WTG/PANEL

SELECTION
COMMUN PROVINC PRE-FS/
No. PROJECT NAME Type MW E/DISTRIC DEVELOPERS/ CLIENTS WIND
E
T MAST

For details:
TEL: +86 18016419286
Nhơn Hội
Phương Economic Binh Dinh E-
2 Mai No. 3 Wind 21 mail:info@buimgroup. Gamesa Y
Zone, Quy
WF org
Nhơn City www.vietnamwind.co
m

Văn Lâm For details:


village, TEL: +86 18016419286
Phước E-
Văn Lâm Nam Ninh
13 Wind 50 mail:info@buimgroup.
WF commune Thuan org
, Ninh www.vietnamwind.co
Phước m
district
An Lĩnh, For details:
An Thọ, TEL: +86 18016419286
An Mỹ, An E- 03 wind
Hòa and Phu Yen
14 HBRE WF Wind 300 mail:info@buimgroup. masts on
An Hiệp org going
commune www.vietnamwind.co
s, Tuy An m
district

Wind
measure
ment:
EVN 60m
mast, LAT
11044’17.
040” -
LON
For details:
Lợi Hải 109003’4
Lợi Hải TEL: +86 18016419286
WF No. 2 1.940”; 5
commune E-
(Location 28,875 , Thuận Ninh years data
11 Wind mail:info@buimgroup. Gamesa
10 on Thuan (2008-
Bắc org
master 2012); CF
district www.vietnamwind.co
plan) 36.4%
m
Document
1235 PPC
dated
27/3/201
3
approved
for survey
Document
4986/UB
ND dated
29/11/20
13 by PPC
and
Document
408/UBN
D dated
27/1/201
4
For details: approved
TEL: +86 18016419286
Nhơn Hội for survey.
Nhon Hoi Economic Binh Dinh E-
3 Wind 61 mail:info@buimgroup.
WF Zone, Quy Wind
org
Nhơn City www.vietnamwind.co speed: 6.5
m/s at 80
m m, but
the wind
mast at
bottom of
mountain,
so wind
speed will
be higher
on the top
of
mountain
Document
3008
UBND
dated
28/6/201
1 and
Document
4482
Hòa For details: UBND
Thắng TEL: +86 18016419286 dated
Hòa commune Binh E- 29/11/20
4 Thắng WF Wind 100 , Chợ Lầu Thuan mail:info@buimgroup. 16
No. 1.2 town, Bắc org approved
Bình www.vietnamwind.co for
district m survey;
Wind
measure
ment: 01
wind
measure
ment
(100m)on
going

Tiến Document
Thành 3604
Commune For details: UBND
, Phan TEL: +86 18016419286 dated
Thiet City;
Hàm E- 22/7/200
Hàm Binh
5 Cường Wind 48 mail:info@buimgroup. 9
Cường Thuan
WF No. 2 org approved
commune www.vietnamwind.co for
, Hàm m survey;
Thuận No wind
Nam mast
district
Document
1336 PPC
approved
for survey

Document
No.
734/UBN
D dated
03 March
2017
approved
for survey
For details: and study
Tiến TEL: +86 18016419286 the site;
Tien Thành E-
commune Binh the site
6 Thanh WF Wind 50 mail:info@buimgroup.
Thuan included
No. 1 , Phan org
Thiết City www.vietnamwind.co in master
plan (not
m yet
approved
by MoIT
for
province);
Wind
measure
ment: 01
mast;
10o49.3N
108oE;
12/2007-
12/2008
Wind
measure
Cầu Đất For details: ment: 01
village, TEL: +86 18016419286 mast,
Xuân E- 11O53.2'
Cau Dat
9 Wind 28 Trường Lam Dong mail:info@buimgroup. N
WF commune org 108O33.7'
, Đà Lạt www.vietnamwind.co E, 1/2006-
city m 1/2007
(owned
by EVN)
IES
installed 2
additional
140m
height
masts in
6/2016;

Wind
mast
(100m)
installed
by DNV
GL in
7/2012
and
complianc
For details: e with IEC
TEL: +86 18016419286 61400-12
Sekong E- 150 x standard;
10 Monsoon Wind 600 and Laos mail:info@buimgroup. V150 Averaged
Attapeu org 4.0MW wind
www.vietnamwind.co speed of
m 6.3 m/s
extrapolat
ed at
139m
height;

