Professional Documents
Culture Documents
(BELOW)
MH MH
CONCRETE
PAD B
MH
EQT
STP BLOWER (BELOW)
ROOM SBR
(BELOW)
MH MH MH A
INFLUENT
CHAMBER
(BELOW)
5000
00-00-0000
COARSE BASKET
SCREEN
SBR TANK
PROJECT NAME:
STP PLAN
2 S.T.P. PLAN @ BASIN BASE LEVEL FOR QUOTATION Drawn: OXI Date 08.10.19
STP 001 SCALE: N.T.S PURPOSES Checked: MUS Drawing No. 00-CW-A1
3000
INFLUENT
CHAMBER
EQT SBR
STP BOTTOM
SLAB LEVEL
STP BLOWER
00-00-0000
ROOM REV. DATE DESCRIPTION DRAWN CHECKED
CONCRETE CONTRACTOR:
PAD
TOP SLAB LEVEL
3000
PROJECT NAME:
SLAB LEVEL
STP SECTION
STP 002 SCALE: N.T.S PURPOSES Checked: MUS Drawing No. 00-CW-A1
AIRLINE
WASTEWATER LINE
SLUDGE LINE
BLOWER-SBR 1
CHLORINE
DOSING UNIT
F
TO DRAIN
FPV
(BY OTHERS)
COARSE BASKET FLOW METER
SCREENING
WAS
W/ SAMPLING
B
PORT
INLET PIPE FINE BASKET FILTER
SCREENING
(BY OTHERS) PRESSURE
VESSEL
L
00-00-0000
CONTRACTOR:
SUBMERSIBLE DP
MIXER AIRLIFT
PROPOSED SEWAGE
INFLUENT EQUALIZATION SBR TANK CCT TREATMENT PLANT
FOR 8 - STOREY BUILDING
CHAMBER TANK
SHEET CONTENT: