KINGDOMOFSAUDIARABIA Page 1 of 1

Saline Water Conversion Corporation Form: F1711-06, Rev. 1. Dated: 02/07/2019


STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

WIR No.:WIR-1711-T393-F0002
WELDING INSPECTION REPORT (WIR)
WIR Date: 24-AUG-2019
Mfr. Eq. No.: TK-393 Item: ANNULAR TO ANNULAR WELDING VISUAL INSPECTION JO No.: 17-11
(TK-05)
Tick the Applicable
Mat’l. WPS Welder NDT NDT
Results
Dwg. Joint No. J.Fit-up Post Weld VT
Thk. No. No. Required?
PT MT RT VB PO Air Acc./Rej./Hold

J201-02 R1 16mm 18424 - Yes √ Acc


76-QP10-S-116 SHT1of3 REV 0

JFR/1711/T393/F0002

MET-06-95 Rev.3

Attachments to the WIR: Inspector’s Comments/Remarks:

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC

QCI: Mechanical/Welding
Distribution List: Original – QA/QC Dept., e-copies to Production, Client’s Witnessing Inspector/s.