Professional Documents
Culture Documents
GEOTECHNICAL &
INSTRUMENTATION WORKS
SOIL LABORATORY
PROJECT MANAGEMENT
1–3
4–6
7 – 10
11 – 17
18 – 44
[2021]
GRE ENGINEERING SOLUTIONS SDN BHD
GEOTECHNICAL/GEOLOGICAL SERVICES
• Static Load Test / Maintain Load Test
• Pile Dynamic Test
• Sonic Loging Test
• Cone Penetration Test (CPT)
• Field Exploration which includes Trial Pitting, Boring and Drilling, Soil Sampling (Disturbed and
Undisturbed Samples), Standard Penetration Test, Water Sampling and Measurement, Hand Augering,
Pit Augering, Mackintosh Probes Test, Field Vane Test and etc
• Jet grouting, Micro piling, Pressure Grouting, Soil Nailing, Dowel, Rock Bolts, Ground Anchoring,
Guniting, Horizontal Drain, Underpinning Work, etc
• Geotechnical Consultancy Services - Settlement Analysis and Prediction, Slope Stability Analysis,
Foundation Design and Recommendation
LABORATORY SERVICES
• Soil (Compliance to BS 1377:1990) - Classification (Moisture Content, Atterberg Limit, Particle Size
Distribution, Specific Gravity, etc), Shear Strength Test (Isotropically Consolidated Undrained (CIU)
Triaxial Compression Test, Unconsolidated Undrained Triaxial Compression Test (UU), UC, SUU, CD,
Direct Shear, etc), 1-D Consolidation, Permeability Test (Constant Head & Falling Head), Chemical
analysis (pH, SO2, Cl-, Organic Content etc), Compaction Test (Rammer method), CBR Test (Soaked
& Unsoaked)
• Aggregate's Physical, Mechanical & Chemical Testing - Clay, Silt and Dust Content, Grading Analysis,
Atterberg Limit, Specific Gravity, Water Absorption Test, Organic Impurities Test, Flakiness Index,
Elongation Index, Aggregate Crushing Value, Aggregate Impact Value, Los Angeles Abrasion Test,
Ten Percent Fine Value, Soundness Test, Polish Stone Value Test, SO4 & Cl- content, etc
• Rock - Unconfined Compressive Strength Test, Point Load Test & etc
• Concrete - Compressive Strength Tests (Cube & Cylinder, Core Test), Rebound Hammer Test,
Concrete Coring, etc
1
GRE ENGINEERING SOLUTIONS SDN BHD
•One(1) unit
•Soil Nail
•Micro pile
•Soil Investigation
5. MACHINTOSH PROBES
6. HAND AUGER
2
GRE ENGINEERING SOLUTIONS SDN BHD
3
GRE ENGINEERING SOLUTIONS SDN BHD
4
Managing Director
Ir.Voon Choo Yen
BEng.Civil (Hons), East London, UK
MIEM, PEng
Director
Mr.Chai Chee Yong
Msc.Geotechnical Engineering, Newcastle, UK
BEng.Civil & Structural (Hons), Bradford, UK
5
GRE ENGINEERING SOLUTIONS SDN BHD
6
GRE ENGINEERING SOLUTIONS SDN BHD
1. EAST COAST RAIL LINK (ECRL) – Soil Investigation & Testing Works from Kota Bharu to Dungun
Section. Stage 1 (100 Numbers of 60m Boreholes)
(Client: CCCC – China Communications Construction (ECRL) Sdn.Bhd.).
2. EAST COAST RAIL LINK (ECRL) – Soil Investigation & Testing Works from Kota Bharu to Dungun
Section. Stage 2 (300 Numbers of 100m Boreholes)
(Client: CCCC – China Communications Construction (ECRL) Sdn.Bhd.).
3. SECOND TRUNK ROAD – Samarahan to Roban with extent link to Pan Borneo Highway, Sebuyau to
Sri Aman / Betong and Jalan Kelupu / Jalan Tg. Genting to Lanang Bridge, Sibu. Stage 1 (60 Numbers
of Boreholes & 70 Numbers of Mackintosh probe with vane shear test).
(Client: China Habour – CHEC Construction (M) Sdn.Bhd).
4. Soil Investigation Work for Sarawak Coastal Road Network, Package D2B, Project Jambatan Batang
Lupar, Bahagian Samarahan/Betong, Sarawak. (13 Numbers of River Boreholes).
(Client: Jabatan Kerja Raya Sarawak).
5. Soil Investigation Work for proposed development of Sadong Jaya Mangrove Tourism on Block 7, 8 &
9, Sadong Land District Samarahan, Sarawak. (2 Numbers of Soil Investigation and 17 Numbers of
MPT).
