WATER TREATMENT PRINCIPAL

2 INDEPENDANT LIGNES
2 X 6,000 m3/day
OPTION 2

RAW WATER INTAKE RAW WATER RESRVOIR AERATORS CASCADE COAGULATION - FLOCCULATION - CLARIFICATION SAND FILTRATION CONTACT RESERVOIR DISTRIBUTION
+ PUMPING STATION 1,500 m3 RESERVOIRS
PUMPING STATION

PUMPS QTY :1 QTY: 2 QTY: 2 QTY: 2 QTY: 2 QTY: 4


QTY : 2+1 V : 100 m3 Steps : 4 Rt: 68,7 s Rt: 27,5 mn Settling charge: 6.5 m/h S = 28 m2
F: 1200 m3/h Rt : 10 min Hignt : 20 cm V : 6 m3 V : 144 m3 V Hazen: 0.65 m/h V = 5.55 m/h
H: 202 m Oxidation G : 700 s-1 G : 50 s-1 V: 245 m3
Prechlorination Coagulant Flocculant Hydraulic load on weir: 6.67m3/h/m
PAC

KECC Modifications
Scale: JOINT VENTURE
REPUBLIC OF RWANDA FEASIBILITY STUDY, DETAILED DESIGNS AND Address: 21, Sangil-ro 6-gil, Gangdong-gu, Seoul, FEASIBILITY DESIGN Without
Republic of Korea https://www.kecc.co.kr
Done by: - Visa Date Description WATER TREATMENT
E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\image007.jpg
SUPERVISION OF WORKS FOR THE Contact: TEL. +82-2-2049-2802 FAX. +82-2-2049-5093
Dessin No.:
E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\KECC.png

E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\escudo-de-ruanda.png

Holistic Controled by: - PRINCIPAL


Water and Sanitation Corporation (WASAC) CONSTRUCTION OF NGOMA RIVER WATER Kimironko Road, KG 11 Av.81, Triumph House – 1st
Floor, P.O. BOX: 5825 Kigali-Rwanda
Approuved by: - OPTION 2 E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\HOLISTIC.jpg

SUPPLY SYSTEM (PHASE 1) Tel :( +250)788851713 • website: hccafrica.com Checked by: DATE: 12/2020
PAGE 1 sur 1

You might also like