You are on page 1of 35

GAGASAN TEGUH SDN. BHD.

COMPANY PROFILE
GAGASAN TEGUH SDN. BHD.

TABLE OF CONTENTS

Company Overview ……………………………………………………………………..……...... 2

Corporate Information …………………………………………………………………...……... 3

Vision & Mission ……………………………..…………………………………………….......... 4

Scope of Services Rendered …………………………………………………………………....... 5

Our Services ……………………………………………………………………………………… 7

Certification & Accreditation …………………………………………………………………... 11

Management Team …………………………………………………………………………….... 20

Organization Chart ……………………………………………………………………………... 26

Equipment ……………………………………………………………………………………….. 28

Completed Project ………………………………………………………………………………. 29

2
GAGASAN TEGUH SDN. BHD.

COMPANY OVERVIEW

Gagasan Teguh Sdn. Bhd. is a well established Geotechnical service and ground engineering company
operating for more than two decades in Malaysia.

Up to the end of 2017, Gagasan Teguh Sdn. Bhd. has completed more than ten thousand projects
involving site investigation, rock probing, ground clearing, slope stabilization, wall retention,
micropiling and many other Geotechnical and foundational works. These projects were essential in
paving the way for the successful construction of many high rise commercial buildings, condominiums,
housing estates, industrial factories, highways, tunnels, bridges, rail tracks, telecommunication towers,
water reservoir, treatment plants and etc.

Gagasan Teguh Sdn. Bhd. is a registered and certified site investigation service provider with the
complete range of site investigation equipment manned by qualified and experienced personnel. The
company notably achieved the ISO 9001: 2015 industry standard in 2017 and continues to aim for the
hallmark of quality, excellence and safety.

3
GAGASAN TEGUH SDN. BHD.

CORPORATE INFORMATION

Company Name : Gagasan Teguh Sdn. Bhd.

Registration Number : 227358-V

Head Office : No. 29-1, Jalan PUJ 3/5,


Taman Puncak Jalil,
Bandar Putra Permai,
43300 Seri Kembangan,
Selangor Darul Ehsan.

Tel. : (603) 8944 0385 / 9704

Fax. : (603) 8944 0325

Email : mail@gagasanteguh.com.my

Board of Director : Mr. Ng Eng Leong / Mr. Michael Law

Managing Director : Mr. Ng Eng Leong

Company Certificates :-

 CIDB : G5
 PKK : Kelas C

4
GAGASAN TEGUH SDN. BHD.

VISION

 Be the PROFESSIONAL frontrunner in shaping the


future of the Geotechnical Investigation industry in the
Country.

MISSION

 To provide Excellence Quality, Timely and Presentable Results


for infrastructure and environment development

 Raising up the Industry Benchmarks by Empowering, Equipping


and Developing our People to realize their Full Potential

 Maintaining Strong Core business Values

5
GAGASAN TEGUH SDN. BHD.

SCOPE OF SERVICES RENDERED

1. SITE INVESTIGATION

• Deep Boring Land, Offshore / Overwater, Limited Headroom,


Deep Sounding Tests, Cone Penetration Tests (Piezocone),
Mackintosh Probes, Augering, Dynamic Cone Tests And
Penetration Field Vane Tests.

2. LABORATORY TESTS

• Classification Tests – Natural Moisture Content, Atterberg Limits,


Bulk Density, Linear Shrinkage, Specific Gravity, Particle Size
Distribution for coarse and fine grained soils.

• Strength tests – Unconfined Compression Strength,


Unconsolidated Undrained Triaxial Compression without pore
water measurement, Consolidated Undrained Triaxial Compression
with pore water pressure measurement, Direct Shear Box Tests and
One Dimensional Consolidation.

• Chemical Tests – Organic Matter Content, Total Sulphate, Ph


Value and Chloride Content.

• Compaction Tests – Compaction Tests, CBR Tests, Standard


Compaction, Modified Proctor, CBR Soaked and Unsoaked.

3. FIELD TEST

• In-situ Field Density Test, In-situ CBR, Plate Bearing Tests,


Covermeter Tests, Rebound Hammer Tests, Concrete Coring,
Geonor Vane, Pressuremeter, Lageon (Packer) Test, and
Permeability.

4. INSTRUMENTATION

• Open Standpipe, Standpipe Piezometer, Pnuematic Piezometer,


Deep Levelling Datum, Inclinometer, Extensometer, Rod
Settlement Gauge / Markers, Tiltmeters, Building Settlement
Markers, Demec Crack Monitoring Meters, Sensor and Vibration,
Fibre Opric Sensor, Noise and Vibration, and Vibrating Wire
Piezometer.

5. GROUTING

• Neat Cement Grouting, Cavity Probing and Mortar Grouting.

6
GAGASAN TEGUH SDN. BHD.

6. MAPPING / GEOPHYSICAL SURVEY

• Geological Mapping, Terrain Mapping, Borehole, Seismic Survey


(2D/3D), Resistivity Survey (2D/3D), Crosshole / Downhole,
Seismic inside.

7. SAMPLING TOOLS

• For Very Soft material – Piston Samplers.


• For Firm to Stiff material – Thin-walled Samplers (50mm –
72mm).
• For Loose to Very Dense Sand – SPT Split Spoon Sampler with
Sand Trap.
• For rock – NMLC Triple Tube Core Barrel / NQ Wireline Core
Barrel / BWG Core Barrel.

8. BACKUP SERVICES

• Laboratory Services

1. SOIL RESEARCH LAB


No. 23, Jalan 1/35 C,
Taman Sri Kepong Baru,
Kepong,
52100 Wilayah Persekutuan,
Kuala Lumpur.