(Client: Sarawak Forestry Corporation).
6. Soil Investigation Work for Long Lama – Temala Junction main road and Uma Akeh Spur road
improvements. (62 Numbers of Soil Investigation).
(Client: Kendiri Emas Sdn Bhd).
7. Soil Investigation Work for proposed improvement of existing road to Long Laput (Phase 1), Miri
Division.
(Main Contractor: Kendiri Emas Sdn Bhd) .
8. Soil Investigation Work for proposed construction of new single line bridge crossing Sungai Layun at
Long Kevok, Miri Division.
(Main Contractor: Kendiri Emas Sdn Bhd).
9. Soil Investigation Work for proposed upgrading of existing road from Lawas Damit to Long Lempaki,
Lawas District, Limbang Division.
(Main Contractor: Kendiri Emas Sdn Bhd).
10. Soil Investigation Work for proposed upgrading of internal road and drainage system for Kampung
Munchu, Lawas District, Limbang Division
(Main Contractor: Kendiri Emas Sdn Bhd).
11. CBR & FDT testing for proposed renovation and extension to existing & storey X-FAB Administration
Building with association external works on part of Lot 1339, Block 12, Muara Tebas ID Samajaya Fiz.
(Client: Hock Seng Lee Berhad).
12. Additional Soil Investigation Works for (FEED) Contractor for RAPID Project, Package 012B: FEED
Solid Products Jetty, in Mukim of Pengerang, Kota Tinggi District, Johor Darul Takzim
(Client: Arsea Consulting Engineers Sdn Bhd.).
13. Geotechnical Works for Petronas RAPID – Package No.6A (LLDPE) & Package No.11 (EO/EG) in
Pengerang area, Johor Darul Takzim
(Client: Samsung Engineering Sdn. Bhd.).
14. Soil Investigation Works for RAPID Project – Polypropylene Units Spheripol 3305 and Spherizone 3315
in Pengerang Area, Johor Darul Takzim (CAMP AREA).
(Client: Tecnimont SpA.).
7
GRE ENGINEERING SOLUTIONS SDN BHD
15. Soil Investigation Works for RAPID Project – Polypropylene Units Spheripol 3305 and Spherizone 3315
in Pengerang Area, Johor Darul Takzim (PROCESS AREA).
(Client: Tecnimont SpA.).
16. Soil Investigation Works at Lot 1135, Mukim Pengerang, Daerah Pengerang and Lot 1122, Mukim
Pengerang, Daerah Kota Tinggi, Johor Darul Takzim
(Client: Trueclass Option Sdn. Bhd.).
17. Marine Soil Investigation Works for proposed Forest City Island Reclamation and Mixed Development
– Island 1
(Client: Country Garden Pacific View Sdn. Bhd.).
18. Soil Investigation Works for cadangan jalan keluar masuk di KM2.7 Lebuhraya Tanjung Pelepas
hingga cadangan Pembangunan Pelan Induk Forest City sepanjang 6KM, Mukim Tanjung Kupang,
Daerah Johor Bahru, Jahor Darul Takzim.
(Client: Country Garden Pacific View Sdn. Bhd.).
19. Soil Investigation Works for RAPID package OUI 14, Pengerang.
(Client: Knusford Construction Sdn. Bhd.).
20. Soil Investigation Works for proposed Forest Island Reclamation and Mixed Development Mukim
Tanjung Kupang, Johor Bahru, Johor Darul Takim. (Retaining Wall).
(Client: Country Garden Pacific View Sdn. Bhd.).
22. Soil Investigation Works for Engineering, Procurement, Constuction & Commissioning (EPCC) for the
development of Pengerang 275kV Overhead Transmission Line from Pengerang Cogen Transmission
Line from Pengerang Cogen Plant (PCP) to Peninsular Malaysia Grid and 275/132kV Pengerang
Station – Contruction of New 275/132kV Substation Civil Works and Electrical Works.
(Client: Bras Ventures Berhad.).
23. Geotechnical Investigation Works for Elixir: C4 INA Petrochemical Project for Petronas Project
Refinery and Petrochemical Intergrated Development (RAPID) Project, in Mukim of Pengerang, Kota
Tinggi District, Johor Darul Takzim.
(Client: BASF Petronas – Flour JV.).
24. Soil Investigation Works at Plot 25 (Phase 1), Forest City, Tanjung Kupang for Country Garden Pacific
View Sdn Bhd.).
(Client: Country Garden Pacific View Sdn Bhd.).