PDA
signed
with Gov
of Laos in
8/2015 to
site
exclusivity
in SeKong
and
Attapeu
provinces;
Wind
measure
ment: 01
For details: mast
Phước Hải Phuoc TEL: +86 18016419286 (60m),
WF Dinh E- 11o25.9'N
(Location commune Ninh
10 Wind 98 mail:info@buimgroup. 108o59.2'
9 on , Thuan Thuan org E;
master Nam www.vietnamwind.co 10/2008-
plan) district m (owned
by
MoIT/WB)
;

02 mast,
Hau Sanh
mast
11O30.2'
N
108O52.4'
For details: E; La Chu
Duyên Hải Phước TEL: +86 18016419286 mast
I - Phước Hữu E- 11O29.8'
Hữu WF commune Ninh
12 Wind 30 mail:info@buimgroup. N
(Location , Ninh Thuan org 108O54.1'
13 master Phước www.vietnamwind.co E,
plan) district m 3/2012-;
Wind
speed: 5.7
m/s at
80m;
operated
by IMPSA
Wind
measure
ment: 01
Hải Ninh mast,
and Gia 17o16.5'N
Ninh For details: 106o49.7'
commune TEL: +86 18016419286 E; 5/2012-
s, Quảng E- (owned
Ninh Quang
15 B&T WF Wind 350 mail:info@buimgroup. by
district; Binh org MOIT/GIZ)
Ngư Thủy www.vietnamwind.co ;
Bắc m preparing
commune new wind
, Lệ Thủy masts (3)
district due to the
land use
changed
Wind
mast
installed,
7.2-7.3
m/s at
105 m
height;

AEP
calculatio
Trường n by DNV-
For details:
Long Hoà GL:
TEL: +86 18016419286
& Dân Mr. Benoit
E-
Tra Vinh Thành Nguyen
16 Wind 144 commune Tra Vinh mail:info@buimgroup.
WF Head of
org
s, Duyên www.vietnamwind.co Section,
Hải Clean
m
district Technolog
y Centre
DNV GL -
Energy
E:
benoit.ng
uyen@dn
vgl.com
M: +65
8223
3274
Wind
mast
installed,
7.2-7.3
m/s at
105 m
height;

AEP
calculatio
n by DNV-
For details:
Trường GL:
TEL: +86 18016419286
Long Hoà Mr. Benoit
E-
Tra Vinh commune Tra Vinh Nguyen
17 Wind 144 mail:info@buimgroup.
WF , Duyên Head of
org
Hải www.vietnamwind.co Section,
district Clean
m Technolog
y Centre
DNV GL -
Energy
E:
benoit.ng
uyen@dn
vgl.com
M: +65
8223
3274
Approved
For details: for survey
TEL: +86 18016419286
Cát Hiệp by PPC
commune Binh Dinh E- based on
19 Cát Hiệp SF Solar 50 mail:info@buimgroup.
, Phù Cát Document
org
district 741 dated
www.vietnamwind.co 28 Feb
m 2017.
For details:
Hồng TEL: +86 18016419286
Phong
Hồng E-
commune Binh
21 Phong 1 Solar 250 mail:info@buimgroup. Y
s, Bắc Thuan
SF org
Bình www.vietnamwind.co
district m
Document
For details: No.
TEL: +86 18016419286 741/UBN
Phan Lâm E- D dated
commune Binh
22 Phan Lam 1 Solar 37 mail:info@buimgroup. 03 March
, Bắc Bình Thuan org 2017
district www.vietnamwind.co approved
m by PPC for
survey;

For details: Document


TEL: +86 18016419286
Phan Lâm 741 PPC
E-
commune Binh dated
23 Phan Lam 2 Solar 49 mail:info@buimgroup.
, Bắc Bình Thuan 3/3/2017
org
district approved
www.vietnamwind.co for survey
m
PPC
For details: approved
TEL: +86 18016419286
Bình An for survey
E-
commune Binh via Doc
24 Bình An No. Solar 50 mail:info@buimgroup.
, Bắc Bình Thuan 729 UBND
org
district dated 3
www.vietnamwind.co March
m 2017