2. GEOSOIL ENGINEERING SDN. BHD.


No. A-G-12,
Jalan PJU 10/10G,
Saujana Damansara,
47830 Petaling Jaya,
Selangor Darul Ehsan.

3. SOILPRO TECHNICAL SERVICES SDN. BHD.


No. 16, Jalan TIB-1/17,
Taman Industri Boltan,
68100 Batu Caves,
Selangor Darul Ehsan.

7
GAGASAN TEGUH SDN. BHD.

OUR SERVICES

8
GAGASAN TEGUH SDN. BHD.

SOIL INVESTIGATION WORKS

ROTARY WASH BORING (ON LAND)

ROTARY WASH BORING (OVERWATER) ROTARY WASH BORING (OVERWATER)


- JACK UP PONTOON - FLOATING DRUM PONTOON

ROTARY WASH BORING (OVERWATER) INSITU FIELD TEST


- WOODEN STAGING
PLATE BEARING TEST FIELD DENSITY TEST

9
GAGASAN TEGUH SDN. BHD.

CONE PENETRATION TEST TRIAL / TEST PITS

INSTRUMENTATION & MONITORING

INCLONOMETER PRESSUREMETER

SURFACE SETTLEMENT MARKER DEMEC GAUGE

10
GAGASAN TEGUH SDN. BHD.

CONCRETE CORING & CUTTING

LABORATORY TEST

MOISTURE CONTENT ATTERBERG LIMIT PARTICLE SIZE DISTRIBUTION PARTICLE SIZE DISTRIBUTION
(PSD) – COARSE (PSD) - FINE

STRENGTH TEST : STRENGTH TEST : SHEAR BOX TEST


UNCONFINED COMPRESSION TEST (UCS) & CONSOLIDATED UNDRAINED TRIAXIAL TEST
UNCONSOLIDATED UNDRAINED TRIXIAL TEST (UU) (CIU)

11
GAGASAN TEGUH SDN. BHD.

CERTIFICATION & ACCREDITATION

12
GAGASAN TEGUH SDN. BHD.

13
GAGASAN TEGUH SDN. BHD.

14
GAGASAN TEGUH SDN. BHD.

15
GAGASAN TEGUH SDN. BHD.

16
GAGASAN TEGUH SDN. BHD.

17
GAGASAN TEGUH SDN. BHD.

18
GAGASAN TEGUH SDN. BHD.

19
GAGASAN TEGUH SDN. BHD.

20
GAGASAN TEGUH SDN. BHD.

MANAGEMENT TEAM

21
GAGASAN TEGUH SDN. BHD.

MANAGING DIRECTOR
NG ENG LEONG
Bachelor of Economics La Trobe University, Australia (1991)

Mr. Ng Eng Leong founded Gagasan Teguh Sdn Bhd in 1991 and was
primarily responsible for the growth of the company during the early years. He
manages all the important aspects of the company’s operation and ensures
every project is completed to the satisfaction of the clients.
Mr.Ng holds a Bachelor of Economics from La Trobe University, Australia and
prior to starting Gagasan Teguh, he was the site co-ordinator for Gerudi
Bumi Sdn Bhd and was in charge of many site investigation projects covering many geotechnical
activities.

 CAREER SUMMARY

Project Heading Amount (RM)


PR1MA D’Marina Parcel 1&2: Cadangan Pembangunan Perumahan Di Atas Lot Pt 98631 Hingga
Pt 98642 Dan Pt 98650 Hingga Pt 98966 (Fasa 1) Dan PT 98629 Hingga PT 98630, PT 99191
Hingga PT 99760 Dan PT 99958 (Fasa 2), Benuh Rendang, Mukim Kuala Kuantan, Daerah
Kuantan, Pahang Darul Makmur & PR1MA D’Marina Parcel 3 : Cadangan Pembangunan 250,458.00
Perumahan Dan Perniagaan Secara “Gated & Guarded” Berhakmilikan Strata Di Atas Lot Pt
98967 Hingga Pt 99963, Pt 99964, Pt 101296 Dan Sebahagian Tanah Kerajaan Seluas 28.00 Ekar
(Fasa 3), Benuh Rendang, Mukim Kuala Kuantan, Daerah Kuantan, Pahang Darul Makmur.
Project Penswastaan Lebuhraya Bertingkat Damansara – Shah Alam (Dash), Package Ca4:
Construction And Completion Of Mainline And Other Associated Works From Ch 4983 To Ch 946,591.00
9307
Project Mass Rapid Transit Laluan 2 – Sungai Buloh-Serdang-Putrajaya (Ssp) Package V207:
Construction And Completion Of Viaduct Guideway And Other Associated Works From Upm To 799,768.00
Taman Pinggiran Putra.
The Exeution And Completion Of Soil Investigation Works For Proposed Development On Lot
497-499, At Jalan Bukit Bintang, Lot 511-513 At Jalan Delima And Lot 503, 504, 1160 & 1181 At 328,888.00
Jalan Jati, Kuala Lumpur.