8
GRE ENGINEERING SOLUTIONS SDN BHD
1. PDA Test for the Proposed Pan Borneo Highway, Sarawak (WPC 10).
Bakun Junction Interchange PDA Test Report for Pile Ref: (N-46, O-55, T-56,Q-5,B1, U-46, R-45, O-
46, G-5, H-4, K-4, M-5, Q-5, A-51, E-45, A-45, C-46, C-49, A130, C131, C135, B121, C124, B127,
F143, H142, A138, B142, D141, E137, D139, 137, E131, E133, G135, E127, F129, G131, G122, E122,
F124, D116, E118, D120, C114, B116, A118, A110, C122, A113, U94, B94, H94, K90, A86, U90, G88,
F86, E90, V87, S88, R90, B67, Q68, W63, K94, 80-81, 79-Y1, 80-Z5, L76, 577-G, 78-U1, 78-A1, B75,
B71, N70, L73, J75, V72, T72, O72, L64, P62, W 69, A62,C64,162, 81-Y1, A53, A58, A63, A37, A42,
A48, A24, A27, A32, A13, A16, A21, N10, P7, S7, A74, A67, E13, T19, T17, T14, M20, Q19, P13, J14,
I17, K19, A1, A3, A4 & A6).
Niah Interchange PDA Test Report for Pile Ref: (A-13, A-1, 1-7, R-1, Q119, R122, Q128, Q132, R136,
O141, J140, J131, K127, J123, J115, L110, G108, H102, G98 & C97).
Suai Interchange PDA Test for Pile Ref: (A24, B21, A27, A17, D20, B19, A9, A11, A14, T11, J11, J9,
A81, A78, A75, B86, A72, A68, A44, A41, A38, A65, A58, A61, A54, A51, B47, A34, A31, J7-2, J6, J4,
F2, F1, D7, K24, J34, E36, D30, K27, L3, K1, E25, K27, L3, K1, E25, K38, L41, G41, E32, L47, L44,
E49, D,53, D63, N7, P2, O1, T9, T6, T4, T3 & T1).
Suai Junction PDA Test Report for Pile Ref: (T103, Q82, S93, T95, T99, T81, T85 & P93, T51, 54, T58,
T61, T65, T68, T72, T75, T78, T88, T106, S108, S121, Q125, S128, S113, Q110, R117, Q131, S135,
S149, S156, Q160, S162, S169, S175 & S134)
2. PDA Test for the proposed construction and completion of proposed RC Jetty at Rural Growth Centre
(RGC) Semop, Daro, Mukah Division.
(Contractor: I-Ilham Corporation Sdn Bhd).
3. Development and upgrading of the proposed Pan Borneo Highway (WPC02) (20 Nos. of Inclinometer)
and 10 Nos. of Piezometer
(Contractor: Samling Group of Companies).
4. The construction and completion of concrete weir with associated ancillary works at Suai Water
Treatment plant raw water intake, Batu Niah, Miri Division.
(Client: Tamaworld Sdn Bhd).
5. PDA Test for the proposed piling work for menaik taraf kapasiti Loji Rawatan Air Nyabau at Bintulu.
(Client: Jaguh Bina Sdn Bhd).
6. PDA & MLT for the construction and completion of Jalan Sungai Maong ke Segedup, Kuching Division.
(Cient: Pekerjaan Piasau Konkerit Sdn. Bhd.).
7. PDA & MLT for the construction and completion of proposed upgrading of Jalan Pakan, Pakan District,
Sarikei Division, Sarawak.
(Client: Kendiri Emas Sdn Bhd).
8. Proposed conservation & restoration works to Mill Hill Blocks at Smk St Joseph’s School on Lot 196,
Section 19, KTLD, Jalan Tun Abang Haji Openg, Kuching.
(Client: St. Joseph School).
9. Installation, testing and commissioning of two units of mackintosh probe for the proposed extension
of National School of Folk Tupong, Jalan Diplomatik & Off Jalan Bako, Kampung Tupong Tengah
93050 Kuching, Sarawak.
(Client: Orascom).
10. Proposed Soil Investigation Works for project KSR Interchange Kuching, Sarawak.
(Client: Musyati Sdn Bhd).
9
GRE ENGINEERING SOLUTIONS SDN BHD
10
GRE ENGINEERING SOLUTIONS SDN BHD
1) CONSULTING OFFICE
2) STORE
11
GRE ENGINEERING SOLUTIONS SDN BHD
3) LABORATORY
12
GRE ENGINEERING SOLUTIONS SDN BHD
1) EAST COAST RAIL LINK (ECRL) – KOTA BHARU TO DUNGUN (TERENGGANU) SECTION
13
GRE ENGINEERING SOLUTIONS SDN BHD
14
GRE ENGINEERING SOLUTIONS SDN BHD
15
GRE ENGINEERING SOLUTIONS SDN BHD
16
GRE ENGINEERING SOLUTIONS SDN BHD
17
GRE ENGINEERING SOLUTIONS SDN BHD
o Earthworks;
The earthworks area was around 100 acres, it consisted of major cut and filled of
200,000 metre cube of earth, storm water drainage (2,500mm width) and R.C. retaining
wall.
