1 DATE & DAY :1/3/2010 Monday 2 WEATHER :Fore Noon: After Noon :
3 TEMPERATURE : Maximum Minimum
4 RAIN : 5 AVERAGE WIND SPEED :
6 PROJECT : Madukkarai orchids

7 SITE ACTIVITIES - PROGRESS OF WORK

To be
sl. Achieved Achieve
no Description of work Unit Qty Qty Cum. Qty Remarks
entrance arch hard
rock breaking and
1 side earth cutting cm 0.75

Steel cutting & binding MT 0.45

2 Boundray wall work

F grid Block work sq m 8

3 Diesel shed
Block work sq m 2.4
Plastering sq m 4.8

4 model shed
20mm metal stocking
Bamboo blinds
E B Cable work

8 MAN POWER DETAILS

S. Harihara model
no Man power Departmental P.Thurairaj k.ramesh Indus shed
1 thurairaj
1 Engineer

2 Unskilled - M/C 1 2 3
- F/C 1
3 Mason 1
4 Skilled
-Carpenter
-Bar bender 4
- Helper 2
5 Fabrication work
- Fitter 1
- welder
- helper 1
TOTAL LABOUR 2 10 2 3 17

9 MATERIALS RECEIPT :

S.N Receipt on Received till Cumulative Used on the Cumulative Balance at


O Description Material Unit the day Pervious day receipt day usage site
no of
1 Cement bag 5
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Thick 200mm nos
- Thick 150mm nos
- Thick 100mm nos
6 STEEL - 8mm ton
-10mm ton
-12mm ton
-16mm ton
-20mm ton
-25mm ton
-32mm ton

10 Materials Inward details

Material
Purchase received
S.N order Chelan inward Vehicle
O Material description Unit number Received Qty number number number Remarks

11 Machinery & Equipment form inner or outer

s.n Fuel Starting Closing Running


o Description of items Unit issues time time time Location & Work details
12 IF any dispensaries

prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR

DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


TEMPERATURE : Maximum Minimum
RAIN : 5 AVERAGE WIND SPEED :
PROJECT : orchids boundary wall NAME OF CONTRACTOR : Sri sudarshan Enterprises
SCOPE OF WORK : Material with labour contract
CONTRACT NUMBER : SO-ICP-CBE-H-203

SITE ACTIVITIES - PROGRESS OF WORK


To be
Boq Achieved Achieve
s.no Description of work Unit Qty Qty Cum. Qty Remarks
1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Grade of concrecu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first lift cu m
- second lift cu m
iv column cu m
6 Shuttering
Footing, pedestal &
retain wall sq m
column sq m
7 Steel binding work MT
Hollow block Masonry
200mm thk with CM
8 1:5 sq m

MAN POWER DETAILS


S.
no Man power Depart mental Yester day increase Today
1 Engineer

2 Unskilled - M/C
- F/C
3 Mason
4 Skilled - car
-Bar bender
- Helper
TOTAL LABOUR

Material inward details & Machinery details


Material Security
S.N Received Chelan received Vehicle inward
O Material description Unit Qty number from number number Remarks

IF any dispensaries

prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE

DAILY PROGRESS REPORT

1 DATE & DAY : 2/03/2010 2 WEATHER :Fore Noon: After Noon :


3 TEMPERATURE : Maximum Minimum
4 RAIN : 5 AVERAGE WIND SPEED :
6 PROJECT : Orchids - Madukkarai

7 SITE ACTIVITIES - PROGRESS OF WORK

s. Achieved To be
no Description of work Unit Qty Achieve Qty Cum. Qty Remarks

8 MAN POWER DETAILS

S. Harihara
no Man power Departmental P.Thurairaj k.ramesh Indus

1 Engineer 1

2 Unskilled - M/C 2 10
- F/C
3 Mason 1
4 Skilled
-Carpenter 4
-Bar bender
- Helper 2
5 Fabrication work
- Fitter 1
- welder 1
- helper 1

TOTAL LABOUR 3 17 3 23

9 MATERIALS RECEIPT :
S.
N Receipt on Received till Cumulative Used on the Cumulative Balance at
O Description Material Unit the day Pervious day receipt day usage site
no of
1 Cement bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Thick 200mm nos
- Thick 150mm nos
- Thick 100mm nos
6 STEEL - 8mm ton
-10mm ton
-12mm ton
-16mm ton
-20mm ton
-25mm ton
-32mm ton

10 Materials Inward details

Material
S. Purchase received
N order Chelan inward Vehicle
O Material description Unit number Received Qty number number number Remarks
11 Machinery & Equipment form inner or outer

s. Closing Running
no Description of items Unit Fuel issues Starting time time time Location & Work details

