1
Objective
2
Outline
Background
3
Background
SAFANIYA
JUBAIL
RAS TANURA
QATIF
DHAHRAN
MADINAH ABQAIQ
KHURAIS
YANBU’ RIYADH ‘UTHMANIYAH
HAWIYAH
RABIGH HARADH
HAWTAH
SHAYBAH
ABHA
JAZAN
4
Background - Network at a Glance
Total Length = 20,074 km
<20” 22-46” >46”
5
Challenges of Managing Pipelines Integrity
6
Challenges of Managing Pipelines Integrity
7
Integrity Management Approach
Consensus Assessment
Isolated
ISU Risk
Corrosion Assessment
ISU CP
Simulation Corrosion
Isolated
Isolated Simulation Piping Assessment
Assessment
Piping Inspection
Inspection
Operation
Maintenance Operation
8
Integrity Management Approach
Integrity Management Cycle
Establish Integrity
Feedback
Maintain Integrity
Condition Condition Integrity Risk
Monitoring Control Restoration Management
9
Integrity Management Approach
Integrity Management Plans
Planning
Integrity Plan
Integrity Assessment
Mitigations
Feedback
10
Integrity Management Plans
• Planning Stage
– Pipeline Selection based on: Planning
• Operational Criticality
• Integrity Condition
• Leaks History
Integrity Assessment
– Communication with SMEs
• Pipelines Specialists
– Int./Ext. Corrosion
• ISU Engineers Mitigations
• DMU
– Population Density Index
– Elevation Profile Feedback
• Area Operation Engineer
• CP/Inspection Foremen
11
Integrity Management Plans
• Integrity Assessment
– HCA Assessment Planning
– OSI Records
– CP Potentials
Integrity Assessment
– ILI Findings
• Corrosion Alignment Sheets
Mitigations
Feedback
12
Corrosion Alignment Sheets
• External Corrosion
13
Corrosion Alignment Sheets
• Internal Corrosion
14
Integrity Management Plans
• Mitigations
– Integrity Restoration Planning
• Repair Scope (NDE)
• Area Class Revision
• HCA Implications Integrity Assessment
– Integrity Control
• Corrosion Inhibition
Mitigations
• Biocide Treatment
• Cleaning Runs Frequency
– Integrity Monitoring Feedback
• ILI Runs
15
Integrity Management Plans
Recommendations: Corrosion Related
• External Corrosion:
• Attending Low CP Potential
• Checking Joint Coating Type
• Internal Corrosion
• Reviewing Velocity Profile History (Potential
Bacterial Growth)
• Adjusting Cleaning Scraping Frequency
• Attending OSI Low Reading (FFP)
Integrity Management Plans
Recommendations: Repair Scope
Metal loss (%)
100
90 Immediate repair
80 Verification Digs
2013 Scope
70
HCA
60
50
40
30 KM1183
20 KM1187
10 KM1193
KM1186
1150 KM
1100
1110
1120
1130
1140
1160
1170
1180
1190
1200
Type of Repair Repair Category No of Joints Affected Metal loss ranges (%)
Integrity Assessment
Mitigations
Feedback
18
PTSD Integrity Plan Workflow
DMU PSU IMU ISU A&TU
Plan the ILI Revalidation
Review Previous Integrity
Run
Plans, Rehab Projects, MRPs
and Issued Reports
Perform the ILI Run
Provide PDI
Issue the Immediate Repair Plans (classify into
30 and 90 days based on failure mode and ERF) To provide
and Conduct Run QA/QC Checks operating
philosophy
20
21