Housing Projects:
o 250, 98, 125,137 units of Double Storey Links House at Phase 6B, 2B, 3E, 3C.
o 35, 55 units of Double Storey Semi Detached House at Phase 5A, 5B.
o 37 units of Double storey Detached House at Phase 2E
Apr 2001 to May 2004: Design Engineer at SKM Engineering Sdn. Bhd. / H S Liao Sdn.
Bhd.
Projects involved:
o Putrajaya Convention Centre
Combination of concrete and steel structure, composite concrete and steel beam design.
70m diameter Grillage floor system analysis and design for State of Head Room. Other
conventional RC Structural design.
o Taylors College
Preliminary design of 14 storeys teaching block, 5-storeys sport centre, multi-purpose
hall, swimming pool etc.
19
GRE ENGINEERING SOLUTIONS SDN BHD
20
GRE ENGINEERING SOLUTIONS SDN BHD
21
GRE ENGINEERING SOLUTIONS SDN BHD
22
GRE ENGINEERING SOLUTIONS SDN BHD
Mr. Chai Chee Yong has more than 10 June 2017 to Present: Director, GRE Engineering
years’ experience in the Civil and Structural Solutions Sdn Bhd
Engineering Consultancy field. Most of the
Jul 2010 to Sep 2013: Senior Civil Engineer, Jurutera
projects that he handled were government Artecon Sdn. Bhd.
projects such as building schools, institutions,
fire stations, police stations, irrigation o Involved in analyzing and designing of civil and structural
schemes, jetties, telecommunication towers, engineering works, prepared Bill of Quantities and
ferry ramp, roads and etc. The building specification, project monitoring, attending meeting,
supervising site work and etc.
structures of the projects were in Reinforced
o
Concrete, Steel, Masonry and Timber.
Project Involved:
o Cadangan Pembinaan Kampus Wilayah Sarawak Institut
He had completed his postgraduate
Tadbiran Awam Negara (INTAN), Kota Samarahan,
degree programme in MSc.Geotechnical Sarawak. (Reka Dan Bina)
Engineering at Newcastle University (United RM 68,000,000.00
Kingdom) in September 2014 with the result
of Pass with Merit. His last position before o Cadangan (SMK) Sekolah Menengah Kebangsaan Datuk
pursuing for Master Degree programme was a Abdul Rahman Yaakob, Kanowit, Sarawak.
RM 77,000,000.00
Senior Civil Engineer in a Civil and Structural
consultant firm (Jurutera Artecon Sdn Bhd) in o Cadangan Pembinaan Dan Penyiapan Kompleks Pusat
Sarawak. Islam Di Universiti Malaysia Sarawak (UNIMAS), Kota
Samarahan, Sarawak.
RM 35,000,000.00
o Projek Bekalan Air Luar Bandar (BALB) Ke Dabuk Tanu, Boleng Road Junction Along
Engkelili/Saratok, Sarawak. (Water Reservior, Booster Pump Station and Water Pipelines),
Sarawak.
RM 45,000,000.00
o Proposed Sg. Sebalak Padi Scheme Betong Division, Sarawak. (Package C / Phase 2 : Proposed
Flood Mitigation & Access Road)
RM 10,000,000.00
o Cadangan MEmbina Sekolah Baru 20 Bilik Darjah, Asrama 400 Pelajar, 8 Unit Rumah Guru Serta
Lain-Lain Kemudahan Di SMK Lingga, Lot 907, Block 16, Bijat L.D., Sri Aman, Sarawak
RM 45,000,000.00
o Membina Dan Menyiapkan Projek Jalan Skim Penempatan Semula Kuala Lawas, Bahagian
Limbang, Sarawak.
RM 35,000,000.00
March 2005 to June 2010: Civil Engineer, Jurutera Artecon Sdn. Bhd.
o Involved in analyzing and designing of civil and structural engineering works, prepared Bill of
Quantities and specification, project monitoring, attending meeting, supervising site work and
etc.
Project involved:
o Cadangan Membina Dan menyiapkan Sebuah Balai Polis Sentral, Di Atas Lot 2643, Daerah
Bandar Sibu, Sarawak (850)
RM 10,000,000.00
o Cadangan Membina Dan Menyiapkan Sebuah Balai Polis Sibu Jaya Serta Lain-Lain Kemudahan
Di Atas Lot 5322, Daerah Bandar Sibu, Bandar Sibu Jaya, Sibu, Sarawak (846).