12 IF any dispensaries

prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR

DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


TEMPERATURE : Maximum Minimum
RAIN : 5 AVERAGE WIND SPEED :
PROJECT : orchids boundary wall NAME OF CONTRACTOR : Sri sudarshan Enterprises
SCOPE OF WORK : Material with labour contract CONTRACT NUMBER : SO-ICP-CBE-H-203

SITE ACTIVITIES - PROGRESS OF WORK


Boq Achieved To be
s.no Description of work Unit Qty Achieve Qty Cum. Qty Remarks
1 Excavation cu m 2255
2 Back filing cu m 1180
3 PCCM7.5 Grade of concrete cu m 106
4 Concrete M20 Grade
i Footing cu m 278
ii wall - first lift cu m 188
- second lift cu m 210
iv column cu m 15
6 Shuttering
Footing, pedestal sq m 1622
retain wall 2092
column sq m 238
7 Steel binding
Hollow work
block Masonry MT 48
8 200mm thk with CM 1:5 sq m 1074

MAN POWER DETAILS


S.
no Man power Depart mental Yester day increase Today
1 Engineer

2 Unskilled - M/C
- F/C
3 Mason
4 Skilled - carpenter
-Bar bender
- Helper
TOTAL LABOUR

Material inward details & Machinery details


S. Material Security
N Received Chelan received Vehicle inward
O Material description Unit Qty number from number number Remarks

IF any dispensaries

prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE

DAILY PROGRESS REPORT

1 DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


3 TEMPERATURE : Maximum Minimum
4 RAIN : 5 AVERAGE WIND SPEED :
6 PROJECT :

7 SITE ACTIVITIES - PROGRESS OF WORK

To be
Description Achieved Achieve
sl.no of work Unit Qty Qty Cum. Qty Remarks

8 MAN POWER DETAILS

Harihara
S.no Man power Departmental P.Thurairaj k.ramesh Indus

1 Engineer

2 Unskilled -
- F/C
3 Mason
4 Skilled
-Carpenter
-Bar bender
- Helper
5 Fabrication
- Fitter
- welder
- helper

TOTAL LABOUR

9 MATERIALS RECEIPT :
Received till
Description Receipt on Pervious Cumulative Used on the Cumulative Balance at
S.NO Material Unit the day day receipt day usage site
1 Cement no of bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Th nos
- Thi nos
- Thi nos
6 STEEL - ton
ton
ton
ton
ton
ton
ton

10 Materials Inward details

Material
Purchase received
Material order Received Chelan inward Vehicle
S.NO description Unit number Qty number number number Remarks

11 Machinery & Equipment form inner or outer


Description Starting Closing Running
s.no of items Unit Fuel issues time time time Location & Work details

12 IF any dispensaries

prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR

DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


TEMPERATURE : Maximum Minimum
RAIN : 5 AVERAGE WIND SPEED :
PROJECT : orchids boundary wall NAME OF CONTRACTOR : Sri sudarshan Enterprises
SCOPE OF WORK : Material with labour contractCONTRACT NUMBER : SO-ICP-CBE-H-203

SITE ACTIVITIES - PROGRESS OF WORK


To be
Description Achieved Achieve
Boq s.no of work Unit Qty Qty Cum. Qty Remarks

1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Gra cu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first li cu m
- secon cu m
iv column cu m
6 Shuttering
Footing,
pedestal
& retain
wall sq m
column sq m
7 Steel bindi M T
Hollow
block
Masonry
200mm
thk with
8 CM 1:5 sq m

MAN POWER DETAILS


S.no Man power Depart mental Yester day increase Today
1 Engineer

2 Unskilled -
- F/C
3 Mason
4 Skilled
-Bar bender
- Helper
TOTAL LABOUR

Material inward details & Machinery details


Material Security
Material Received Chelan received Vehicle inward
S.NO description Unit Qty number from number number Remarks

IF any dispensaries

prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE

DAILY PROGRESS REPORT

1 DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


3 TEMPERATURE : Maximum Minimum
4 RAIN : 5 AVERAGE WIND SPEED :
6 PROJECT :

7 SITE ACTIVITIES - PROGRESS OF WORK

To be
Description Achieved Achieve
sl.no of work Unit Qty Qty Cum. Qty Remarks

8 MAN POWER DETAILS

Harihara
S.no Man power Departmental P.Thurairaj k.ramesh Indus

1 Engineer

2 Unskilled -
- F/C
3 Mason
4 Skilled
-Carpenter
-Bar bender
- Helper
5 Fabrication
- Fitter
- welder
- helper

TOTAL LABOUR

9 MATERIALS RECEIPT :
Received till
Description Receipt on Pervious Cumulative Used on the Cumulative Balance at
S.NO Material Unit the day day receipt day usage site
1 Cement no of bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Th nos
- Thi nos
- Thi nos
6 STEEL - ton
ton
ton
ton
ton
ton
ton

