeneous Range (I.S .I.)
') PVC (M F) Classic roll 1.00mm thick Sqm 233.86 240.16 242,52 224.41 242.52 220,47 238,58 239,37 242.52 242.52 242.52 242.52 242.52
II) PVC (M F) classic t<le l.OOmm tlisck Sqm 275.59 271,65 277.17 258.27 277 17 251.97 275-59 276.38 277.17 277.17 277.17 277.17 277.17
III) PVC (M F) impress rolt-1.50mm thick Sqm 317.32 314.96 320.47 295,28 320.47 291,34 314.96 318.11 320.47 320.47 320.47 320.47 320.47
IV) PVC (M F) impress tile- 1.50mm thick Sqm 366.14 380.31 385.04 354.33 385 04 350.39 376.38 385.04 385.04 385.04 385.04 385.04 385.04
v) PVC (M F) super roll-2.Q0mnri thick Sqm 411.81 425.20 429.13 394.49 429.13 390.55 416.54 429.13 429 13 429.13 422.83 429,13 429.13
VI) PVC (M F) super tits -2.00mm thick Sqm 478.74 492.13 496.06 455.12 196.06 451.18 478.74 496.06 496.06 496 06 495.28 496.06 496.06
(13) Heteroqeneous Ranqe (I.S .I.)
i) PVC (M F) Hetro roll- 2.00mm thick Sqm 439.37 441.73 450,39 423,62 450-39 409,45 431.50 450,39 450,39 433.07 450.39 450,39 450.39
1') PVC (M F) hetro tile- 2.00mm thick Sqm 488.98 504.72 511.02 478.74 511.02 464.57 490.55 511.02 511.02 472.44 511.02 511.02 511,02
1?1 Aluminium extruded section Kq 216.17 219.57 224.68 223,83 224.68 224.68 224.68 222,98 224.68 224,68 224.68 224.68 224,68
Roil formed sections made of pre painted steel ( base
steel as per IS-513 of 0.6 mm thick "D 1 quality,
1/?
galvanised as per 15-277 with zinc of 120 gm / sq. mtr)

a) Outer frames Po-527 Mtr 286.81 286.81 290.21 263.83 290.21 263.83 285.11 290.21 290.21 290.21 290.21 290.21 290.21
b) Intermediate mullion Po-528 Mtr 310 64 315.74 322.55 293 62 322.55 293.62 314.89 322.55 322.55 322.55 322.55 322.55 322,55
c) Shutter frame Po-153 Mtr 242 55 240.00 243.40 221.28 243.40 221.28 236.60 243.40 243.40 243 40 243.40 243.40 243.40
d) Fixed beedinq Po-179 Mtr 125.11 120.00 125.11 114.04 125 11 114.04 125.11 125.11 125,11 125 11 125.11 125.11 125.11
c) Slidinn shutter Poi254 Mtr 149 79 147.23 149 79 136.17 149 79 136.17 149.79 149.79 149.79 149 79 149.79 149.79 149 79
f) Outer frames(side / top) Po-255 Mtr 180.43 178.72 182 13 165,96 182.13 165.96 178.72 182.13 182,13 178 72 182.13 182.13 182 13
q) Outer framesf bottom) Po-256 Mtr 125 96 121.70 125 96 114.89 125 96 114.89 123.40 125.96 125 96 125 96 125 96 125 96 125.96
----
1 ) Siidinq track (S S ) Po .'57 Mtr 466 38 474,04 4/7.45 434.04 177 45 434.04 457.87 477.45 477 45 177 45 477.45 477.45 477,45
i) Sashbar P d 101 I Mtr 440 00 449.36 J49 3 6 1 f 4%H.S1 149 36 408,51 435 74 145.96 449.36 44^ 36 449 36 449 36 449.

-3
e

Sundargarh
ra

Sam b alp ur

Dhenkanal

Kalahandi
Balasore

Phulbani
Balangir
(0

Koraput
Cuttack

Ganjam
SI. j:
£

Puri
a
No Nam e of items Unit 3
c
> 0
4?
n] it
£
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
i) Sashbar at shutter Po-107 Mtr 222.98 245.96 247.66 225.53 247,66 225.53 240.85 247.66 247.66 247.66 247.66 247.66 247.66
k) Louvered horizontal (Too / bottom} Po-193 A Mtr 125.96 125 .11 125 96 114.89 125.96 114.89 125.96 125.96 125.96 125,96 125.96 125,96 125.96
H 33 x 57 Box Section Mtf 290.21 290.21 294.47 268.09 294.47 268.09 285.11 294,47 294.47 294.47 294.47 294.47 294,47
m) 100x50mm Box Section Mtr 431 49 434.89 440.00 400.00 440.00 400.00 432.34 440,00 440.00 440,00 440.00 440.00 440,00
n)Small Z Section Mtr 212.77 211.91 215.32 195.74 215.32 195.74 212.77 215.32 215.32 215-32 215.32 215.32 215,32
o) Extended 2 Section Mtr 285.11 286.81 290.21 263.83 290.21 263.83 284.26 251.91 290,21 290.21 290.21 290.21 290.21
p) Cover Profile Mtr 102.98 102.13 104,68 95,32 104,68 95.32 102.13 104.68 104.68 104.68 104.68 104.68 S04.68
A cesso ries
a) sliding outer frame assembiy / pc Each 227.23 228.09 231.49 211.06 231,49 211.06 225.53 231.49 231.49 231 49 231.49 231.49 231.49
b) slidinq shutter /pc Each 192.34 281.70 285.11 259.57 285.11 259.57 279.15 285.11 285.11 285.1 1 285.11 285.11 285.11
c) Sashbar Each 15.32 15.32 15.32 14.47 15.32 14.47 15.32 15.32 15.32 15.32 15,32 15.32 15.32
d) wail fixing with polymide anchor at every 600mm c/c
Each 24.68 24.68 24.68 22.98 24.68 22.98 24.68 24.68 24.68 24.68 24.68 24.68 24.68
of outer frame
e) Outer frame corner Each 37.45 37.45 37.45 34.04 37.45 34.04 36.60 37.45 37.45 37.45 37.45 37.45 37.45
f) T o d hunq shutter / DC Each 302.13 306,38 308.94 280.85 308.94 280.85 303.83 308.94 308.94 306.38 308.94 308.94 308.94
q) Fixed mullion Each 46.81 45.96 46.81 42.55 46.81 42.55 45.96 46.81 46.81 46.81 If 81 46.81 46.81
h) Fixed qlazinq Each 93.62 91.06 93.62 85,11 93.62 85.11 93.62 93.62 93.62 93.62 93.62 93.62 93.62
i) Louvered blade Each 24.68 24.68 24.68 22.98 24.68 22.98 24.68 24.68 24.68 24.68 24.68 24.68 24,68
1) Side hunq door / pc Each 346,38 353.19 355.74 323.40 1 355.74 323.40 347.23 355.74 355.74 355.74 355.74 355.74 355,74
k) Door lock / pc ... li 311.49 314.89 318.30 289.36 318.30 289.36 306,38 318.30 318.30 318.30 318,30 318.30 318.30
1) Swinq door shutter /pc Each 174.47 176.17 177.87 161.70 177.87 161.70 170.21 177.87 177.87 177.87 177.87 177.87 177.87
m) Floor Sprinq (Godrei Make) Each 2664,68 2710.64 2714 89 2468.09 2714.89 2468.09 2659.57 2714.89 2714.89 2638.30 2714.89 2714.89 2714.89
G asket
a ) For Shutter Po 153 Mtr 34.89 34.89 34.89 32.34 34,89 32,34 33.19 34,89 34.89 34.89 34.89 34.89 34.89
b) For besdmq Po 179 Mtr 46.81 45,96 46.81 42,55 46.81 42-55 45.11 46.8! 45.11 46.81 46.81 46.81 46.81
c) For Sashbar Po-101 Mtr 97.02 96.17 97.87 89.36 97,87 89,36 95.32 97.87 97.a7 97.87 97.87 97.87 97.87
173 Rate of 60 micron powder coating (including labour
Kg of
charges and material for powder coating) for aluminium 22.83 22.83 21.26 21.26 22.83 21.26 22.83 22.83 22,83 22.83 22.83 22.83 22.83
Aluminium
section.
174 17.5 mm thick qypsum board of Size 6’ x 4' One Piece 299.21 299.21 275.59 275.59 303 15 275.59 303.15 303.15 303.15 303.15 303.15 303.15 303.15
N e w Ite m
175 W a s t e P la s tic duly cleaned and shredded conforming
to the size passing 2.36mm sieve and retained on 600
Per Kg 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
micron seive and conforming to requirement if
IRC: SP: 98-2013.

ic c? ’ 0
NOTES:

1) All Reinforcement Steel and structural steel shall be procured and used as per specifications;
mentioned in BIS's documents- IS:1786and IS:2062 respectively. Independent tests shall be
conducted, wherever required, to ensure that the materials procured conform to the
specifications.

These steel shall be procured only from those firms, which are established, reliable,
Indigenous & primary producers of steel, having Integrated Stee! Plants (ISP), using iron ore
as the basic raw material as per Minis try of Steel's guidelines.

No re-rolled steel shall be permitted in works. Alt other specifications and guidelines of
MORTH shall be complied.

All reinforcement steel and structural steel shall be procured from primary producers of
steel:- SAIL/RINL/TATA/JINDAL STEEL/SHYAM STEEL.

In case of exigency, other brands (primary producers) of steel may be used with proper
justification and prior approval of competent authority satisfying the tests as required by
BIS's code.

2) The Cement of the companies having their own manufacturing units in the State of
Odisha is to be used in all works,

3) In case of bridge works expansion joints and bearings are to be procured from only
specified manufacturing units approved by MORTH,

4) Hard stone is to be used in lieu of granite for slope protection work.

I. Stone and Stone Products


1) The rates of materials in SR are basic rates excluding cost of conveyance, royalty & GST but
including cost of stacking.

2} Normally blasted stones should not be used for soling stone where hand broken stones
are available,
3) The box heaps of 1.5mx 1.5mx 0.44m is to he measured as 1 Cu. M.

II. W ood W o rk
(a) The rate of wood work items are equivalent to the rates of Orissa
Forest Corporation on the average. If any change to the rates are made by the Forest
Corporation the revised rates shall be taken into consideration while arriving at the
finished rates.
(b) For wood works the supply rates as fixed by the Forest Corporation shall prevail over
that stated in this schedule of rates.

III. Items under M iscellaneous Head


The rates under the sub-head under the Miscellaneous items are enclosure of labour and
cost of all materials and conveyance except where otherwise mentioned in the
description of items.

IV. W eight of Cement


14,30 quintals per one Cu. M.
V. M aterials u nd er E.P.M. /D.G.S. & D.'s Rale
1) In case of item of work or for supply of materials against which rates have been approved by
Directorate of Export Promotion and Marketing the same shall be made applicable for adoption
in this schedule of rates.

In case of items of work or for supply oT materials, against which rates have been approved by
the D.G.S & D. the same rate shall be made applicable for adoption in this schedule of rates
provided that if the rates of same items of work or for supply of materials are also forced by
E.P.M. the E.P.M. rates will prevail over D.G.S. & D.'s rates.

VI. Rate of Cement, Steel and Bitum en w ill increase/decrease as m entioned below:
1) Steel: Rate as fixed by Steel Authority of India Limited (SAIL,).
2) Cement: Average factory price of three manufacturers of cement inside the State.
3) Bitumen: Rate as fixed by Indian Oil Corporation Limited (10CL) / Hindustan Petroleum
Corporation Limited (HPCI.)/Bharat Petroleum Corporation Limited (BPCL).

VII. In Cement Concrete item s of A nalysis of Rate centering and shuttering shall be
added extra w h e re ve r necessary depending upon the item of w ork.
VIII. Overhead Charges include the following elements

i. Site accom m odation, setting up plant, access road, w a te r supply, electricity and
general site arrangem ents,
ii. Office furniture, equipm ent and com m unications
iii. Expend iture on
a) Corporate office contractor
b) Site supervision
c) Docum entation and "as built" draw ings
iv. M obilisation/dc-m obilisation of resources
v. Labour camps w ith m inim um am enities and transportation to w o rk sites
vi. Light vehicles for site supervision including ad m inistrative and m anagerial
requirem ents
yii, Lab o rato ry equipm ent and quality control including field and laboratory
testing
viii. M in or T&tP and survey instrum ents and setting out w orks, including
verification of line, dim ensions, trial pits and bore holes, w h e re required
ix. W atch and w ard
x. Traffic m anagem ent during construction
xi. Expenditure on safeguarding environm ent
xii. Sundries
xiii. Financing Expenditure
xiv. W o rk Insurance/com pensation

xv. For the purpose of calculation of overhead charges @ 7,5 % to he adopted in


Analysis of Rates of various items to work out estimated cost.
CHAPTER-11
POST GST RA TE OF LABO UR
SI. No D ESC RIPTIO N UNIT RATE in Rs.
1 2 3 4
A Category unskilled
1 Per day 150.00
M ale m ulia
2 Female mulia Per day 150.00
3 Survey Khalasi/ Chain man Per day 150.00
4 Scavanger Per day 150.00
B Category Semi skilled
1 Per day 150.00
M ale m ulia
2 Female mulia Per day 150.00
3 Survey Khalasi/ Chain man Per day 150.00
4 Scavanger Per day 150.00
B Category Semi skilled
1 Mulia working in water or arduous nature of work Per day 170.00
2 Night mulia or attendant working in flood and Per day 170.00
other emergent work
3 Mulia for handling hot binder and Tar boiler men Per dav 170.00
4 Sangi mulia Per day 170.00
5 Pile driving rriatef Guide man ) Per day 170.00
6 Mate Per day 170.00
7 Helper to carpenter or Blacksmith/ Painter/ Per day 170.00
Blaster/ Plumber/ Electrician/ Fitter/ Welder
8 Hammer man Per day 170.00
9 Thatcher/ Gharami Per day 170.00
10 Tile: turner Per day 170.00
11 Boat man Pei' day 170.00
12 Bhisti Per day 170.00
13 Well sinker Per day 170.00
14 Rod binder and bender Per day 170.00
15 Cleaner/ Sweeper Per day 170.00
16 Stone packer Per day 170.00
17 Pump helper Per day 170.00
18 W atch m an( Sto re)/G u rkh a / Secu rity Guard Per day 170.00
19 Bellow man Per day 170.00
D Category Highly Skilled
1 Blaster (licensed) Per day 205.00
2 Mason (special) Per day 205.00
3 Car pen ter (special) Per day 205.00
4 Blacksmith (special) Per day 205.00
5 Fitter(special) Per day 205.00
6 Painter/ Polisher (special) Per day 205.00
7 Welder(special) Per dav 205.00
8 Plumber(special) Per day 205.00
9 Driller (Special) Per day 205.00
10 Stone dresser/ Cutter(special) Per day 205.00
11 Diver for well sinking in bridge ( per shift Per day 205.00
of four hours,) 1
SI. No D ESCRIPTIO N UNIT RATE in Rs.
1 2 3 4
12 Electrician/ Air conditioned plant operator/ wire Per day 205.00
man/ fill operator/ Diesel pump operator
(special).
13 Jeep d river/ T ra cto r d rive r / T ru ck d rive r / Per day 205.00
Dozer d riv e r / Roller d rive r /Concrete
m ixture operator / Crane operator
14 Auto electrician Per day 205.00
15 Guiniting Machine operator Per day 205.00
16 Senior Accountant / Stenographer Per day 205.00
17 Supervisor / Manager Per day 205.00
18 Testing Laboratory Assistant / Instrument Per day 205.00
Mechanic/ Telephone Mechanic.
19 Rigger and Cobbler with Tools Driver (Heavy Per day 205.00
Vehicle)

Note :

1. Labour rates for un-skilled, Semi-skilled, Skilled and Highly skilled as are Lo be fixed

from time to time by Labour Department under Minimum Wages Act Shall prevail in

respect of any category what so ever.

2. The rates for above four categories ofiabour are inclusive of weekly day of rest.

3. An adult Employee shall work for 8 (Eight) hours per day including half-an-hour of rest.

SI D e s c rip tio n U n it R a te in
No. (R s.)
E. Other Category
(Not covered by the Notification of Labour &
Employment Department).
01 Boring Mistry (Special) Per Day 205.00
02 Winch operator Per Day 205.00
03 Well Sinker (Special) Per Day 205.00

04 1lelper to Well Sinker Per Day 190.00

05 Compijter Programmer Per Month 7000.00

06 Data Entry Operator Per Month 5200 00

07 Helper to operator of Heavy construction Machineries Per Month 5000.00


08 Mechanic for Heavy construction Machineries Per Month 6000.00
09 Helper to mechanic for heavy construction Machineries Per Month 5000.00
10 Operator lor Heavy construction Machineries Per Month 6000.00

11 Junior Research Assistant (Technical Assistant) Per Month 5200,00

14
CHAPTER-III
P O S T G S T R A T E F O R C O N V EY A N C E OF M A T E R IA L S
ITEM NO-1. Conveyance of M aterials by Ten Tonne T ru ck s including loading & unloading.
Distance to Rough stone, Bricks 23cm= 2500 nos Iron, Grills. Bulky
he. carried metal, khoa, Bricks 25cm= 2000 nos Cement, Bitumen, materials
chips, sand, Cement concrete & fly ash blocks A.C sheet, GCI like.
Surki, quarry 40Ummx200mn!x200nun- 300 nos Sheet & Paint Machineries,
rubbish, 400mmx 150mmx200mm- 400 nos elc(per 1000 kg) generators,
moo rum 400mmx 100mnix200mm- 600 nos Wood (per 1.25 concrete
laterite stone, 300mmx200mmxl50mm= 550 nos cum) pipe &
washed gravel, 300mmxl50mmxl50rhm= 730 nos furniture etc
flyash & earth 300mmxl00mrnxl50mm= 1100 nos (per Truck)
(Per 1 cum) All Kinds of tiles = 180 Sqm
(per truck)

Railway Other
station places
1 2 3 4 5 6
Up to 5 KM 149.67 967.27 175.50 161.72 1320.57
Every extra 8.80 39.62 8.23 8.23 40.67
KM beyond
5 KM and
up to 50 Km
Every extra 6.22 31,87 6,99 6,99 31.87
KM beyond
50 KM

Note : Extra percentage to be allowed over the rates

1. For earthen roads or village tracks or cross country tracks, 20 % extra may be allowed

on the certificate of Executive Engineer after his inspection and duly approved by

Superintending Engineer.