For details: PPC


Hồng TEL: +86 18016419286 approved
Phong
Hồng E- for survey
commune Binh
25 Phong No. Solar 48 mail:info@buimgroup. via Doc
s, Bắc Thuan
5.2 SF org 3382
Bình www.vietnamwind.co dated 31
district m Aug 2017
Document
No.
734/UBN
D dated
03 March
2017
For details: approved
Hồng TEL: +86 18016419286 for survey
Phong
Hồng E- and study
commune Binh
26 Phong No. Solar 48 mail:info@buimgroup. the site;
s, Bắc Thuan
4 SF org the site
Bình www.vietnamwind.co included
district m in master
plan (not
yet
approved
by MoIT
for
province)
For details: PPC
Hồng TEL: +86 18016419286 approved
Phong
Hồng E- for survey
commune Binh
27 Phong No. Solar 40 mail:info@buimgroup. via Doc
s, Bắc Thuan
9 SF org 739 dated
Bình www.vietnamwind.co 03 Mar
district m 2017
For details: Document
Cam An TEL: +86 18016419286 326 PPC
AMI Nam E-
commune Khanh dated
36 Khanh Solar 50 mail:info@buimgroup.
, Can Lâm Hoa 6/6/2017
Hoa SF org
district www.vietnamwind.co approved
for survey
m
Interest
letter was
sent to
province
and
received
the
Document
No.
3658/UB
ND dated
For details:
Hồng 10 Aug
TEL: +86 18016419286
Phong 2016
Hồng E-
commune Binh replied
28 Phong No. Solar 50 mail:info@buimgroup.
s, Bắc Thuan and
7 SF org
Bình www.vietnamwind.co approved
district for survey
m and study
the site;
the site
included
in master
plan (not
yet
approved
by MoIT
for
province)

Document
For details: 4088
Hòa TEL: +86 18016419286 UBND
Hòa Thắng E-
commune Binh dated
29 Thắng No. Solar 50 mail:info@buimgroup.
, Bắc Bình Thuan 16/10/20
3.1 SF org 17
district www.vietnamwind.co approved
m for survey
Document
For details: 4088
Hòa TEL: +86 18016419286 UBND
Hòa Thắng E-
commune Binh dated
30 Thắng No. Solar 50 mail:info@buimgroup.
, Bắc Bình Thuan 16/10/20
3.2 SF org 17
district www.vietnamwind.co approved
m for survey

Document
For details: 4088
Hòa TEL: +86 18016419286 UBND
Hòa Thắng E-
commune Binh dated
31 Thắng No. Solar 50 mail:info@buimgroup.
, Bắc Bình Thuan 16/10/20
3.3 SF org 17
district www.vietnamwind.co approved
m for survey
PPC
For details: approved
TEL: +86 18016419286
Bình An for survey
E-
Bình An commune Binh via Doc
32 Solar 36 mail:info@buimgroup.
No. 2 SF , Bắc Bình Thuan 729 UBND
org
district dated 3
www.vietnamwind.co March
m 2017

Preparing
the Pre-FS
for master
plan
Kroong For details: applicatio
Buk Hạ TEL: +86 18016419286 n by
lake, Ea E- PECC3;
Phê
33 BMT SF Solar 30 commune Dak Lak mail:info@buimgroup. PPC
org approved
, Kroong www.vietnamwind.co for survey
Pắc m via Doc
district 8537
UBND
dated 27
Oct 2017
Signed
MoU with
local
authorty
since
middle of
Tiểu khu 2016;
207, Cư For details: Installed
Kbang TEL: +86 18016419286 capcity:
commune
AES Dak E- 300-
and Tiểu Dak Lak
34 Lak SF Solar 500 mail:info@buimgroup. 500MW
khu 227,
(No. 7) org (50 MW
Cư Mlan www.vietnamwind.co in 1st
commune m phase in
, Ea Súp 2018; 200
district MW in
2019-
2020; 250
MW in
2020-
2021)

Wind
Thạnh Hải measure
For details:
commune ment: GIZ
TEL: +86 18016419286
Thiên Phú , Thanh wind
E-
WF Phú mast;
1 Wind 155 Ben Tre mail:info@buimgroup.
(nearshor district 2011-on-
org
e) (location going; 6.1
www.vietnamwind.co
no. 3 and m/s (3
m
6) year
average)
GEOTECHNICAL DATA

TOPOGRAPHY MAP

TRANSMISSION
INVESTMENT

AGREEMENT

AGREEMENT

AGREEMENT
SCADA/EMS
CERTIFICATE

METERING
(1/500)
MASTER PLAN GRID-CONNECTION

(Y/N)
(Y/N) AGREEMENT

already
renew
project
recently
with new Under
Y Y sharehold approval
er
(HALCOM,
80% of
the
project)

Decision
2574
MOIT Connectin
dated g to the
23/4/201 exisiting
3 110kV
Y approved Ninh
for Ninh Phước
Thuan substation
wind ;
master
plan;
Appraisal
meeting
with MoIT
for
inclusion
into
master
plan;

Phase 1:
100MW
by 2019;
Phase 2:
100 MW
by 2020;
Phase 3:
100 MW
by 2021

Decision
2574
MOIT
dated Signed
23/4/201 agreemen
3 t dated
Y approved Y Y Y Y
18/3/201
for Ninh 4; 6,4 km
Thuan from MV;
wind
master
plan;
Decision
3521
MOIT
dated
22/4/201
4 Connectin
approved g into the
on master IC No. existing
plan; 35202300 Nhon Hoi
0211 110kV
Y Y
PPC dated substation
Request 02/6/201 , 500m
670 dated 4 from the
28/2/201 project
4 to MOIT site
for
approval
into
master
plan.
17
approved
on master
plan;

18 Oct:
MoIT
reported New
PM for 22/110kV
approval substation
into ;
master 2x63MVA;
plant; operating
MoIT in 2020-
requested 2022
PM via
Doc. New
Decision
9257/BCT 110kV
1034
dated double
UBND
Y 05/10/20 lines
dated
17; connectin
17/4/201 g into the
Approved 7 on IC existing
for master 110kV
plan in Mũi Né -
08/2017; Lương
request Sơn; ACSR
2035/TT- 240mm2;
UNBD 5km;
dated 15 operating
June 2017 2020-
to MoIT 2022
for
inclusion
into
master
plan;
approved
for

Decision
4715
MOIT
dated
16/8/201
2 Decision
approved 2202
the UBND
Y provincial dated
wind 2/8/2017
master approved
plan for IC
the period
2011-
2020, a
vision to
2030.
Approved
in 2/2018;

PPC
request Document
3818/TT- 4094
UBND UBND
Y dated 29 dated
Sep 2017
to MoIT 25/8/200
8
for
including
into
master
plan;
Investmen
t
Certificate
No.
42121000
467 dated
Decision 11/5/200
7441 9 and
MOIT revised on
dated 20/8/201
21/8/201 2;
Y 4 Y Y Y
approved Document
for master 8125 PPC
plan (1st dated
phase: 30/11/20
28.8 MW) 17 not
approval
for
extension
of project
implemen
tation;
New
230kV
grid line
connectin
g into Ban
Lak 25
substation
, Pakse
district;
Phase 1: 500kV
250MW transmissi
in on from
2018/201 Pakse to
9 Ubon
Ratchatha
Phase 2: ni 3
350MW substation
in ; the
2020/202 ASEAN
1 Power
Grid
(Thailand,
Laos,
Vietnam);
50km
from Da
Nang,
Vietnam
Decision
2574
MOIT
dated
23/4/201
3
Y approved Y
for Ninh
Thuan
wind
master
plan;

Decision Approved
2574 grid-
MOIT connectio
dated n: transit
23/4/201 to the
3
Y approved Y Y Y Y existing Y
110kV
for Ninh Tháp
Thuan Chàm -
wind Ninh
master Phước;
plan;
25 Sep
2017:
Signed
the
cooperati
on Approved
contract grid-
with connectio
Netherlan n: the
Decision ds Climate busbar
Investor
1944 110kV,
One (60%
MoIT Duyên Trà
shares);
dated 110kV
4/3/2015 Investmen substation
Y Y
approved t ; 16km;
for Tra ACSR240
Vinh wind Certificate
No.
master New
58204300
plan; 22/110kV
0027 substation
dated ,
12/3/201 25+40MV
5 issused A
by Trà
Vinh
Economic
Zone
Managem
ent Unit
Decision
1944
MoIT
dated PPC
4/3/2015 approved
Y approved IC since
for Tra May 2016
Vinh wind
master
plan;
Approved
grid-
connectio
n: the
busbar
110kV,
Phù Cát
Approved 100kV
for master substation
plan via ;
Decision
Y Y Y Y Y
4321/QĐ- Connectin
MOIT g to the
dated 16 busbar
Nov 2017. 110kV at
Phù Cát
110kV
substation
,
ACSR185,
6km
Phan
Thiết,
ACSR
Document 2x330,
155 PM 1.5km;
approved
for master Document
plan VII 2661 PPC
dated dated
31/8/201 29/6/201
8; Decision 8
943 and approved
18 Oct: 944 dated on
MoIT 12 April tranmissio
reported 2018 n
PM for approved direction
approval on IC
into New
master Principal Y 22/220kV Approved
Y Y Y O
plant; IC substation
MoIT approved ; 63 +
requested at 2x125
PM via Decision MVA;
Doc. No. 2018-
9257/BCT 1036/UB 2019
dated ND dated
05/10/20 17 April New
17; 2017 220kV
double
PPC lines
Request connectin
2236 g into the
dated 15 existing
June 220kV
2017; Vĩnh Tân -
Phan
Thiết,
ACSR2x33
Decision
4272
MoIT
dated
14/11/20 Approved
17 grid-
approved Decision connectio
for master 223 PPC n: transit
plan; dated to the
Y Request 19/1/201 Y Y Y Y existing Approved Y
8 110kV Đại
for master approved Ninh -
plan
based on IC; Phan Rí;
request 2x25MVA
2338/TT-
UBND
dated 26
June 2017
to MoIT;

connectin
g into the
110kV
Decision Sông Bình
Decision 1795 PPC - Đại
1959 dated Ninh; TBA
MOIT
Y 13/7/201 Y Y Y 22/110kV
dated 8 1x63 MVA
6/6/2018 approved substation
approved IC ; investing
the
second
line
Decision
1960
MOIT 110kV
dated double-
6/6/2018 lines
approved Decision (10km)
master 1794 PPC connectin
plan; dated g into the
Y 13/7/201 Y Y Y grid
PPC
requested 8 110kV Đại
MoIT for approved Ninh -
IC Phan Rí;
master TBA
plan via 22/110kV;
Doc 4127 1x63MVA
UBND
dated 17
Oct 2017;

Decision
480 MOIT 110kV
dated double-
06/2/201 lines
8 (07km)
approved connectin
for master g into the
plan; 110kV
Y Y Y Y Lương
PPC Sơn -
requested Phan
MoIT for Thiết; TBA
master 22/110kV
plan 2x25MVA
dated 03 substation
Oct 2017;
Decision
587 MOIT
dated
13/2/201 Decision
1665 PPC
8
approved dated
for master 29/6/201
8
plan; Connectin
approved g to the
IC
PPC busbar
Y request Document Y Y Y 110kV of
3818/TT- 151 Ha Do Hồng
UBND Phong No.
dated 29 Energy 9 plant
Sep 2017 dated
to MoIT 13/6/291
8
for
including requested
for IC
into
master
plan;
dated
9/8/2018
request
the PM
for
approval
into
master
plan;

Already
appraisal
meeting
with MoIT
for 110kV
approval single-line
(05km)
PPC connectin
requested g into the
N to MoIT 110kV
for
approved Mũi Né
substation
in master ;
plan 2x25MVA
based on
Document
3945
UBND
dated 06
Oct 2017;
subtmited
applicatio
n for
master
plan in
Oct 2017;
included
into draft
provincial
Approved
grid-
connectio
n: the
busbar
110kV,
Cam Ranh
110kV
substation
;
Agreemen
t signed
4/1/2018
Decision Decision Document Agreemen
3645 2995 A new 11146 t 2170
MOIT PPCdated 22/110kV PPC dated EPTC
Y dated 10 Oct Y Y Substatio 24/11/20 dated
22/9/201 2017
7 approved n, 40 17 18/6/201
MVA; line approved 8 signed
approved IC ACSR
240mm,
5.6 km

110kV
line to the
busbar of
Cam Ranh
110kV
Substatio
n, 2x25
MVA, 5.8
km
Already
appraisal
meeting 220kV
with double-
MOIT for lines
approval AC330
(1.5km)
Province connectin
requested g into the
N MoIT for N Y Y existing
master
plan 220kV
Vĩnh Tân -
based on Phan
Official Thiết; TBA
Document 22/220kV;
4063 1x63MVA
UBND
dated 13
Oct 2017;

Already 110kV
appraisal double-
meeting lines
with (07km)
MOIT for connectin
approval g into the
110kV
PPC Hồng
N Request Phong -
5193 Bắc Bình;
dated TBA
22/12/20 22/110kV;
17 to (2x63 +
MOIT for 1x40)
approval MVA
of master substation
plan s
Already 110kV
appraisal double-
meeting lines
with (07km)
MOIT for connectin
approval g into the
110kV
PPC Hồng
N Request Phong -
5192 Bắc Bình;
dated TBA
22/12/20 22/110kV;
17 to (2x63 +
MOIT for 1x40)
approval MVA
of master substation
plan s

Already 110kV
appraisal double-
meeting lines
with (07km)
MOIT for connectin
approval g into the
110kV
PPC Hồng
N Request Phong -
5191 Bắc Bình;
dated TBA
22/12/20 22/110kV;
17 to (2x63 +
MOIT for 1x40)
approval MVA
of master substation
plan s
Waiting
for the
appraisal
meeting
with MoIT
Adding a
PPC new
requested 40MVA
N MoIT for transform
master er at Binh
plan via An Solar
Doc 1273
UBND
dated
3/4/
2018;

Decision A new
1469 22/110 kV
MoIT substation
dated ,
2/5/2018 1x40MVA;
approved; A new
110kV
PPC grid
Y requested N Y Y (0.1km,
MoIT for AC185)
master connectin
plan via g into the
Document existing
10461 110kV Ea
UBND Kar -
dated 27 Krong Pắc
Dec 2017
Waiting
for
master
N plan,
approved
princial IC
by MoIT;

