You are on page 1of 3

CCT

(BELOW)
MH MH
CONCRETE
PAD B
MH
EQT
STP BLOWER (BELOW)
ROOM SBR
(BELOW)
MH MH MH A
INFLUENT
CHAMBER
(BELOW)

1 S.T.P. PLAN @ BLOWER ROOM LEVEL


STP 001 SCALE: N.T.S

5000

00-00-0000

REV. DATE DESCRIPTION DRAWN CHECKED

CCT EQT CONTRACTOR:


2600

COARSE BASKET
SCREEN
SBR TANK
PROJECT NAME:

INFLUENT PROPOSED SEWAGE


CHAMBER TREATMENT PLANT
FOR 8 - STOREY BUILDING
FINE BASKET
SCREEN SHEET CONTENT:

STP PLAN

2 S.T.P. PLAN @ BASIN BASE LEVEL FOR QUOTATION Drawn: OXI Date 08.10.19
STP 001 SCALE: N.T.S PURPOSES Checked: MUS Drawing No. 00-CW-A1

Approved: TREI Sheet No. STP - 001

Scale: AS SHOWN Revision 0


STP BLOWER
ROOM
CONCRETE
PAD
TOP SLAB LEVEL

3000
INFLUENT
CHAMBER
EQT SBR

STP BOTTOM
SLAB LEVEL

1 S.T.P. SECTION "A"


STP 002 SCALE: N.T.S

STP BLOWER
00-00-0000
ROOM REV. DATE DESCRIPTION DRAWN CHECKED

CONCRETE CONTRACTOR:

PAD
TOP SLAB LEVEL
3000

PROJECT NAME:

CCT EQT PROPOSED SEWAGE


SBR
TREATMENT PLANT
FOR 8 - STOREY BUILDING

STP BOTTOM SHEET CONTENT:

SLAB LEVEL
STP SECTION

2 S.T.P. SECTION "B" FOR QUOTATION Drawn: OXI Date 08.10.19

STP 002 SCALE: N.T.S PURPOSES Checked: MUS Drawing No. 00-CW-A1

Approved: TREI Sheet No. STP-002

Scale: AS SHOWN Revision 0


LEGEND:

AIRLINE
WASTEWATER LINE
SLUDGE LINE

CHLORINE DOSING LINE

BLOWER-SBR 1

CHLORINE
DOSING UNIT

F
TO DRAIN
FPV
(BY OTHERS)
COARSE BASKET FLOW METER
SCREENING
WAS
W/ SAMPLING
B
PORT
INLET PIPE FINE BASKET FILTER
SCREENING
(BY OTHERS) PRESSURE
VESSEL
L

00-00-0000

REV. DATE DESCRIPTION DRAWN CHECKED

CONTRACTOR:

SUBMERSIBLE DP
MIXER AIRLIFT

TP FFP PROJECT NAME:

PROPOSED SEWAGE
INFLUENT EQUALIZATION SBR TANK CCT TREATMENT PLANT
FOR 8 - STOREY BUILDING
CHAMBER TANK
SHEET CONTENT:

PROCESS FLOW DIAGRAM


1 PROCESS FLOW DIAGRAM
STP 003 SCALE: N.T.S FOR QUOTATION Drawn: OXI Date 08.10.19

PURPOSES Checked: MUS Drawing No. 00-CW-A1

Approved: TREI Sheet No. STP-003

Scale: AS SHOWN Revision 0