RM 20,000,000.00
o Cadangan Membina Dan Menyiapkan Sebuah Balai Polis Selangau Serta Lain-Lain Kemudahan Di
Atas Lot 638, Block 15, Daerah Bandar Gigis, Selangau, Sarawak (844).
RM 20,000,000.00
o Proposed Sg. Sebalak Padi Scheme Betong Division, Sarawak.(Package C / Proposed Flood
Mitigation & Access Road to the Central Area)
RM10,000,000.00
o Proposed Sebalak Padi Scheme Betong Division, Sarawak. (Package A : Proposed Drainage and
Irrigation System & Flood Mitigation)
RM60,000,000.00
o Proposed Sand Filling Works To Mosque & Commercial Areas And Road Works, Semup RGC
Service Centre, Mukah Division (Phase 1), Sarawak.
RM 5,000,000.00
o Proposed Kampung Bundong Extension On Lot 362, Block 28, Seredeng Land District, Sarikei
Division, Sarawak.
RM1,600,000.00
o Proposed Blok Asrama Dan Latihan Semenggok (Fasa 2) at Lot 869 (Parent Lot 263), Block 3,
Sentah-Segu Land District, Semenggok, Kuching, Sarawak.
RM2,500,000.00
o Proposed Double Storey Detached House (YB Dato Sri Mohd. Asfia Awg. Nassar) On Lot 3397,
Block 14, Salak Land District, Demak Road, Kuching, Sarawak.
RM 3,000,000.00
24
GRE ENGINEERING SOLUTIONS SDN BHD
o Proposed Construction And Completion Of Pejabat Agama Syariah Islam (JAIS) Dan
Mahkamah Syariah, Mukah, Sarawak.
RM3,000,000.00
o Proposed Construction And Completion of Pejabat Agama Islam (JAIS) Dan Mahkamah
Syariah, Sarikei, Sarawak.
RM 3,000,000.00
July 2004 to Feb 2005: Resident Engineer, Jurutera Artecon Sdn. Bhd.
Project involved:
o Proposed Construction and Completion of SRK Senadin, Miri, Sarawak secara “Design And
Built”.
RM20,000,000.00
Jan 2004 to Jul 2004: Graduate Civil Engineer, Jurutera Artecon Sdn. Bhd.
Project involved:
o Submission of 36 sites for Telecommunications Tower and PCN Poles to Local Authority
(Council and State Planning Authority) based in Kuching, Sibu, Bintulu, Limbang and Miri,
Sarawak.
Jul 2002 to Sep 2002: Senior Draught Person, Jurutera Artecon Sdn. Bhd.
Duties:
o Drafting of civil and structural engineering drawing plan.
o Filing of all drawings for ease of future reference.
o Assisting in submission of plan.
o Design of RC beams, column, foundation and roof truss by using structure software.
o Work as consultant site supervisor (Clerk of Works) for 2 weeks (Supervise on micro piling
construction for TM-Touch Telecommunication Tower at Batu Kawah Road, Kuching,
Sarawak)
Oct 2002 to Mac 2001: Draught Person, Jurutera Artecon Sdn. Bhd.
Project involved:
o Proposed Construction and Completion of SMK Sibu Jaya, Sibu, Sarawak (Design & Build)
RM26,800,000.00
o Proposed Construction and Completion of SRK Senadin, Miri, Sarawak Secara “Design &
Built”.
RM20,200,000.00
o Proposed Construction and Completion of SRK Sibu Jaya, Sibu, Sarawak (Design & Built)
RM20,200,000.00
25
GRE ENGINEERING SOLUTIONS SDN BHD
26
GRE ENGINEERING SOLUTIONS SDN BHD
27
GRE ENGINEERING SOLUTIONS SDN BHD
28
GRE ENGINEERING SOLUTIONS SDN BHD
29
GRE ENGINEERING SOLUTIONS SDN BHD
30
GRE ENGINEERING SOLUTIONS SDN BHD
31
GRE ENGINEERING SOLUTIONS SDN BHD
o Design Engineer
Project: Project Jiwa Murni bagi membina jalan baru dari Nanga Jagau ke Nanga Simunjan,
Kanowit Bahagian Sibu, Sarawak.