2. For declared ghat road, add extra length of ghat road portion.

15
ITEM NO. 2: Loading into T rucks and Unloading from trucks (W ith in 50 m lead) including
stacking

SI. Rate
D etails of m aterials Unit
No (in Us.)
1 Rough stone, metal, khoa, chips, sand, surki, quarry 1 Cum 79.00
rubbish, moorum, laterite stone, washed gravel, & earth
etc.
2 Iron, grills, cement, Bitumen, A.C sheet, GCI Sheet 1 qtl. 11,00
,Coke,coal lime etc
3 Bricks 23cm= 2500 nos 1 truck 448.00
Bricks 25cm= 2000 nos load
Cement concrete & flyash blocks
400mmx200mmx200mm= 300 nos
400mmxl50mmx200mm= 400 nos
400mmxl00mmx200mm= 600 nos
300mmx200mmxl50mm= 550 nos
300mmxlSOmmxlF>0mm= 730 nos
300mmx1 OOmmxl 50mm= 1I 00 nos
All kinds of ti 1es = 180 Sqm
4 Bulky material such as
a) Hume pipes & furnitures 1 truck 611.00
load
b) Heavy machineries such as compressors .concrete 1 truck 728.00
mixer, hotmix plant etc. load
Note : a) fo r item no . 1

i) 2/3 of rate is considered for loading

ii) 1/3 of rate is considered for unloading

b) for item no 2,3 & 4

i] 50 % of rate is considered for loading

ii) 50 % of rate is considered for unloading.

16
ITEM NO. 3 Carriage by Bu llo ck Cart including Loading and Unloading

SI.
Distance to be carried. Unit Rate
No (in Rs.)

1 First KM 1 cart load 67.00

2 Subsequent KM 1 cart load 34.00

ITEM NO. 4 Unloading from R ailw ay wagon and loading into trucks

SI.
Details of m aterials. Unit Rate
No
(in Rs.)

1 Unloading from Railway wagon and l Qtl. 1.60


stacking on platform 1.0 m in clear of rails
within 15 m lead

a) Cement, Bitumen, coal, paint etc

b) Steel, A.C sheet, GCI Sh eet, etc 1 Qtl. 5.80

2 Removing from railway platform and 1 Qtl. 1.60


loading into trucks

a) Cement, Bitumen, coal, paint etc

b) Steel, A.C sheet, GCI Sheet, etc l Qtl. 5.80

IT EM NO. 5 Conveyance by Head load including loading & unloading and stacking

SI. Distance to be carried. Rough stone,


No metal, khoa, chips, Iron, grills,
sand, surki, quarry cement,lime,
rubbish, moortim, Bitumen, A.C sheet,
laterite stone, GCI Sheet
moo rum, washed ,paint etc (p e r i
gravel, fly ash & quintal},
earth per cum wood ( per
0.125 cum)

1 2 3 4
Rate Rate
(in Rs.) (in Rs.)
1 Up to 50 mtr. 33.00 8.30
2 Beyond 50 mtr and upto 100 mtr 38.00 12.40
3 Beyond 100 mtr and upto .150 mtr 50.00 18.00

17
ITEM NO. 6 Conveyance by Bout including loading & unloading

Distance to be Rough stone, Bricks 23cm- 2500 nos Iron, grills,


carried. metal, khoa chips, Bricks 25cm= 2000 nos cement, lime.,
sand, surki, quarry Cement concrete & flyash blocks Bitumen,
A.Cshcet, GCI
rubbish, moo rum 40 0mmx200 mmx2 00mm= 300nos
Sheet &, paint etc
laterite stone, 400mmxl50mmx200mm= 400 os
(per 1
moorum, washed 400mmx 100mmx200mm=600 nos quintal )wood(per
gravel,fly ash & 300mmx200mmxl50mm=550 nos 0.125 cum)
earth 300mmxl50mmxl50mm=730 nos
[per cum) 300mmxlOOmmxlSOmm=1100 nos
All kind ofTiles-180 Sqm
1 2 3 4

Rate [in Rs.) Kate [in Rs.) Rate


(in Rs.)

A) In River

i)Up to 5 KM. 49.00 280.00 8.40

ii)Every extra
KM beyond 5.00
Km and upto 16 5.20 24.70 0.70
KM

iii)Every extra
2.60 18.00 0.60
KM beyond 16
KM

Ii) In canal

34.00 245.50 7.00


i)Up to 5 KM.

iijevery extra
KM beyond 5.00
Km and upto 16 5.80 20.80 0.90
KM

iii) every extra


KM beyond 16
KM 2.60 16.00 0.70

18
Item No.7 Capacity of Trucks

SI. No. Description o fltem s Capacity

1 2 3

1, Rough stone and cut laterite stones

i). Rough stone(Boulders) 4.00 Cum

ii) Cut laterite stone 5.00 Cum

2. Gravel, sand & surki 5.50 Cum

3, Cut stone (granite & hard stone) 5.50 Cum

4. Lime 5.50 Cum

5. Wood 5.00 Cum

6-(a) Bricks 25 cm 2000 Nos

b) Bricks 23 cm 2500 Nos

c) Cement concrete & flyash blocks

400mm x 200mm x 200mm 300 Nos


400mm x 150mm x 200mm 400 Nos
400mm x 100mm x 200mm 600 Nos
300mm x 200mm x 150mm 550 Nos '
300mm x 150mm x 150mm 730 Nos
300mm x 100mm x 150mm 1100 Nos

d) Ail kinds of tiles 180 Sqm

7. Iron, tar, pitch and other materials considered 7.00 tonnes


by weight

8. Cement 8.00 tonnes

9. Straw for thatching 1000 Nos or 100 head loads or 50


Bliar loads

10. Bamboos 30 Bhar loads

11. Hume pipe up to 600mm diameter 5 Nos.

12. Rume pipe 900mm & above diameter 3 Nos.

Note:-

Where materials are to be conveyed by head loads or by pack animals, rates are to be

worked out on actual analysis and approved by the Superintending Engineer.

19
Item No. 8: Head Loads

SI.No. Description o fitem s Capacity

1 2 3

1. Each head load of straw 1 bundle of 1.5 mtr. in girth

2. Each bhar load of straw 2 bundle of 1.5 mtr. in girth

3. Each, head load of bamboo. Belangi 10 Nos., mult 3 nos

4. Each bhar load of bamboo Belangi 20 Nos., muli 6. nos

Item No -9 : Cart Load of M aterials

S! No
D escription of Items Quantity p er cart load

Plain Road H illy Road

1 2 3 4
1. Rpugh.sto.ne cut laterite stone 0.28 cum 0.23 cum
2. Gravel , Sand & Surki 0.36 cum 0.28 cum
3. Cut Stone (granite & hard Stone) 0.20 cum 0.15 cum
4. Lime and wood 0.60 cum 0.42 cum
5. Bricks 200 nos 150 nos
6. Cement concrete & flyash blocks
400mm x 200 mm x 200 mm 3.0 nos 22 nos
400mm x 150 mm x 200 mm 40 nos 30 nos
400mm x 100 mm x 200 mm 60 nos 45 nos
300mm x 200 mm x 150 mm 55 nos 41 nos
300 mmx 150 mmx'150 mm 73 nos 55 nos
300 mmx 100 mmx 150 nun 110 nos 82 nos
7. Pan tiles 1000 nos 800 nos
8, Flat tiles
i) 15cmxl5cmxl.25cm 2000 nos 1600 nos
ii) 30cmxl5cmx2.5cm 500 nos 400 nos
iii) 30crnx30cmx2.5cm 250 nos 200 nos
9. Nuria Tiles. - 20 cm x 25 cm 800 nos 600 nos
10. Mangalore and Ranigartg tiles 250 nos 200 nos
11. Iron , Cement,tar,Pitch and other materials 454 kg 363 kg
by weight

Note: -The rates of conveyance of materials are exclusive of voids of materials.

20
C H A P T E R - IV

PO S T GST S E R V IC E CONTRACT FO R P LA N T S AND M A C H IN E R IE S

SI.
D ES C R IP T IO N S USAGE R A T ES IN RS
No.

Rate
M achin e A ctivity Output U nit
(in Rs.)

1 Dozer D-50 -A 15 Spreading ZOO cum/hour per hour 1592.17

Cutting 1OOcu in/hour per hour

per hour
Cleaning 150cum/hour

2 Dozer D-80-A 12 Spreading 300cum/hour per hour 2190.43

Cutting 150cum/hour per hour

Cleaning 250cum/hour per hour

Motor Grader 3.35meter


3 Clearing 200cum/hour per hour 1343.48
blade

Spreading 200cum/hour per hour

CSB 5 Ocu m/hour per hour

WMM SOcum/hour per hour

Tractor with ordinary


4 per hour 251.30
grader
Hydraulic Excavator of
5 Soil ordinary 60cu m/hour per hour 730.43
lcum bucket
Soil Marshy 60cum/hour per hour

Soil unsuitable 60cum/hour per hour

Hydraulic Excavator of
6 Soil per hour 1624.35
2cum bucket

21
SI.
D ESC R IPT IO N S USAGE R A T ES IN RS
No.

Rate
M achine A ctivity Output Unit
(in Rs.)
Front End loader 1 cum
7 Soil loading 60cum/hour per hour 452.17
bucket capacity
Aggregate]0ading 2 5cum/hour per hour

per km. 20.87

per
Transportation of
tonne.km 2.17
8 Tipper-5cum soil, GSB, WMM, 5.5 cum
Hotmix etc.
per hour 506.09

per hour 506.09

Vibratory Roller 8-10


9 Earth/soil 1OOcu m/hour per hour 864.35
tonne
GSB 60cum/hour per hour
WMM 60cum/hour per hour

Smooth wheeled Roller


10 Soil compaction 70 cum/hour per hour 294.78
8-10 tonne
BM compaction 25cum/hour per hour

11 Sheep foot Roller Soil compaction per hour 56.52

Truck mounted water


12 W ater transport 6KL per hour 506.09
tanker

13 Tractor Pu 11itig 501 IP per hour 200.87

14 Rotavator Mixing 2 S.gu m /h o u r per hour 9.57


15 Ripper Scarifying 60cum/hour per hour 15.65

16 Air Compressor General purpose 170/250cfm per hour 179.13

17 Diesel Compressor 400cfm per hour 744.35

per hour
18 Diesel Compressor 300cfm 618.26

19 Electrical Compressor 5OQcfiTi per hour 432.17

20 W et Mix Plant 60 TPH Wet Mix 25cum/hour per hour 675.65

21 Wet Mix Plant 75 T P I1 W et Mix 34cum/hour per hour 900.87

22
SI.
D ESC R IPT IO N S USAGE R A T ES IN RS
No.

Rate
Machine A ctivity Output Unit
(in Rs.)
Mechanical broom
22 Surface cleaning 1250sqm/hour per hour 200.00
hydraulic
Bitumen pressure Applying bitumen
23 1750sqm/hour per hour 601.74
distributor tack coat

Emulsion pressure Applying emulsion


24 1750sqm/hour per hour 448.70
distributor tack coat

DBM/BM/SDC/
25 Hotmix plant *120 TPH 40cum/hour per hour 13130.43
Premix
DBM/BM/SDC/
26 Hotmix plant-100 TPH 30cum/hour per hour 9710.43
Premix
DBM/BM/SDC/
27 Hotmix plant -60 to 90TPH 25cu m/hour per hour 7765.22
Premix
DBM/BM/SDC/Pr
28 Hotmix plant -40 to 60TPH 17cu m/hour per hour 6217.39
emix

29 Hotmix plant -8 to 10TPH Premix cum/hour per hour 891.30

Paver Finisher Hydrostatic


Paving of DBM
30 with sensor control 100 40cum/hour per hour 1500.00
/BM /SDC/Premix
TPH

Paver Finisher Mechanical Paving of


31 40cum/hour per hour 642.61
100 TPH WMM/PMC

Paving of DEC 30cum/hour per hour

32 Paver Finisher Mechanical Paving of DEC 75cum/hour per hour 1605.22

33 Hydraulic Chips Spreader Surface Dressing 1500sqm/hou r per hour 1478.26

Rolling of Asphalt
34 Tandem Road Roller 30cum/hour per hour 641.74
surface

Rolling of Asphalt
35 Pneumatic Road Roller 25cum/hour per hour 697.39
surface

36 Pot hole repair machine Repair of pot holes 4cum/liour per hour 508.70

37 Bitumen boiler oi! fired Bitumen spraying ISOOLitre per hour 111.30

38 Tar boiler Bitumen spraying per hour 64.35

23
SI.
D ESC RIPTIO N S USAGE RA TES IN RS
No.

M achine A ctivity Output ii


U nit* Rate
„ ,
(ill Rs.)

39 GSR Plant 50 cum Producing GSB 40cum/hour per hour 582.61

Mastic Wearing
40 Mastic Cooker 1tonne per hour 1379. L3
Coat

Batching and Mixing plant


41 Concrete Mixing 13cum/hour per hour 1043.48
15-20cum

Batching and Mixing plant


42 Concrete Mixing 20cu m/hour per hour 1252.17
30cum

Batching and Mixing plant


43 Concrete Mixing 75cum/h our per hour 2400.00
112.Scum

Batching and Mixing plant


44 Concrete Mixing 175cum/hour per hour 4486.96
262.5cum

Transportation of
45 Transit Mixer 4.5cum/hour per hour 521.74
concrete mix to site

3cum/hour per hour 478.26

46 Grout pump per hour 56.52

Concrete pump of 45 & 30 33cum/hour


47 Pumping Concrete per hour 143.48
cum 22cu m/hour

Pump with 5HP diesel


48 Pumping of Water per hour 51.30
engine

Pump with 10HP diesel


49 Pumping of Water per hour 93.91
engine

Pump with 20HP diesel


50 Pumping of Water per hour 144.35
engine

Pump with 40HP diesel


51 Pumping of Water per hour 241.74
engine

52 Pump with 40HP electrical per hour 129.57

53 Pump with 50HP electrical per hour 158.26

54 Cranes 80 tonnes Lifting purpose per hour 717.39

55 Cranes 35 tonnes Lifting purpose per hour J 478.26


SI.
D ESC R IPT IO N S USAGE RA TES IN RS
No.

i, . Rate
Machine A ctivity Output Unit .. .
(in Rs.)
56 Cranes 3 tonnes Lifting purpose per hour 200.00
Crawler mounted Crane
57 Lifting purpose per hour 1493.04
(18T)

58 Tower Crane Lifting purpose per hour 479.13

59 Welding transformer Welding per hour 70.43


Gunneting machine without
60 per hour 79.13
compressor

61 Mechanical Winch (10T) per hour 194.78

62 Power Winch (40I1P) per hour 191.30


For pouring
63 Concrete Bucket lcum per hour 8.70
concrete

64 Kerb casting machine Kerb making 80RM/hour per hour 173.91

Concrete Mixer
65 Concrete M ixing 2.Scum/hour per hour 153.91
a)04/0.28 cum
b)01cum 7,5cu m/hour per hour
Compacting
66 Vibrator (3HP diesel) per hour 92.17
Concrete
0.75m dia to 1.2m
Piling Rig with Bantonite
67 dia Boring 2 to 3RM/hour per hour 3065.22
Pump
Attachment
Concrete Paver Finisher Paving of Concrete
68 20cum/hour per hour 1608.70
with 40HP Motor Surface

69 integrated stone crusher Crushing of Spalls 10DTPH per hour 4060.87

Crushing ol Spalls 200TPII per hour 10226.09

70 Stone crusher (electrical) Crushing of Spalls per hour 160.00


Crushing & processing plant
71 per hour 204.35
(electrical)

Concrete Paver Finisher Paving of Concrete


72 175cum/hour per hour 14076.52
with 4011P Motor Surface

Prestressing Jack with Pump


73 Stressing of Steel Wires/Stands per hour 72.17
& Access
Generation of
74 Generator 100 KVA 100KVA per hour 391.30
Electric Energy

Generation of
75 Generator 250KVA 100KVA per hour 978.26
Electric Energy

Generation of
76 Generator 33KVA 50 KVA per hour 208.70
Electric Energy

25
SI.
D ESC RIPTIO N S USAGE R A T ES IN RS
No.

Rate
M achine A ctivity Output U nit n ,
fin Rs.)
Generation of
77 Generator 40 KVA KVA per hour 369.57
Electric Energy
Generation of
78 Generator 125KVA KVA per hour 786.96
Electric Energy
Pneumatic Sinking 1.5 to 2.0
79 Pneumatic Sinking Plant per hour 2339.13
of wells cum/hour
Per Km 17.39

80 Truck 5. Scum per 10 tonnes Material Transport 4.Scum per tonne.km 1.74

per hour 484.35

81 Road Marking machine Road marking lOOs.q m/hour per hour 52.17

Mobile Slurry Seal Mixing and laying


82 2700sqm/hour per hour 565.22
Equipment slurry seal

83 Wagon drill per hour 111.30

84 Dimond drill per hour 293.91

85 Inwell rings per hour 62.61

86 Jack hammer per hour 7.83

87 Pneumatic rammer per hour 11.30

88 Pusher leg per hour 4.35

3f.V - ' '

26
X X V . P O S T G ST M IS C E L L A N E O U S IT E M S

SI Rate
Description of Items Unit
No. (in Rs.)

1 2 3 4
(a ) R.C.C. W o rk s
Making R.C.C. jally as per approved design 2.5 cm to 5.00
cm thick and fixing in cement mortar in position after
1 lSq.M 211.54
cutting the grooves, etc. complete including cost of all
materials.
Providing and fixing in position 50mm, thick precast
cement concert' jally [1:2:4] hard granite chips
2 including roughening, cleaning, fixing and finishing in lSq.M 317.31
cement mortar (1:3) etc., complete

5 c.m. thick R.C.C. shelves (1:2:4) with hard granite chips


12mm size fitted and fixed in position finished smooth
3 complete with all materials. lSq.M 201.92

R.C.C. boundary stones (1:2:4) with washed


4 shingles or hard stone chips 10cm x 10cm and Each 52.88
1.2M high fitted and fixed complete
R.C.C. post (1:2:4) using 12mm size hard granite chips
using 75Kgs of steel reinforcement per Cu.M. including
5 cost of all materials and labour fitting and fixing in Cum 4480.77
position etc.
Supplying and fixing 15cm dia and 1.00 M. long guard
posts of cement concrete (1:2:4) with hard granite chips
6 Each 67.79
including cost of all reinforcement.