Decision
800 PPC
dated
4/4/2017
approved
Decision IC for
wind
2497 Connectin
location
MoIT g to the
No. 6;
dated 110kV
18/3/201 onshore Thạnh
Y 5 Phú
approved Decision substation
the Ben 2212 PPC ;
dated
Tre wind 18/9/201 ACSR185,
master 14.4 km
7
plan; approved
IC for
wind
location
No. 3;
nearshore
PROTECTIVE RELAY
AGREEMENT

FIRE PREVENTION
AGREEMENT

EIA (Y/N)

by
FS STUDY/ BASIC
DESIGN

Fitchner
Prepared

1/500 SCALE
DETAILED
CONSTRUCTION
PLANNING

TECHNICAL DESIGN

MINING CLEARANCE

LANDUSE (Ha)
140

CONSTRUCTION
PERMIT

FINANCING/
INVESTMENT COST
(Billion VND)
9,000

Approved 523 for


dated
Y Y 22/7/201 Y Y Y survey (17 1,350
for use)
4
700

Decision
305 QD-
UBND
dated
18/2/201
1 on
inclusion
the
project
into
landuse
master
plan of
Nhon Hoi
Economic
Zone
1170

Overlappi
ng with
Titan
reserved
areas

605

Overlappi
ng with
Titan
reserved
areas
17 by PPC
on
requestin
g PM for
approved
the
project
overlappi
ng with
Titan
reserved
areas
(320ha);

measurin
g the land
use and
applicatio
n for
including
into
master
plan by
consulting
firm (long
wait for
approval
from
MoIT for
provincial
solar
master
plan); PPC
confirmed
on
landuse
to MoIT's
request
Document
1780 DoIT
dated
7/8/2018
request
relevant
departme
nts to
comment
on Basic 57 million
350
design; USD

FS
prepared
by ASIA
Constructi
on
Consultin
g
Company;
Having
Prepared the
by DNV premilinar
GL; ty support
letters for
Transport 68,000 debt
rounte (use 400- financing
from 625 ha) about
Laemchab 1.05
ang port billion
to
Monsoon USD from
ADB and
Site; IFC
980 for
survey (49
for use)

Overlappi
ng with
Titan
mining by
Vinacomi
n JSC of
Ninh
Thuan
and
Quang 296
Thuận
One-
member
Ltd. Co;
Document
No.
2271/VPC
P-KTN
dated Jan.
10, 2009
(Governm
ent
Office)

285.7 for
survey
(9.5 ha
including
Y Y Y Y Y Y 9.0 ha of 1,260
rice crop
and 0.5
ha of
others)
2,350 8,000
1,200 2800
offshore
and 1.9 Equity
ha financial
onshore
Y close
process
Intertidal by 4/10 -
water 15/11/20
depth 18
~1.5-7m
2,400
offshore
and 2.5ha
onshore;
4,952
Intertidal
water
depth
~1.5-7m
83 ha
350

Included
in landuse
Decision plan of
2026 and Bac Binh
2027 PPC district for
dated 6,608
2018
07/8/201
8 Overlappi
approved ng with
Titan
reserved
areas
Document
1856 PPC
Decision dated
1061 11/5/201
dated 8
Y Y Y 26/4/201 Approved 47 approved 1,124
8 PPC on
approved detailed
EIA constructi
on plan;

59 1,202
59 1,220

65
FS study
done by Overlappi
German ng with 1,339
ILF Titan
consulting reserved
areas
8 DPM
directs
MONRE
to clarigy
overlappi
ng Titan;

Overlappi
ng with
Titan
reserved
areas

Document
1282
UBND
dated
03/4/201
8 by PPC 1,176
on
requestin
g PM for
approved
the
project
overlappi
ng with
Titan
master
plan;

Document
4654
UBND
dated
16/11/20
17 by PPC
on
50
(bought
almost
land)

Document
2471 PPC
dated
20/6/201 970
8 to
MONRE
on Titan

Overlappi
ng with
Titan
reserved
areas
Constructi
66.6 on Permit
Decision
Landuse No. 1354
616 PPC issued by
Document dated compensa Departme
425 MOIT 02/3/201 tion
Agreemen Agreemen nt of
dated 425 8 under
t 147 EVN t 11/2018 Under CJR Transport
approved
dated Dipatchin Y considera dated preparatio going dated 1,246
09/3/201 for the
04/1/201 g Center tion n 28/5/201
8 signed signed 8 plant in Approved 8
detailed landuse approved
approved constructi plan for for access
on 2018 (128 road from
planning families Lập ĐỊnh -
impacted) Suối Môn
MONRE -
GDGM
dated
7/6/2018
approved
for
implemen
ting
project
overlappi
ng Titan;

