REGISTER OF REQUEST FOR INSPECTION

Project Title : Civil Work for Re-Location of MCPP B Line to SMCP Area Date : 12/07/2019
Project No : C0118C Client : PT. Kideco Jaya Agung
Area : SMCP Contractor : PT. Petrosea, Tbk
Sub Area No. : N/A Sub-Contractor : PT. Kaliraya Sari
Operation Area : All Operation Area
AREA OPERATION SUBMIT INSPECTIO COMPLETE WEEK
NO RFI NO. RFI SUBJECT ITR NO. ITR SUBJECT KRS REPORT NO. AREA SUB AREA WORK ITEM SUB WORK ITEM STATUS OS DAY PIC REMARKS
CODE AREA DATE N DATE DATE ENDING

1 KRS-SB-RFI-0001 Material Inspection of Steel Pipe KRS-SB-MER-0001 Material Receiving Inspection Report For Steel Pipe N/A SMCP 00 Silo Line SME2 SME2 Material Material Receiving 2-Aug-19 3-Aug-19 9-Aug-19 10 CLOSE 0 GERRY
2 KRS-SB-RFI-0002 Material Inspection of Rebar D13,D16,D19,D22,D25 KRS-SB-MER-0002 Material Receiving Inspection Report For Rebar D13 N/A SMCP 00 KM 22 KM 22 Material Material Receiving 3-Aug-19 4-Aug-19 9-Aug-19 10 CLOSE 0 GERRY
KRS-SB-MER-0003 Material Receiving Inspection Report For Rebar D16 N/A SMCP 00 KM 22 KM 22 Material Material Receiving 3-Aug-19 4-Aug-19 9-Aug-19 10 CLOSE 0 GERRY
KRS-SB-MER-0004 Material Receiving Inspection Report For Rebar D19 N/A SMCP 00 KM 22 KM 22 Material Material Receiving 3-Aug-19 4-Aug-19 9-Aug-19 10 CLOSE 0 GERRY
KRS-SB-MER-0005 Material Receiving Inspection Report For Rebar D22 N/A SMCP 00 KM 22 KM 22 Material Material Receiving 3-Aug-19 4-Aug-19 9-Aug-19 10 CLOSE 0 GERRY
KRS-SB-MER-0006 Material Receiving Inspection Report For Rebar D25 N/A SMCP 00 KM 22 KM 22 Material Material Receiving 3-Aug-19 4-Aug-19 9-Aug-19 10 CLOSE 0 GERRY
3 KRS-SB-RFI-0003 00
4 KRS-SB-RFI-0004 Survey, Pilling Work and Visual Welding Report ISL 1 KRS-SB-SUV-0001 Survey Report for ISL1 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 7-Aug-19 8-Aug-19 21-Aug-19 10 CLOSE 0 GERRY
KRS-SB-ITR-0001 Piling Record for ISL1 KRS-SB-PDR-0001 SMCP 00 Silo Line SME2 ISL1 Piling Pile Driving 7-Aug-19 8-Aug-19 21-Aug-19 10 CLOSE 0 GERRY
KRS-SB-WVR-0001 Welding Visual Report for ISL1 N/A SMCP 00 Silo Line SME2 ISL1 Piling Fit Up & Welding Visual Inspection 7-Aug-19 8-Aug-19 21-Aug-19 10 CLOSE 0 GERRY
5 KRS-SB-RFI-0005 Survey, Pilling Work and Visual Welding Report GSL 1 KRS-SB-SUV-0002 Survey Report for GSL1 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 8-Aug-19 9-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-ITR-0002 Piling Record for GSL1 KRS-SB-PDR-0002 SMCP 00 Silo Line SME2 GSL1 Piling Pile Driving 8-Aug-19 9-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0002 Welding Visual Report for GSL1 N/A SMCP 00 Silo Line SME2 GSL1 Piling Fit Up & Welding Visual Inspection 8-Aug-19 9-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
6 KRS-SB-RFI-0006 Survey, Pilling Work and Visual Welding Report ISL3,HSL2,GSL3 KRS-SB-SUV-0003 Survey Report for ISL3,HSL2,GSL3 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-ITR-0003 Piling Record for HSL2 KRS-SB-PDR-0003 SMCP 00 Silo Line SME2 HSL2 Piling Pile Driving 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for GSL3 KRS-SB-PDR-0004 SMCP 00 Silo Line SME2 GSL3 Piling Pile Driving 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for ISL3 KRS-SB-PDR-0005 SMCP 00 Silo Line SME2 ISL3 Piling Pile Driving 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0003 Welding Visual Report for HSL2 N/A SMCP 00 Silo Line SME2 HSL2 Piling Fit Up & Welding Visual Inspection 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0004 Welding Visual Report for GSL3 N/A SMCP 00 Silo Line SME2 GSL3 Piling Fit Up & Welding Visual Inspection 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0005 Welding Visual Report for ISL3 N/A SMCP 00 Silo Line SME2 ISL3 Piling Fit Up & Welding Visual Inspection 12-Aug-19 13-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
7 KRS-SB-RFI-0007 Survey, Pilling Work and Visual Welding Report GSL4,ISL4,HSL5,GSL6 KRS-SB-SUV-0004 Survey Report for GSL4,ISL4,HSL5,GSL6 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-ITR-0004 Piling Record for GSL4 KRS-SB-PDR-0006 SMCP 00 Silo Line SME2 GSL4 Piling Pile Driving 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for ISL4 KRS-SB-PDR-0007 SMCP 00 Silo Line SME2 ISL4 Piling Pile Driving 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for HSL5 KRS-SB-PDR-0008 SMCP 00 Silo Line SME2 HSL5 Piling Pile Driving 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for GSL6 KRS-SB-PDR-0009 SMCP 00 Silo Line SME2 GSL6 Piling Pile Driving 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0006 Welding Visual Report for GSL4 N/A SMCP 00 Silo Line SME2 GSL4 Piling Fit Up & Welding Visual Inspection 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0007 Welding Visual Report for ISL4 N/A SMCP 00 Silo Line SME2 ISL4 Piling Fit Up & Welding Visual Inspection 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0008 Welding Visual Report for HSL5 N/A SMCP 00 Silo Line SME2 HSL5 Piling Fit Up & Welding Visual Inspection 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0009 Welding Visual Report for GSL6 N/A SMCP 00 Silo Line SME2 GSL6 Piling Fit Up & Welding Visual Inspection 13-Aug-19 14-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
8 KRS-SB-RFI-0008 Survey, Pilling Work and Visual Welding Report ISL6,GSL7,ISL7,HSL8 KRS-SB-SUV-0005 Survey Report for ISL6,GSL7,ISL7,HSL8 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-ITR-0005 Piling Record for ISL6 KRS-SB-PDR-0010 SMCP 00 Silo Line SME2 ISL6 Piling Pile Driving 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for GSL7 KRS-SB-PDR-0011 SMCP 00 Silo Line SME2 GSL7 Piling Pile Driving 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for ISL7 KRS-SB-PDR-0012 SMCP 00 Silo Line SME2 ISL7 Piling Pile Driving 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
Piling Record for HSL8 KRS-SB-PDR-0013 SMCP 00 Silo Line SME2 HSL8 Piling Pile Driving 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0010 Welding Visual Report for ISL6 N/A SMCP 00 Silo Line SME2 ISL6 Piling Fit Up & Welding Visual Inspection 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0011 Welding Visual Report for GSL7 N/A SMCP 00 Silo Line SME2 GSL7 Piling Fit Up & Welding Visual Inspection 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0012 Welding Visual Report for ISL7 N/A SMCP 00 Silo Line SME2 ISL7 Piling Fit Up & Welding Visual Inspection 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
KRS-SB-WVR-0013 Welding Visual Report for HSL8 N/A SMCP 00 Silo Line SME2 HSL8 Piling Fit Up & Welding Visual Inspection 14-Aug-19 15-Aug-19 21-Aug-19 11 CLOSE 0 GERRY
9 KRS-SB-RFI-0009 Survey, Pilling Work and Visual Welding Report GSL9,ISL9,DSL1 KRS-SB-SUV-0006 Survey Report for GSL9,ISL9,DSL1 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-ITR-0006 Piling Record for GSL9 KRS-SB-PDR-0014 SMCP 00 Silo Line SME2 GSL9 Piling Pile Driving 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
Piling Record for ISL9 KRS-SB-PDR-0015 SMCP 00 Silo Line SME2 ISL9 Piling Pile Driving 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
Piling Record for DSL1 KRS-SB-PDR-0016 SMCP 00 Silo Line SME2 DSL1 Piling Pile Driving 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0014 Welding Visual Report for GSL9 N/A SMCP 00 Silo Line SME2 GSL9 Piling Fit Up & Welding Visual Inspection 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0015 Welding Visual Report for ISL9 N/A SMCP 00 Silo Line SME2 ISL9 Piling Fit Up & Welding Visual Inspection 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0016 Welding Visual Report for DSL1 N/A SMCP 00 Silo Line SME2 DSL1 Piling Fit Up & Welding Visual Inspection 15-Aug-19 16-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
10 KRS-SB-RFI-0010 Survey, Pilling Work and Visual Welding Report FSL1,ESL2,DSL3,FSL3 KRS-SB-SUV-0007 Survey Report for FSL1,ESL2,DSL3,FSL3 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-ITR-0007 Piling Record for FSL1 KRS-SB-PDR-0017 SMCP 00 Silo Line SME2 FSL1 Piling Pile Driving 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
Piling Record for ESL2 KRS-SB-PDR-0018 SMCP 00 Silo Line SME2 ESL2 Piling Pile Driving 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
Piling Record for DSL3 KRS-SB-PDR-0019 SMCP 00 Silo Line SME2 DSL3 Piling Pile Driving 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
Piling Record for FSL3 KRS-SB-PDR-0020 SMCP 00 Silo Line SME2 FSL3 Piling Pile Driving 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0017 Welding Visual Report for FSL1 N/A SMCP 00 Silo Line SME2 FSL1 Piling Fit Up & Welding Visual Inspection 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0018 Welding Visual Report for ESL2 N/A SMCP 00 Silo Line SME2 ESL2 Piling Fit Up & Welding Visual Inspection 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0019 Welding Visual Report for DSL3 N/A SMCP 00 Silo Line SME2 DSL3 Piling Fit Up & Welding Visual Inspection 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0020 Welding Visual Report for FSL3 N/A SMCP 00 Silo Line SME2 FSL3 Piling Fit Up & Welding Visual Inspection 16-Aug-19 18-Aug-19 21-Aug-19 12 CLOSE 0 GERRY
11 KRS-SB-RFI-0011 Survey, Pilling Work and Visual Welding Report DSL4,FSL4,ESL5,DSL6,FSL6 KRS-SB-SUV-0008 Survey Report for DSL4,FSL4,ESL5,DSL6,FSL6 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-ITR-0008 Pilling Record for DSL4 KRS-SB-PDR-0021 SMCP 00 Silo Line SME2 DSL4 Piling Pile Driving 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
Pilling Record for FSL4 KRS-SB-PDR-0022 SMCP 00 Silo Line SME2 FSL4 Piling Pile Driving 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
Pilling Record for ESL5 KRS-SB-PDR-0023 SMCP 00 Silo Line SME2 ESL5 Piling Pile Driving 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
Pilling Record for DSL6 KRS-SB-PDR-0024 SMCP 00 Silo Line SME2 DSL6 Piling Pile Driving 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
Pilling Record for FSL6 KRS-SB-PDR-0025 SMCP 00 Silo Line SME2 FSL6 Piling Pile Driving 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0021 Welding Visual Report for DSL4 N/A SMCP 00 Silo Line SME2 DSL4 Piling Fit Up & Welding Visual Inspection 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0022 Welding Visual Report for FSL4 N/A SMCP 00 Silo Line SME2 FSL4 Piling Fit Up & Welding Visual Inspection 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0023 Welding Visual Report for ESL5 N/A SMCP 00 Silo Line SME2 ESL5 Piling Fit Up & Welding Visual Inspection 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0024 Welding Visual Report for DSL6 N/A SMCP 00 Silo Line SME2 DSL6 Piling Fit Up & Welding Visual Inspection 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0025 Welding Visual Report for FSL6 N/A SMCP 00 Silo Line SME2 FSL6 Piling Fit Up & Welding Visual Inspection 18-Aug-19 19-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
12 KRS-SB-RFI-0012 Survey, Pilling Work and Visual Welding Report DSL7 KRS-SB-SUV-0009 Survey Report For DSL7 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 19-Aug-19 20-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-ITR-0009 Pilling Record for DSL7 KRS-SB-PDR-0026 SMCP 00 Silo Line SME2 DSL7 Piling Pile Driving 19-Aug-19 20-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0026 Welding Visual Report DSL7 N/A SMCP 00 Silo Line SME2 DSL7 Piling Fit Up & Welding Visual Inspection 19-Aug-19 20-Aug-19 23-Aug-19 12 CLOSE 0 GERRY
13 KRS-SB-RFI-0013 Survey, Pilling Work and Visual Welding Report FSL7, ESL8, DSL9, FSL9 KRS-SB-SUV-0010 Survey Report for FSL7, ESL8, DSL9, FSL9 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
KRS-SB-ITR-0010 Pilling Record for FSL7 KRS-SB-PDR-0027 SMCP 00 Silo Line SME2 FSL7 Piling Pile Driving 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
Pilling Record for ESL8 KRS-SB-PDR-0028 SMCP 00 Silo Line SME2 ESL8 Piling Pile Driving 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
Pilling Record for DSL9 KRS-SB-PDR-0029 SMCP 00 Silo Line SME2 DSL9 Piling Pile Driving 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
Pilling Record for FSL9 KRS-SB-PDR-0030 SMCP 00 Silo Line SME2 FSL9 Piling Pile Driving 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0027 Welding Visual Report for FSL7 N/A SMCP 00 Silo Line SME2 FSL7 Piling Fit Up & Welding Visual Inspection 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0028 Welding Visual Report for ESL8 N/A SMCP 00 Silo Line SME2 ESL8 Piling Fit Up & Welding Visual Inspection 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0029 Welding Visual Report for DSL9 N/A SMCP 00 Silo Line SME2 DSL9 Piling Fit Up & Welding Visual Inspection 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0030 Welding Visual Report for FSL9 N/A SMCP 00 Silo Line SME2 FSL9 Piling Fit Up & Welding Visual Inspection 20-Aug-19 21-Aug-19 30-Aug-19 12 CLOSE 0 GERRY
14 KRS-SB-RFI-0014 Survey, Pilling Work and Visual Welding Report ASL1,BSL2,CSL1 KRS-SB-SUV-0011 Survey Report for ASL1, BSL2, CSL1 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
KRS-SB-ITR-0011 Pilling Record for ASL1 KRS-SB-PDR-0031 SMCP 00 Silo Line SME2 ASL1 Piling Pile Driving 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
Pilling Record for CSL1 KRS-SB-PDR-0032 SMCP 00 Silo Line SME2 CSL1 Piling Pile Driving 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
Pilling Record for BSL2 KRS-SB-PDR-0033 SMCP 00 Silo Line SME2 BSL2 Piling Pile Driving 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0031 Welding Visual Report for ASL1 N/A SMCP 00 Silo Line SME2 ASL1 Piling Fit Up & Welding Visual Inspection 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0032 Welding Visual Report for CSL1 N/A SMCP 00 Silo Line SME2 CSL1 Piling Fit Up & Welding Visual Inspection 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
KRS-SB-WVR-0033 Welding Visual Report for BSL2 N/A SMCP 00 Silo Line SME2 BSL2 Piling Fit Up & Welding Visual Inspection 21-Aug-19 22-Aug-19 29-Aug-19 12 CLOSE 0 GERRY
15 KRS-SB-RFI-0015 Compressive Stregth Test K-300 KRS-SB-ITR-0022 Trial Mix K-300 KRS-SB-CST-0002 SMCP 00 Silo Line SME2 SILO Civil works Trial Concrete Mix Design 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY 7 day
Trial Mix K-300 (30 kg Cement) KRS-SB-CST-0003 SMCP 00 Silo Line SME2 SILO Civil works Trial Concrete Mix Design 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY 7 day
16 KRS-SB-RFI-0016 Survey, Pilling Work and Visual Welding Report ASL3, CSL3, CSL4, ASL4 KRS-SB-SUV-0012 Survey Report for ASL3, CSL3, CSL4, ASL4 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-ITR-0012 Pilling Record for ASL3 KRS-SB-PDR-0034 SMCP 00 Silo Line SME2 ASL3 Piling Pile Driving 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for CSL3 KRS-SB-PDR-0035 SMCP 00 Silo Line SME2 CSL3 Piling Pile Driving 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for CSL4 KRS-SB-PDR-0036 SMCP 00 Silo Line SME2 CSL4 Piling Pile Driving 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for ASL4 KRS-SB-PDR-0037 SMCP 00 Silo Line SME2 ASL4 Piling Pile Driving 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0034 Welding Visual Report for ASL3 N/A SMCP 00 Silo Line SME2 ASL3 Piling Fit Up & Welding Visual Inspection 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0035 Welding Visual Report for CSL3 N/A SMCP 00 Silo Line SME2 CSL3 Piling Fit Up & Welding Visual Inspection 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0036 Welding Visual Report for CSL4 N/A SMCP 00 Silo Line SME2 CSL4 Piling Fit Up & Welding Visual Inspection 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0037 Welding Visual Report for ASL4 N/A SMCP 00 Silo Line SME2 ASL4 Piling Fit Up & Welding Visual Inspection 22-Aug-19 23-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
17 KRS-SB-RFI-0017 Survey, Pilling Work and Visual Welding Report BSL5, CSL6, ASL6, ASL7 KRS-SB-SUV-0013 Survey Report for BSL5, CSL6, ASL6, ASL7 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-ITR-0013 Pilling Record for BSL5 KRS-SB-PDR-0038 SMCP 00 Silo Line SME2 BSL5 Piling Pile Driving 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for CSL6 KRS-SB-PDR-0039 SMCP 00 Silo Line SME2 CSL6 Piling Pile Driving 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for ASL6 KRS-SB-PDR-0040 SMCP 00 Silo Line SME2 ASL6 Piling Pile Driving 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for ASL7 KRS-SB-PDR-0041 SMCP 00 Silo Line SME2 ASL7 Piling Pile Driving 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0038 Welding Visual Report for BSL5 N/A SMCP 00 Silo Line SME2 BSL5 Piling Fit Up & Welding Visual Inspection 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0039 Welding Visual Report for CSL6 N/A SMCP 00 Silo Line SME2 CSL6 Piling Fit Up & Welding Visual Inspection 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0040 Welding Visual Report for ASL6 N/A SMCP 00 Silo Line SME2 ASL6 Piling Fit Up & Welding Visual Inspection 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0041 Welding Visual Report for ASL7 N/A SMCP 00 Silo Line SME2 ASL7 Piling Fit Up & Welding Visual Inspection 23-Aug-19 24-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
18 KRS-SB-RFI-0018 Survey, Pilling Work and Visual Welding Report CSL7, BSL8, ASL9, CSL9 KRS-SB-SUV-0014 Survey Report for CSL7, BSL8, ASL9, CSL9 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-ITR-0014 Pilling Record for CSL7 KRS-SB-PDR-0042 SMCP 00 Silo Line SME2 CSL7 Piling Pile Driving 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for BSL8 KRS-SB-PDR-0043 SMCP 00 Silo Line SME2 BSL8 Piling Pile Driving 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for ASL9 KRS-SB-PDR-0044 SMCP 00 Silo Line SME2 ASL9 Piling Pile Driving 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
Pilling Record for CSL9 KRS-SB-PDR-0045 SMCP 00 Silo Line SME2 CSL9 Piling Pile Driving 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0042 Welding Visual Report for CSL7 N/A SMCP 00 Silo Line SME2 CSL7 Piling Fit Up & Welding Visual Inspection 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0043 Welding Visual Report for BSL8 N/A SMCP 00 Silo Line SME2 BSL8 Piling Fit Up & Welding Visual Inspection 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0044 Welding Visual Report for ASL9 N/A SMCP 00 Silo Line SME2 ASL9 Piling Fit Up & Welding Visual Inspection 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0045 Welding Visual Report for CSL9 N/A SMCP 00 Silo Line SME2 CSL9 Piling Fit Up & Welding Visual Inspection 24-Aug-19 25-Aug-19 29-Aug-19 13 CLOSE 0 GERRY
19 KRS-SB-RFI-0019 Survey and Pilling Work AFT9 1,BFT9 1,AFT8 2,BFT8 2 KRS-SB-SUV-0015 Survey Report for AFT9 1,BFT9 1,AFT8 2,BFT8 2 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 25-Aug-19 26-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
KRS-SB-ITR-0015 Pilling Record for AFT9 1 KRS-SB-PDR-0046 SMCP 00 Silo Line SME2 AFT9 1 Piling Pile Driving 25-Aug-19 26-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
Pilling Record for BFT9 1 KRS-SB-PDR-0047 SMCP 00 Silo Line SME2 BFT9 1 Piling Pile Driving 25-Aug-19 26-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
Pilling Record for AFT8 2 KRS-SB-PDR-0048 SMCP 00 Silo Line SME2 AFT8 2 Piling Pile Driving 25-Aug-19 26-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
19 KRS-SB-RFI-0019 Survey and Pilling Work AFT9 1,BFT9 1,AFT8 2,BFT8 2
KRS-SB-ITR-0015