Labour for fixing 15 cm dia and 1 m long R.C.C.


7 Each 1.92
guard posts in position 45cm below ground level.
Providing and fixing pre-cast R.C.C. (1:2:4)
8 kilometre stone as per I.R.C. design including 0.00
finished smooth.
110cm long ordinary Km. Stone for N.H., S.H. and M.D.R.
Each 298.00

150cm long ordinary 5 Km. Stone for N.H., S.H. and M.D.R.
(b) Each 423.65

95cm long ordinary Km. Stone for N.H., S.H. and village
(c) Each 221.15
roads.
8 cm thick R.C.C. fins walls (1:2:4) with black hard granite
chips 12mm size using 3.0 kg to 3.50 Kg of steel
9 reinforcement perSq.M. including shuttering, finishing isqm. 312.98
complete
R.C.C. railing (1:2:4), 8 cm thick 90cm high with hard
10 granite chips 6mm to 20mm size complete as per R.M 327.12
approved design.

27
SI Rate
D escription of Items U nit
No. (in Rs.)

1 2 3 4
I.R.C. standard R.C.C. railing (1:2:4] using black hard
granite.chips 12mm size including cost of centering and
11 R.M 557.69
shuttering and cost and conveyance of all materials and
labour etc. complete.
Boxing with cement concrete (1:3:6) with wire netting
12 and washed pit singles or hard stone chips including 1 Cum 1346.15
cement plaster 6mm, thick finished smooth complete.

Filling bitumen and cement and jute fibre in expansion


joints inclusive of cost of materials, bitumen and
13 cement proportion (3:1) including cleaning before 1 RM 9.90
pouring 12mm to 25mm and 15cm depth.

Ditto extra for each additional 2.5cm depth over the depth
14 1 RM 2.02
of 15cm
Inserting premoulded expansion joint including cleaning
15 1 RM 1.15
(labour only)
(b ) Doors and W in d o w 0.00
Labour of replacing glass- panes including cutting to size
1 with cost of nails and putty. 1 Sqm 50.00

2 Cleaning glass-panes with spirit including cost of spirit 1 Sqm 3.94


Frosting glass-panes including cost of all labour and
3 1 Sqm 14.62
materials
Fitting and fixing glass louvers in position in wooden,
4 steel window frames, including cutting grooves. 1 Sqm 67.31

5 Renewing putty in fixing glass-panes 1 Sqm 38.56


Fixing old glass panes with wooden heading including
6 cost of nails and headings 1 Sqm 43.94

Providing, fitting and fixing with sal wood battens, 7.5cm *


1.2cm with 6mm mesh wire netting, or expanded metal
7 1 Sqm 298.08
including panting complete

Fixing wire netting or welded mesh including screw and


8 nails (Labour only) 1 Sqm 40.58

Providing, fitting and fixing 25mm thick sal wood batten,


jaf'fry, door shutters fitted and fixed in position
9 1 Sqm 293.27
including cost of iron fitting and hinged cleats etc.
complete.
Labour for taking out wooden/steel door frame and
refixing the same after necessary repair including making
10 Bach 53.65
good damages to walls.

Labour for taking out wooden/steel window and refixing


11 the same after necessary repairs including making good Each 41.44
damages to. walls.

o 2S
SI Rate
Description o f Items Unit
No. (in Rs.)

1 2 3 4
Taking out the door or window shutters and refixing them
12 including screws as may be required.

(a) Doors Each 51.63


(b) Windows Each 31.44
Labour for fitting and fixing-departmental shutters
excluding cost of fixing and fitting Chaukath but including
13 mending size of grooves in chaukaths and size of shutters, Sqm 22.31
etc. complete

(a) Supplying and fixing W.L clamps 33c'm to 38Cm long of


35mm x 5mm size for doors and windows and ventilators
14 including fixing in cement concrete (1:3:6) with 12mm, to Each 19.71
20mm hard stone chips or in cement mortar (1:3)
including cost of all materials.

(b) Supplying and fixing W.L clamps 25cm to 30cm long of


35mm * 5mm size for doors and windows and ventilators
including fixing in cement concrete (1:3:6) with 12mm to Each 10.77
20mm hard stone chips or in cement mortar (1:3)
including cost of all materials.
Labour for fixing tower bolts 15cm to 23cm long including
15 Each 3.94
supply of screw.
Labour for fixing tower bolts 25cm to 30cm long
16 Each 5.48
including supply of screws.
Labor for fixing iron bolts of different sizes, iron chains,
17 iron rings or brass rings to doors and windows. Each 2.02

Supplying and fixing wooden blocks to walls


18 Each 1.44

Supplying and fixing Sal wood, sand blocks 13cm * 10cm x


19 7 cm to choukaths including cost of screws. Each 2.21

Supplying and fixing hinged cleats H cm to 10cm long and


20 Each 4.23
4cm thick including cost of screws
Labour for fixing catch hooks of different size to doors and
21 Each 2.12
windows.
22 Easing, oiling and petty repairs windows Each 4.13
Replacing the wooden lintels of doors and windows with
23 siew precast R.C.C. lintels including making good to the Each 50.00
damage (Labour only)
Labour for making chaukaths and burgas from old wood
24 works 1 Cum 913.46

Supplying, fitting and fixing Sal wood gate as per approved


25 designed including painting, etc. complete in all respect lsqm. 274.04

Cutting grooves in laterite stone masonry for fixing


26 Each 3.27
choukaths of doors and windows.

29
SI Rate
Description of Items Unit
No, (in Rs.)

1 2 3 4
27 Making cement concrete (1:2:4) door sills 1 RM 9.81
Providing and fixing in position 20mm thick (solid core
type) sita board or equivalent approved quality flush
shutter double leaf, (treated with liquid phenoiformal
28 dehyde synthetic resin) with and including door 1 Sqm 644.23
dropper, cleats, both side commercial shutter and
superior hinges, etc. complete.
Providing and fixing in position 30mm thick Ditto one side
29 1 Sqm 769.23
decorative shutter Ditto.
Providing and fixing in position 30mm thick Ditto both
30 1 Sqm 986.06
side decorative shutter Ditto.
Providing and fixing in position 25mm thick Ditto both
31 1 Sqm 568.08
side decorative shutter Ditto.
Providing and fixing in position 25mm thick Ditto one side
32 1 Sqm 721.44
and one side commercial shutter Ditto.
Providing and fixing in position 25mm thick Ditto both
33 side decorative shutter Ditto 1 Sqm 836-92

Labour only for fixing in position flush shutters fixtures of


34 1 Sqm 43.65
any thickness and any quality.
35 Add extra for vision panels in square shape 0.00
(a) Both side commercial of any thickness Each 63.08
(b) One side or both side decorative of any thickness
Bach 76.73

Deduct for single leaf shutters as rebete cutting is not


36 Sqm 24.13
required (for flush shutters)
37 Add extra for Teak wood leaping (Double leaf)
(a) Commercial 25mm thick Sqm 161.92
(b) Commercial 30mm thick Sqm 161.92
Add extra for teak wood leaping double leaf decorative
38 (one side or both side)

(a) 25mm thick Sqm 101.15


(b) 30mm thick Sqm 106.44
Add extra for Teak leaping with commercial wood for
39 single leaf shutters on both the sides.

(a) 25mm thick Sqm 100.77


(b) 30mm thick Sqm 111.35
Add extra for Teak leaping decorative for single leaf
40 Sqm
shutters, one side or both the sides
(a) 25mm thick Sqm 68.08
(b) 30mm thick Sqm 53.56

o p - *"

30
SI Rate
D escription of Items Unit
No. (in Rs.)

1 2 3 4
Supplying R.C.C. door/window frames of cross section
100mm x 60mm of M-250 concrete using OPC 43 Grade
cement and steel reinforcement of 5.5 mm to 6.0 mm dia
41 1 RM 153.85
M.S. Rod with provision of hinges, locks, W.I. clamps, etc.
(Ex-factory)

Pitting and fixing of R.C.C. door/window frames of sizes


42

(a) Doors Each 86.63


(b) W in dow s - 1.80m* 1.35m. size Each 98.27
1.50m x 1.35m. size Each 98.27
1.20m x 1.35m. size Each 54.81
0.90m x 1.35m. size Each 54.81
Providing & fixing 25mm to 12mm Teak wood beading
43 all round door and window and polished as required. 1 RM 22.31

(c) Roofing
Leak repair to terrace roof with cement and cow dung
1 100 sqm 202.12
proportion 1:1 (by volume)
Leak repair to terrace roof with cement and cow dung
2 proportion 1:1 (by volume) lime or cement grouting to 100 m 221.15
cracks.
Leak repair to corrugated asbestos or G.l. sheet roofing
3 with pitch and coal tar, putty and paint around the 100 nos. 86.54
holes.