Soil Investigation Works For Design, Construction, Supply, Installation, Completion, testing,
Commissioning And Maintenance Of Electrified Double Track From Gemas To Johor Bahru 975,100.36
Package 3 (CH 709600 To CH 754180) Layang Layang To Johor Baru, Johor.
Soil Investigation Works And Other Related Works At Other Related Works At Precinct 2 (Lot
PT6234 – PT6234, PT6236 – PT6239), Persiaran Mokhtar Dahari And Precinct 3 (Lot PT7053,
PT7057, PT7062, PT7065 – PT7066), Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan
– (Precinct 2)
Soil Investigation Works And Other Related Works At Precinct 2 (Lot PT6232 – PT6234, PT6236
– PT6239), Persiaran Mokhtar Dahari And Precinct 3 (Lot PT7053, PT7057, PT7059 – PT7062, 604,288.35
PT7065 – PT7066), Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan – (Precinct 3)
Soil Investigation Works And Other Related Works At Precinct 2 (Lot PT6232, PT6234, PT6236 –
PT6239), Persiaran Mokhtar Dahari And Precinct 3 (Lot PT7053, PT7057, PT7059 – PT7062,
PT7065 – PT7066), Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan – (Persiaran
Mohtar Dahari)
Proposed Soil Investigation Works On Mixed Commercial Development At Lot 223, Lot 224, Lot
225, Lot 227, Lot 417, Lot 212, lot 213, Lot 419, Lot 420, Lot 418, Lot 216, Lot 217, Lot 214, lot
256,150.00
215 And Lot 1074, Seksyen 57, Jalan Raja Chulan, Kuala Lumpur Untuk Tetuan Malola Garden
City Sdn. Bhd.

22
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

Cadangan Pembangunan Bercampur Di Atas Lot PT143, Seksyen 56 Di Jalan Hang Tuah / Jalan
259,175.00
Pudu, Wilayah Persekuttuan, Kuala Lumpur Untuk Tetuan BBCC Development Sdn. Bhd.

Proposed Development At Lot63109, Kepong, Kuala Lumpur. 378,000.00

Soil Investigation Works For Project – East Coast Rail Link (ECRL) – Kotasas To Lanchang. 519,773.97

Proposed Residential Development (340 Units) On Lot 54383, 1.7 Acres, Taman Danau Desa,
160,000.00
Mukim Kuala Lumpur, Wilayah Persekutuan.

Soil Investigation – project Penambakan Laut Seluas 170 Ekar Di Mukim Klebang Besar, Daerah
485,888.10
Melaka Tengah, Melaka.

Project Mass Rapid Transit Laluan 2: Sungai Buloh – Serdang – Putrajaya, Underground Sub-
Contract Package C – KCMRT-SSP-DFSB-SC-0055 – Rock probing Works At Bandar Malaysia 915,440.00
South Station And Crossover No.2

Construction And Completion Of Guideway, Stations, Park And Rides, Ancillary Buildings And
other Associated Works For Package GS04 For Light Rail Transit Line 3 (LRT 3) Project From 1,416,488.60
Bandar Utama To Johan Setia
Project: Construction And Completion Of Light Transit Rail Line 3 (LRT 3) From Bandar Utama
To Johan Setia Package GS01: Guideway, Stations, Park And Ride, Anchillary Buildings And 1,448,957.95
Other Associated Works.
Design, Construction, Supply, Installation, Completion, Testing, Commissioning And Maintenance
Of Electrified Double Track From Gemas To Johor Bahru
2,449.281.00
Proposed Detailed Soil Investigation Works For “Projek Landasan Keretapi Berkembar Elektrik
Gemas – Johor Bahru” Kulai To Johor Bahru. (Section 5)

23
GAGASAN TEGUH SDN. BHD.

PROJECT DIRECTOR
MICHAEL LAW
Certificate in Computing Programming, City & Guilds, London (1987)

Mr. Michael Law possesses a wealth of experience and knowledge in the site
investigation industry. He began as a Site Supervisor with Majumec Sdn Bhd
in 1987 and in 1990, he moved on to Geotech Recon as a Site Manager. He was
promoted as Project Manager with Ujiteknik Sdn Bhd and managed three in-
house teams in many significant site investigation projects in Malaysia and in
Indonesia.
Mr. Law holds a certificate in Computer Programming, City & Guilds, London (1987). Since joining
Gagasan Teguh as Project Director in 2001, he has implemented a successful project management
system to ensure the smooth running of every project undertaken.

 CAREER SUMMARY

Project Heading Amount (RM)

Proposed Development At Jalan Jalil Perkasa 19 For International Medical University (IMU),
153,981.96
Bukit Jalil, Kuala Lumpur.
Cadangan Pembangunan Pangsapuri Servis Yang Mengandungi: Fasa 1: (A) 1 Blok Pangsapuri
Servis (30 Tingkat) Blok A 414 Unit Dengan Ruang Mekanikal Di Aras Bumbung, (B) 1 Podium
(8 Tingkat) Dengan Ruang Legar, Ruang Letak Kereta Dan 1 Tingkat Kemudahan Penduduk, Dan
138,000.00
(C) 1 Tingkat Ruang Letak Kereta Dan Mekanikal Sub-Besmen. Fasa 2: (A) 1 Blok Pangsapuri
ervis (31 Tingkat) Blok B 366 Unit Dengan Ruang Mekanikal Di Aras Bumbung Di Atas Lot
17911, Mukim Setapak, Kuala Lumpur.
Proposed Construction And Completion Of Package 2A Earthworks And Other Related Works For
Development Of Phase 2 At Lot PT 55383, PT 55385, PT 55386, PT 55387, PT 55388, PT 55395
114,632.00
And Part Of Government Land, Serenia City, Mukim Dengkil, Sepang District, Selangor Darul
Ehsan For MESSRS Sime Darby Serenia Development Sdn. Bhd.

Projek Penswastaan Lebuhraya Bertingkat Damansara-Shah Alam Seksyen B – Kota Damansara


139,066.70
To Penchala Interchange Package CB4 (CH. 16238.848 To Penchala Interchange)

Soil Investigation Works For Cadangan Pembangunan Bercampur Di Atas GM 2360, Lot 3470 &
125,000.00
Lot 2373, Mukim Sena Perlis For Tetuan Pembangunan Bandar Perlis Sdn. Bhd.

