You are on page 1of 46

GRE ENGINEERING SOLUTIONS SDN BHD

GEOTECHNICAL &
INSTRUMENTATION WORKS

SOIL INVESTIGATION WORKS

SOIL LABORATORY

PROJECT MANAGEMENT

GRE ENGINEERING SOLUTIONS SDN BHD


1ST FLOOR, SL 19, BLOCK H, SENTOSA
PARADE, BATU 7, JALAN KUCHING/SERIAN,
93250 KUCHING, SARAWAK

TEL: +6082 295 216


FAX: +6082 295 216
E-MAIL: greengineeringsol@gmail.com
GRE ENGINEERING SOLUTIONS SDN BHD

1–3

4–6

7 – 10

11 – 17

18 – 44

[2021]
GRE ENGINEERING SOLUTIONS SDN BHD

GRE ENGINEERING SOLUTIONS SDN BHD is


a multi-disciplinary engineering expertise firm set up in July
2017 to utilize the combined experience and expertise of its
partners in providing geotechnical, Instrumentation Works,
Soil Investigation Works, Materials Testing, Pile Testing as
well as project management services. The firm is
committed to provide best service and solution for our
client with an experience and vast knowledge in the field.
We also emphasizing on meeting our client deadline and
financial budget.

GEOTECHNICAL, SOIL INVESTIGATION & INSTRUMENTATION WORKS, AND SOIL


LABORATORY

GEOTECHNICAL/GEOLOGICAL SERVICES
• Static Load Test / Maintain Load Test
• Pile Dynamic Test
• Sonic Loging Test
• Cone Penetration Test (CPT)
• Field Exploration which includes Trial Pitting, Boring and Drilling, Soil Sampling (Disturbed and
Undisturbed Samples), Standard Penetration Test, Water Sampling and Measurement, Hand Augering,
Pit Augering, Mackintosh Probes Test, Field Vane Test and etc
• Jet grouting, Micro piling, Pressure Grouting, Soil Nailing, Dowel, Rock Bolts, Ground Anchoring,
Guniting, Horizontal Drain, Underpinning Work, etc
• Geotechnical Consultancy Services - Settlement Analysis and Prediction, Slope Stability Analysis,
Foundation Design and Recommendation

LABORATORY SERVICES
• Soil (Compliance to BS 1377:1990) - Classification (Moisture Content, Atterberg Limit, Particle Size
Distribution, Specific Gravity, etc), Shear Strength Test (Isotropically Consolidated Undrained (CIU)
Triaxial Compression Test, Unconsolidated Undrained Triaxial Compression Test (UU), UC, SUU, CD,
Direct Shear, etc), 1-D Consolidation, Permeability Test (Constant Head & Falling Head), Chemical
analysis (pH, SO2, Cl-, Organic Content etc), Compaction Test (Rammer method), CBR Test (Soaked
& Unsoaked)
• Aggregate's Physical, Mechanical & Chemical Testing - Clay, Silt and Dust Content, Grading Analysis,
Atterberg Limit, Specific Gravity, Water Absorption Test, Organic Impurities Test, Flakiness Index,
Elongation Index, Aggregate Crushing Value, Aggregate Impact Value, Los Angeles Abrasion Test,
Ten Percent Fine Value, Soundness Test, Polish Stone Value Test, SO4 & Cl- content, etc
• Rock - Unconfined Compressive Strength Test, Point Load Test & etc
• Concrete - Compressive Strength Tests (Cube & Cylinder, Core Test), Rebound Hammer Test,
Concrete Coring, etc

GEOTECHNICAL, INSTRUMENTATION AND MONITORING


• Incliometer, Standpipe Piezometer, Pneumatic Piezometer, Observation well, Rod Settlement, Gauges,
Surface Settlement Marker, etc

1
GRE ENGINEERING SOLUTIONS SDN BHD

LIST OF TESTING EQUIPMENTS, INSTRUMENTATION &


BORING MACHINES

SOIL INVESTIGATION (LAND AND MARINE)

1. SOIL INVESTIGATION RIG CAMACCHION G305

•One(1) unit
•Soil Nail
•Micro pile
•Soil Investigation

2. CONE PENETRATION TEST CPT - FM - 123

•ONE (1) Unit

3. YWE BORING MACHINE

•TWENTY FIVE (25) Units


•Site Investigation Drilling
•Prospecting for minerals, Aggregates etc
•Structural Drilling
•Shallow water well Drilling
•Seismic shot hole Drilling
•Wellpoint and piezometer installation Holes
•Micropiling

4. VANE SHEAR TEST EQUIPMENT

•FOUR (4) Sets

5. MACHINTOSH PROBES

•FIVE (5) Sets

6. HAND AUGER

•THREE (3) Sets

2
GRE ENGINEERING SOLUTIONS SDN BHD

TESTING EQUIPMENT & INSTRUMENTATIONS

1. Static Load Test Equipment (No Picture)

2. Pile Driving Analyzer (PDA) 3. Pile Integrity Tester(PIT)

4.Cone Penetration Testing


5. Soil Inclionometer
Equipment (CPT)

6. Piezometer & Water


7. Vibration Minitoring
Standpipe

3
GRE ENGINEERING SOLUTIONS SDN BHD

ESTABLISHED NAME : GRE ENGINEERING SOLUTIONS SDN BHD

SERVICES OFFERED : SOIL INVESTIGATION & INSTRUMENTATION


WORKS

BUSINESS REGISTRATION : 1236568-U

BEM REGISTRATION : 1813-1000-SP-1156

SPA REGISTRATION : 056/2018

ADDRESS : GRE ENGINEERING SOLUTIONS SDN BHD


1st FLOOR, SL.19, BLOCK H,
SENTOSA PARADE, BATU 7,
JALAN KUCHING/SERIAN,
93250 KUCHING, SARAWAK.

TELEPHONE/FACSIMILE NUMBER : +(60) 82 295 216

E-MAIL ADDRESS : greengineeringsol@gmail.com

DATE OF COMMENCEMENT : JUNE 2017

NO. OF STAFF : PROFESSIONAL – 4 (ENGINEERS)


– 1 (GEOLOGIST)
SUB-PROFESSIONAL – 15
CLERICAL – 3 (ADMINISTRATION)

SHAREHOLDERS & DIRECTORS : IR. VOON CHOO YEN


ENG. CHAI CHEE YONG

COMPANY’S BANKERS : AMBANK BERHAD


Satok Branch

4
Managing Director
Ir.Voon Choo Yen
BEng.Civil (Hons), East London, UK
MIEM, PEng

Director
Mr.Chai Chee Yong
Msc.Geotechnical Engineering, Newcastle, UK
BEng.Civil & Structural (Hons), Bradford, UK

Senior Engineer Senior Engineer


Ms. Lu Tsui Ming Mr. Lidang Anak Disen
BEng. Civil (Hons) / Bachelor of Commerce B.Sc (Hons) Civil Engineering, Universiti Teknologi
(Management), Swinburne University of Technology Malaysia (UTM) Johor
(Hawthorn Campus)