Pilling Record for BFT8 2 KRS-SB-PDR-0049 SMCP 00 Silo Line SME2 BFT8 2 Piling Pile Driving 25-Aug-19 26-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
20 KRS-SB-RFI-0020 Survey and Pilling Work AFT7 3,BFT7 3 KRS-SB-SUV-0016 Survey Report for AFT7 3,BFT7 3 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 26-Aug-19 27-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
KRS-SB-ITR-0016 Pilling Record AFT7 3 KRS-SB-PDR-0050 SMCP 00 Silo Line SME2 AFT7 3 Piling Pile Driving 26-Aug-19 27-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
Pilling Record BFT7 3 KRS-SB-PDR-0051 SMCP 00 Silo Line SME2 BFT7 3 Piling Pile Driving 26-Aug-19 27-Aug-19 19-Sep-19 13 CLOSE 0 GERRY
21 KRS-SB-RFI-0021 Survey, Pilling Work and Visual Welding Report ACF1 4,BCF1 4,ACF1 3 KRS-SB-SUV-0017 Survey Report for ACF1 4,BCF1 4,ACF1 3 N/A SMCP 00 Silo Line SME2 SME2 Piling Survey Piling 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-ITR-0017 Pilling Record for ACF1 4 KRS-SB-PDR-0052 SMCP 00 Silo Line SME2 ACF1 4 Piling Pile Driving 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
Pilling Record for BCF1 4 KRS-SB-PDR-0053 SMCP 00 Silo Line SME2 BCF1 4 Piling Pile Driving 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
Pilling Record for ACF1 3 KRS-SB-PDR-0054 SMCP 00 Silo Line SME2 ACF1 3 Piling Pile Driving 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0046 Welding Visual Report for ACF1 4 N/A SMCP 00 Silo Line SME2 ACF1 4 Piling Fit Up & Welding Visual Inspection 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0047 Welding Visual Report for BCF1 4 N/A SMCP 00 Silo Line SME2 BCF1 4 Piling Fit Up & Welding Visual Inspection 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0048 Welding Visual Report for ACF1 3 N/A SMCP 00 Silo Line SME2 ACF1 3 Piling Fit Up & Welding Visual Inspection 27-Aug-19 28-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
22 KRS-SB-RFI-0022 Survey, Pilling Work BCF1 3,ACF1 2,BCF1 2,AFT1 1,AMS2 8, Visual Welding Report KRS-SB-SUV-0018 Survey Report for BCF1 3,ACF1 2,BCF1 2,AFT1 1,AMS2 8 N/A SMCP 00 Conveyor Line SME2-BC SME2 Piling Survey Piling 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
BCF1 3,ACF1 2,BCF1 2 and Pre-pouring Concrete K-300 KRS-SB-ITR-0018 Pilling Record for BCF1 3 KRS-SB-PDR-0055 SMCP 00 Conveyor Line SME2-BC BCF1 3 Piling Pile Driving 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
Pilling Record for ACF1 2 KRS-SB-PDR-0056 SMCP 00 Conveyor Line SME2-BC ACF1 2 Piling Pile Driving 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
Pilling Record for BCF1 2 KRS-SB-PDR-0057 SMCP 00 Conveyor Line SME2-BC BCF1 2 Piling Pile Driving 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
Pilling Record for AFT1 1 KRS-SB-PDR-0058 SMCP 00 Conveyor Line SME2-BC AFT1 1 Piling Pile Driving 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
Pilling Record for AMS2 8 KRS-SB-PDR-0059 SMCP 00 Conveyor Line SME2-BC AMS2 8 Piling Pile Driving 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0049 Welding Visual Report for BCF1 3 N/A SMCP 00 Conveyor Line SME2-BC BCF1 3 Piling Fit Up & Welding Visual Inspection 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0050 Welding Visual Report for ACF1 2 N/A SMCP 00 Conveyor Line SME2-BC ACF1 2 Piling Fit Up & Welding Visual Inspection 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-WVR-0051 Welding Visual Report for BCF1 2 N/A SMCP 00 Conveyor Line SME2-BC BCF1 2 Piling Fit Up & Welding Visual Inspection 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-PCR-0001 Pile Head Treatment N/A SMCP 00 Silo Line SME2 SME2 Civil works Pre-Pouring Concrete 28-Aug-19 29-Aug-19 12-Sep-19 13 CLOSE 0 GERRY
KRS-SB-PCR-0002 Pile Head Treatment N/A SMCP 00 Silo Line SME2 SME2 Civil works Pre-Pouring Concrete 28-Aug-19 29-Aug-19 17-Oct-19 13 OPEN 0 GERRY
23 KRS-SB-RFI-0023 Survey and Pilling Work BMS2 8,AMS2 7,BMS2 7,AFT2 6,BFT2 6,AFT3 5,BFT3 5 KRS-SB-SUV-0019 Survey Report for BMS2 8,AMS2 7,BMS2 7,AFT2 6,BFT2 6,AFT3 5,BFT3 5 N/A SMCP 00 Conveyor Line SME2-BC SME2 Piling Survey Piling 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
KRS-SB-ITR-0019 Pilling Record for BMS2 8 KRS-SB-PDR-0060 SMCP 00 Conveyor Line SME2-BC BMS2 8 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
Pilling Record for AMS2 7 KRS-SB-PDR-0061 SMCP 00 Conveyor Line SME2-BC AMS2 7 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BMS2 7 KRS-SB-PDR-0062 SMCP 00 Conveyor Line SME2-BC BMS2 7 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
Pilling Record for AFT2 6 KRS-SB-PDR-0063 SMCP 00 Conveyor Line SME2-BC AFT2 6 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BFT2 6 KRS-SB-PDR-0064 SMCP 00 Conveyor Line SME2-BC BFT2 6 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
Pilling Record for AFT3 5 KRS-SB-PDR-0065 SMCP 00 Conveyor Line SME2-BC AFT3 5 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BFT3 5 KRS-SB-PDR-0066 SMCP 00 Conveyor Line SME2-BC BFT3 5 Piling Pile Driving 29-Aug-19 30-Aug-19 12-Sep-19 14 CLOSE 0 GERRY
24 KRS-SB-RFI-0024 Survey, Pilling Work AFT4 4,BFT4 4,AFT5 3,BFT5 3,ATA2 2,BTA2 2 and Visual Welding KRS-SB-SUV-0020 Survey Report for AFT4 4,BFT4 4,AFT5 3,BFT5 3,ATA2 2,BTA2 2 N/A SMCP 00 Conveyor Line SME2-BC SME2 Piling Survey Piling 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
Report ATA2 2,BTA2 2 KRS-SB-ITR-0020 Pilling Record for AFT4 4 KRS-SB-PDR-0067 SMCP 00 Conveyor Line SME2-BC AFT4 4 Piling Pile Driving 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BFT4 4 KRS-SB-PDR-0068 SMCP 00 Conveyor Line SME2-BC BFT4 Piling Pile Driving 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
Pilling Record for AFT5 3 KRS-SB-PDR-0069 SMCP 00 Conveyor Line SME2-BC AFT5 3 Piling Pile Driving 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BFT5 3 KRS-SB-PDR-0070 SMCP 00 Conveyor Line SME2-BC BFT53 Piling Pile Driving 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
Pilling Record for ATA2 2 KRS-SB-PDR-0071 SMCP 00 Conveyor Line SME2-BC ATA2 2 Piling Pile Driving 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BTA2 2 KRS-SB-PDR-0072 SMCP 00 Conveyor Line SME2-BC BTA2 2 Piling Pile Driving 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
KRS-SB-WVR-0052 Welding Visual Report for ATA2 2 N/A SMCP 00 Conveyor Line SME2-BC ATA2 2 Piling Fit Up & Welding Visual Inspection 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
KRS-SB-WVR-0053 Welding Visual Report for BTA2 2 N/A SMCP 00 Conveyor Line SME2-BC BTA2 2 Piling Fit Up & Welding Visual Inspection 30-Aug-19 31-Aug-19 19-Sep-19 14 CLOSE 0 GERRY
25 KRS-SB-RFI-0025 Survey and Pilling Work AFT6 4,BFT6 4 KRS-SB-SUV-0021 Survey Report for AFT6 4,BFT6 4 N/A SMCP 00 Conveyor Line SME2-BC SME2 Piling Survey Piling 31-Aug-19 1-Sep-19 4-Oct-19 14 CLOSE 0 GERRY
KRS-SB-ITR-0021 Pilling Record for AFT6 4 KRS-SB-PDR-0073 SMCP 00 Conveyor Line SME2-BC AFT6 4 Piling Pile Driving 31-Aug-19 1-Sep-19 4-Oct-19 14 CLOSE 0 GERRY
Pilling Record for BFT6 4 KRS-SB-PDR-0074 SMCP 00 Conveyor Line SME2-BC BFT6 4 Piling Pile Driving 31-Aug-19 1-Sep-19 4-Oct-19 14 CLOSE 0 GERRY
26 KRS-SB-RFI-0026 Dynamic Cone Penetrometer KRS-SB-ITR-0023 Dynamic Cone Penetrometer for Silo KRS-SB-DCP-0001 SMCP 00 Silo Line SME2 SME2 Earthwork DCP 27-Aug-19 28-Aug-19 2-Oct-19 13 CLOSE 0 GERRY
27 KRS-SB-RFI-0027 Dynamic Cone Penetrometer KRS-SB-ITR-0024 Dynamic Cone Penetrometer for Silo KRS-SB-DCP-0002 SMCP 00 Silo Line SME2 SME2 Earthwork DCP 28-Aug-19 29-Aug-19 2-Oct-19 13 CLOSE 0 GERRY
28 KRS-SB-RFI-0028 Dynamic Cone Penetrometer and Compressive Streght Test K-175 KRS-SB-ITR-0025 Dynamic Cone Penetrometer for Silo KRS-SB-DCP-0003 SMCP 00 Silo Line SME2 SME2 Earthwork DCP 4-Sep-19 5-Sep-19 2-Oct-19 14 CLOSE 0 GERRY
LC Silo Line SME-2 KRS-SB-CST-0004 SMCP 00 Silo Line SME2 SILO Civil works Trial Concrete Mix Design 4-Sep-19 5-Sep-19 2-Oct-19 14 CLOSE 0 GERRY 7 day
Trial Mix K-175 KRS-SB-CST-0005 SMCP 00 Silo Line SME2 SILO Civil works Trial Concrete Mix Design 4-Sep-19 5-Sep-19 2-Oct-19 14 CLOSE 0 GERRY 28 day
29 KRS-SB-RFI-0030 Survey, Pilling Record and Visual Welding Report ATA2 1, BTA2 1 KRS-SB-SUV-0022 Survey Report for ATA2 1,BTA2 1 N/A SMCP 00 Conveyor Line SME2-BC SME2 Piling Survey Piling 4-Sep-19 5-Sep-19 19-Sep-19 14 CLOSE 0 GERRY
KRS-SB-ITR-0027 Pilling Record for ATA2 1 KRS-SB-PDR-0075 SMCP 00 Conveyor Line SME2-BC ATA2 1 Piling Pile Driving 4-Sep-19 5-Sep-19 19-Sep-19 14 CLOSE 0 GERRY
Pilling Record for BTA2 1 KRS-SB-PDR-0076 SMCP 00 Conveyor Line SME2-BC BTA2 1 Piling Pile Driving 4-Sep-19 5-Sep-19 19-Sep-19 14 CLOSE 0 GERRY
KRS-SB-WVR-0054 Welding Visual Report ATA2 1 N/A SMCP 00 Conveyor Line SME2-BC ATA2 1 Piling Fit Up & Welding Visual Inspection 4-Sep-19 5-Sep-19 19-Sep-19 14 CLOSE 0 GERRY
KRS-SB-WVR-0055 Welding Visual Report BTA2 1 N/A SMCP 00 Conveyor Line SME2-BC BTA2 1 Piling Fit Up & Welding Visual Inspection 4-Sep-19 5-Sep-19 19-Sep-19 14 CLOSE 0 GERRY
30 KRS-SB-RFI-0031 Survey, Piling Record and Visual Welding Report AWG8 KRS-SB-SUV-0023 Survey Report for AWG8 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 8-Sep-19 9-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-ITR-0028 Piling Record for AWG8 KRS-SB-PDR-0077 SMCP 00 Wing Gate SME1 AWG8 Piling Pile Driving 8-Sep-19 9-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0056 Welding Visual Report AWG8 N/A SMCP 00 Wing Gate SME1 AWG8 Piling Fit Up & Welding Visual Inspection 8-Sep-19 9-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