Document
1668 PPC
dated
27/4/201
8 to
MoNRE
on
PECC5 titanium 1,148
preparing issue;
Document
3684 Gov.
Office
dated
20/4/201
8 directs
MONRE
and
Province
to solve
the
overlappi
ng Titan;

Document
1326 PPC
request

63

Overlappi
ng with 1,157
Titan
reserved
areas
63

Overlappi
ng with 1,178
Titan
reserved
areas

64

Overlappi
ng with 1,188
Titan
reserved
areas
36 715

PECC3 37 696
preparing
500

340

land area:
340 ha on 3,399
land and
3,600 ha
over sea
PPA (Y/N)
25 years
of
concessio
n
PPA
signed
dated
7/2018
Under approval
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Approved;

Document 1188 SCT-


QLNL dated 17
For details: PPC approved for
survey via Document August 2017 and
TEL: +86 18016419286
1 Thuận Nam No. 13 SFSolar 50 Ninh Thuan Document 3447 Y Y
E-mail:info@buimgroup.org 3193 UBND dated 04 UBND dated 23
www.vietnamwind.com August 2017 August 2017
requested MoIT for
approving master
plan;

Approved in 2/2018
For details: PPC Request No.
TEL: +86 18016419286
2 Vinh Hao No. 4 SF Solar 50 Binh Thuan Approved 3562 dated Y Y Y
E-mail:info@buimgroup.org 14/9/2017 to MoIT
www.vietnamwind.com on including into
master plan

Document No.
734/UBND dated 03 Approved in 2/2018;
March 2017
For details: approved for survey PPC request
TEL: +86 18016419286
3 Hong Phong No. 4 SF Solar 48 Binh Thuan and study the site; 3818/TT-UBND dated Y Y Y
E-mail:info@buimgroup.org the site included in 29 Sep 2017 to MoIT
www.vietnamwind.com master plan (not yet for including into
approved by MoIT master plan;
for province)
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

01 dismounted mast
at the site (60m) and
01 mast nearby the
For details: project site (80m) in Approved for 20MW
TEL: +86 18016419286
4 Tien Thanh WF Wind 50 Binh Thuan operation by Ba Ria in the first phase;
E-mail:info@buimgroup.org Thermal Power
www.vietnamwind.com Company (investing
the wind project
nearby);

Approved for
350MWp in the PDP
VII (350MW in 2020;
1650MW in 2020-
For details: 2030);
TEL: +86 18016419286
5 Xuan Cau SF Solar 350 Tay Ninh E-mail:info@buimgroup.org province sent the
www.vietnamwind.com request for including
into master plan to
MoIT in Sep 2017;
approved for survey;

Approved via
Decision 4272 dated
14/11/2017 by MoIT
For details:
TEL: +86 18016419286
6 Phan Lam SF Solar 36.72 Binh Thuan Approved PPC Request No. Y Y Y
E-mail:info@buimgroup.org 3353 dated
www.vietnamwind.com 30/8/2017 to MoIT
for including master
plan;

Waiting for approval


For details: PPC approved for
TEL: +86 18016419286 survey via Doc 729 PPC requested MoIT
7 Bình An SF Solar 50 Binh Thuan Y Y
E-mail:info@buimgroup.org UBND dated 3 March for master plan via
www.vietnamwind.com 2017 Doc 4127 UBND
dated 17 Oct 2017
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

For details: Approved for survey Approved for master


TEL: +86 18016419286 by PPC based on plan via Decision
8 Cát Hiệp SF Solar 50 Binh Dinh Y Y
E-mail:info@buimgroup.org Document 741 dated 4321/QĐ-MOIT
www.vietnamwind.com 28 Feb 2017. dated 16 Nov 2017.