Soil Investigation, Instrumentation & Laboratory Team Office Team


Associate Partner
Mr. Edwin Tang Hung Kong
Bachelor’s Degree in Geology, Universiti Kebangsaan Malaysia
Technical Staff Administration
1. Daniel Ho Zheng Yuan 1. Phang Ying Ying (Account &
Site Coordinator (Assistant Engineer) (Diploma) Human Resources Manager)
Mr. Chong Hon Khoon 2. Khalid Bin Kiprawi BA (Hons) Finance, UK
(Senior Draught Person) 2. Siaw Boon Tzin (Senior
3. Darrell Anak Tawi Account & Admin Executive)
Laboratory Technician Instrumentation Supervisor (Draughtsperson) 3. Flora Anak Peter
1. Hipni Bin Muda 1. Vincent Voon Zhi Fu (PDA Test) 4. Phu Shiuan Woei (Admin Assistant)
2. Sufian Bin Muda 2. Joseph Ling (PDA Test) (Diploma) Bachelor of Business
GRE ENGINEERING SOLUTIONS SDN BHD ORGANIZATION CHART

3. Jasmi Bin Ojek 5. Fam Yun Qian Administration (Hons)


4. Seleman Bin Jini (Diploma) in E-Commerce
GRE ENGINEERING SOLUTIONS SDN BHD

5. Nurazani Bin Chik (Azmi)


6. Mohammad Haliff
7. Rasdi Bin Sirat

5
GRE ENGINEERING SOLUTIONS SDN BHD

6
GRE ENGINEERING SOLUTIONS SDN BHD

LIST OF PROJECTS FOR GEOTECHNICAL AND INSTRUMENTATION WORKS

A. SOIL INVESTIGATION WORKS

1. EAST COAST RAIL LINK (ECRL) – Soil Investigation & Testing Works from Kota Bharu to Dungun
Section. Stage 1 (100 Numbers of 60m Boreholes)
 (Client: CCCC – China Communications Construction (ECRL) Sdn.Bhd.).

2. EAST COAST RAIL LINK (ECRL) – Soil Investigation & Testing Works from Kota Bharu to Dungun
Section. Stage 2 (300 Numbers of 100m Boreholes)
 (Client: CCCC – China Communications Construction (ECRL) Sdn.Bhd.).

3. SECOND TRUNK ROAD – Samarahan to Roban with extent link to Pan Borneo Highway, Sebuyau to
Sri Aman / Betong and Jalan Kelupu / Jalan Tg. Genting to Lanang Bridge, Sibu. Stage 1 (60 Numbers
of Boreholes & 70 Numbers of Mackintosh probe with vane shear test).
 (Client: China Habour – CHEC Construction (M) Sdn.Bhd).

4. Soil Investigation Work for Sarawak Coastal Road Network, Package D2B, Project Jambatan Batang
Lupar, Bahagian Samarahan/Betong, Sarawak. (13 Numbers of River Boreholes).
 (Client: Jabatan Kerja Raya Sarawak).

5. Soil Investigation Work for proposed development of Sadong Jaya Mangrove Tourism on Block 7, 8 &
9, Sadong Land District Samarahan, Sarawak. (2 Numbers of Soil Investigation and 17 Numbers of
MPT).
 (Client: Sarawak Forestry Corporation).

6. Soil Investigation Work for Long Lama – Temala Junction main road and Uma Akeh Spur road
improvements. (62 Numbers of Soil Investigation).
 (Client: Kendiri Emas Sdn Bhd).

7. Soil Investigation Work for proposed improvement of existing road to Long Laput (Phase 1), Miri
Division.
 (Main Contractor: Kendiri Emas Sdn Bhd) .

8. Soil Investigation Work for proposed construction of new single line bridge crossing Sungai Layun at
Long Kevok, Miri Division.
 (Main Contractor: Kendiri Emas Sdn Bhd).

9. Soil Investigation Work for proposed upgrading of existing road from Lawas Damit to Long Lempaki,
Lawas District, Limbang Division.
 (Main Contractor: Kendiri Emas Sdn Bhd).

10. Soil Investigation Work for proposed upgrading of internal road and drainage system for Kampung
Munchu, Lawas District, Limbang Division
 (Main Contractor: Kendiri Emas Sdn Bhd).

11. CBR & FDT testing for proposed renovation and extension to existing & storey X-FAB Administration
Building with association external works on part of Lot 1339, Block 12, Muara Tebas ID Samajaya Fiz.
 (Client: Hock Seng Lee Berhad).

12. Additional Soil Investigation Works for (FEED) Contractor for RAPID Project, Package 012B: FEED
Solid Products Jetty, in Mukim of Pengerang, Kota Tinggi District, Johor Darul Takzim
 (Client: Arsea Consulting Engineers Sdn Bhd.).

13. Geotechnical Works for Petronas RAPID – Package No.6A (LLDPE) & Package No.11 (EO/EG) in
Pengerang area, Johor Darul Takzim
 (Client: Samsung Engineering Sdn. Bhd.).

14. Soil Investigation Works for RAPID Project – Polypropylene Units Spheripol 3305 and Spherizone 3315
in Pengerang Area, Johor Darul Takzim (CAMP AREA).
 (Client: Tecnimont SpA.).
7
GRE ENGINEERING SOLUTIONS SDN BHD

15. Soil Investigation Works for RAPID Project – Polypropylene Units Spheripol 3305 and Spherizone 3315
in Pengerang Area, Johor Darul Takzim (PROCESS AREA).
 (Client: Tecnimont SpA.).

16. Soil Investigation Works at Lot 1135, Mukim Pengerang, Daerah Pengerang and Lot 1122, Mukim
Pengerang, Daerah Kota Tinggi, Johor Darul Takzim
 (Client: Trueclass Option Sdn. Bhd.).

17. Marine Soil Investigation Works for proposed Forest City Island Reclamation and Mixed Development
– Island 1
 (Client: Country Garden Pacific View Sdn. Bhd.).

18. Soil Investigation Works for cadangan jalan keluar masuk di KM2.7 Lebuhraya Tanjung Pelepas
hingga cadangan Pembangunan Pelan Induk Forest City sepanjang 6KM, Mukim Tanjung Kupang,
Daerah Johor Bahru, Jahor Darul Takzim.
 (Client: Country Garden Pacific View Sdn. Bhd.).

19. Soil Investigation Works for RAPID package OUI 14, Pengerang.
 (Client: Knusford Construction Sdn. Bhd.).

20. Soil Investigation Works for proposed Forest Island Reclamation and Mixed Development Mukim
Tanjung Kupang, Johor Bahru, Johor Darul Takim. (Retaining Wall).
 (Client: Country Garden Pacific View Sdn. Bhd.).

21. Soil Investigation Works at Landmark Tower, Forest City, Johor.


 (Client: Country Garden Pacific View Sdn. Bhd.).

22. Soil Investigation Works for Engineering, Procurement, Constuction & Commissioning (EPCC) for the
development of Pengerang 275kV Overhead Transmission Line from Pengerang Cogen Transmission
Line from Pengerang Cogen Plant (PCP) to Peninsular Malaysia Grid and 275/132kV Pengerang
Station – Contruction of New 275/132kV Substation Civil Works and Electrical Works.
 (Client: Bras Ventures Berhad.).