Proposed Lebuhraya Putrajaya To KLA (MEX II) – Commencing From Putrajaya Interchange And
107,941.95
Terminating At KLIA

Monitoring Works For “Cadangan Pembangunan Bercampur Di Atas Lot 26315 Jalan 16/11,
Bandar Bercampur Di Atas Lot 26315 Jalan 16/11, Bandar Petaling Jaya, Daerah Petaling, 121,906.00
Selangor Darul Ehsan.
Proposed Soil Investigation Works For Permohonan Kebenaran Merancang Pelan Susunatur Bagi
Cadangan Pindaan Kepada Pelan Yang Telah Diluluskan Rujukan Bil. (54) MBSA.PRG/2016 – 96
(32) JLD. 17 Bertarikh 31/10/2014 Bagi Tujuan Penyerahan Dan Pemberimilikan Semula Di
Bawah Seksyen 197 & 76 (KTN) Bagi Cadangan Pembangunan Perumahan Di Atas Lot 91331,
132,799.00
Lot 91333, Lot (PT. 128183 – PT 128192) Dan Sebahagian Tanah Kerajaan Seluas 3.005 PT
128186, PT 128187, PT 128188, PT128191, PT128190, PY 128189 Dan Sebahagian Tanah
Kerajaan Jalan Sungai Rincing 32/66, Seksyen 32, Mukim Klang, Daerah Klang, 40460 Shah
Alam, Selangor Darul Ehsan Untuk Tetuan Bukit Rimau Development Sdn. Bhd.

24
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

Subsurface Investigation (S.I) Works For Proposed Condominium Development (SKYVUE) On Lot
144,600.96
1478, Taman Bukit Desa, Kuala Lumpur.

Permohonan Kebenaran Merancang Bagi Tujuan Mendirikan Pangsapuri Perkhidmatan YangTerdiri


Daripada 1 Blok 38 Tingkat Pangsapuri Perkhidmatan (408 Unit), 1 Blok 8 Tingkat Garden Suite
117,346.72
(104) Unit Beserta Kemudahan-Kemudahan Komuniti Di Atas Podium Tempat Letak Kereta 6
Tingkat Di Atas Lot PT 27209, Mukim Rasah, Daerah Seremban, Negeri Sembilan.

Instrumentation Works At Tanjung Karang –Sabak Bernam, Selangor. 112,996.00

Pelan Susunatur Pembangunan Kota Perdana Di Atas Lot PT.8, PT.11, PT.13 – PT.26, PT2019 (Zon
1) Dan Di Atas Lot PT.29 – PT. 69 (Zon 2) Mukim Sungai Laka, Bukit Kayu Hitam, Daerah Kubang 128,459.00
Pasu, Negeri Kedah Darul Aman.

Proposed Soil Investigation Works For Cadangan Pembangunan Perumahan Dan Perniagaan Di Atas
185,836.00
Lot 1913, Ladang Bangi, Mukim Semenyih Daerah Hulu Langat, Selangor Darul Ehsan.

Proposed Soil Investigation Works For Proposed Integrated Water Supply Scheme (IWSS) Labuhan
259,244.48
Dagang, Kuala Langat, Selangor.

Proposed Additional Soil Investigation Works For Cadangan Pembangunan Komersial Bercampur
Di Atas Lot 85114 (Lot Lama 3636), Seluas 64.29 Ekar Kwasa Damansara, Seksyen U4, Shah Alam, 182,544.72
Selangor.

25
GAGASAN TEGUH SDN. BHD.

Management Team
 Managing Director : Mr. Ng Eng Leong – Bach. of Economics
 Project Director : Mr. Michael Law – Cert. in Computing Programming

Project Department
 Assistant Project Manager : Abdullah Syakirin Bin Mohammad – Bachelor of Science (B.Sc)(Hons) Geology
 Site Manager : Mr. Foo Kuan Heng
 Assistant Project Manager : En. Muhammad Akif Bin Zurkornain – BSc. Geology (Hons)
 Assistant Project Manager : En. Ahmad Sayful Bin Mohamad – Bach. of Applied Science (Geophysics) (Hons)
 Project Executive : Mr. Lim Ming Fuook – Dip. in IT System Support
 Project Executive : En. Helmi Fahmie Bin Rosli – BSc. Geology (Hons)
 Eng. Geologist / Site Coordinator : En. Aamir Bin Ab’Kamel Thani – Bach. of Tech. (Hons) Petroleum Geosciences
 Geotechnical Instrumentation Tech. : En. Mohammad Yusuf Bin Mohd Raslan – SPM
 Project Coordinator : Nor Ain Juhana Binti Johari – Degree in Civil Engineering Technology (Construc)
 Project Executive : Helmi Fahmie Bin Rosli – Bachelor Degree in Geology/Geophysics
 Project Coordinator : Tengku Nur Soliha Bte Tengku Muhammad Danial – BSc. Science (Hons) Geology
 Instrumentation Technician : Muhammad Zahirul Amry Bin Badrul – Diploma in Business Management
 Junior Land Surveyor cum : Muhammad Firdaus Bin Hussin – Diploma in Surveying Science and Geomatics
 Instrumentation Technician
 Instrumentation Technician : Nur Alif Bin Hamzan – Diploma in Business
 Project Administrator : Nurul Fatihah Binti Husin – Bachelor of Applied Science
(Natural Resources Science)(Hons)
 Project Coordinator cum Trainee : Mohd Asyraf Bin Awang – Bachelor of Engineering (Hons)(Oil and Gas)
Project Executive
 Trainee Project Manager : Ahmad Nor Zaimie Bin Roslan – Master in Science (Engineering Geology)

