3 WEEK ROLLING PLAN

Cum. 05/07 to 12/07 to


SL No Activity Scope done till Balance 28/6 to 03/07 10/07 17/07 Remarks
date PLANNED ACHIEVED PLANNED PLANNED
ORCHIDS
1 BLOCK 171
c Plint PCC 715 rmt 250 rmt 465 rmt 260 rmt 110 rmt 160 rmt
d Plinth beam concrete 715 rmt 120 rmt 595 rmt 200rmt 350 rmt 150 rmt
e Column including double lif 94 nos 10 nos 84 nos 10 nos 10 nos 20 nos
f Shear wall above plinth 72 rmt 6 rmt 66 rmt 15 rmt 6 rmt 20 rmt
2 BLOCK 173
b Column including double lif 94 nos 88 nos 6 nos 44 nos 38 nos 6 nos
c Shear wall above plinth 72 rmt 53 rmt 19 rmt 37 rmt 18 rmt 19 rmt
d Beam bottoms 715 rmts 200 rmt 120 rmt
e Slab shuttering 60 sq mt 100 Sq mt

3 ROW HOUSES 1 TO 19
a Excavation 222 nos 194 nos 28 nos 58 nos 30 nos 28 nos
b PCC for Footings 222 nos 164 nos 58 nos 58 nos 58 nos
c RCC for Footings 222 nos 164 nos 58 nos 58 nos
d stub column 222 nos 156 nos 66 nos 58 nos 50 nos 8 nos
e Plinth beam 900 rmt 313 rmts 587 rmts 200 rmt 113 rmt 87 rmt 100 rmt
f Column - Ground floor 222 nos 58 nos 174 nos 10nos 10 nos 30 nos Second lif 350 mm heigth progress
g Stair case - ground floor 1st fligth 19 nos 19 nos 3 nos

COMPOUND WALL
RCC :-
Block work in N grid 203 rmt 176 rmt 12 rmt 12 rmt 12 rmt
W & Z grid block work 0.8 m Brick pillar
Block work in W & Z grid 111 rmt 81 rmt 30 rmt 96 rmt 66 rmt 30 rmt & grill work rate to be finalise
Coping - concrete E & F grid 252 rmt 200 rmt 52 rmt 49 rmt 20 rmt
Plaster - inner 252 rmt 165 rmt 87 rmt 22 rmt
Plaster - outer 252 rmt 150 rmt 102 rmt 20 rmt 20 rmt
Coping - concrete M grid 208 rmts 60 rmts 148 rmts 105 rmt 43 rmt
Plaster - inner 208 rmt 45 rmt 163 rmt 30 rmt 20 rmt 50 rmt
Plaster - outer 208 rmt 20 rmt

ENTRANCE ARCH WORKS


As per Mr. Das instruction during site
b Addl Strengthening works complete this visit some additional work for cloumn
week work under progress
c Fabrication of New works
d Erection of old truss activities will be
Erection of New truss activities commened

Material Requirement
for entrance works
Cement 600 bags

Steel Requirement Steel requirement send 0n 7th july


2010
AGENCY REQMT.:
1 Electrical

452909614.xls
Orchids compound wall contractor Sri sundarshan
scope of work compound wall
Daily achieved Qty details
Sl.no Description of work unit 12/21/2019 5/18/2010 5/19/2010 5/20/2010 5/21/2010 5/22/2010 Remarks

1 Excavation
By excavator

By comperssor

2 PCC M-10 grade

3 RCC footing concrete M 25

4 Rcc Wall concrete M25

6 Block Masonary

7 Coping

8 Plastering inner & outer


e
m

Mechincal
na

Carpenter

Electrican
or

Helper

Helper
mason
ct

Fitter
ra

Total
Date

M/C
nt

F/C
co

24/5/2010 Siva construction 14 19 14 7 7 10 10 1 82


A & B construction 6 17 3 2 3 2 3 36
Sri sudrashan Enterprises 5 6 2 2 1 1 17