31 KRS-SB-RFI-0032 Survey, Piling Record and Visual Welding Report AWG7, KRS-SB-SUV-0024 Survey Report for AWG7,AWG6,BWG6,AWG5 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
AWG6,BWG6,AWG5 KRS-SB-ITR-0029 Piling Record for AWG7 KRS-SB-PDR-0078 SMCP 00 Wing Gate SME1 AWG7 Piling Pile Driving 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for AWG6 KRS-SB-PDR-0079 SMCP 00 Wing Gate SME1 AWG6 Piling Pile Driving 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for BWG6 KRS-SB-PDR-0080 SMCP 00 Wing Gate SME1 BWG6 Piling Pile Driving 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for AWG5 KRS-SB-PDR-0081 SMCP 00 Wing Gate SME1 AWG5 Piling Pile Driving 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0057 Welding Visual Report AWG7 N/A SMCP 00 Wing Gate SME1 AWG7 Piling Fit Up & Welding Visual Inspection 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0058 Welding Visual Report AWG6 N/A SMCP 00 Wing Gate SME1 AWG6 Piling Fit Up & Welding Visual Inspection 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0059 Welding Visual Report BWG6 N/A SMCP 00 Wing Gate SME1 BWG6 Piling Fit Up & Welding Visual Inspection 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0060 Welding Visual Report AWG5 N/A SMCP 00 Wing Gate SME1 AWG5 Piling Fit Up & Welding Visual Inspection 9-Sep-19 10-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
32 KRS-SB-RFI-0033 Survey, Piling Record and Visual Welding Report BWG5, KRS-SB-SUV-0025 Survey Report for BWG5,AWG4,BWG4 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
AWG4,BWG4 KRS-SB-ITR-0030 Piling Record for BWG5 KRS-SB-PDR-0082 SMCP 00 Wing Gate SME1 BWG5 Piling Pile Driving 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for AWG4 KRS-SB-PDR-0083 SMCP 00 Wing Gate SME1 AWG4 Piling Pile Driving 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for BWG4 KRS-SB-PDR-0084 SMCP 00 Wing Gate SME1 BWG4 Piling Pile Driving 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0061 Welding Visual Report BWG5 N/A SMCP 00 Wing Gate SME1 BWG5 Piling Fit Up & Welding Visual Inspection 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0062 Welding Visual Report AWG4 N/A SMCP 00 Wing Gate SME1 AWG4 Piling Fit Up & Welding Visual Inspection 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0063 Welding Visual Report BWG4 N/A SMCP 00 Wing Gate SME1 BWG4 Piling Fit Up & Welding Visual Inspection 10-Sep-19 11-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
33 KRS-SB-RFI-0034 Survey, Piling Record and Visual Welding Report AWG3, KRS-SB-SUV-0026 Survey Report for AWG3,BWG3,AWG2 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
BWG3,AWG2 KRS-SB-ITR-0031 Piling Record for AWG3 KRS-SB-PDR-0085 SMCP 00 Wing Gate SME1 AWG3 Piling Pile Driving 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for BWG3 KRS-SB-PDR-0086 SMCP 00 Wing Gate SME1 BWG3 Piling Pile Driving 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
Piling Record for AWG2 KRS-SB-PDR-0087 SMCP 00 Wing Gate SME1 AWG2 Piling Pile Driving 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0064 Welding Visual Report AWG3 N/A SMCP 00 Wing Gate SME1 AWG3 Piling Fit Up & Welding Visual Inspection 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0065 Welding Visual Report BWG3 N/A SMCP 00 Wing Gate SME1 BWG3 Piling Fit Up & Welding Visual Inspection 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
KRS-SB-WVR-0066 Welding Visual Report AWG2 N/A SMCP 00 Wing Gate SME1 AWG2 Piling Fit Up & Welding Visual Inspection 11-Sep-19 12-Sep-19 27-Sep-19 15 CLOSE 0 GERRY
34 KRS-SB-RFI-0035 Survey, Piling Record and Visual Welding Report BWG2, KRS-SB-SUV-0027 Survey Report for BWG2,AWG1,BWG1 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
AWG1,BWG1 KRS-SB-ITR-0032 Piling Record for BWG2 KRS-SB-PDR-0088 SMCP 00 Wing Gate SME1 BWG2 Piling Pile Driving 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
Piling Record for AWG1 KRS-SB-PDR-0089 SMCP 00 Wing Gate SME1 AWG1 Piling Pile Driving 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
Piling Record for BWG1 KRS-SB-PDR-0090 SMCP 00 Wing Gate SME1 BWG1 Piling Pile Driving 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0067 Welding Visual Report BWG2 N/A SMCP 00 Wing Gate SME1 BWG2 Piling Fit Up & Welding Visual Inspection 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0068 Welding Visual Report AWG1 N/A SMCP 00 Wing Gate SME1 AWG1 Piling Fit Up & Welding Visual Inspection 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0069 Welding Visual Report BWG1 N/A SMCP 00 Wing Gate SME1 BWG1 Piling Fit Up & Welding Visual Inspection 12-Sep-19 13-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
35 KRS-SB-RFI-0036 Survey, Piling Record and Visual Welding Report BWG7, KRS-SB-SUV-0028 Survey Report for BWG7,BWG8 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 13-Sep-19 14-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
BWG8 KRS-SB-ITR-0033 Piling Record for BWG7 KRS-SB-PDR-0091 SMCP 0 Wing Gate SME1 BWG7 Piling Pile Driving 13-Sep-19 14-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
Piling Record for BWG8 KRS-SB-PDR-0092 SMCP 00 Wing Gate SME1 BWG8 Piling Pile Driving 13-Sep-19 14-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0070 Welding Visual Report BWG7 N/A SMCP 00 Wing Gate SME1 BWG7 Piling Fit Up & Welding Visual Inspection 13-Sep-19 14-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0071 Welding Visual Report BWG8 N/A SMCP 00 Wing Gate SME1 BWG8 Piling Fit Up & Welding Visual Inspection 13-Sep-19 14-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
36 KRS-SB-RFI-0037 Survey, Piling Record and Visual Welding Report AFH3, KRS-SB-SUV-0029 Survey Report for AFH3,AWG16 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 SME1 Piling Survey Piling 14-Sep-19 15-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
AWG16 KRS-SB-ITR-0034 Piling Record for AFH 3 KRS-SB-PDR-0093 SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AFH3 Piling Pile Driving 14-Sep-19 15-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
Piling Record for AWG16 KRS-SB-PDR-0094 SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AWG16 Piling Pile Driving 14-Sep-19 15-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0072 Welding Visual Report AFH 3 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AFH3 Piling Fit Up & Welding Visual Inspection 14-Sep-19 15-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0073 Welding Visual Report AWG16 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AWG16 Piling Fit Up & Welding Visual Inspection 14-Sep-19 15-Sep-19 27-Sep-19 16 CLOSE 0 GERRY
37 KRS-SB-RFI-0038 Survey, Piling Record and Visual Welding Report BWG16,AWG15 KRS-SB-SUV-0030 Survey Report for BWG16,AWG15 N/A SMCP 00 Wing Gate SME1 SME1 Piling Survey Piling 15-Sep-19 16-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-ITR-0035 Piling Record for BWG16 KRS-SB-PDR-0095 SMCP 00 Wing Gate SME1 BWG16 Piling Pile Driving 15-Sep-19 16-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
Piling Record for AWG15 KRS-SB-PDR-0096 SMCP 00 Wing Gate SME1 AWG15 Piling Pile Driving 15-Sep-19 16-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0074 Welding Visual Report for BWG16 N/A SMCP 00 Wing Gate SME1 BWG16 Piling Fit Up & Welding Visual Inspection 15-Sep-19 16-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0075 Welding Visual Report for AWG15 N/A SMCP 00 Wing Gate SME1 AWG15 Piling Fit Up & Welding Visual Inspection 15-Sep-19 16-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
38 KRS-SB-RFI-0039 Survey, Piling Record and Visual Welding Report BWG15,AWG14 KRS-SB-SUV-0031 Survey Report for BWG15,AWG14 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 16-Sep-19 17-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-ITR-0036 Piling Record for BWG15 KRS-SB-PDR-0097 SMCP 00 Wing Gate SME1 BWG15 Piling Pile Driving 16-Sep-19 17-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
Piling Record for AWG14 KRS-SB-PDR-0098 SMCP 00 Wing Gate SME1 AWG14 Piling Pile Driving 16-Sep-19 17-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0076 Welding Visual Report for BWG15 N/A SMCP 00 Wing Gate SME1 BWG15 Piling Fit Up & Welding Visual Inspection 16-Sep-19 17-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0077 Welding Visual Report for AWG14 N/A SMCP 00 Wing Gate SME1 AWG14 Piling Fit Up & Welding Visual Inspection 16-Sep-19 17-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
39 KRS-SB-RFI-0040 Survey, Piling Record and Visual Welding Report BWG14,AWG13,BWG13 KRS-SB-SUV-0032 Survey Report for BWG14,AWG13,BWG13 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-ITR-0037 Piling Record for BWG14 KRS-SB-PDR-0099 SMCP 00 Wing Gate SME1 BWG14 Piling Pile Driving 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