Contracts Department
 Assistant Contract Manager : Pn. Jamaliah Binti Ismail – Bach. Deg. Engineering
 Junior Contract Executive : Pn. Sharifah Nabilah Binti Syed Hassan – Dip in Hotel & Catering Management
 Contract Assistant : Cik Haziera Binti Hamir – Bach. Of Customer Services Management (Hons)

Accounts Department
 Financial Controller : Ms. Sin Bee Hong – LLCI A/C
 Accounts Executive : Ms. Wendy Ching Mooi Ngok – LLCI A/C Intermediate
 Billing Executive : Ms. Connie Ng Pei Khum – Cert. Book Keeping & Acc.
 Junior Billing Executive : Cik Nurul Farhana Binti Mahamad Nazri – BSc. (Hons) Construction Management

Human Resource / Administration Department


 Office Manager cum : Ms Lorita Katleen Anak Bangik – Bachelor Degree in Business Admin (Hons)
 Junior Admin Executive : Pn Nur-Mie Binti Amir – Professional Certificate in Management & Secretary
 Despatch : En. Muhamad Ariff Bin Atan – SPM

Report Department
 Head of Report Section : Pn. Roshazyana Binti Tumiran – SPM
 Geotechnical Reporting Executive : Pn. Norazuin Binti Mohd Hassim – BSc. Geology (Hons)
 General Cum Data Entry Clerk : Pn. Norazura Binti Mohamad – BSc. Software Engineering (Hons)
 Data Entry Clerk : Pn. Fatin Farhana Binti Mohammed Haizol Azmi – Diploma in Landscape
Architecture

26
GAGASAN TEGUH SDN. BHD.

ORGANIZATION CHART

27
GAGASAN TEGUH SDN. BHD.

Organization Chart

GAGASAN TEGUH SDN BHD


BOARD OF DIRECTORS

NG ENG LEONG
Managing Director

MICHAEL LAW
Project Director

Contract Department In-house Department Project Department Project Department HR/Admin Department Account Department
JAMALIAH FOO KUAN HENG *ABDULLAH SYAKIRIN *AHMAD NOR ZAIMIE LORITA KATLEEN SIN BEE HONG
Financial Controller
Asst. Contract Manager Site Manager Project Manager Trainee Project Manager Office Manager cum Senior
HR Executive

SHARIFAH *AKIF *ASYRAF LIM MING *HELMI Instrumentation Report Section WENDY CONNIE
NUR-MIE
Contracts Asst. Project Trainee Project FUOOK FAHMIE SAIFUL ROSHAZYANA Accounts Billing
Manager Project Executive Junior Admin
Executive Executive Project Executive Asst. Project Head of Report Executive Executive
Executive
Manager Section

HAZIERA AMIR *TENGKU NOR *AAMIR NURUL


Contract Engineering Project Coordinator Project ARIFF Junior Billing
ZAHIRUL YUSUF *NORAZUIN
Assistant Geologist / SC Coordinator Despatch Executive
Geotechnical Geotechnical Geotechnical
Instrumentation Instrumentation Reporting Exec.
Technician Technician
Store

NOR AIM AZURA


Other FATIHAH AMRY
Project Project Firdaus GC Data Entry
Specialized Instrumentation
Administrator Administrator Instrumentation Clerk
Projects
Trainee Technician Trainee Technician

Difficult Sites Soil Laboratory


Mackintosh
Tests
Probes / Hand ALIF
Augers Teams 28 Instrumentation
House Teams In- House
Sub Contractors (without Trainee
boreholes) Technician
* Geologist Personnel
GAGASAN TEGUH SDN. BHD.

EQUIPMENT

• Toho-D1 Rotary Drilling Rig Complete with Kubota 12 1/2HP diesel engine.

• YWE D-90 Rotary Drilling Rig Complete with Yanmar TF 160 diesel engine.

• JKR/Mackintosh Probe Apparatus.

• YWE Hand Auger

• Crawler for track-mounted drilling rig.

• Geotecnical Instrument Electronic Dipmeters.

• Farnell Vane Shear Appratus.

• Geonor Penetration Vane Shear Apparatus.

• Geonol 100 KN Cone Penetrometer c/w Electrical Piezones.

• U-2 50mm Samplers.

• U-2 63.5mm Piston Samplers.

• U-3 75mm Piston Samplers.

• Sokisha Theodolite.

• Sokisha Dumpy Level.

• Prismatic Compass.

• Garmin GPS Locator.

• Triplex Water Supply Pumps c/w Robin Petrol Engines.

• YWE Single Piston Pumps c/w Yanmar 7hp Diesel Engines.

• Complete set of laboratory testing equipment.

• Longyear Wireline Apparatus (NQ size casing up to 200m).

• Bunker Spritz 38 DHM Mortar Grout Pump.

• RST Digital Inclinometer Readout Unit With Tiltsensor Probe.

• RST Tiltmeter.

• Jack-up Pontoon.

• N Size Pneumatic Grouting Packers.

• Grout Mixer

29
GAGASAN TEGUH SDN. BHD.

COMPLETED PROJECT

30
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

PR1MA D’Marina Parcel 1&2: Cadangan Pembangunan Perumahan Di Atas Lot Pt 98631 Hingga Pt
98642 Dan Pt 98650 Hingga Pt 98966 (Fasa 1) Dan PT 98629 Hingga PT 98630, PT 99191 Hingga
PT 99760 Dan PT 99958 (Fasa 2), Benuh Rendang, Mukim Kuala Kuantan, Daerah Kuantan, Pahang
Darul Makmur & PR1MA D’Marina Parcel 3 : Cadangan Pembangunan Perumahan Dan Perniagaan 250,458.00
Secara “Gated & Guarded” Berhakmilikan Strata Di Atas Lot Pt 98967 Hingga Pt 99963, Pt 99964,
Pt 101296 Dan Sebahagian Tanah Kerajaan Seluas 28.00 Ekar (Fasa 3), Benuh Rendang, Mukim
Kuala Kuantan, Daerah Kuantan, Pahang Darul Makmur.