23. Geotechnical Investigation Works for Elixir: C4 INA Petrochemical Project for Petronas Project
Refinery and Petrochemical Intergrated Development (RAPID) Project, in Mukim of Pengerang, Kota
Tinggi District, Johor Darul Takzim.
 (Client: BASF Petronas – Flour JV.).

24. Soil Investigation Works at Plot 25 (Phase 1), Forest City, Tanjung Kupang for Country Garden Pacific
View Sdn Bhd.).
 (Client: Country Garden Pacific View Sdn Bhd.).

8
GRE ENGINEERING SOLUTIONS SDN BHD

B. PDA & INSTRUMENTATION WORKS

1. PDA Test for the Proposed Pan Borneo Highway, Sarawak (WPC 10).
Bakun Junction Interchange PDA Test Report for Pile Ref: (N-46, O-55, T-56,Q-5,B1, U-46, R-45, O-
46, G-5, H-4, K-4, M-5, Q-5, A-51, E-45, A-45, C-46, C-49, A130, C131, C135, B121, C124, B127,
F143, H142, A138, B142, D141, E137, D139, 137, E131, E133, G135, E127, F129, G131, G122, E122,
F124, D116, E118, D120, C114, B116, A118, A110, C122, A113, U94, B94, H94, K90, A86, U90, G88,
F86, E90, V87, S88, R90, B67, Q68, W63, K94, 80-81, 79-Y1, 80-Z5, L76, 577-G, 78-U1, 78-A1, B75,
B71, N70, L73, J75, V72, T72, O72, L64, P62, W 69, A62,C64,162, 81-Y1, A53, A58, A63, A37, A42,
A48, A24, A27, A32, A13, A16, A21, N10, P7, S7, A74, A67, E13, T19, T17, T14, M20, Q19, P13, J14,
I17, K19, A1, A3, A4 & A6).
Niah Interchange PDA Test Report for Pile Ref: (A-13, A-1, 1-7, R-1, Q119, R122, Q128, Q132, R136,
O141, J140, J131, K127, J123, J115, L110, G108, H102, G98 & C97).
Suai Interchange PDA Test for Pile Ref: (A24, B21, A27, A17, D20, B19, A9, A11, A14, T11, J11, J9,
A81, A78, A75, B86, A72, A68, A44, A41, A38, A65, A58, A61, A54, A51, B47, A34, A31, J7-2, J6, J4,
F2, F1, D7, K24, J34, E36, D30, K27, L3, K1, E25, K27, L3, K1, E25, K38, L41, G41, E32, L47, L44,
E49, D,53, D63, N7, P2, O1, T9, T6, T4, T3 & T1).
Suai Junction PDA Test Report for Pile Ref: (T103, Q82, S93, T95, T99, T81, T85 & P93, T51, 54, T58,
T61, T65, T68, T72, T75, T78, T88, T106, S108, S121, Q125, S128, S113, Q110, R117, Q131, S135,
S149, S156, Q160, S162, S169, S175 & S134)

2. PDA Test for the proposed construction and completion of proposed RC Jetty at Rural Growth Centre
(RGC) Semop, Daro, Mukah Division.
 (Contractor: I-Ilham Corporation Sdn Bhd).

3. Development and upgrading of the proposed Pan Borneo Highway (WPC02) (20 Nos. of Inclinometer)
and 10 Nos. of Piezometer
 (Contractor: Samling Group of Companies).

4. The construction and completion of concrete weir with associated ancillary works at Suai Water
Treatment plant raw water intake, Batu Niah, Miri Division.
 (Client: Tamaworld Sdn Bhd).

5. PDA Test for the proposed piling work for menaik taraf kapasiti Loji Rawatan Air Nyabau at Bintulu.
 (Client: Jaguh Bina Sdn Bhd).

6. PDA & MLT for the construction and completion of Jalan Sungai Maong ke Segedup, Kuching Division.
 (Cient: Pekerjaan Piasau Konkerit Sdn. Bhd.).

7. PDA & MLT for the construction and completion of proposed upgrading of Jalan Pakan, Pakan District,
Sarikei Division, Sarawak.
 (Client: Kendiri Emas Sdn Bhd).

8. Proposed conservation & restoration works to Mill Hill Blocks at Smk St Joseph’s School on Lot 196,
Section 19, KTLD, Jalan Tun Abang Haji Openg, Kuching.
 (Client: St. Joseph School).

9. Installation, testing and commissioning of two units of mackintosh probe for the proposed extension
of National School of Folk Tupong, Jalan Diplomatik & Off Jalan Bako, Kampung Tupong Tengah
93050 Kuching, Sarawak.
 (Client: Orascom).

10. Proposed Soil Investigation Works for project KSR Interchange Kuching, Sarawak.
 (Client: Musyati Sdn Bhd).

9
GRE ENGINEERING SOLUTIONS SDN BHD

11. Proposed land preparation project for Changi Airport Terminal 5


(Owner: Changi Airport Group (CAG)
(Client: Penta Ocean.).
 Geotechnical Instrumentation Installation and Monitoring.

12. Proposed land preparation and ancillary works at Changi East


(Owner: Defence Science and Technology Agency (DSTA)
(Client: KTC Civil Engineering & Construction Pte Ltd.).
 Cone Penetration Testing & Geotechnical Instrumentation Installation Work

10
GRE ENGINEERING SOLUTIONS SDN BHD

OFFICE, STORE / LABORATORY & MACHINERY

1) CONSULTING OFFICE

2) STORE

11
GRE ENGINEERING SOLUTIONS SDN BHD

3) LABORATORY

5) VANE SHEAR TEST


4) COMACCHIO G305 EQUIPMENT

12
GRE ENGINEERING SOLUTIONS SDN BHD

SOIL INVESTIGATION SITE PHOTOGRAPHS

1) EAST COAST RAIL LINK (ECRL) – KOTA BHARU TO DUNGUN (TERENGGANU) SECTION

13
GRE ENGINEERING SOLUTIONS SDN BHD

2) SECOND TRUNK ROAD – SAMARAHAN TO SIBUYAU – LINGGA


– SRI AMAN SECTION

14
GRE ENGINEERING SOLUTIONS SDN BHD

15
GRE ENGINEERING SOLUTIONS SDN BHD

3) BATANG LUPAR, SARAWAK RIVER BOREHOLE

4) STATIC LOAD TEST AT SUNGAI MAONG, KUCHING

16
GRE ENGINEERING SOLUTIONS SDN BHD

5) BATANG LUPAR – RIVER BOREHOLE PLATFORM

17
GRE ENGINEERING SOLUTIONS SDN BHD

June 2017 to Present: Managing Director of GRE


Engineering Solutions Sdn Bhd

June 2010 to Dec 2012: Resident Engineer at Jurutera


Date of Birth : 26th November 1977 Minsar Consult Sdn. Bhd.
Marital Status : Married
Project involved:
Nationality : Malaysian
o Redevelopment of Kota Kinabalu International Airport –
Construction and Completion Of The Uncompleted Works
Including Any Remedial Works On Package 2-Civil And
B Eng (Hons) in Civil Engineering Second
Structural Works.
Upper Class, University of East London
The Project cost of RM 155 million including runway extension,
taxiway and apron extension, Offshore platform for the approach
lighting, Revetment wall at the seafront, Glide Path, Localizer
Member of Board of Engineers Malaysia
and PAPI foundation.
(BEM), Professional Engineer with Registered
No. C112426 March 2007 to May 2010: Resident Engineer at
Perunding GEA (Sabah) Sdn. Bhd.
Member of Institute of Engineer (IEM) with
Registered No. 23624 Project involved:

o Cadangan Pembangunan Semula Hospital Queen Elizabeth


Kota Kinabalu, Sabah (Pakej 4) – Pembinaan Tower Block.
Ir. Voon Choo Yen has involved in Civil and
Structural Engineering Consultancy field for Based on site and overlooking the overall C&S works, including 5
more than 15 years. He involved in many storeys podium, 2 tower blocks consist of 12 storeys high, sum
aspects of works including Civil & Structural up with total built-up area of 75,000 m2, project sum of RM
design, supervision and quality assurance of 364,853,813.50. This is a 660 bedded hospital with 17 Operation
construction works, contract and project Theatres, a Imaging Department, a CSS Department, a Forensic
management. Department, a Mortuary, a Endoscopic suite, Burn unit, Nephro.
& Gastro ward, Ophal. & Urology ward, Neurology
&Neurosurgery ward, Day medical, Surgical care ward, Plastic
surgical, HDW & ICU ward, TPN (clean room class B) and A&E
June 2017 to Present: Department.
Managing Director,
GRE Engineering Solutions Sdn Bhd Apr 2004 to March 2007: Resident Engineer at
Kemasepakat Sdn. Bhd.
June 2010 to Dec 2012:
Resident Engineer, Joined as a Resident Engineer, seconded to Sime Darby-Sime
Jurutera Minsar Consult Sdn. Bhd. UEP Development Sdn Bhd, stationed at Ara Damansara Project
Site Office, Subang. It is a 700 acres of Mixed Development
March 2017 to May 2010: inclusive of double storey houses, five storey low cost
Resident Engineer, apartments, main infrastructure works and some M & E works.
Perunding GEA (Sabah) Sdn. Bhd.
Project involved:
Apr 2004 to March 2007: o Elevated Water Tank;
Resident Engineer The capacity is 250 thousand gallons, elevated 35
Kemasepakat Sdn. Bhd. metre from ground.

Apr 2001 to May 2004: o Bridge over River Kayu Ara;


Design Engineer,  It is a three span bridge with 24 metre precast
SKM Engineering / H S Liao Sdn. Bhd. pretensioned M6 beam at each span. WCT
Construction Sdn Bhd is the main contractor.
Jun 2000 to Jan 2001:
Trainee Graduate Engineer,
London Borough of Tower Hamlets Council 18
GRE ENGINEERING SOLUTIONS SDN BHD

o Arterials Road, Main Sewerage line, Falling Main and Drainage;


 The total length of the road is around 5 km, it is mostly 132 ft road course on top of the
450mm thick subbase. The sewerage line consist of 600mm dia. RC pipe, 300mm,
200mm dia. VCP pipe, the new line is connected to existing Sewerage Treatment
Plant(capacity of 75,000 PE). A pump house pump (capacity of 3,500 PE) sewer across
the bridge. The road side drainage (1,000mm, 900mm, 600mm width), basically
received surface water collected from the carriageway.

o Earthworks;
 The earthworks area was around 100 acres, it consisted of major cut and filled of
200,000 metre cube of earth, storm water drainage (2,500mm width) and R.C. retaining
wall.

o 150 units of 5 storey Low Cost Flat :


 The contractors are using Tunnel Formwork for the wall and slab construction.

Housing Projects:

o 250, 98, 125,137 units of Double Storey Links House at Phase 6B, 2B, 3E, 3C.
o 35, 55 units of Double Storey Semi Detached House at Phase 5A, 5B.
o 37 units of Double storey Detached House at Phase 2E

Apr 2001 to May 2004: Design Engineer at SKM Engineering Sdn. Bhd. / H S Liao Sdn.
Bhd.

Projects involved:
o Putrajaya Convention Centre
 Combination of concrete and steel structure, composite concrete and steel beam design.
70m diameter Grillage floor system analysis and design for State of Head Room. Other
conventional RC Structural design.

o Ritz Carlton Service Apartment


 38 storeys service apartment and hotel podium. Involved in footing and pilecap design
and basement structure. Transfer beam using finite element design. Loading analysis
and overall RC structural design.

o Booth Street Apartment (Manchester, UK)


 Liftcore spread footing design of 19 storeys apartment block, and flat slab design.

o Taylors College
 Preliminary design of 14 storeys teaching block, 5-storeys sport centre, multi-purpose
hall, swimming pool etc.

o Sunway Hotel (Zone 1C)


 26-storeys service apartment and hotel podium. New construction is connected to the
existing uncompleted structure. Involved in RC Structural Design.

o Kajang Villa Low – Medium Cost Apartment


 12 storeys apartment. Involved in footing, pilecap, basement, retaining wall structure
design. Overall substructure design. Transfer floor design using Finite element analysis.
Checking on the aluminium system formworks construction method.

o Sunway Oasis Walkway (extension work)


 Combination of concrete and steel structure, composite concrete and steel beam design.
(connection of new structure with existing structure) Experience in design of high-rise
building, foundation design, RC structure, steel Structure, etc.

19
GRE ENGINEERING SOLUTIONS SDN BHD

20
GRE ENGINEERING SOLUTIONS SDN BHD

21
GRE ENGINEERING SOLUTIONS SDN BHD

22
GRE ENGINEERING SOLUTIONS SDN BHD

June 2017 to Present:


Director, GRE Engineering Solutions Sdn Bhd

Sep 2013 to Jan 2015:


Date of Birth : 15th November 1979 Pursuit for Msc. Study in the UK
Marital Status : Married
Nationality : Malaysian Jul 2010 to Sep 2013:
Senior Civil Engineer, Jurutera Artecon Sdn. Bhd.

March 2005 to June 2010:


MSc. Geotechnical Engineering (Newcaastle, Civil Engineer, Jurutera Artecon Sdn. Bhd.
UK)
July 2004 to Feb 2005:
B.Eng. Civil & Structural (Bradford, UK) Resident Engineer, Jurutera Artecon Sdn. Bhd.

Jan 2004 to July 2004:


Graduate Civil Engineer, Jurutera Artecon Sdn. Bhd.
Graduate Member of Institute of Civil
Engineers (ICE) in the UK with Membership July 2002 to Sep 2002:
No. 71513250 since 24th September 2014. Senior Draught Person, Jurutera Artecon Sdn. Bhd.

Graduate Member of Board of Engineers Oct 2000 to Mac 2001:


Malaysia (BEM) with Registered No. 82605R Draught Person, Jurutera Artecon Sdn. Bhd.
since 17th January 2013.

Mr. Chai Chee Yong has more than 10 June 2017 to Present: Director, GRE Engineering
years’ experience in the Civil and Structural Solutions Sdn Bhd
Engineering Consultancy field. Most of the
Jul 2010 to Sep 2013: Senior Civil Engineer, Jurutera
projects that he handled were government Artecon Sdn. Bhd.
projects such as building schools, institutions,
fire stations, police stations, irrigation o Involved in analyzing and designing of civil and structural
schemes, jetties, telecommunication towers, engineering works, prepared Bill of Quantities and
ferry ramp, roads and etc. The building specification, project monitoring, attending meeting,
supervising site work and etc.
structures of the projects were in Reinforced
o
Concrete, Steel, Masonry and Timber.
Project Involved:
o Cadangan Pembinaan Kampus Wilayah Sarawak Institut
He had completed his postgraduate
Tadbiran Awam Negara (INTAN), Kota Samarahan,
degree programme in MSc.Geotechnical Sarawak. (Reka Dan Bina)
Engineering at Newcastle University (United  RM 68,000,000.00
Kingdom) in September 2014 with the result
of Pass with Merit. His last position before o Cadangan (SMK) Sekolah Menengah Kebangsaan Datuk
pursuing for Master Degree programme was a Abdul Rahman Yaakob, Kanowit, Sarawak.
 RM 77,000,000.00
Senior Civil Engineer in a Civil and Structural
consultant firm (Jurutera Artecon Sdn Bhd) in o Cadangan Pembinaan Dan Penyiapan Kompleks Pusat
Sarawak. Islam Di Universiti Malaysia Sarawak (UNIMAS), Kota
Samarahan, Sarawak.
 RM 35,000,000.00

o Cadangan Pembinaan Balai Bomba dan Penyelamat Atas


Lot 1507, Blok 17, Ktibas L.D., Song Daerah Kapit,
Sarawak.
 RM 8,000,000.00
23
o Projek Bekalan Air Luar Bandar (BALB) Ke Dabuk Tanu,
Boleng Road Junction Along gkelili/Saratok, Sarawak.
(Water Reservior, Booster Pump Station and Water
GRE ENGINEERING SOLUTIONS SDN BHD

o Projek Bekalan Air Luar Bandar (BALB) Ke Dabuk Tanu, Boleng Road Junction Along
Engkelili/Saratok, Sarawak. (Water Reservior, Booster Pump Station and Water Pipelines),
Sarawak.
 RM 45,000,000.00

o Proposed Sg. Sebalak Padi Scheme Betong Division, Sarawak. (Package C / Phase 2 : Proposed
Flood Mitigation & Access Road)
 RM 10,000,000.00

o Cadangan MEmbina Sekolah Baru 20 Bilik Darjah, Asrama 400 Pelajar, 8 Unit Rumah Guru Serta
Lain-Lain Kemudahan Di SMK Lingga, Lot 907, Block 16, Bijat L.D., Sri Aman, Sarawak
 RM 45,000,000.00

o Membina Dan Menyiapkan Projek Jalan Skim Penempatan Semula Kuala Lawas, Bahagian
Limbang, Sarawak.
 RM 35,000,000.00

March 2005 to June 2010: Civil Engineer, Jurutera Artecon Sdn. Bhd.

o Involved in analyzing and designing of civil and structural engineering works, prepared Bill of
Quantities and specification, project monitoring, attending meeting, supervising site work and
etc.

Project involved:
o Cadangan Membina Dan menyiapkan Sebuah Balai Polis Sentral, Di Atas Lot 2643, Daerah
Bandar Sibu, Sarawak (850)
 RM 10,000,000.00

o Cadangan Membina Dan Menyiapkan Sebuah Balai Polis Sibu Jaya Serta Lain-Lain Kemudahan
Di Atas Lot 5322, Daerah Bandar Sibu, Bandar Sibu Jaya, Sibu, Sarawak (846).
 RM 20,000,000.00

o Cadangan Membina Dan Menyiapkan Sebuah Balai Polis Selangau Serta Lain-Lain Kemudahan Di
Atas Lot 638, Block 15, Daerah Bandar Gigis, Selangau, Sarawak (844).
 RM 20,000,000.00

o Proposed Sg. Sebalak Padi Scheme Betong Division, Sarawak.(Package C / Proposed Flood
Mitigation & Access Road to the Central Area)
 RM10,000,000.00

o Proposed Sebalak Padi Scheme Betong Division, Sarawak. (Package A : Proposed Drainage and
Irrigation System & Flood Mitigation)
 RM60,000,000.00

o Proposed Sand Filling Works To Mosque & Commercial Areas And Road Works, Semup RGC
Service Centre, Mukah Division (Phase 1), Sarawak.
 RM 5,000,000.00

o Proposed Kampung Bundong Extension On Lot 362, Block 28, Seredeng Land District, Sarikei
Division, Sarawak.
 RM1,600,000.00

o Proposed Blok Asrama Dan Latihan Semenggok (Fasa 2) at Lot 869 (Parent Lot 263), Block 3,
Sentah-Segu Land District, Semenggok, Kuching, Sarawak.
 RM2,500,000.00

o Proposed Double Storey Detached House (YB Dato Sri Mohd. Asfia Awg. Nassar) On Lot 3397,
Block 14, Salak Land District, Demak Road, Kuching, Sarawak.
 RM 3,000,000.00

24
GRE ENGINEERING SOLUTIONS SDN BHD

o Proposed Development Of Telecommunication Infrastructure And Facilities On Lot 5122, Block


18, Salak Land District, Kuching, Sarawak.
 RM500,000.00

o Proposed Development Of Telecommunication Infrastructure And Facilities At Matang Wildlife


Centre, Kuching, Sarawak.

o Cadangan Pembinaan Pejabat Pangkalan Hadapan Beserta Tempat Penginapan Kakitangan Di


Awat-Awat, Lawas, Sarawak.
 RM1,800,000.00

o Peningkatan Kemudahan Pelancongan Di Taman Tasik Sibu, Sarawak.


 RM5,000,000.00

o Proposed Construction And Completion Of Pejabat Agama Syariah Islam (JAIS) Dan
Mahkamah Syariah, Mukah, Sarawak.
 RM3,000,000.00

o Proposed Construction And Completion of Pejabat Agama Islam (JAIS) Dan Mahkamah
Syariah, Sarikei, Sarawak.
 RM 3,000,000.00

July 2004 to Feb 2005: Resident Engineer, Jurutera Artecon Sdn. Bhd.

Project involved:
o Proposed Construction and Completion of SRK Senadin, Miri, Sarawak secara “Design And
Built”.
 RM20,000,000.00

Jan 2004 to Jul 2004: Graduate Civil Engineer, Jurutera Artecon Sdn. Bhd.

Project involved:
o Submission of 36 sites for Telecommunications Tower and PCN Poles to Local Authority
(Council and State Planning Authority) based in Kuching, Sibu, Bintulu, Limbang and Miri,
Sarawak.

Jul 2002 to Sep 2002: Senior Draught Person, Jurutera Artecon Sdn. Bhd.

Duties:
o Drafting of civil and structural engineering drawing plan.
o Filing of all drawings for ease of future reference.
o Assisting in submission of plan.
o Design of RC beams, column, foundation and roof truss by using structure software.
o Work as consultant site supervisor (Clerk of Works) for 2 weeks (Supervise on micro piling
construction for TM-Touch Telecommunication Tower at Batu Kawah Road, Kuching,
Sarawak)

Oct 2002 to Mac 2001: Draught Person, Jurutera Artecon Sdn. Bhd.

Project involved:
o Proposed Construction and Completion of SMK Sibu Jaya, Sibu, Sarawak (Design & Build)
 RM26,800,000.00

o Proposed Construction and Completion of SRK Senadin, Miri, Sarawak Secara “Design &
Built”.
 RM20,200,000.00

o Proposed Construction and Completion of SRK Sibu Jaya, Sibu, Sarawak (Design & Built)
 RM20,200,000.00

25
GRE ENGINEERING SOLUTIONS SDN BHD

26
GRE ENGINEERING SOLUTIONS SDN BHD

27
GRE ENGINEERING SOLUTIONS SDN BHD

28
GRE ENGINEERING SOLUTIONS SDN BHD

29
GRE ENGINEERING SOLUTIONS SDN BHD

30
GRE ENGINEERING SOLUTIONS SDN BHD

March 2021 to Present: Senior Engineer of GRE


Engineering Solutions Sdn Bhd

Sept 2016 – Feb 2021: Civil/Structural Engineer


st
Date of Birth : 30 April 1989
Responsibilities:
Marital Status : Single
Nationality : Malaysian
o Planning and designing of structural and civil
engineering works.
o Prepared calculation, structural and civil engineering
B.Eng. Civil (Hons) / Bachelor of Commerce drawings for authority submission.
(Management), Swinburne University of o Prepared of civil work drawings in AutoCAD.
Technology (Hawthorn Campus).
Jan 2014 – Aug 2016: Civil/Structural Engineer
B.Eng. Civil / Bachelor of Commerce
(Management), Swinburne University of Responsibilities:
Technology (Sarawak Campus).
o Reinforced concrete design.
o Checked site measurement progress and interim
payment.
Lu Tsui Ming graduated from
Swinburne University of Technology o Liaised with sub-consultant, client and management
(Hawthorn Campus) in 2013 with Bachelor of team.
Engineering in Civil Engineering (Hons) / o Attended technical meeting with client, consultant and
Bachelor of Commerce (Management). architect when necessary.
o Carried out site and building inspection.
Currently, Lu Tsui Ming has
experience in planning and designing of
structural and civil engineering works,
calculation, reinforced concrete design, o Design Engineer
carried out site and building inspection.
Project: Proposed water reticulation on Lot 249 (Plot 1
& Plot 2), Block 17, Kuching Central Land District,
March 2021 to Present: Kuching.
Senior Engineer, Work Scope: Design and analyse the water reticulation
GRE Engineering Solutions Sdn Bhd network calculation by using MES software. A key
responsibility included produced layout plan and make
Sept 2016 – Feb 2021: cure the minimum residual pressure is sufficient for the
Civil / Structural Engineer, proposed development site.
Perunding Jutrakem Sdn Bhd

Jan 2014 – Aug 2016: o Design Engineer


Civil / Structural Engineer,
PCS Konsultant Sdn Bhd Project: Project Jiwa Murni bagi membina jalan baru
dari Nanga Ngungun ke Nanga Jagau, Kanowit Bahagian
Sibu, Sarawak.
Work Scope: Feasibility study for the horizontal and
vertical alignment from Nanga Ngungun to Nanga Jagau
which located at Sibu, Sarawak. Key responsibilities
included design the abutment for a bailey bridge which
across the river in order for the car to access from
Nanga Ngungun to Nanga Jagau.

31
GRE ENGINEERING SOLUTIONS SDN BHD

o Design Engineer

Project: Project Jiwa Murni bagi membina jalan baru dari Nanga Jagau ke Nanga Simunjan,
Kanowit Bahagian Sibu, Sarawak.
Work Scope: Produced feasibility study and proposed 14km new route for a single
carriageway from Nanga Jagau to Nanga Simunjan. Key responsibilities included designing
the horizontal alignment and checking vertical alignment complied with Design Manual Road
and Bridges.

o Design Engineer

Project: Projek menaiktaraf bekas jalan – jalan balak Negeri Sarawak (FASA IV) – Bahagian
Miri secara rundingan terus trunkey (Reka dan Bina).
Work Scope: Alignment design and earthworks calculation by using MXRoad software. Key
responsibilities included coordinating the design of upgrading Baram Logging Tracks in Miri,
Sarawak and layout information.

o Design Engineer

Project: Proposed Balingian coal stockyard and related buildings at Jalan Bukut, Ulu
Balingian, Bawan Land District, Mukah.
Work Scope: Delivery of consultant designs for building structures and liaised with client
and sub-consultants on design. Key responsibilities included design cost estimation and safety
assessments.

o Design Engineer

Project: Proposed 4 units double storey semi-detached houses on 161, (Plot 3-4 & 5-6)
Block 224, K.N.L.D, at Lorong 2, Jalan Datuk Stephen Yong, Kuching.
Work Scope: Carried out structural design and produced structural calculation report. Key
responsibilities include supervision and inspection of the works by contractor to ensure
compliance to design and specifications.

o Design Engineer

Project: Permohonan pelan bangunan di bawah Akta 133 bagi tujuan membina: 32 units
kedai / pejabat 2 tingkat, Bandar Puteh Indah, Mukim Linau, Daerah Batu Pahat, Johor.
Work Scope: Managed and carried detailed design. Produced structural calculation report.

o Design Engineer

Project: Proposed 14 units 3 storeys shophouses on Lot 33 (Sublot 1-6), Block 26, Muara
Tuang Land District at Jalan Datuk Mohammad Musa, Samarahan.
Work Scope: Planning and design of structural design. Checking the works complied with
design and specifications, making sure the works quality is maintained throughout the
construction.

o Design Engineer

Project: Proposed double storey semi-detached houses on Lot 297, 1341 & 1343 (Plot 15-
16), Block 8, Rimbas Land District, at Jalan Belasau, Debak.
Work Scope: Managed and produced feasible design of civil and structural design.
Producing layout drawings and cross section drawings as well as civil and structural design
report.

o Design Engineer

Project: Proposed double storey semi-detached houses on Lot 297, 1341 & 1343 (Plot 15-
16), Block 8, Rimbas Land District, at Jalan Belasau, Debak.
Work Scope: Produced structural design and layout plan drawings. Carried out structural
design report for authority submission. Supervised the workmanship and compliance of works
to design and specifications. 32
GRE ENGINEERING SOLUTIONS SDN BHD

33
GRE ENGINEERING SOLUTIONS SDN BHD

34
GRE ENGINEERING SOLUTIONS SDN BHD

October 2021 to Present: Senior Engineer,


G.R.E. Engineering Solutions

21st June 2021 – 30th September 2021: Geotechnical


Date of Birth : 29th March 1975 Engineer, Minkonsult Sdn Bhd.
Marital Status : Married
Nationality : Malaysian Responsibilities:
o To supervision the Soil Investigation Work to desired
quality required by specification and drawing.
o To ensure all tests carried out in the course of the work
B.Sc (Hons) Civil Engineering, Universiti is being recorded to take count of the quality achieved.
Teknologi Malaysia (UTM) Johor o To ensure and implement correct procedure of work and
Quality Control measures are being followed.
Sijil Pelajaran Malaysia, Sekolah Menengah o To assist Company work flow.
Kerajaan Bau, Sarawak o Monitors and report work progress to General Manager.
o Site Inspection.
o To ensure the work meet the client needed.
o He must compile all filing record which related to the
Graduate Member Board of Engineers project.
Malaysia (BEM) with Registration No. 42509R. o Meeting with client, consultant and subcontractor.

Graduate Member Lembaga Teknologis 14th August 2009 – May 2021: Manager / Project
Malaysia (MBOT) with Registration No. Manager, Syarikat Bumi L.M.I
GT21050885.
Responsibilities:
o To enforce work to desired quality required by
October 2021 to Present: specification and drawing.
Senior Engineer, o To ensure all tests carried out in the course of the work
G.R.E. Engineering Solutions is being recorded to take count of the quality achieved.
o To ensure and implement correct procedure of work and
21st June 2021 – 30th September 2021: Quality Control measures are being followed.
Geotechnical Engineer, o To assist GM in the company work flow.
Minkonsult Sdn Bhd. o Monitors and report work progress to General Manager.
o Site Inspection.
14th August 2009 – May 2021: o To ensure the work meet the client needed.
Manager / Project Manager, o He must compile all filing record which related to the
Syarikat Bumi L.M.I. project.
o Attend meeting with client, consultant and
1st April 2003 – 31st March 2007: subcontractor.
Project Engineer, o Managing site investigation works for southern and
PPES Works (Sarawak) Sdn Bhd. Central Region.

14th February 2000 – 31st March 2003:


Site Engineer,
Pohood Construction and Development Sdn
Bhd.

1st July 1999 – February 2000:


Site Engineer,
Saytech Corporation Sdn Bhd.

35
GRE ENGINEERING SOLUTIONS SDN BHD

1st April 2003 – 31st March 2007: Project Engineer, PPES Works (Sarawak) Sdn Bhd.

Project: The Construction and Completion of the Proposed Jalan Bintulu / Similajau
(Section B), Bintulu Division Sarawak.
Project Cost: RM 27.18 Million.
Client: Jabatan Kerja Raya (JKR).
Consultant Team: Perunding Utama Engineering Sdn Bhd.

Project brief:
o The project was to construct and complete: 8.162 Km single carriage way of 0.575m thick
road pavement.
o Earth cutting to 292,440 cu.m and embankment fill to 402,700 cu.m.
o Rock blasting quantity of 35,000 cu.m.
o Varies sizes of RC box culvert ranged from 2.0 m to 2.5 m width.
o Varies sizes of RC pipe culvert ranged from 0.90 m to 1.80 m diameter.
o Varies sizes of RC drainages ranged from 0.30m to 0.60m width.
o 1 no. of 3 spans (55 meter) RC Concrete Bridge.
o Driven to set 156 points of 450mm diameter of RC spun piles.
o Driven to set 200 points of 250mm x 250mm RC square piles.
o Driven to set 16,435 points of 100mm diameter bakau piles.

Responsibilities:
o To enforce work to desired quality required by specification and drawing.
o To ensure quality specified materials are used in the finished work through testing of physical
and chemical properties of material.
o To ensure all tests carried out in the course of the work is being recorded to take count of
the quality achieved.
o To ensure and implement correct procedure of work and Quality Control measures are being
followed.
o To assist PM and QA Executive in the preparation of QA report and monthly progress report.
o Monitors and report work progress to Project Manager.
o To assist Project Manager on Site Inspection and to compile weekly reports for submission to
Project Manager.
o To ensure prompt submission of work request form from the subcontractors.
o He must follow the work programmed given by the Project Manager.
o He must follow the quality record procedure of all works.
o Report Daily Records.
o To prepare Monthly Progress Report for submission to the consultant.
o Record day work of subcontractor.
o He must compile all filing record which related to the project.

Project: Federal Road Maintenance, Zone 1, State of Sarawak.


Project Cost: RM 14.5 Million (annually)
Client: Ministry of Works
Consultant: Jabatan Kerja Raya (JKR), Sarawak.

Project brief:
The project was consisting 3 major scopes of works:
1. Routine Maintenance
o RO 1 Maintenance of road pavement
o RO 2 Maintenance of road shoulder
o RO 3 Grass cutting
o RO 4 Maintenance of road furniture
o RO 5 Maintenance of culverts & drainages
o RO 7 Drainages

2. Periodic Maintenance
o Beyond the Agreed Performance Standard as per contract.
o Emergency Maintenance
o The works beyond expectation such as flooding, landslide, fallen trees etc.

36
GRE ENGINEERING SOLUTIONS SDN BHD

Responsibilites:
o As Road Maintenance Engineer for Federal Road Maintenance, Zone 1 consisting Kuching
Division, Samarahan Division, Sri Aman Division, Betong Division and Sarikei Division.
o To ensure smooth routine maintenance operation in Federal Road Maintenance.
o Ensure good coordination with clients, local authorities, subcontractors and related
enforcement departments.
o Preparation and monitoring of annually routine maintenance budgeting, project cash flow,
project reporting and cost control to ensure target profit margin are achievable.
o Analysis, planning and review subcontracting strategies for routine maintenance works.
o Preparation of tender documents and specifications for subcontracting works in routine
maintenance.
o Coordinating of Monthly Progress Report, Monthly Quality Control Report and » Routine
Inspection Report.
o Prepared, designed and submissions of periodic maintenance works proposal to client.
o To enforce work to desired quality required by specification and drawing.
o To ensure quality specified materials are used in the finished work through testing of physical
and chemical properties of material.
o To ensure all tests carried out in the course of the work is being recorded to take count of
the quality achieved.
o To ensure and implement correct procedure of work and Quality Control measures are being
followed.

14th February 2000 – 31st March 2003: Site Engineer, Pohood Construction and
Development Sdn Bhd

Project: The Construction and Completion of the Proposed Road Linking Jalan Tanjung
Batu and Jalan Sultan Iskandar, Bintulu Division.
Project Cost: RM 3.78 Million.
Client: Bintulu Development Authority (BDA).
Consultant Team: Bintulu Development Authority (BDA).

Project brief:
The project was to construct and complete:
o 3.2 km of dual carriage way 0.575m thick road pavement.
o Sand embankment fill of 22,500 cu.m to road formation levels
o Varies sizes of RC box culvert ranged from 1.2m to 2.4m width.
o Varies sizes of RC pipe culvert ranged from 0.45 m to 0.9m diameter.
o Varies sizes of RC drainages ranged from 0.9m to 3.2m width.
o 14.8 km of road kerb.
o Bakau piling works.

Project: The Construction and Completion of the Proposed Jalan Asyakirin and Civil
Works within BDA Housing Estate, Bintulu Division.
Project Cost: RM 5.8 Million.
Client: Bintulu Development Authority (BDA).
Consultant Team: Perunding Utama Engineering S/B.

Project brief:
The project was to construct and complete:
o 2.1 km of dual carriage way 0.575m thick road pavement.
o Replacement of 12,500 cu.m of unsuitable materials to road formation levels
o Varies sizes of RC box culvert ranged from 0.6m to 3.2 m width.
o Varies sizes of RC pipe culvert ranged from 0.45 m to 1.2m diameter.
o Varies sizes of RC drainages ranged from 0.3m to 3.0m width.
o 8.8 km of road kerb.
o Bakau piling works.

37
GRE ENGINEERING SOLUTIONS SDN BHD

Responsibilities:
o To assist Project Manager on Monthly Progress Report and Quality Control Report.
o To assist Project Manager monitoring and coordinate subcontractor.
o To assist Project Manager on implementation and monitoring of Quality Assurance on site.
o To assist Project Manager on staffs and workers welfare.
o To assist Project Manager on Variation Order proposal and claims.
o Coordinate services agency on detections and relocations of the affected services.
o To assist Project Manager on coordination with client and consultant team.
o To assist Project Manager monitor the project’s petty cash flow account.

1st July 1999 – February 2000: Site Engineer, Saytech Corporation Sdn Bhd

Project: The Construction and Completion of Sekolah Rendah Kerajaan Sageng,


Simunjan,
Kota Samarahan Division.
Project Cost: RM 1.23 Million.
Client: Kementerian Pendidikan Malaysia.
Consultant Team: Jabatan Kerja Raya (JKR), Kota Samarahan.

Project brief:
The project was to construct and complete:
o Earth embankment fill of 250,000 cu.m earth as building platform.
o Driven 4 lengths @ 12 m RC Square (300mm x 300mm) piles.
o Construct and complete one unit RC Pipe culvert (0.9m diameter).
o 0.34Km access of 0.45m thick road pavement.
o Basic building’s mechanical and electrical facilities.

Project: The Construction and Completion of Sekolah Rendah Kerajaan Meranek, Kota
Samarahan, Kota Samarahan Division.
Project Cost: RM 1.20 Million.
Client: Kementerian Pendidikan Malaysia.
Consultant Team: Jabatan Kerja Raya (JKR), Kota Samarahan.

Project brief:
The project was to construct and complete one block of 4 storey school building consist:
o Earth embankments fill of 20,000 cu.m as building platform.
o Driven 4 lengths @ 12 m RC Square (300mm x 300mm) piles for building foundations.
o 0.25Km access of 0.45m thick road pavement.
o Football field.
o Basic building’s mechanical and electrical facilities.

Responsibilities:
o To assist Project Manager on Monthly Progress Report and Quality Control Report.
o To assist Project Manager monitoring and coordinate subcontractor.
o To assist Project Manager on implementation and monitoring of Quality Assurance on site.

38
GRE ENGINEERING SOLUTIONS SDN BHD

39
GRE ENGINEERING SOLUTIONS SDN BHD

40
GRE ENGINEERING SOLUTIONS SDN BHD

41
GRE ENGINEERING SOLUTIONS SDN BHD

2014 – 2015: Clerk of Works

Projek Bekalan Air Luar Bandar (BALB) Sistem Retikulasi, Rumah


Sengat & Kampung Tanjong, Limbang, Sarawak.
Date of Birth : 3rd January 1951
Marital Status : Married 2012 – 2014: Clerk of Works
Nationality : Malaysian
Projek membina dan menyiapkan Jalan Menalun, Sungai Poi,
Kanowit, Bahagian Sibu, Sarawak.

General Certificate of Education in Cambridge 2010 – 2011: Clerk of Works


School
Cadangan pembinaan Jabatan Awam Malaysia di atas Lot 8763,
Blok 18, Salak Land District, Petra Jaya, Kuching, Sarawak.
Member of Board of Engineer Malaysia (BEM), 2009 – 2010: Clerk of Works
Certificate of Registration of Inspector of
Works with Registered No. W13483 since 16th
Cadangan projek pembinaan, penaiktarafan dan pembaikpulihan
August 2018.
Sekolah-Sekolah dan Asrama di Negeri Sarawak SK. Lobang
Batu, Serian, Sarawak.

Chong Hon Khoon has more than 20 years of 2007 – 2009: Clerk of Works
experience in construction field. He is a
member of Board of Engineer Malaysia (BEM), Cadangan pembangunan Sekolah Menengah Beladin, Betong,
Certificate of Registration of Inspector of Sarawak.
Works with Registered No. W13483 since 16th
August 2018. 2004 – 2006: Clerk of Works

Proposed and completion of Pejabat Jabatan Agama Islam dan


Makhamah Syariah, Sarawak.
January 2018 to Present: Site
Coordinator of GRE Engineering 2002 – 2004: Clerk of Works (Kejuruteraan JEC)
Solutions Sdn Bhd
Proposed Bangkit/Rembai/Bangkit Ijok/Suri Road, Debak Phase
2017 – 2018: Inspector of Works 11, Sri Aman Division, Sarawak.

Cadangan membina dan menyiapkan sebuah 2000 – 2002: Clerk of Works (Jurutera Jasa Sarawak Sdn
Poliklinik Kesihatan Angkatan Tentera di Lot Bhd)
264, Block 36, Muara Tuang Land District, 7
½ Mile, Penrissen Road, Kuching, Sarawak. Construction, completion and commissioning of the proposed
water treatment plant extension pumping main and elevated
2016 – 2017: Inspector of Works
tank at Sebuyau, Samarahan.
Development and upgrading of the proposed
Pan Borneo Highway in the State of Sarawak, 1999 – 2000: Site Supervisor
Malaysia.
Construction of RC bridge, RC box culverts and gabion wall at
2015 – 2016: Clerk of Works Telaga Air Kuching, Sarawak.

Foundation and 3 Storey basement of the


construction and completion of the proposed
10 storey commercial cum SOHO on Lot 33,
KTLD at Jalan Abang Openg, Sarawak.

42
GRE ENGINEERING SOLUTIONS SDN BHD

1996 – 1998: Site Foreman (Siu Yeung Welding & Engineering in Negara Brunei
Darussalam)

o Construction of warehouse, road and RC drains sewer line, water tanks and car park.
o Proposed provision for a new access road, car park area. Compound lighting and general
improvement to riffle and pistol target range at Brunei Darussalam.

1995 – 1996: Site Supervisor

o 4.6 Million Secondary School projects in Semporna, Sabah.


o Construction of 5 rows 4 storey building (Secondary School).
o Two 4 storey teacher’s quarters.
o Construction of septic tank, water mains, roads and car parks.

1992 – 1994: Subcontractor

Drainage works, culvert and road works at Simpang Tiga flyover interchange by Pilecon Construction.

1991 – 1992: Supervisor

Undertaking drainage works for local Contractor.

1988 – 1990: Site Foreman (Ocean Quarry and Construction Sdn Bhd)

Supervising the civil and building works, drain and road kerbs, box culverts, retaining and gabion
walls.

1983 – 1987: Subcontractor

Working in the construction sector in Negara Brunei Darussalam in the Civil and Building works.

o The Jerudong Mini Istana project costing BND$ 9.6 Million by Alim Bena Sdn Bhd.
o The Kampung Retale Resettlement Scheme – Phase 1 Trunk Infrastructure by Gaya Iron
Works (Sabah) Sdn Bhd.

1979 – 1981: Site Supervisor

For cocoa plantation estate in Balung, Tawau, Sabah.

1977 – 1978: Site Foreman

Supervising the building works for construction and completion of 4 rows of 4 storey army barracks,
road and drainage works in Brunei Darussalam.

1971 – 1976: Joined the Department of Argiculture as Junior Argicultural Assistant.

43
GRE ENGINEERING SOLUTIONS SDN BHD

44

You might also like