Piling Record for AWG13 KRS-SB-PDR-0100 SMCP 00 Wing Gate SME1 AWG13 Piling Pile Driving 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-ITR-0037 Piling Record for BWG13 KRS-SB-PDR-0101 SMCP 00 Wing Gate SME1 BWG13 Piling Pile Driving 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0078 Welding Visual Report for BWG14 N/A SMCP 00 Wing Gate SME1 BWG14 Piling Fit Up & Welding Visual Inspection 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0079 Welding Visual Report for AWG13 N/A SMCP 00 Wing Gate SME1 AWG13 Piling Fit Up & Welding Visual Inspection 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0080 Welding Visual Report for BWG13 N/A SMCP 00 Wing Gate SME1 BWG13 Piling Fit Up & Welding Visual Inspection 17-Sep-19 18-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
40 KRS-SB-RFI-0041 Survey, Piling Record and Visual Welding Report AWG12,BWG12 KRS-SB-SUV-0033 Survey Report for AWG12,BWG12 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 18-Sep-19 19-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-ITR-0038 Piling Record for AWG12 KRS-SB-PDR-0102 SMCP 00 Wing Gate SME1 AWG12 Piling Pile Driving 18-Sep-19 19-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
Piling Record for BWG12 KRS-SB-PDR-0103 SMCP 00 Wing Gate SME1 BWG12 Piling Pile Driving 18-Sep-19 19-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0081 Welding Visual Report for AWG12 N/A SMCP 00 Wing Gate SME1 AWG12 Piling Fit Up & Welding Visual Inspection 18-Sep-19 19-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
KRS-SB-WVR-0082 Welding Visual Report for BWG12 N/A SMCP 00 Wing Gate SME1 BWG12 Piling Fit Up & Welding Visual Inspection 18-Sep-19 19-Sep-19 4-Oct-19 16 CLOSE 0 GERRY
41 KRS-SB-RFI-0042 Survey, Piling Record and Visual Welding Report AWG11,BWG11,AWG10 KRS-SB-SUV-0034 Survey Report for AWG11,BWG11,AWG10 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-ITR-0039 Piling Record for AWG11 KRS-SB-PDR-0104 SMCP 00 Wing Gate SME1 AWG11 Piling Pile Driving 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for BWG11 KRS-SB-PDR-0105 SMCP 00 Wing Gate SME1 BWG11 Piling Pile Driving 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for AWG10 KRS-SB-PDR-0106 SMCP 00 Wing Gate SME1 AWG10 Piling Pile Driving 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0083 Welding Visual Report for AWG11 N/A SMCP 00 Wing Gate SME1 AWG11 Piling Fit Up & Welding Visual Inspection 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0084 Welding Visual Report for BWG11 N/A SMCP 00 Wing Gate SME1 BWG11 Piling Fit Up & Welding Visual Inspection 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0085 Welding Visual Report for AWG10 N/A SMCP 00 Wing Gate SME1 AWG10 Piling Fit Up & Welding Visual Inspection 19-Sep-19 20-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
42 KRS-SB-RFI-0043 Survey, Piling Record and Visual Welding Report BWG10,AWG9 KRS-SB-SUV-0035 Survey Report for BWG10,AWG9 N/A SMCP 00 Wing Gate SME1 SME2 Piling Survey Piling 20-Sep-19 21-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-ITR-0040 Piling Record for BWG10 KRS-SB-PDR-107 SMCP 00 Wing Gate SME1 BWG10 Piling Pile Driving 20-Sep-19 21-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for AWG9 KRS-SB-PDR-108 SMCP 00 Wing Gate SME1 AWG9 Piling Pile Driving 20-Sep-19 21-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0086 Welding Visual Report for BWG10 N/A SMCP 00 Wing Gate SME1 BWG10 Piling Fit Up & Welding Visual Inspection 20-Sep-19 21-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0087 Welding Visual Report for AWG9 N/A SMCP 00 Wing Gate SME1 AWG9 Piling Fit Up & Welding Visual Inspection 20-Sep-19 21-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
43 KRS-SB-RFI-0044 Pre-Pouring Concrete K-300 KRS-SB-PCR-0003 Pre-Pouring Concrete Inspection 1st Floor Foundation Silo N/A SMCP 00 Silo Line SME2 SME2 Civil works Pre-Pouring Concrete 20-Sep-19 21-Sep-19 2-Oct-19 17 CLOSE 0 GERRY
44 KRS-SB-RFI-0045 Survey, Piling Record and Visual Welding Report AWG9,AFH4,DFH5,DFH4 KRS-SB-SUV-0036 Survey Report for AWG9,AFH4,DFH5,DFH4 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 SME1 Piling Survey Piling 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
44 KRS-SB-RFI-0045 Survey, Piling Record and Visual Welding Report AWG9,AFH4,DFH5,DFH4
KRS-SB-ITR-0041 Piling Record for AWG9 KRS-SB-PDR-109 SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AWG9 Piling Pile Driving 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for AFH4 KRS-SB-PDR-110 SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AFH4 Piling Pile Driving 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for DFH5 KRS-SB-PDR-111 SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 DFH5 Piling Pile Driving 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for DFH4 KRS-SB-PDR-112 SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 DFH4 Piling Pile Driving 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0088 Welding Visual Report for AWG9 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AWG9 Piling Fit Up & Welding Visual Inspection 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0089 Welding Visual Report for AFH4 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 AFH4 Piling Fit Up & Welding Visual Inspection 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0090 Welding Visual Report for DFH5 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 DFH5 Piling Fit Up & Welding Visual Inspection 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0091 Welding Visual Report for DFH4 N/A SMCP 00 Wing Gate SME1 & Hopper Feeder SME1 DFH4 Piling Fit Up & Welding Visual Inspection 21-Sep-19 22-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
45 KRS-SB-RFI-0046 Survey, Piling Record and Visual Welding Report DFH3,DFH2,CFH2 KRS-SB-SUV-0037 Survey Report for DFH3,DFH2,CFH2 N/A SMCP 00 Hopper Feeder SME1 SME1 Piling Survey Piling 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-ITR-0042 Piling Record for DFH3 KRS-SB-PDR-113 SMCP 00 Hopper Feeder SME1 DFH3 Piling Pile Driving 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for DFH2 KRS-SB-PDR-114 SMCP 00 Hopper Feeder SME1 DFH2 Piling Pile Driving 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for CFH2 KRS-SB-PDR-115 SMCP 00 Hopper Feeder SME1 CFH2 Piling Pile Driving 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0092 Welding Visual Report for DFH3 N/A SMCP 00 Hopper Feeder SME1 DFH3 Piling Fit Up & Welding Visual Inspection 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0093 Welding Visual Report for DFH2 N/A SMCP 00 Hopper Feeder SME1 DFH2 Piling Fit Up & Welding Visual Inspection 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0094 Welding Visual Report for CFH2 N/A SMCP 00 Hopper Feeder SME1 CFH2 Piling Fit Up & Welding Visual Inspection 22-Sep-19 23-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
46 KRS-SB-RFI-0047 Compressive Stregth Test 1st Floor Foundation Silo KRS-SB-ITR-0043 Silo Line SME2 1st Layer KRS-SB-CST-0013 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 28-Sep-19 29-Sep-19 2-Oct-17 17 CLOSE 0 GERRY SL-1-1 & SL-1-2 & 7 day
Silo Line SME2 1st Layer KRS-SB-CST-0014 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 28-Sep-19 29-Sep-19 2-Oct-17 17 CLOSE 0 GERRY SL-1-3 & SL-1-4 & 7 day
47 KRS-SB-RFI-0048 Survey, Piling Record and Visual Welding Report BFH2,AFH2,AFH1,EFH1,DFH1 KRS-SB-SUV-0038 Survey Report for BFH2,AFH2,AFH1,EFH1,DFH1 N/A SMCP 00 Hopper Feeder SME1 SME1 Piling Survey Piling 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-ITR-0044 Piling Record for BFH2 KRS-SB-PDR-116 SMCP 00 Hopper Feeder SME1 BFH2 Piling Pile Driving 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for AFH2 KRS-SB-PDR-117 SMCP 00 Hopper Feeder SME1 AFH2 Piling Pile Driving 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for AFH1 KRS-SB-PDR-118 SMCP 00 Hopper Feeder SME1 AFH1 Piling Pile Driving 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for EFH1 KRS-SB-PDR-119 SMCP 00 Hopper Feeder SME1 EFH1 Piling Pile Driving 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
Piling Record for DFH1 KRS-SB-PDR-120 SMCP 00 Hopper Feeder SME1 DFH1 Piling Pile Driving 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0095 Welding Visual Report for BFH2 N/A SMCP 00 Hopper Feeder SME1 BFH2 Piling Fit Up & Welding Visual Inspection 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0096 Welding Visual Report for AFH2 N/A SMCP 00 Hopper Feeder SME1 AFH2 Piling Fit Up & Welding Visual Inspection 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0097 Welding Visual Report for AFH1 N/A SMCP 00 Hopper Feeder SME1 AFH1 Piling Fit Up & Welding Visual Inspection 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0098 Welding Visual Report for EFH1 N/A SMCP 00 Hopper Feeder SME1 EFH1 Piling Fit Up & Welding Visual Inspection 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
KRS-SB-WVR-0099 Welding Visual Report for DFH1 N/A SMCP 00 Hopper Feeder SME1 DFH1 Piling Fit Up & Welding Visual Inspection 23-Sep-19 24-Sep-19 4-Oct-19 17 CLOSE 0 GERRY
48 KRS-SB-RFI-0049 Trial Mix Design KRS-SB-ITR-0045 Trial Mix K-300 KRS-SB-CST-0007 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 12-Sep-19 13-Sep-19 17-Oct-19 16 CLOSE 0 GERRY K-300 & 28 day
Trial Mix K-300 (30 kg Cement) KRS-SB-CST-0008 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 12-Sep-19 13-Sep-19 17-Oct-19 16 CLOSE 0 GERRY K-300 & 28 day