Project Penswastaan Lebuhraya Bertingkat Damansara – Shah Alam (Dash), Package Ca4:
946,591.00
Construction And Completion Of Mainline And Other Associated Works From Ch 4983 To Ch 9307

Project Mass Rapid Transit Laluan 2 – Sungai Buloh-Serdang-Putrajaya (Ssp) Package V207:
Construction And Completion Of Viaduct Guideway And Other Associated Works From Upm To 799,768.00
Taman Pinggiran Putra.

The Exeution And Completion Of Soil Investigation Works For Proposed Development On Lot 497-
499, At Jalan Bukit Bintang, Lot 511-513 At Jalan Delima And Lot 503, 504, 1160 & 1181 At Jalan 328,888.00
Jati, Kuala Lumpur.

Soil Investigation Works For Design, Construction, Supply, Installation, Completion, testing,
Commissioning And Maintenance Of Electrified Double Track From Gemas To Johor Bahru 975,100.36
Package 3 (CH 709600 To CH 754180) Layang Layang To Johor Baru, Johor.

Soil Investigation Works And Other Related Works At Other Related Works At Precinct 2 (Lot
PT6234 – PT6234, PT6236 – PT6239), Persiaran Mokhtar Dahari And Precinct 3 (Lot PT7053,
PT7057, PT7062, PT7065 – PT7066), Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan –
(Precinct 2)

Soil Investigation Works And Other Related Works At Precinct 2 (Lot PT6232 – PT6234, PT6236 –
PT6239), Persiaran Mokhtar Dahari And Precinct 3 (Lot PT7053, PT7057, PT7059 – PT7062, 604,288.35
PT7065 – PT7066), Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan – (Precinct 3)

Soil Investigation Works And Other Related Works At Precinct 2 (Lot PT6232, PT6234, PT6236 –
PT6239), Persiaran Mokhtar Dahari And Precinct 3 (Lot PT7053, PT7057, PT7059 – PT7062,
PT7065 – PT7066), Mukim Ijok, Daerah Kuala Selangor, Selangor Darul Ehsan – (Persiaran Mohtar
Dahari)

Proposed Soil Investigation Works On Mixed Commercial Development At Lot 223, Lot 224, Lot
225, Lot 227, Lot 417, Lot 212, lot 213, Lot 419, Lot 420, Lot 418, Lot 216, Lot 217, Lot 214, lot
256,150.00
215 And Lot 1074, Seksyen 57, Jalan Raja Chulan, Kuala Lumpur Untuk Tetuan Malola Garden City
Sdn. Bhd.

Cadangan Pembangunan Bercampur Di Atas Lot PT143, Seksyen 56 Di Jalan Hang Tuah / Jalan
259,175.00
Pudu, Wilayah Persekuttuan, Kuala Lumpur Untuk Tetuan BBCC Development Sdn. Bhd.

Proposed Development At Lot63109, Kepong, Kuala Lumpur. 378,000.00

Soil Investigation Works For Project – East Coast Rail Link (ECRL) – Kotasas To Lanchang. 519,773.97

Proposed Residential Development (340 Units) On Lot 54383, 1.7 Acres, Taman Danau Desa,
160,000.00
Mukim Kuala Lumpur, Wilayah Persekutuan.

31
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

Soil Investigation – project Penambakan Laut Seluas 170 Ekar Di Mukim Klebang Besar, Daerah
485,888.10
Melaka Tengah, Melaka.

Project Mass Rapid Transit Laluan 2: Sungai Buloh – Serdang – Putrajaya, Underground Sub-
Contract Package C – KCMRT-SSP-DFSB-SC-0055 – Rock probing Works At Bandar Malaysia 915,440.00
South Station And Crossover No.2

Construction And Completion Of Guideway, Stations, Park And Rides, Ancillary Buildings And
other Associated Works For Package GS04 For Light Rail Transit Line 3 (LRT 3) Project From 1,416,488.60
Bandar Utama To Johan Setia
Project: Construction And Completion Of Light Transit Rail Line 3 (LRT 3) From Bandar Utama
To Johan Setia Package GS01: Guideway, Stations, Park And Ride, Anchillary Buildings And 1,448,957.95
Other Associated Works.
Design, Construction, Supply, Installation, Completion, Testing, Commissioning And Maintenance
Of Electrified Double Track From Gemas To Johor Bahru
2,449.281.00
Proposed Detailed Soil Investigation Works For “Projek Landasan Keretapi Berkembar Elektrik
Gemas – Johor Bahru” Kulai To Johor Bahru. (Section 5)

Proposed Development At Jalan Jalil Perkasa 19 For International Medical University (IMU),
153,981.96
Bukit Jalil, Kuala Lumpur.