Work Scope: Produced feasibility study and proposed 14km new route for a single
carriageway from Nanga Jagau to Nanga Simunjan. Key responsibilities included designing
the horizontal alignment and checking vertical alignment complied with Design Manual Road
and Bridges.
o Design Engineer
Project: Projek menaiktaraf bekas jalan – jalan balak Negeri Sarawak (FASA IV) – Bahagian
Miri secara rundingan terus trunkey (Reka dan Bina).
Work Scope: Alignment design and earthworks calculation by using MXRoad software. Key
responsibilities included coordinating the design of upgrading Baram Logging Tracks in Miri,
Sarawak and layout information.
o Design Engineer
Project: Proposed Balingian coal stockyard and related buildings at Jalan Bukut, Ulu
Balingian, Bawan Land District, Mukah.
Work Scope: Delivery of consultant designs for building structures and liaised with client
and sub-consultants on design. Key responsibilities included design cost estimation and safety
assessments.
o Design Engineer
Project: Proposed 4 units double storey semi-detached houses on 161, (Plot 3-4 & 5-6)
Block 224, K.N.L.D, at Lorong 2, Jalan Datuk Stephen Yong, Kuching.
Work Scope: Carried out structural design and produced structural calculation report. Key
responsibilities include supervision and inspection of the works by contractor to ensure
compliance to design and specifications.
o Design Engineer
Project: Permohonan pelan bangunan di bawah Akta 133 bagi tujuan membina: 32 units
kedai / pejabat 2 tingkat, Bandar Puteh Indah, Mukim Linau, Daerah Batu Pahat, Johor.
Work Scope: Managed and carried detailed design. Produced structural calculation report.
o Design Engineer
Project: Proposed 14 units 3 storeys shophouses on Lot 33 (Sublot 1-6), Block 26, Muara
Tuang Land District at Jalan Datuk Mohammad Musa, Samarahan.
Work Scope: Planning and design of structural design. Checking the works complied with
design and specifications, making sure the works quality is maintained throughout the
construction.
o Design Engineer
Project: Proposed double storey semi-detached houses on Lot 297, 1341 & 1343 (Plot 15-
16), Block 8, Rimbas Land District, at Jalan Belasau, Debak.
Work Scope: Managed and produced feasible design of civil and structural design.
Producing layout drawings and cross section drawings as well as civil and structural design
report.
o Design Engineer
Project: Proposed double storey semi-detached houses on Lot 297, 1341 & 1343 (Plot 15-
16), Block 8, Rimbas Land District, at Jalan Belasau, Debak.
Work Scope: Produced structural design and layout plan drawings. Carried out structural
design report for authority submission. Supervised the workmanship and compliance of works
to design and specifications. 32
GRE ENGINEERING SOLUTIONS SDN BHD
33
GRE ENGINEERING SOLUTIONS SDN BHD
34
GRE ENGINEERING SOLUTIONS SDN BHD
Graduate Member Lembaga Teknologis 14th August 2009 – May 2021: Manager / Project
Malaysia (MBOT) with Registration No. Manager, Syarikat Bumi L.M.I
GT21050885.
Responsibilities:
o To enforce work to desired quality required by
October 2021 to Present: specification and drawing.
Senior Engineer, o To ensure all tests carried out in the course of the work
G.R.E. Engineering Solutions is being recorded to take count of the quality achieved.
o To ensure and implement correct procedure of work and
21st June 2021 – 30th September 2021: Quality Control measures are being followed.
Geotechnical Engineer, o To assist GM in the company work flow.
Minkonsult Sdn Bhd. o Monitors and report work progress to General Manager.
o Site Inspection.
14th August 2009 – May 2021: o To ensure the work meet the client needed.
Manager / Project Manager, o He must compile all filing record which related to the
Syarikat Bumi L.M.I. project.
o Attend meeting with client, consultant and
1st April 2003 – 31st March 2007: subcontractor.
Project Engineer, o Managing site investigation works for southern and
PPES Works (Sarawak) Sdn Bhd. Central Region.
35
GRE ENGINEERING SOLUTIONS SDN BHD
1st April 2003 – 31st March 2007: Project Engineer, PPES Works (Sarawak) Sdn Bhd.
Project: The Construction and Completion of the Proposed Jalan Bintulu / Similajau
(Section B), Bintulu Division Sarawak.
Project Cost: RM 27.18 Million.
Client: Jabatan Kerja Raya (JKR).
Consultant Team: Perunding Utama Engineering Sdn Bhd.