G.L sheet gutter upto 30cm wide including fixing with


4 clamps and making connection with rain water pipes, etc. 1 RM 72.12
complete.
Taking out choked up rain water C.I. down pipe including
5 refixing the same in position with cement. Each 24.52

Labour for fitting and fixing 8 cm to 10 cm (11 down pipe.


6 1 RM 4.33

Labour for fixing rain water down pipe with necessary


7 bend shoes and heads etc. including cost of clamps and 1 RM 9.62
nails

8 7.5cm dia earthen rain w aterspout 1.0M long Each 21.63

9 Cleaning flues of chimneys Each 9.81


Fixing ridges and valley in C.I. sheet roofing (Labour
10 1 sqm 9.71
only)
11 Lime m ortar ridge over pan tiled roof 1 RM 15.00
Labour for changing burgas irrespective of length and
12 Each 8.27
size including repairs to damages.

13 Labour for laying local Raniganj tile roofing 1 Sqm 5.53


14 Leak repairs to single Nuria tile roofing 1 Sqm 1.15
'
SI Rate
Descr iption of Items Unit
No. (in Rs.)

1 2 3 4
15 Leak repairs to double Nuria tile roofing 1 sqm 0.77
Labour for fitting and fixing old roof timbers
16 1 Cum 552.88
including cost of nails
Labour for removal of old bamboo frame including
17 stacking the useful materials for reuse. 1 Sqm 0.77

Labour for fixing 'J' 'L* or 'U' hooks for repair works only.
18 Each 1.44

(d ) C eiling
Hassain ceiling stretched on Sal wood frame and mountain
1 battens including all aterials, etc.complete 1 Sqm 34.33

Hassain mat ceiling stretched on old frames


2 including all m aterials etc. 1 sqm 19.23

Bamboo celiling with new Sal frame including all


3 materials etc. complete 1 sqm 67.88

Bamboo celiling w ith old Sal frame including all


4 materials etc. complete 1 sqm 14.62

(e ) F lo o rin g
1 Picking up old floor for resurfacing 1 sqm 3.37
Polishing the floor surface with red oxide, bees wax and
2 turpentine 1 sqm 11.73

Rubbing old marble chips or marble tile flooring and


3 dados skirting including wax polishing to give 1 sqm 52.88
granolithic finish.
(f) Iro n w o rk s
Labour for fitting and fixing flat iron wind ties
1 including drilling holes and supplying bolts and nuts. 1 qtl 202.40

2 Fabricated iron w orks (Labour only) 1 qtl 260.38


Labour for fixing M.S. bed plates 12mm thickset in
3 1 sqm 115.87
cement.
W elding of rods to proper specification and strength
including cutting and shaping the ends to receive the
4 welding materials and cutting to proper sizes as
required for the w ork complete.

(a) 25mm dia M.S. Rods Per joint 72.50


(b) 28mm dia M.S. Rods Per joint 84.52
(c) 30mm dia M.S. Rods Per joint 86.73
(d) 35mm dia M.S. Rods Per joint 88.56
(e) 38mm dia M.S. Rods Per joint 88.94
SI Rate
D escription of Items Unit
No. (in Rs.)

1 2 3 4
Labour for fitting and fixing of M.S. w indow grills
5 including cost of screws complete 1 Sqm 11.63

Labour for fitting and fixing of M.S. Gates as per


6 approved design including cost of all materials 1 Sqm 67.40
complete
Labour for fixing holding down bolts in cement mortar
7 Bach 2.98

Labour for fixing fan hooks in existing R.C. ceiling


8 Each 14.62

(g) w h ite w a s h in g
W h ite washing and refiguring kilometer stones or mile
1 stones or boundary pillars Each 4.33

W hite washing and refiguring furling posts or 100M


2 Each 2.12
post
3 Chalk washing one coat to receive distempering 1 sqm 1.73
Chalk washing two coats to receive distempering
4 1 sqm 1.92

Labour for rubbing out heavy moss from shift walls


5 100 sqm 10.48
exposed to w eather
Washing the plastered surface with soap and soda
6 100 sqm 19.71
water
(h ) P a in tin g
Painting figures and letters of various size upto 120mm
1 Each 1.15

2 Painting figures and letters above 120 mm size 1 RM 1.15


Engraving letters of various sizes from 5cm to 10cm
3 1 RM 2.12
including painting, etc. Complete
Painting and w riting road signs of all kinds as per I.R.C.
4 1 RM 6.44
standard including painting boards.
5 Marking and painting lines or arrows 1 RM 1.73
W all painting with any approved paint 1 coat
6 1 sqm 3.75
(Labour only)
W all painting with any approved paint 2 coats
7 1 sqm 4.62
(Labour only)
Scraping old paint with scrapers, sand papering
8 andwashing with soap w ater or soda including 1 sqm 3.37
scaffolding charges upto 5M height

Scraping old paint with scrapers, sand papering and


washing with soap w ater or soda including
9 1 sqm 4.62
scaffolding charges above 5M high and upto 8M height
SI Rate
D escription of Items Unit
No. (in Ks.)

1 2 3 4
W ashing and cleaning plastic paint/cement
10 paint/distempered walls including cost of painting 100 sqm 19.62
sponge
( i) Pile D rivin g 0.00
Labour for driving sal bullah piles and fixing in position
1 12cm to 15cm, dia upto 1.50M depth including 1m 11.73
sharpening the end,

2 Ditto- Ditto-beyond 1.50m depth - Do - Do 1m 19.71


Ditto-Ditto above 15 Cm and upto 20cm dia upto 1.50M
3 1m 20.96
depth

4 Ditto- Ditto-beyond 1.50M depth - Do - Do 1m 24.62


Ditto-Ditto above 20 Cm and upto 20cm dia upto 1.50M
5 1m 27.60
depth
6 Ditto- Ditto-beyond 1.50M depth - Do - Do 1m 30.48
Ditto-Ditto above 25 Cm and upto 20cm dia upto 1.50M
7 1 ni 31.54
depth
8 Bamboo jafree on top of piles 100 Sqm 1230.77
Split bamboo jafree closely woven including bamboo
9 100 Sqm 980.77
posts 7.5cm to 10 Cm dia 1.8 M apart.

Bamboo piling 1.50M long 30cm apart to be driven to a


10 depth of 90Cm with 60Cm jafree on top. 1 RM 24.81

Bamboo piling 2.00M long 30cm apart to be driven to a


11 depth of 1.0M w ith 90Cm jafree on top. 1 RM 30.29

Bamboo piling 3.7M long 30cm apart to be driven to a


12 depth of 2M with 1.50M jafree on top. 1 RM 73.75

Half bullah tying pieces fitted and fixed with nails


13 1 RM 5.96
(labour only)
I'or driving piles in w ater add extra to the respective
14 1 RM 1.73
rate of pile driving item.
(j) Strin g c o u rse and co rn ice
6 cm to 8cm projection plinth moudling with brick in
1 cement m ortar (1:3) 6 cm to 8 cm depth including 1 RM 14.71
cement plaster 1:4 complete

9 cm projection 6 cm deep cornice with brick in cement


2 mortar (1:3) and cement m ortar (1:4) complete 1 RM 25.19

15cm projection and 15cm deep cornice with brick in


3 cement (1:3) including drip course and cement plaster 1 RM 34.42
(1:4) complete.
S! Rate
D escription of Items Unit
No. (in Rs.)

1 2 3 4
23cm projection and 23cm deep cornice with brick in
cement m ortar (1:3) including drip course and cement
4 1 RM 57.88
plaster (1:4) including plaster (1:4) complete.

25 Cm deep brick coping on compound wal!


including cement plaster (1:4) complete for 35cm to
5 1 RM 43.65
38cm thick walls including plastering (1:4) complete

15 Cm deep brick coping 23cm to 25cm thick walls


6 including plastering (1:4) complete. 1 RM 30.38

15 cm deep brick coping for llc r n to 12cm thick walls


7 1 RM 24.81

7.5cm deep brick coping on compound wall of 23cm to


a 25cm thick including cement plaster (1:4) complete. 1 RM 24.62

Providing 8 cm deep cement concrete (1:5:10) on top of


9 compound wall and plastering with cement plaster 1 RM 26.44
(1:4) complete.

6 cm projection for 23cm to 25cm wall stringcourse


10 with brick in cement mortar (1:3) and cement plaster 1 RM 12.02
(1:4) complete
Brick moulding including plastering with cement
li mortar (1:4) 12cm deep and 11cm projection 1 RM 22.60

(k ) D rain
15cm. * 15cm concrete drain with cement concrete ( 1:3:6)
i and cement plaster (1:3) including punning over hard base. 1 RM 69.62

10cm. x 15cm concrete drain with cement concrete


2 (1 :3:6) and cement plaster (1:3) including punning over 1 RM 47.88
hard base.
25cm, * 23cm concrete drain with cement concrete ( 1:3:6)
3 and cement plaster (1:3) finished smooth with 10cm thick 1 RM 105.96
concrete over hard base.