Cadangan Pembangunan Pangsapuri Servis Yang Mengandungi: Fasa 1: (A) 1 Blok Pangsapuri
Servis (30 Tingkat) Blok A 414 Unit Dengan Ruang Mekanikal Di Aras Bumbung, (B) 1 Podium
(8 Tingkat) Dengan Ruang Legar, Ruang Letak Kereta Dan 1 Tingkat Kemudahan Penduduk, Dan
138,000.00
(C) 1 Tingkat Ruang Letak Kereta Dan Mekanikal Sub-Besmen. Fasa 2: (A) 1 Blok Pangsapuri
ervis (31 Tingkat) Blok B 366 Unit Dengan Ruang Mekanikal Di Aras Bumbung Di Atas Lot
17911, Mukim Setapak, Kuala Lumpur.
Proposed Construction And Completion Of Package 2A Earthworks And Other Related Works For
Development Of Phase 2 At Lot PT 55383, PT 55385, PT 55386, PT 55387, PT 55388, PT 55395
114,632.00
And Part Of Government Land, Serenia City, Mukim Dengkil, Sepang District, Selangor Darul
Ehsan For MESSRS Sime Darby Serenia Development Sdn. Bhd.
Projek Penswastaan Lebuhraya Bertingkat Damansara-Shah Alam Seksyen B – Kota Damansara
139,066.70
To Penchala Interchange Package CB4 (CH. 16238.848 To Penchala Interchange)

Soil Investigation Works For Cadangan Pembangunan Bercampur Di Atas GM 2360, Lot 3470 &
125,000.00
Lot 2373, Mukim Sena Perlis For Tetuan Pembangunan Bandar Perlis Sdn. Bhd.

Proposed Lebuhraya Putrajaya To KLA (MEX II) – Commencing From Putrajaya Interchange And
107,941.95
Terminating At KLIA

Monitoring Works For “Cadangan Pembangunan Bercampur Di Atas Lot 26315 Jalan 16/11,
Bandar Bercampur Di Atas Lot 26315 Jalan 16/11, Bandar Petaling Jaya, Daerah Petaling, 121,906.00
Selangor Darul Ehsan.

Proposed Soil Investigation Works For Permohonan Kebenaran Merancang Pelan Susunatur Bagi
Cadangan Pindaan Kepada Pelan Yang Telah Diluluskan Rujukan Bil. (54) MBSA.PRG/2016 – 96
(32) JLD. 17 Bertarikh 31/10/2014 Bagi Tujuan Penyerahan Dan Pemberimilikan Semula Di
Bawah Seksyen 197 & 76 (KTN) Bagi Cadangan Pembangunan Perumahan Di Atas Lot 91331,
132,799.00
Lot 91333, Lot (PT. 128183 – PT 128192) Dan Sebahagian Tanah Kerajaan Seluas 3.005 PT
128186, PT 128187, PT 128188, PT128191, PT128190, PY 128189 Dan Sebahagian Tanah
Kerajaan Jalan Sungai Rincing 32/66, Seksyen 32, Mukim Klang, Daerah Klang, 40460 Shah
Alam, Selangor Darul Ehsan Untuk Tetuan Bukit Rimau Development Sdn. Bhd.

32
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

Subsurface Investigation (S.I) Works For Proposed Condominium Development (SKYVUE) On


144,600.96
Lot 1478, Taman Bukit Desa, Kuala Lumpur.

Permohonan Kebenaran Merancang Bagi Tujuan Mendirikan Pangsapuri Perkhidmatan


YangTerdiri Daripada 1 Blok 38 Tingkat Pangsapuri Perkhidmatan (408 Unit), 1 Blok 8 Tingkat
117,346.72
Garden Suite (104) Unit Beserta Kemudahan-Kemudahan Komuniti Di Atas Podium Tempat Letak
Kereta 6 Tingkat Di Atas Lot PT 27209, Mukim Rasah, Daerah Seremban, Negeri Sembilan.

Instrumentation Works At Tanjung Karang –Sabak Bernam, Selangor. 112,996.00

Pelan Susunatur Pembangunan Kota Perdana Di Atas Lot PT.8, PT.11, PT.13 – PT.26, PT2019
(Zon 1) Dan Di Atas Lot PT.29 – PT. 69 (Zon 2) Mukim Sungai Laka, Bukit Kayu Hitam, Daerah 128,459.00
Kubang Pasu, Negeri Kedah Darul Aman.

Proposed Soil Investigation Works For Cadangan Pembangunan Perumahan Dan Perniagaan Di
185,836.00
Atas Lot 1913, Ladang Bangi, Mukim Semenyih Daerah Hulu Langat, Selangor Darul Ehsan.

Proposed Soil Investigation Works For Proposed Integrated Water Supply Scheme (IWSS)
259,244.48
Labuhan Dagang, Kuala Langat, Selangor.

Proposed Additional Soil Investigation Works For Cadangan Pembangunan Komersial Bercampur
Di Atas Lot 85114 (Lot Lama 3636), Seluas 64.29 Ekar Kwasa Damansara, Seksyen U4, Shah 182,544.72
Alam, Selangor.

33
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

PROJECT CODE: WCE1


PRIVATIZATION OF LEBUHRAYA PESISIRAN PANTAI BARAT (TAIPING- BANTING)
THE CONSTRUCTION AND COMPLETION OF CIVIL WORKS FOR SECTION 1- BANTING 32,828.73
INTERCHANGE TO SKVE INTERCHANGE FOR MESSRS WEST COAST EXPRESSWAY
SDN. BHD.

PRIVATISATION OF LEBUHRAYA PERSISIRAN PANTAI BARAT (TAIPING - BANTING)


63,749.41
SECTION 6 - KAPAR INTERCHANGE TO ASSAM JAWA INTERCHANGE

PROJEK MENAIKTARAF KEMUDAHAN INFRASTRUKTUR KERETAPI BERKEMBAR


ELEKTRIK DI LEMBAH KLANG (KLANG VALLEY ELECTRIFIED DOUBLE TRACK -
17,655.00
KVDT)

CADANGAN PEMBANGUNAN 138 UNIT RUMAH TERES DUA TINGKAT (18' X 60')
PAKEJ 1 DARIPADA 234 UNIT DI ATAS LOT 1528, 1194 DAN SEBAHAGIAN LOT 1648, 19,568.28
MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR.