10 Materials Inward details

Material
Purchase received
Material order Received Chelan inward Vehicle
S.NO description Unit number Qty number number number Remarks

11 Machinery & Equipment form inner or outer


Description Starting Closing Running
s.no of items Unit Fuel issues time time time Location & Work details

12 IF any dispensaries

prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR

DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


TEMPERATURE : Maximum Minimum
RAIN : 5 AVERAGE WIND SPEED :
PROJECT : orchids boundary wall NAME OF CONTRACTOR : Sri sudarshan Enterprises
SCOPE OF WORK : Material with labour contractCONTRACT NUMBER : SO-ICP-CBE-H-203

SITE ACTIVITIES - PROGRESS OF WORK


To be
Description Achieved Achieve
Boq s.no of work Unit Qty Qty Cum. Qty Remarks

1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Gra cu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first li cu m
- secon cu m
iv column cu m
6 Shuttering
Footing,
pedestal
& retain
wall sq m
column sq m
7 Steel bindi M T
Hollow
block
Masonry
200mm
thk with
8 CM 1:5 sq m

MAN POWER DETAILS


S.no Man power Depart mental Yester day increase Today
1 Engineer

2 Unskilled -
- F/C
3 Mason
4 Skilled
-Bar bender
- Helper
TOTAL LABOUR

Material inward details & Machinery details


Material Security
Material Received Chelan received Vehicle inward
S.NO description Unit Qty number from number number Remarks

IF any dispensaries

prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE

DAILY PROGRESS REPORT

1 DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


3 TEMPERATURE : Maximum Minimum
4 RAIN : 5 AVERAGE WIND SPEED :
6 PROJECT :

7 SITE ACTIVITIES - PROGRESS OF WORK

sl. Achieved To be
no Description of work Unit Qty Achieve Qty Cum. Qty Remarks

8 MAN POWER DETAILS

S. Harihara
no Man power Departmental P.Thurairaj k.ramesh Indus

1 Engineer

2 Unskilled - M/C
- F/C
3 Mason
4 Skilled
-Carpenter
-Bar bender
- Helper
5 Fabrication work
- Fitter
- welder
- helper

TOTAL LABOUR
9 MATERIALS RECEIPT :

S. Receipt on Received till Cumulative Used on the Cumulative Balance at


NO Description Material Unit the day Pervious day receipt day usage site
no of
1 Cement bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Thick 200mm nos
- Thick 150mm nos
- Thick 100mm nos
6 STEEL - 8mm ton
-10mm ton
-12mm ton
-16mm ton
-20mm ton
-25mm ton
-32mm ton

10 Materials Inward details

Material
Purchase received
S. order Chelan inward Vehicle
NO Material description Unit number Received Qty number number number Remarks

11 Machinery & Equipment form inner or outer

s. Fuel Starting Closing Running


no Description of items Unit issues time time time Location & Work details

12 IF any dispensaries
prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR

DATE & DAY : 2 WEATHER :Fore Noon: After Noon :


TEMPERATURE : Maximum Minimum
RAIN : 5 AVERAGE WIND SPEED :
PROJECT : orchids boundary wall NAME OF CONTRACTOR : Sri sudarshan Enterprises
SCOPE OF WORK : Material with labour contract CONTRACT NUMBER : SO-ICP-CBE-H-203

SITE ACTIVITIES - PROGRESS OF WORK

Boq Achieved To be
s.no Description of work Unit Qty Achieve Qty Cum. Qty Remarks
1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Grade of concrete cu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first lift cu m
- second lift cu m
iv column cu m
6 Shuttering
Footing, pedestal & retain
wall sq m
column sq m
7 Steel binding work MT
Hollow block Masonry
8 200mm thk with CM 1:5 sq m

MAN POWER DETAILS


S.
no Man power Depart mental Yester day increase Today
1 Engineer

2 Unskilled - M/C
- F/C
3 Mason
4 Skilled - carpenter
-Bar bender
- Helper
TOTAL LABOUR

Material inward details & Machinery details


Material Security
S. Received Chelan received Vehicle inward
NO Material description Unit Qty number from number number Remarks

IF any dispensaries
prepared by checked by