1 DATE & DAY :1/3/2010 Monday 2 WEATHER :Fore Noon: After Noon :
3 TEMPERATURE : Maximum Minimum
4 RAIN : 5 AVERAGE WIND SPEED :
6 PROJECT : Madukkarai orchids
To be
sl. Achieved Achieve
no Description of work Unit Qty Qty Cum. Qty Remarks
entrance arch hard
rock breaking and
1 side earth cutting cm 0.75
3 Diesel shed
Block work sq m 2.4
Plastering sq m 4.8
4 model shed
20mm metal stocking
Bamboo blinds
E B Cable work
S. Harihara model
no Man power Departmental P.Thurairaj k.ramesh Indus shed
1 thurairaj
1 Engineer
2 Unskilled - M/C 1 2 3
- F/C 1
3 Mason 1
4 Skilled
-Carpenter
-Bar bender 4
- Helper 2
5 Fabrication work
- Fitter 1
- welder
- helper 1
TOTAL LABOUR 2 10 2 3 17
9 MATERIALS RECEIPT :
Material
Purchase received
S.N order Chelan inward Vehicle
O Material description Unit number Received Qty number number number Remarks
prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR
2 Unskilled - M/C
- F/C
3 Mason
4 Skilled - car
-Bar bender
- Helper
TOTAL LABOUR
IF any dispensaries
prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE
s. Achieved To be
no Description of work Unit Qty Achieve Qty Cum. Qty Remarks
S. Harihara
no Man power Departmental P.Thurairaj k.ramesh Indus
1 Engineer 1
2 Unskilled - M/C 2 10
- F/C
3 Mason 1
4 Skilled
-Carpenter 4
-Bar bender
- Helper 2
5 Fabrication work
- Fitter 1
- welder 1
- helper 1
TOTAL LABOUR 3 17 3 23
9 MATERIALS RECEIPT :
S.
N Receipt on Received till Cumulative Used on the Cumulative Balance at
O Description Material Unit the day Pervious day receipt day usage site
no of
1 Cement bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Thick 200mm nos
- Thick 150mm nos
- Thick 100mm nos
6 STEEL - 8mm ton
-10mm ton
-12mm ton
-16mm ton
-20mm ton
-25mm ton
-32mm ton
Material
S. Purchase received
N order Chelan inward Vehicle
O Material description Unit number Received Qty number number number Remarks
11 Machinery & Equipment form inner or outer
s. Closing Running
no Description of items Unit Fuel issues Starting time time time Location & Work details
12 IF any dispensaries
prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR
2 Unskilled - M/C
- F/C
3 Mason
4 Skilled - carpenter
-Bar bender
- Helper
TOTAL LABOUR
IF any dispensaries
prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE
To be
Description Achieved Achieve
sl.no of work Unit Qty Qty Cum. Qty Remarks
Harihara
S.no Man power Departmental P.Thurairaj k.ramesh Indus
1 Engineer
2 Unskilled -
- F/C
3 Mason
4 Skilled
-Carpenter
-Bar bender
- Helper
5 Fabrication
- Fitter
- welder
- helper
TOTAL LABOUR
9 MATERIALS RECEIPT :
Received till
Description Receipt on Pervious Cumulative Used on the Cumulative Balance at
S.NO Material Unit the day day receipt day usage site
1 Cement no of bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Th nos
- Thi nos
- Thi nos
6 STEEL - ton
ton
ton
ton
ton
ton
ton
Material
Purchase received
Material order Received Chelan inward Vehicle
S.NO description Unit number Qty number number number Remarks
12 IF any dispensaries
prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR
1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Gra cu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first li cu m
- secon cu m
iv column cu m
6 Shuttering
Footing,
pedestal
& retain
wall sq m
column sq m
7 Steel bindi M T
Hollow
block
Masonry
200mm
thk with
8 CM 1:5 sq m
2 Unskilled -
- F/C
3 Mason
4 Skilled
-Bar bender
- Helper
TOTAL LABOUR
IF any dispensaries
prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE
To be
Description Achieved Achieve
sl.no of work Unit Qty Qty Cum. Qty Remarks
Harihara
S.no Man power Departmental P.Thurairaj k.ramesh Indus
1 Engineer
2 Unskilled -
- F/C
3 Mason
4 Skilled
-Carpenter
-Bar bender
- Helper
5 Fabrication
- Fitter
- welder
- helper
TOTAL LABOUR
9 MATERIALS RECEIPT :
Received till
Description Receipt on Pervious Cumulative Used on the Cumulative Balance at
S.NO Material Unit the day day receipt day usage site
1 Cement no of bag
2 Fine aggregate
-River sand cft
-Dust cft
3 Coarse Aggregate
-20mm cft
-10mm cft
-40mm cft
4 Bricks nos
5 Blocks
- Th nos
- Thi nos
- Thi nos
6 STEEL - ton
ton
ton
ton
ton
ton
ton
Material
Purchase received
Material order Received Chelan inward Vehicle
S.NO description Unit number Qty number number number Remarks
12 IF any dispensaries
prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR
1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Gra cu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first li cu m
- secon cu m
iv column cu m
6 Shuttering
Footing,
pedestal
& retain
wall sq m
column sq m
7 Steel bindi M T
Hollow
block
Masonry
200mm
thk with
8 CM 1:5 sq m
2 Unskilled -
- F/C
3 Mason
4 Skilled
-Bar bender
- Helper
TOTAL LABOUR
IF any dispensaries
prepared by checked by
RAKINDO KOVAI TOWNSHIP LTD . COIMBATORE
sl. Achieved To be
no Description of work Unit Qty Achieve Qty Cum. Qty Remarks
S. Harihara
no Man power Departmental P.Thurairaj k.ramesh Indus
1 Engineer
2 Unskilled - M/C
- F/C
3 Mason
4 Skilled
-Carpenter
-Bar bender
- Helper
5 Fabrication work
- Fitter
- welder
- helper
TOTAL LABOUR
9 MATERIALS RECEIPT :
Material
Purchase received
S. order Chelan inward Vehicle
NO Material description Unit number Received Qty number number number Remarks
12 IF any dispensaries
prepared by checked by
DAILY PROGRESS REPORT - CONTRACTOR
Boq Achieved To be
s.no Description of work Unit Qty Achieve Qty Cum. Qty Remarks
1 Excavation cu m
2 Back filing cu m
3 PCCM7.5 Grade of concrete cu m
4 Concrete M20 Grade
i Footing cu m
ii wall - first lift cu m
- second lift cu m
iv column cu m
6 Shuttering
Footing, pedestal & retain
wall sq m
column sq m
7 Steel binding work MT
Hollow block Masonry
8 200mm thk with CM 1:5 sq m
2 Unskilled - M/C
- F/C
3 Mason
4 Skilled - carpenter
-Bar bender
- Helper
TOTAL LABOUR
IF any dispensaries