Project brief:
o The project was to construct and complete: 8.162 Km single carriage way of 0.575m thick
road pavement.
o Earth cutting to 292,440 cu.m and embankment fill to 402,700 cu.m.
o Rock blasting quantity of 35,000 cu.m.
o Varies sizes of RC box culvert ranged from 2.0 m to 2.5 m width.
o Varies sizes of RC pipe culvert ranged from 0.90 m to 1.80 m diameter.
o Varies sizes of RC drainages ranged from 0.30m to 0.60m width.
o 1 no. of 3 spans (55 meter) RC Concrete Bridge.
o Driven to set 156 points of 450mm diameter of RC spun piles.
o Driven to set 200 points of 250mm x 250mm RC square piles.
o Driven to set 16,435 points of 100mm diameter bakau piles.
Responsibilities:
o To enforce work to desired quality required by specification and drawing.
o To ensure quality specified materials are used in the finished work through testing of physical
and chemical properties of material.
o To ensure all tests carried out in the course of the work is being recorded to take count of
the quality achieved.
o To ensure and implement correct procedure of work and Quality Control measures are being
followed.
o To assist PM and QA Executive in the preparation of QA report and monthly progress report.
o Monitors and report work progress to Project Manager.
o To assist Project Manager on Site Inspection and to compile weekly reports for submission to
Project Manager.
o To ensure prompt submission of work request form from the subcontractors.
o He must follow the work programmed given by the Project Manager.
o He must follow the quality record procedure of all works.
o Report Daily Records.
o To prepare Monthly Progress Report for submission to the consultant.
o Record day work of subcontractor.
o He must compile all filing record which related to the project.
Project brief:
The project was consisting 3 major scopes of works:
1. Routine Maintenance
o RO 1 Maintenance of road pavement
o RO 2 Maintenance of road shoulder
o RO 3 Grass cutting
o RO 4 Maintenance of road furniture
o RO 5 Maintenance of culverts & drainages
o RO 7 Drainages
2. Periodic Maintenance
o Beyond the Agreed Performance Standard as per contract.
o Emergency Maintenance
o The works beyond expectation such as flooding, landslide, fallen trees etc.
36
GRE ENGINEERING SOLUTIONS SDN BHD
Responsibilites:
o As Road Maintenance Engineer for Federal Road Maintenance, Zone 1 consisting Kuching
Division, Samarahan Division, Sri Aman Division, Betong Division and Sarikei Division.
o To ensure smooth routine maintenance operation in Federal Road Maintenance.
o Ensure good coordination with clients, local authorities, subcontractors and related
enforcement departments.
o Preparation and monitoring of annually routine maintenance budgeting, project cash flow,
project reporting and cost control to ensure target profit margin are achievable.
o Analysis, planning and review subcontracting strategies for routine maintenance works.
o Preparation of tender documents and specifications for subcontracting works in routine
maintenance.
o Coordinating of Monthly Progress Report, Monthly Quality Control Report and » Routine
Inspection Report.
o Prepared, designed and submissions of periodic maintenance works proposal to client.
o To enforce work to desired quality required by specification and drawing.
o To ensure quality specified materials are used in the finished work through testing of physical
and chemical properties of material.
o To ensure all tests carried out in the course of the work is being recorded to take count of
the quality achieved.
o To ensure and implement correct procedure of work and Quality Control measures are being
followed.
14th February 2000 – 31st March 2003: Site Engineer, Pohood Construction and
Development Sdn Bhd
Project: The Construction and Completion of the Proposed Road Linking Jalan Tanjung
Batu and Jalan Sultan Iskandar, Bintulu Division.
Project Cost: RM 3.78 Million.
Client: Bintulu Development Authority (BDA).
Consultant Team: Bintulu Development Authority (BDA).
Project brief:
The project was to construct and complete:
o 3.2 km of dual carriage way 0.575m thick road pavement.
o Sand embankment fill of 22,500 cu.m to road formation levels
o Varies sizes of RC box culvert ranged from 1.2m to 2.4m width.
o Varies sizes of RC pipe culvert ranged from 0.45 m to 0.9m diameter.
o Varies sizes of RC drainages ranged from 0.9m to 3.2m width.
o 14.8 km of road kerb.
o Bakau piling works.
Project: The Construction and Completion of the Proposed Jalan Asyakirin and Civil
Works within BDA Housing Estate, Bintulu Division.
Project Cost: RM 5.8 Million.
Client: Bintulu Development Authority (BDA).
Consultant Team: Perunding Utama Engineering S/B.
Project brief:
The project was to construct and complete:
o 2.1 km of dual carriage way 0.575m thick road pavement.
o Replacement of 12,500 cu.m of unsuitable materials to road formation levels
o Varies sizes of RC box culvert ranged from 0.6m to 3.2 m width.
o Varies sizes of RC pipe culvert ranged from 0.45 m to 1.2m diameter.
o Varies sizes of RC drainages ranged from 0.3m to 3.0m width.
o 8.8 km of road kerb.
o Bakau piling works.