49 KRS-SB-RFI-0050 Trial Mix Design Conch Cement KRS-SB-ITR-0046 Trial Mix K-300 KRS-SB-CST-0009 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 6-Sep-19 7-Sep-19 15 CLOSE 0 GERRY as mix design, as mix design + cement 40 kg,
17-Oct-19 as mix design + cement 80 kg
50 KRS-SB-RFI-0051 Trial Mix Design Conch Cement KRS-SB-ITR-0047 Trial Mix K-300 (430 kg Cement Conch) KRS-SB-CST-0010 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 18-Sep-19 19-Sep-19 17-Oct-19 16 CLOSE 0 GERRY 3 day
Trial Mix K-300 (400 kg Cement Conch) KRS-SB-CST-0011 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 18-Sep-19 19-Sep-19 17-Oct-19 16 CLOSE 0 GERRY 3 day
51 KRS-SB-RFI-0052 Pre Pouring Concrete K-300 KRS-SB-PCR-0004 Belt Conveyor Line SME2 (MS2) N/A SMCP 00 Conveyor Line SME2-BC SME2 Civil works Pre-Pouring Concrete 11-Oct-19 12-Oct-19 17-Oct-19 20 CLOSE 0 GERRY
52 KRS-SB-RFI-0053 Trial Mix Design Conch Cement KRS-SB-ITR-0048 Trial Mix K-300 (430 kg Cement Conch) KRS-SB-CST-0012 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 22-Sep-10 23-Sep-19 17-Oct-19 17 CLOSE 0 GERRY K-300 & 8 day
53 KRS-SB-RFI-0054 Compressive Stregth Test 1st Floor Foundation Silo KRS-SB-ITR-0049 Silo Line SME2 2nd Layer KRS-SB-CST-0015 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 30-Sep-19 1-Oct-19 17-Oct-19 18 CLOSE 0 GERRY SL-2-1 & SL-2-2 (K-300 & 7 day)
Silo Line SME2 2nd Layer KRS-SB-CST-0016 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 30-Sep-19 1-Oct-19 17-Oct-19 18 CLOSE 0 GERRY SL-2-3 & SL-2-4 (K-300 & 7 day)
54 KRS-SB-RFI-0055 Compressive Stregth Test 1st Floor Foundation Silo KRS-SB-ITR-0050 Silo Line SME2 3rd Layer KRS-SB-CST-0017 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 1-Oct-19 2-Oct-19 17-Oct-19 18 CLOSE 0 GERRY SL-3-1 & SL-3-2 (K-300 & 7 day)
Silo Line SME2 3rd Layer KRS-SB-CST-0018 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 1-Oct-19 2-Oct-19 17-Oct-19 18 CLOSE 0 GERRY SL-3-3 & SL-3-4 (K-300 & 7 day)
55 KRS-SB-RFI-0056 Trial Mix Design KRS-SB-ITR-0051 Trial Mix Design K-175 KRS-SB-CST-0001 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 14-Aug-19 15-Aug-19 17-Oct-19 11 CLOSE 0 GERRY k-175 & 7 day
56 KRS-SB-RFI-0057 Compressive Stregth Test 1st Floor Foundation Silo KRS-SB-ITR-0052 Silo Line SME2 4th Layer KRS-SB-CST-0019 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 2-Oct-19 3-Oct-19 17-Oct-19 18 CLOSE 0 GERRY SL-4-1 & SL-4-2 (K-300 & 7 day)
Silo Line SME2 4th Layer KRS-SB-CST-0020 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 2-Oct-19 3-Oct-19 17-Oct-19 18 CLOSE 0 GERRY SL-4-3 & SL-4-4 (K-300 & 7 day)
57 KRS-SB-RFI-0058 Compressive Stregth Test FT 8 & FT 9 KRS-SB-ITR-0053 Belt Conveyor Line SME2 (FT9 & FT8) KRS-SB-CST-0021 SMCP 00 Conveyor Line SME2-BC SME2 Civil works Compressive Strength Test 4-Oct-19 5-Oct-19 17-Oct-19 19 CLOSE 0 GERRY K-300 & 8 day
58 KRS-SB-RFI-0059 Compressive Stregth Test FT 8 & FT 9 KRS-SB-ITR-0054 Belt Conveyor Line SME2 (FT7) KRS-SB-CST-0022 SMCP 00 Conveyor Line SME2-BC FT7 Civil works Compressive Strength Test 8-Oct-19 9-Oct-19 17-Oct-19 19 CLOSE 0 GERRY K-300 & 7 day
59 KRS-SB-RFI-0060 Compressive Stregth Test FT 8 & FT 9 KRS-SB-ITR-0055 Belt Conveyor Line SME2 FT 1,FT 2,FT 3,FT 4,FT 5,FT 6 KRS-SB-CST-0023 SMCP 00 Conveyor Line SME2-BC SME2 Civil works Compressive Strength Test 10-Oct-19 11-Oct-19 17-Oct-19 20 CLOSE 0 GERRY K-300 & 28 day
Pile Head Treatment Belt Conveyor Line SME2 KRS-SB-CST-0024 SMCP 00 Conveyor Line SME2-BC SME2 Civil works Compressive Strength Test 10-Oct-19 11-Oct-19 17-Oct-19 20 CLOSE 0 GERRY K-300 & 28 day
60 KRS-SB-RFI-0061 Trial Mix Design Conch Cement KRS-SB-ITR-0056 Trial Mix K-300 (430 kg Cement Conch) KRS-SB-CST-0025 SMCP 00 KM 22 KM 22 Civil works Trial Concrete Mix Design 13-Oct-19 14-Oct-19 17-Oct-19 20 CLOSE 0 GERRY 28 day
61 KRS-SB-RFI-0062 Survey,Piling Record AFT2 6,AFT2 2 KRS-SB-SUV-0039 Survey Report for AFT2 6,AFT2 2 N/A SMCP 00 Conveyor Line SME1-BC SME1 Piling Survey Piling 25-Sep-19 26-Sep-19 17-Oct-19 17 CLOSE 0 GERRY
KRS-SB-ITR-0057 Piling Record for AFT2 6 KRS-SB-PDR-121 SMCP 00 Conveyor Line SME1-BC AFT2 6 Piling Pile Driving 25-Sep-19 26-Sep-19 17-Oct-19 17 CLOSE 0 GERRY
Piling Record for AFT2 2 KRS-SB-PDR-122 SMCP 00 Conveyor Line SME1-BC AFT2 2 Piling Pile Driving 25-Sep-19 26-Sep-19 17-Oct-19 17 CLOSE 0 GERRY
62 KRS-SB-RFI-0063 Survey,Piling Record AMS1 7,AMS1 1,BMS1 7,BMS1 1,FT1 5,FT1 3 KRS-SB-SUV-0040 Survey Report for AMS1 7,AMS1 1,BMS1 7,BMS1 1,FT1 5,FT1 3 N/A SMCP 00 Conveyor Line SME1-BC SME1 Piling Survey Piling 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
KRS-SB-ITR-0058 Piling Record for AMS1 7 KRS-SB-PDR-123 SMCP 00 Conveyor Line SME1-BC AMS1 7 Piling Pile Driving 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
Piling Record for AMS1 1 KRS-SB-PDR-124 SMCP 00 Conveyor Line SME1-BC AMS1 1 Piling Pile Driving 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
Piling Record for BMS1 7 KRS-SB-PDR-125 SMCP 00 Conveyor Line SME1-BC BMS1 7 Piling Pile Driving 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
Piling Record for BMS1 1 KRS-SB-PDR-126 SMCP 00 Conveyor Line SME1-BC BMS1 1 Piling Pile Driving 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
Piling Record for FT1 5 KRS-SB-PDR-127 SMCP 00 Conveyor Line SME1-BC FT1 5 Piling Pile Driving 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
Piling Record for FT1 3 KRS-SB-PDR-128 SMCP 00 Conveyor Line SME1-BC FT1 3 Piling Pile Driving 26-Sep-19 27-Sep-19 17-Oct-19 18 CLOSE 0 GERRY
63 KRS-SB-RFI-0064 Compressive Stregth Test K-300 KRS-SB-ITR-0059 Silo Column Stage 1 KRS-SB-CST-0026 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 15-Oct-19 16-Oct-19 22-Oct-19 20 CLOSE 0 GERRY Silo's Column Stage 1 (1-1 & 1-2)
64 KRS-SB-RFI-0065 Survey,Piling Record AFH5,AFH6,AFH7 KRS-SB-SUV-0041 Survey Report for AFH5,AFH6,AFH7 N/A SMCP 00 Hopper Feeder SME1 SME1 Piling Survey Piling 28-Sep-19 29-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
KRS-SB-ITR-0060 Piling Record for AFH5 KRS-SB-PDR-129 SMCP 00 Hopper Feeder SME1 AFH5 Piling Pile Driving 28-Sep-19 29-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for AFH6 KRS-SB-PDR-130 SMCP 00 Hopper Feeder SME1 AFH6 Piling Pile Driving 28-Sep-19 29-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for AFH7 KRS-SB-PDR-131 SMCP 00 Hopper Feeder SME1 AFH7 Piling Pile Driving 28-Sep-19 29-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
