Professional Documents
Culture Documents
2 INDEPENDANT LIGNES
2 X 6,000 m3/day
OPTION 2
RAW WATER INTAKE RAW WATER RESRVOIR AERATORS CASCADE COAGULATION - FLOCCULATION - CLARIFICATION SAND FILTRATION CONTACT RESERVOIR DISTRIBUTION
+ PUMPING STATION 1,500 m3 RESERVOIRS
PUMPING STATION
KECC Modifications
Scale: JOINT VENTURE
REPUBLIC OF RWANDA FEASIBILITY STUDY, DETAILED DESIGNS AND Address: 21, Sangil-ro 6-gil, Gangdong-gu, Seoul, FEASIBILITY DESIGN Without
Republic of Korea https://www.kecc.co.kr
Done by: - Visa Date Description WATER TREATMENT
E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\image007.jpg
SUPERVISION OF WORKS FOR THE Contact: TEL. +82-2-2049-2802 FAX. +82-2-2049-5093
Dessin No.:
E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\KECC.png
SUPPLY SYSTEM (PHASE 1) Tel :( +250)788851713 • website: hccafrica.com Checked by: DATE: 12/2020
PAGE 1 sur 1