37
GRE ENGINEERING SOLUTIONS SDN BHD
Responsibilities:
o To assist Project Manager on Monthly Progress Report and Quality Control Report.
o To assist Project Manager monitoring and coordinate subcontractor.
o To assist Project Manager on implementation and monitoring of Quality Assurance on site.
o To assist Project Manager on staffs and workers welfare.
o To assist Project Manager on Variation Order proposal and claims.
o Coordinate services agency on detections and relocations of the affected services.
o To assist Project Manager on coordination with client and consultant team.
o To assist Project Manager monitor the project’s petty cash flow account.
1st July 1999 – February 2000: Site Engineer, Saytech Corporation Sdn Bhd
Project brief:
The project was to construct and complete:
o Earth embankment fill of 250,000 cu.m earth as building platform.
o Driven 4 lengths @ 12 m RC Square (300mm x 300mm) piles.
o Construct and complete one unit RC Pipe culvert (0.9m diameter).
o 0.34Km access of 0.45m thick road pavement.
o Basic building’s mechanical and electrical facilities.
Project: The Construction and Completion of Sekolah Rendah Kerajaan Meranek, Kota
Samarahan, Kota Samarahan Division.
Project Cost: RM 1.20 Million.
Client: Kementerian Pendidikan Malaysia.
Consultant Team: Jabatan Kerja Raya (JKR), Kota Samarahan.
Project brief:
The project was to construct and complete one block of 4 storey school building consist:
o Earth embankments fill of 20,000 cu.m as building platform.
o Driven 4 lengths @ 12 m RC Square (300mm x 300mm) piles for building foundations.
o 0.25Km access of 0.45m thick road pavement.
o Football field.
o Basic building’s mechanical and electrical facilities.
Responsibilities:
o To assist Project Manager on Monthly Progress Report and Quality Control Report.
o To assist Project Manager monitoring and coordinate subcontractor.
o To assist Project Manager on implementation and monitoring of Quality Assurance on site.
38
GRE ENGINEERING SOLUTIONS SDN BHD
39
GRE ENGINEERING SOLUTIONS SDN BHD
40
GRE ENGINEERING SOLUTIONS SDN BHD
41
GRE ENGINEERING SOLUTIONS SDN BHD
Chong Hon Khoon has more than 20 years of 2007 – 2009: Clerk of Works
experience in construction field. He is a
member of Board of Engineer Malaysia (BEM), Cadangan pembangunan Sekolah Menengah Beladin, Betong,
Certificate of Registration of Inspector of Sarawak.
Works with Registered No. W13483 since 16th
August 2018. 2004 – 2006: Clerk of Works
Cadangan membina dan menyiapkan sebuah 2000 – 2002: Clerk of Works (Jurutera Jasa Sarawak Sdn
Poliklinik Kesihatan Angkatan Tentera di Lot Bhd)
264, Block 36, Muara Tuang Land District, 7
½ Mile, Penrissen Road, Kuching, Sarawak. Construction, completion and commissioning of the proposed
water treatment plant extension pumping main and elevated
2016 – 2017: Inspector of Works
tank at Sebuyau, Samarahan.
Development and upgrading of the proposed
Pan Borneo Highway in the State of Sarawak, 1999 – 2000: Site Supervisor
Malaysia.
Construction of RC bridge, RC box culverts and gabion wall at
2015 – 2016: Clerk of Works Telaga Air Kuching, Sarawak.
42
GRE ENGINEERING SOLUTIONS SDN BHD
1996 – 1998: Site Foreman (Siu Yeung Welding & Engineering in Negara Brunei
Darussalam)
o Construction of warehouse, road and RC drains sewer line, water tanks and car park.
o Proposed provision for a new access road, car park area. Compound lighting and general
improvement to riffle and pistol target range at Brunei Darussalam.
Drainage works, culvert and road works at Simpang Tiga flyover interchange by Pilecon Construction.
1988 – 1990: Site Foreman (Ocean Quarry and Construction Sdn Bhd)
Supervising the civil and building works, drain and road kerbs, box culverts, retaining and gabion
walls.
Working in the construction sector in Negara Brunei Darussalam in the Civil and Building works.
o The Jerudong Mini Istana project costing BND$ 9.6 Million by Alim Bena Sdn Bhd.
o The Kampung Retale Resettlement Scheme – Phase 1 Trunk Infrastructure by Gaya Iron
Works (Sabah) Sdn Bhd.
Supervising the building works for construction and completion of 4 rows of 4 storey army barracks,
road and drainage works in Brunei Darussalam.
43
GRE ENGINEERING SOLUTIONS SDN BHD
44