65 KRS-SB-RFI-0066 Survey,Piling Record BRT3,ART3,BRT2,ART2,BRT1,ART1,BRT6,ART6 KRS-SB-SUV-0042 Survey Report for BRT3,ART3,BRT2,ART2,BRT1,ART1,BRT6,ART6 N/A SMCP 00 Retaining Wall SME1 Piling Survey Piling 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
KRS-SB-ITR-0061 Piling Record for BRT3 KRS-SB-PDR-132 SMCP 00 Retaining Wall BRT3 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for ART3 KRS-SB-PDR-133 SMCP 00 Retaining Wall ART3 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for BRT2 KRS-SB-PDR-134 SMCP 00 Retaining Wall BRT2 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for ART2 KRS-SB-PDR-135 SMCP 00 Retaining Wall ART2 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for BRT1 KRS-SB-PDR-136 SMCP 00 Retaining Wall BRT1 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for ART1 KRS-SB-PDR-137 SMCP 00 Retaining Wall ART1 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for BRT6 KRS-SB-PDR-138 SMCP 00 Retaining Wall BRT6 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for ART6 KRS-SB-PDR-139 SMCP 00 Retaining Wall ART6 Piling Pile Driving 29-Sep-19 30-Sep-19 22-Oct-19 18 CLOSE 0 GERRY
66 KRS-SB-RFI-0067 Survey,Piling Record BRT5,ART5,BRT4,ART4,DFH6,DFH7,AFT1 4 KRS-SB-SUV-0043 Survey Report for BRT5,ART5,BRT4,ART4,DFH6,DFH7,AFT1 4 N/A SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC SME1 Piling Survey Piling 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
KRS-SB-ITR-0062 Piling Record for BRT5 KRS-SB-PDR-140 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC BRT5 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for ART5 KRS-SB-PDR-141 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC ART5 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for BRT4 KRS-SB-PDR-142 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC BRT4 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for ART4 KRS-SB-PDR-143 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC ART4 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for DFH6 KRS-SB-PDR-144 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC DFH6 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for DFH7 KRS-SB-PDR-145 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC DFH7 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
Piling Record for AFT1 4 KRS-SB-PDR-146 SMCP 00 Retaining Wall, Hopper Feeder SME1, Conveyor Line SME1-BC AFT1 4 Piling Pile Driving 30-Sep-10 1-Oct-19 22-Oct-19 18 CLOSE 0 GERRY
67 KRS-SB-RFI-0068 Compressive Stregth Test k-300 KRS-SB-ITR-0063 Belt Conveyor Line SME2 (MS2) KRS-SB-CST-0027 SMCP 00 Conveyor Line SME2-BC MS2 Civil works Compressive Strength Test 18-Oct-19 19-Oct-19 22-Oct-19 21 CLOSE 0 GERRY K-300 & 7 day
68 KRS-SB-RFI-0069 Compressive Stregth Test k-300 KRS-SB-ITR-0064 Silo Line SME2 1st Layer KRS-SB-CST-0028 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 20-Oct-19 21-Oct-19 22-Oct-19 21 CLOSE 0 GERRY SL-1-1 & SL-1-2 & 28 day
Silo Line SME2 1st Layer KRS-SB-CST-0029 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 20-Oct-19 21-Oct-19 22-Oct-19 21 CLOSE 0 GERRY SL-1-3 & SL-1-4 & 28 day
69 KRS-SB-RFI-0070 Compressive Stregth Test k-300 KRS-SB-ITR-0065 Silo Line SME2 2nd Layer KRS-SB-CST-0030 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 21-Oct-19 22-Oct-19 22-Oct-19 21 CLOSE 0 GERRY SL-2-1 & SL-2-2 & 28 day
Silo Line SME2 2nd Layer KRS-SB-CST-0031 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 21-Oct-19 22-Oct-19 22-Oct-19 21 CLOSE 0 GERRY SL-2-3 & SL-2-4 & 28 day
70 KRS-SB-RFI-0071 Compressive Stregth Test k-300 KRS-SB-ITR-0066 Belt Conveyor Line SME2 (TA2) KRS-SB-CST-0032 SMCP 00 Conveyor Line SME2-BC TA2 Civil works Compressive Strength Test 21-Oct-19 22-Oct-19 22-Oct-19 21 CLOSE 0 GERRY K-300 & 7 day
Belt Conveyor Line SME2 (TA2) KRS-SB-CST-0033 SMCP 00 Conveyor Line SME2-BC TA2 Civil works Compressive Strength Test 21-Oct-19 22-Oct-19 22-Oct-19 21 CLOSE 0 GERRY K-300 & 7 day
71 KRS-SB-RFI-0072 Compressive Stregth Test k-300 KRS-SB-ITR-0067 Belt Conveyor Line SME2 KRS-SB-CST-0034 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 22-Oct-19 23-Oct-19 29-Oct-19 21 CLOSE 1 GERRY SL-3-1 & SL-3-2 (K-300 & 28 day)
Belt Conveyor Line SME2 KRS-SB-CST-0035 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 22-Oct-19 23-Oct-19 29-Oct-19 21 CLOSE 1 GERRY SL-3-3 & SL-3-4 (K-300 & 28 day)
72 KRS-SB-RFI-0073 Compressive Stregth Test k-300 KRS-SB-ITR-0068 Silo Line SME2 4th Layer KRS-SB-CST-0036 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 23-Oct-19 24-Oct-19 29-Oct-19 21 CLOSE 1 GERRY SL-4-1 & SL-4-2 (K-300 & 28 day)
KRS-SB-CST-0037 SMCP 00 Silo Line SME2 SME2 Civil works Compressive Strength Test 23-Oct-19 24-Oct-19 29-Oct-19 21 CLOSE 1 GERRY SL-4-3 & SL-4-4 (K-300 & 28 day)
73 KRS-SB-RFI-0074 Pre Pouring Concrete K-300 KRS-SB-PCR-0005 Belt Conveyor Line SME1 (FT1 & FT2) N/A SMCP 00 Conveyor Line SME1-BC SME1 Civil works Pre Pouring Concrete 24-Oct-19 25-Oct-19 29-Oct-19 22 CLOSE 1 GERRY
74 KRS-SB-RFI-0075 Compressive Stregth Test K-300 KRS-SB-ITR-0069 Belt Conveyor Line SME2 (FT9 & FT8) KRS-SB-CST-0038 SMCP 00 Conveyor Line SME2-BC SME2 Civil works Compressive Strength Test 24-Oct-19 25-Oct-19 22 OPEN 1 GERRY 28 day
75 KRS-SB-RFI-0076 Pre-Pouring Concrete KRS-SB-PCR-0006 Belt Conveyor Line SME1 (MS1) N/A SMCP 00 Conveyor Line SME1-BC MS1 Civil works Pre Pouring Concrete 27-Oct-19 28-Oct-19 30-Oct-19 22 CLOSE 1 GERRY
76 KRS-SB-RFI-0077 Compressive Stregth Test K-300 KRS-SB-ITR-0070 Belt Conveyor Line SME2 (FT7) KRS-SB-CST-0039 SMCP 00 Conveyor Line SME2-BC FT7 Civil works Compressive Strength Test 29-Oct-19 30-Oct-19 2-Nov-19 22 CLOSE 1 GERRY 28 day
77 KRS-SB-RFI-0078 Compressive Stregth Test K-300 KRS-SB-ITR-0071 Belt Conveyor Line SME2 FT 1,FT 2,FT 3,FT 4,FT 5,FT 6 KRS-SB-CST-0040 SMCP 00 Conveyor Line SME2-BC SME2 Civil works Compressive Strength Test 30-Oct-19 31-Oct-19 2-Nov-19 22 CLOSE 1 GERRY 28 day
78 KRS-SB-RFI-0079 Pre Pouring Concrete K-300 KRS-SB-PCR-0007 Belt Conveyor Line SME1 (CF1 & TA1) N/A SMCP 00 Conveyor Line SME1-BC SME1 Civil works Pre Pouring Concrete 30-Oct-19 31-Oct-19 2-Nov-19 22 CLOSE 1 GERRY
REGISTER OF REQUEST FOR INSPECTION
Project Title : Civil Work for Re-Location of MCPP B Line to SMCP Area Date : 12/07/2019
Project No : C0118C Client : PT. Kideco Jaya Agung
Area : SMCP Contractor : PT. Petrosea, Tbk
Sub Area No. : N/A Sub-Contractor : PT. Kaliraya Sari
Operation Area : All Operation Area
AREA OPERATION SUBMIT INSPECTIO COMPLETE WEEK
NO RFI NO. RFI SUBJECT ITR NO. ITR SUBJECT KRS REPORT NO. AREA CODE SUB AREA AREA WORK ITEM SUB WORK ITEM DATE N DATE DATE ENDING STATUS OS DAY PIC REMARKS

1 KRS/SB/RFI/0001 Joint Survey KRS/SB/ITR/0001 KRS/SB/SUV/0001 SMCP 00 Silo Line SME2 FT1 Survey Survey Earthwork 11-Jul-19 11-Jul-19 11-Jul-19 12-Jul-19 Closed 0 Debby
AREA CODE SUB AREA WORK ITEM

Conveyor Line SME1-BC Material


Conveyor Line SME2-BC
Hopper Feeder SME1 Survey
SMCP 00 Silo Line SME2
Wing Gate SME1
Retaining Wall
Miscellaneous Work earthwork

piling

civil works

structure
SUB WORK ITEM

Material Receiving
attach Mill Test/Tensile Test/Data Sheet/Brochure
Survey Earthwork
Survey Piling
Survey Civil
Survey Steel Structure
Excavation
DCP
Sandcone (tentative)
Fit Up & Welding Visual Inspection
Pile Driving
PDLT
Pre-Pouring Concrete
Trial Concrete Mix Design
Compressive Strength Test
Foundation Release Certificate
Fit Up & Welding Visual Inspection
Painting application and DFT measurement
Final Inspection and Steel Structure Release Certificate
Week Ending 1-Aug-19 8-Aug-19 15-Aug-19 22-Aug-19 29-Aug-19 5-Sep-19 12-Sep-19 19-Sep-19
ITR @Week 0 9 21 32 37 13 20 33
RFI @Week 0 3 5 6 10 5 5 9
Cummulative RFI 0 3 8 14 24 29 34 43
Cummulative ITR 0 9 30 62 99 112 132 165

RFI VS ITR
40
37
35 33
32
203
30 192
27
165
25
21
20132
20
112
15 13
11
10
10 9 9 9
59
52 7
6 43
5 5 5
5 29 34
3

0
00
1-Aug-19 8-Aug-19 15-Aug-19 22-Aug-19 29-Aug-19 5-Sep-19 12-Sep-19 19-Sep-19 26-Sep-19 3-Oct-19
RFI @Week ITR @Week Cummulative RFI Cummulative ITR
26-Sep-19 3-Oct-19 10-Oct-19 17-Oct-19 24-Oct-19 31-Oct-19
27 11 2 4 6 6
9 7 2 4 6 6
52 59 61 65 71 77
192 203 205 209 215 221

250

221
215
205 209
203 200
192
27

150

100

11 77
71
9 61 65
59
52 7
66 66 50
44
22
0
26-Sep-19 3-Oct-19 10-Oct-19 17-Oct-19 24-Oct-19 31-Oct-19
RFI Cummulative ITR