PROJEK PENSWASTAAN LEBUHRAYA BERTINGKAT DAMANSARA - SHAH ALAM


SECTION B - KOTA DAMANSARA TO PENCHALA INTERCHANGE 25,020.00
PACKAGE: CB4 (CH. 16238.848 TO PENCHALA INTERCHANGE )

PACKAGE 2: THE CONSTRUCTION AND COMPLETION OF EARTHWORK, BASEMENT


AND ASSOCIATED WORKS FOR - CADANGAN PEMBANGUNAN BERCAMPUR YANG
MENGANDUNGI:
1 BLOK PEJABAT 34 TINGKAT
(I) 30 TINGKAT RUANG PEJABAT DARI TINGKAT 3 SEHINGGA TINGKAT 32
(II) 4 TINGKAT RUANG PERNIAGAAN DARI TINGKAT TANAH HINGGA TINGKAT 2
34,040.00
MEZANINE BERSERTA: TEMPAT LETAK KERETA DI TINGKAT TANAH 4 TINGKAT
BASEMEN 1, 2, 3 & 4 TEMPAT LETAK KERETA & TEMPAT LETAK MOTOSIKAL 1 UNIT
PUSAT PENCAWANG UTAMA DI TINGKAT TANAH
DI FASA 1 DIATAS SEBAHAGIAN LOT 20001 (DAHULUNYA ADALAH LOT 61),
SEKSYEN 96A, JALAN MAAROF, WILAYAH PERSEKUTUAN, KUALA LUMPUR UNTUK
TETUAN BANGSAR 61 SDN BHD

PROPOSED CONSTRUCTION AND COMPLETION OF EARTHWORKS AND OTHER


RELATED WORKS FOR DEVELOPMENT OF PHASE 2 (R11A & R13), AT BANDAR BUKIT
64,635.00
RAJA 2, MUKIM KAPAR, DISTRICT OF KLANG, SELANGOR DARUL EHSAN FOR
MESSRS. SIME DARBY USJ DEVELOPMENT SDN. BHD

CADANGAN PEMBANGUNAN DI ATAS LOT 1610 DAN 1611, MUKIM SEMENYIH,


DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN EXCEL 40,403.12
GLAMOUR HOUSING SDN BHD.

CADANGAN PEMBANGUNAN PANGSAPURI DI ATAS LOT 62199, JALAN RESIDEN 2,


DESA PARKCITY, MUKIM BATU, WILAYAH PERSEKUTUAN KUALA LUMPUR UNTUK 74,564.16
TETUAN CLOUDVEST SDN. BHD.

PRIVATIZATION OF LEBUHRAYA PERSISIRAN PANTAI BARAT (TAIPING – BANTING)


CIVIL WORKS FOR SECTION 1 BANTING INTERCHANGE TO SKVE INTERCHANGE 76,150.00
FOR MESSRS WEST COAST EXPRESSWAY SDN. BHD.

34
GAGASAN TEGUH SDN. BHD.

Project Heading Amount (RM)

PROPOSED INSTRUMENTATIONS WORKS FOR MASBE COFFEE OCR, JALAN YAP


KWAN SENG, KUALA LUMPUR. 34,100.00

PROPOSED CONE PENETRATION TEST (CPT) AT KUANTAN PORT, KUANTAN,


PAHANG. 19,122.40

INSTRUMENTATION WORKS AT TANJUNG KARANG - SABAK BERNAM, SELANGOR.


98,900.00

INTRUMENTATION WORKS AT 9INE CONDOMINIUM JALAN SURIA RESIDEN 1/1, 27,538.00


TAMAN KEMACAHAYA, 43200 BATU 9, CHERAS, SELANGOR.

THE PROPOSED CONSTRUCTION AND COMPLETION OF MERCU TERUNTUM,


PROMENADE EXTENSION AND ASSOCIATED WORKS AT KUANTAN WATERFRONT,
73,490.00
KUANTAN, PAHANG DARUL MAKMUR FOR THE EAST COAST ECONOMIC REGION
DEVELOPMENT COUNCIL (ECERDC)

PILING AND SUB-STRUCTURE WORKS FOR CADANGAN MEMBINA SEBUAH


BANGUNAN PERNIAGAAN YANG MENGANDUNGI 305 UNIT HOTEL (SHERATON
HOTEL) 15 TINGKAT YANG TERDIRI DARIPADA 1 TINGKAT LOBI (ARAS TANAH), 3
TINGKAT TEMPAT LETAK KERETA BAWAH TANAH (ARAS SUB BASEMENT -
BASEMENT 2), 1 TINGKAT BALLROOM DAN RUANG SEMINAR (ARAS 1) 1 TINGKAT 47,690.00
PUSAT PERNIAGAAN (ARAS 2) DI ATAS LOT 31572 (GRN 189681), LOT 31573 (GRN
189682), LOT 31574 (GRN 189683), LOT 31575 (GRN 189684) & LOT 31584 (TNB), MUKIM
LABU, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS UNTUK TETUAN
ARD REAL ESTATE (M) SDN. BHD.

PROJEK MENAIKTARAF LEBUHRAYA PULAU INDAH (FASA 2), KLANG, SELANGOR. -


24,048.59
CPT TEST

PROJEK PENSWASTAAN LEBUHRAYA BERTINGKAT DAMANSARA-SHAH ALAM:


PACKAGE CB4 CONSTRUCTION AND COMPLETION OF MAINLINE AND OTHER 24,500.00
ASSOCIATED WORKS FROM CH 16238.848 TO PENCHALA INTERCHANGE

METAMORPHOO - PT91249, JALAN SETIA DAGANG AH U13/AH, SETIA ALAM, SHAH


ALAM, SELANGOR. 58,575.00

35

You might also like