Shallow brick drain in courtyard 6cm deep with cement


4 1 RM 33.85
piaster (1:3) finished smooth.
23cm 10 30cm drain with cement concrete (1:2:4)
5 1 RM 11.35
finished smooth
6 10cm x 15cm drains finished smooth 1 RM 7.21
15cm thick cement concrete (1:3:6) drain 75cm wide and
7 30cm depth including 12MM cement plastering (1:3) finished 1 RM 365.58
smooth.
8 Ditto 60cm wide and 30cm depth 1 RM 274.04
9 Ditto 30cm wide and 30cm depth 1 RM 139.42

* 35
SI Rate
Description of Items Unit
No. (in Rs.)

1 2 3 4
W aste w ater outlet in cement including cost of gratings
10 Each 16.83

11 W aste w ater outlet in cement without gratings Each 8.56


(!) Fencing

Labour for fitting and fixing woven w ire fencing with


1 top line of barbed w ire to the posts by means of staples 100 m 62.21
and straining hooks.

1.50M high bamboo fencing w ith muli bamboo posts


2 and strong bamboo frame w ork including all 100 m 865.48
materials complete.
Green fencing 1.25M height with thorny bushes and
3 100 m 298.56
split bamboo.
Supplying fitting and fixing R.C.C. (1:2:4) fencing posts
with chips 1.68M long 13cm * 13cm at bottom and 8cm
4 Each 144.23
x 8 cm at top and 30cm x 30cm * 8 cm base finished
smooth
Labour for fixing barbed w ire fencing and post by
Each line
means of staples and straining hooks by means of tying
5 Each 0.48
with G.L w ire and including cost of staples, hooks and
metre
tying wires
(m ) Bridge w ork and other Hydraulic structure
W e ll S in k in g :
Labour for sinking wells in all kinds of soil other than rock, to
lines, levels and plumb by scooping out from inside and
below the staining including cost of necessary tools and plant
supplying and working of pumps bailing out of water or
1 dredging, removal of all materials and obstacles from inside
the well by divers, hire and labour for cantiledge jetting, if
necessary and sinking to a depth of 10M taking precaution
against shifting and tilting disposal of the spoil with all leads
and lifts, etc complete
(a) 3.00 M dia outside circular or octagonal single wall upto
1 RM 4930.77
10.00 M depth
( a l ) 3.00 M dia every successive additional metre depth
Ditto 53.85
beyond 10.00M depth
(b) 3.25M dia outside circular or octagonal single wall,
Ditto 6336.54
upto 10.00M add
( b l ) 3.25 M dia outside circular or octagonal single well
for every successive additional metre depth beyond Ditto 88.46
10.00M depth add.
(c) 3.50M dia outside circular or octagonal single well
Ditto 7938.94
upto 10.00M depth
( c l ) 3.50M dia for every successive additional metre
1 RM 95.19
depth beyond 10.00M add
SI Rate
Description of Items Unit
No. (in Rs.)

1 2 3 4
(d) 4.00 M dia outside circular or octagonal single well
Ditto 9864.90
upto 10.00M depth
( d l) 4.00 M dia for every successive additional metre
Ditto 118.27
depth beyond 10. depth add
(e) 4,25 M dia outside circular or octagonal single well
Ditto 1 1842.79

( e l ) 4.25M dia for every successive additional meter


depth beyond 10.00 M depth add. Ditto 141.83

(f) 4.50M dia outside circular or octagonal single well


Ditto 12460.58

(f'l) 4.5M dia for every successive additional metre


Ditto 149.52
depth beyond 10.00 M depth add.
(g) 4.75M dia outside circuia or octagonal single well
Ditto 13122.12

( g l) 4.75M dia for every successive additional metre


depth beyond 10.00 M depth add. Ditto 170.19

(h) 5.00 M dia outside circular or octagonal single well


Ditto 13875.96

( h i ) 5.SOM dia for every successive additional mete


Ditto 180.29
depth beyond 10.00M depth add.

(i) 5.50 M dia outside circular or octagonal single well


Ditto 14576.44

( i l ) 5.50 M dia for every successive additional metre


depth beyond 10.00M depth add Ditto 189.42

(j) 5.75M dia outside circular or octagonal single well


Ditto 15377.40

( j l ) 5.75M dia for every successive additional metre


Ditto 199.52
depth beyond 10.00M depth add
(k) 6.00 dia outside circular or octagonal single well
Ditto 16214.42

( k l ) 6.00 M dia for every successive additional metre


depth beyond 10.0M depth add. Ditto 210.58

(1) 6.50M dia outside circular or octagonal single well


Ditto 17103.37

(11) 6.50M dia for every successive additional


metredepth beyond 10.00M depth add Ditto 222.1 2

(m ) 6.75M dia outside circular or octagonal single well


Ditto 17766.83

( m l) 6.75M dia for every successive additional metre


Ditto 230.77
depth beyond 10.00M depth add

37
SI Rate*
Description of Items U nit
No. (in Rs.)

1 2 3 4
(n) 7.00M dia outside circular to octagonal single well 18987.50
Ditto

( n i ) 7.00M dia for every successive additional metre


Ditto 246.63
depth beyond 10.00M depth add
(o) 7.25M dia outside circular or octagonal single well Ditto 20001.44
( o l ) 7.25M dia for every successive additional metre
depth beyond 10.00M depth add Ditto 259.62

(p) 7.SOM dia outside circular or octagonal single well Ditto 21052.88
( p i ) 7,SOM dia for every successive additional metre
depth beyond 10.00M depth add. Ditto 273.56

(a) 3.30M dia outside circular or octagonal twin w ell


2 Ditto 14582.69
upto 10.00M depth
(b) 3.00M dia for every successive additional metre
Ditto 140.38
depth beyond 10.00M depth add.
Earth w ork in excavation of foundation in all kinds of
soil with all leads and lifts including^ shoring,
shuttering, propping bullahs, piling dewatering from
3 foundation, supplying and working pumps and
stacking the excavated materials aw ay form working
area as ordered by the Engineer-in-charge upto 60M
etc. complete with coffer dam if required.
(a) Upto 3.00 M depth 1 cum 3725.96
(b) Beyond 3.00M and upto 6.00 M. Depth Ditto 4967.79
(c ) Beyond 6.00M depth Ditto 6209.13
Earth work in excavation of foundation is hard work or
granite rock with all leads and lifts, including dewatering
from foundation supplying shoring pumps and working
4 0.00
pumps and stacking the excavated materials away from
working areas as ordered by Engineer-in-charge upto 60M
and complete with coffer dam if required.
(a) Upto 6.00M depth 100 Cum 17387.02
(b) Beyond 6.00M depth Ditto 21725.00
Excavation of foundation in soft rock or disintegrate rock
with all leads and lifts, including shorting shuttering
propping bullahs, piling dewatering from foundation,
supplying and working pumps and staking the excavated
5
materials away from working area as ordered by the
Engineer-in-charge upto 60M complete with coffer dam if
required.

(a) Upto 6.00 M depth Ditto 11176.92


(b) Beyond 6.00M depth Ditto 13969.23
Leveling the hard rock surface under wells for piers,
6 1 Sqm 156.25
abutments and wings underwater
SI Rate
D escription of Items Unit
No. (in Rs.)

1 2 3 4
Fixing anchoring bars upto 25mm to 38mm dia to the
foundation of piers and abutments alter drilling holes
7 grouting with cement or cement mortar as per approved Each 91.83
proportion, etc. all complete but excluding cos! of rods,

Labour for fitting and fixing in position steel cutting edge as


per approved design using M.S. angle plates, bolts and nuts
complete including cutting angles to required size, bending
8 1 Quintal 900.00
to shape, drilling holes, reverting and welding, etc. complete
in all respect but excluding cost of angles and plates.

9 Labour for fixing rocker and roller bearings Each Set 3509.62
Providing C.I. grating to holes size upto 15cm dia for each
10 drainage of water including cost of a 11materials. Each 43.46

Cement concrete in foundation including dewatering add


11 1 Cum 55.38
extra to the respective rate of cement concrete
Cement concrete in substructure including frame work
12 fshuttering and hoisting) add extra to the respective items of 1 Cum 102.12
work.
Masonry work in foundation below bed level add extra to
13 respective rates of foundation for dewatering and lowering 1 Cum 32.40
of materials.
Shoring foundation trenches, pits, etc. with closed wood
14 sheet piles excluding cost of wood (Labour only) 1 Sqm 12.26

Shuttering in foundation excluding cost of wood (Labour


15 only) 1 Sqm 2.98

Trial boring in river-bed 38mm to 50mm dia upto 9.15M


16 depth 1 RM 33.94

Removing and refixing old wood work saving to the required


sizes where necessary including cost of new nails but
17 excluding cost of bolts complete for bridge work (labour 1 Cum 408.85
only).
Fixing wooden planks and scantling for bridge decking
18 1 Cum 423.85
including cost of new nails ( Labour only)
(a) Strip seal expansion joint as per MORT&I!
19 RM 9134.62
specification.
(b) Compression seal expansion joint as perMORT&H
specification RM 8173.08

N.B. : The rates Tor item No. 1 to 17 are provisional

(n) Tim ber Bridges


Sal bullah rough squared beams including fixing with new
1 nails spikes for bridge work, etc. inclusive of cost of all 1 Cum 7519.52
materials complete

2 Refixing old wood including cost of new nails etc. 1 Cum 442.31

39
SI Rate
Description of Items Unit
No. (in Rs.)

1 2 3 4

3 Dismanting old wood work of bridges and stacking at site 1 Cum 211-54

Sal wood planks and sawn scantling for bridge including


4 1 Cum 17134.00
fixing and cost of new nails, etc. complete

Labour for fitting and fixing old sal planks for fair-weather
5 I Sqm 8.85
road including cost of nails

Labour for fixing old sal bullah including cost of nails after
6 1 RM 4.33
culling to required sizes.

Labour for filling empty cement bags, sewing and laying in


7 100 Nos. 96.15
posit ion including cost of sewing strings.

Labour for filling empty cement bags sewing and laying


8 100 Nos 101.54
under water in position.

Loading cement bags filled with sand in boat within 3.00m.


9 100 Nos 43.46
lead.

10 Caulking, boats, lock gates, etc. with Oakum 30 RM 88.65

(o) Road w ork


Removal of B.T. surface and stacking them away from work
site within initial lead of 50 Mtr. and initial lift of 1.5 Mtr. as
1 1 sqm 13.27
per direction of Engineer-in-charge

Labour charges for pre-coating 10mm chips as per I.R.C. code


2 453/72 1 Cum 365.67

K.B.bricksflal soling including filling on interstics with sand


3 I Sqm 29.52
or sandy soil

4 Second class K.B. bricks on dental brick edging 1 RM 7.79

(p) Other Miscellaneous items


Clearing heavy jungle including uprooting stumps of trees
1 and trees above 1M girth and thick bushes including bamboo 100 sqm 60.67
pre measurement.

2 Clearing shrub jungles uprooting stumps and small bushes 100 sqm 19.42
and trees below 1M girth on premeasurement.

3 Culling and uprooting trees including removal and making Each 29.23
good to the damages to ground, trees up lo 1.50M girth.
Cutting and uprooting trees including removal and making
4 good to the damages to ground treesabove 1.50M upto 3.00 Each 46.35
M girth
Cutting and uprooting trees including removal and making
5 good to the damages lo ground trees above 3.00M. girth Each 70.77

6 Washing newer cot including refixing each cot Each 17.50

40
SI Rate
D escription of Items U nit
No. (in Rs.)

1 2 3 4
Dewatering and removing rubbish and silt and
7 Each 98.17
disinfecting wells upto 1.5M dia
Dewatering and removing rubbish and silt and disinfecting
8 wells above 1.5.0M and upto 2.SOM dia Each 159.13

Supplying fitting and fixing teak wood hand rails 8cm to


10cm wide and 5cm to 8cm depth complete in all respects 230.87
9 1 RM
polished.

Supplying fitting and fixing teak wood picture rail 8 cm to


10 10cm wide and 12cm tick including polishng, etc. complete 1 RM 69.42

Bamboo gabions 60cm dia 1.50 M high including coaltaring 2


11 coats to 30 cm bottom fitted and fixed complete. Each 34.13

Bamboo gabions lm dia 1.50 M high including


12 coaltaring 2 coats to 30 cm bottom fitted anti fixed complete Each 55.96

Recanning arm of dining chair with nylon cane


13 (Back) Each 30.58

Recanningarm ofdining chairwiLh country cane (Back)


14 Each 24.71

Recalling arm of dining chair with nylon cane (seat) Each 55.38
15
Recaning arm ofdining chair with country cane (seat)
16 Each 40.58

17 Recanning easy chair with nylon cane Each 142.50


18 Recanning easy chair with country cane Each 127.12
Construction of brick gabions with dry brick and cement
19 mortar in honey comb joints and two layers solid masonry in
cement mortar f 1:6)in all joints.
(a) 1.25M dia and 1.50M high Each
(b) l.OOM dia and 1.50M high Each 298.08
Laying and fixing in position R.C.C. spun pipes with collars
20 jointed with cement mortar 1:3 complete excluding cost of
spun pipes and collars
(a) 100mm dia R.C.C. pipe 1 RM 8.85
Cb) 150mm dia R.C.C. pipe 1 RM 9.81
to 250mm dia R.C.C. pipe 1 RM 14.62
(d) 300mm dia R.C.C. pipe 1 RM 17.12
(e) 450mm dia R.C.C. pipe 1 RM 22.02
(0 600mm dia R.C.C, pipe 1 RM 27.02
(g) 900mm dia R.C.C. pipe 1 RM 40.58
(h) 1200mm dia R.C.C. pipe 1 RM 70.38
Labour for fixing bullahs 30cm to 50cm below ground for
21 Each 1.15
barricading purpose.
23cmto 30cm dia Sal bullah fitted and fixed
22 1 Cum 6278.85
complete
S! Rate
D escription of Items U nit
No. (in Rs.)

1 2 3 4
10cm to 13cm dia Non-Sal bullah fitted and fixed complete.
23 1m 21.15

Non-sal bullah 13cm to 15cm dia fitted and fixed complete


24 1m 36.73

Non-sal bullah 18cm to 20cm dia fitted and fixed complete


25 1m 52,98

25mm thick sal plank liLted and fixed complete for Shelves
26 1 Sqm 337.31

Fitting and fixing unitex board after culling rebate and


27 grooves and fixing with necessary beads, nails or screws etc. 1 Sqm 87.31
(Labour) nails or screws etc (labour)
Renewing bases of lightening conductors terminals with
28 pillar 25cm * 25cm andl2mm cement plaster (1:6) complete Each 59.71

Making empty coalter drum gabions with thick coat of colalar


29 to exposed surface (drums to be supplied departmentally), Each 9.81

Cutting chase or grooves upto 15cm * 15cm in old walls


30 including fixing C.I. sheet in cement mortar (1:3) 1 RM 9.81

12cm thick honey comb brick works in cement


31 mortar (1:4) including cement plaster (1:6) 1 Sqm 125.00
complete.
Labour for cutting the empty coalter drums and flattering
32 i-ach 2.88
the same
Providing 12cm thick and 30cm high ornamental brick
parapet as per design with (1:6) cement mortar and
33 1 RM 101.06
cement plaster (1:6) finished smooth complete.

Labour For fitting and fixing masonite sheet lining to wall


34 1 Sqm, 18.27
faccs etc. complete.
Crack repair to walls Bern * 2.5cm with cement
35 1 RM 2.31
mortar (1:3)
Clearing of water hyacinth from canal and drainage channels
36

(a) Thickely grown 1 Sqm 1.73


(b) Moderately grown 1 Sqm 1.06
37 Dug belling 23cm * 15cm 100 M 16.83
38 Drilling hole 25cm lo 37mm dia in granite rock L RM 125.19
Drilling hole 25cm to 37mm dia in rock other than granite
39 1 RM 105.87

Sawing charges of wood by machine as per


40 1 Cu. M 350.96
specified size
Sewing charges by hand including cost of the thread hand
41 1 RM 1.25
needless per R.M
( q) Hire and Running charges
1 Trailer with machine Per day 98.08
2 Dug out boat with 1 boat man Per day 70.00

42
SI Rate
Description of Items U nit
No. (in Rs.)

1 2 3 4
3 Boat excluding boat man Per day
(i) Small upto 1M width Per day 59.42
(it) Btgabove 1M width Per day 86.73
4 Plough man with 2 bullocks or buffalos Per day 72.12
5 Bullock or buffalo cart with driver Per day 91.92
N .B .: For flood and hazardous situation, the boat hire charges may be increased upto 2 5 %

Note :

1. Rates under this sub-heads are inclusive of labour and cost of materials and
conveyance; except where otherwise mentioned in the description of’items.
2, 10 percent excess on the above rates w ill be allowed on the w orks being executed
inside the jail premises.

(r ) E PO X Y COATING

SI No. D escrip tio n o f item Dia o f B a r P o st G ST


in mm R ate
(Rs. / M.T.)
Providing fusion bonded epoxy coating not 32 mm Rs.5,144.23
less than 175 micron thickness and upto 28 mm Rs.5,913.46
300 micron to reinforcement of all
25 mm Rs.6,274.04
diameters as per I.S 13620-1993
including testing of coating at plant 20 mm Rs.7,211.54
16 mm Rs.8,076.92
12 mm Rs.8,365.38
10 mm Rs.9,201.92
08 mm R s . l l , 057.69

Notes

1 Epoxy Coating will be adopted only for the structures within a distance of 15 K.M from

seashore as per orders of Government in respective Department and the rate

approved will be effective for one year from the date of approval and subject to

condition that the concerned company will set up a plant in one of the coastal districts

of Orissa within that period.

2. The rate will be valid for one financial year and will be reviewed after one year
(s) A ll W e a th e r Road R e p a irin g Compound.

SI. D e scrip tio n o f item Unit Rate (Rs.)


No
01 Instant All W eather road repairing kg On the basis of
compound of approved make including Analysis of rate
monsoon having composition of approved by
Aggregates having sieve sizes of 8 mm competent
& down, Bitum en having less of wax authority.
content-Anti stripping compound, W hite
spirit, Polym er and Cement

Notes for Po st GST Rates:-

Miscellaneous items in Chapter-XXV of S/R-2006 is remained as it is for estimates

framed at S/R-2014 without any change. As in the works contract, VAT was deducted @ 4 %

in pre GST regime, it is decided to deduct the 4 % VAT component to derive rates of all

miscellaneous item at Post GST regime for Chapter- XXV of S/R-2006.

44