Wind measurement:
For details: EVN 60m mast, LAT
TEL: +86 18016419286 11044’17.040” - LON Approved
9 Lợi Hải No.2 WF Wind 30 Ninh Thuan Approved Premilinary Geo Y
E-mail:info@buimgroup.org 109003’41.940”; 5
www.vietnamwind.com years data (2008-
2012); CF 36.4%
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Waiting
For details: PPC approved for
TEL: +86 18016419286
10 Hồng Phong No.5 SF Solar 48 Binh Thuan survey via Doc 3382 PPC requested MoIT Y Y
E-mail:info@buimgroup.org dated 31 Aug 2017 for master plan
www.vietnamwind.com dated 03 Oct 2017;

Waiting for approval


For details: PPC approved for PPC Request No.
TEL: +86 18016419286 survey via Doc 8537
11 BMT SF Solar 30 Dak Lak 10461 dated Y
E-mail:info@buimgroup.org UBND dated 27 Oct 27/12/2017 to MoIT
www.vietnamwind.com 2017 for approval into
master plan.
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Interest letter was


sent to province and
received the Waiting
Document No.
For details: 3658/UBND dated Province requested
12 Hong Phong No.7.1 Solar TEL: +86 18016419286 10 Aug 2016 replied MoIT for master plan
50 Binh Thuan
SF E-mail:info@buimgroup.org and approved for based on Official
www.vietnamwind.com survey and study the Document 4063
site; the site included UBND dated 13 Oct
in master plan (not 2017;
yet approved by
MoIT for province)

Interest letter was


sent to province and
received the
Document No.
For details: 3658/UBND dated
13 Hong Phong TEL: +86 18016419286 10 Aug 2016 replied
Solar 20 Binh Thuan
No.7.2SF E-mail:info@buimgroup.org and approved for
www.vietnamwind.com survey and study the
site; the site included
in master plan (not
yet approved by
MoIT for province)
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Full geotechnical
For details: Anouncement No Decsion 2953 MoIT survey conducted in
TEL: +86 18016419286 326/TB UBND dated dated 31/7/2017 3/2018;
14 AMI Khanh Hoa SF Solar 50 Khanh Hoa approved for master Y Y
E-mail:info@buimgroup.org 06/6/2017 approved
www.vietnamwind.com for survey. plan. Pullout test is
preparing
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Anouncement No
533/TB-TU dated
4/8/2017 approved
for survey.

Wind measurement: Waiting


For details: 01 mast (80m) in
TEL: +86 18016419286
15 B&T WF Wind 200 Quang Binh operation but 2-4 km Submitted the
E-mail:info@buimgroup.org far from the project application to MoIT
www.vietnamwind.com site; CJR already for approval
helped to make the
configuration for a
new wind
measurement
campaign at site

Decsion 01/QD-
For details: Document No. Decision 4550/QD UBND dated
16 Thuận Nam SF No. TEL: +86 18016419286 3507/UBND dated dated 7/12/2017 by
Solar 49 Ninh Thuan 2/1/2018 by PPC Y Y
19 E-mail:info@buimgroup.org 25/8/2017 approved MoIT approved for approved on the
www.vietnamwind.com for survey master plan. principal IC
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

For details:
TEL: +86 18016419286
17 Van Ninh SF Solar 100 Khanh Hoa Approved Under consideration Approved since 2016 Y Y
E-mail:info@buimgroup.org
www.vietnamwind.com

Announcement
No.583/TB-UBND
For details: dated 05/9/2017 of
TEL: +86 18016419286 Khanh Hoa PCC on Approved for master
18 Cam Lam 1 SF Solar 50 Khanh Hoa Y Y
E-mail:info@buimgroup.org the location study of plan in 2/2018
www.vietnamwind.com KN Cam Lam Solar
Power Plant Project.

For details:
TEL: +86 18016419286 Approved for survey
19 Cam Lam 2 SF Solar 50 Khanh Hoa Y Y
E-mail:info@buimgroup.org by PPC
www.vietnamwind.com
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Approved for survey


For details: by PPC;
TEL: +86 18016419286 Approved for master Approved for
20 Thien Phu WF Wind 15 Ben Tre E-mail:info@buimgroup.org Wind measurement: plan principal IC in 7/2017
www.vietnamwind.com GIZ wind mast; 2011-
on-going;

Waiting
For details: Approved for survey
TEL: +86 18016419286 by PPC; Signed MoU
21 AES SF Solar 50 Dak Lak Submitted the Y
E-mail:info@buimgroup.org with PPC since June application to MoIT
www.vietnamwind.com 2016 for approval

Decision 2202/UBND
dated 02/8/2017 by
PPC on principal IC;
For details: Document Decision 4715/QD-
22 Hàm Cường No.2 TEL: +86 18016419286 3604/UBND dated MOIT dated Developer requested
Wind 48 Binh Thuan Y
WF E-mail:info@buimgroup.org 22/7/2009 approved 16/8/2012 approved PPC for the
www.vietnamwind.com for survey for master plan. investment project
and extending the
schedule dated
17/7/2017

Approved for survey;


Gov Office
World Bank/MOIT
For details: Document
wind mast (60m) at IC No. 43121000159
TEL: +86 18016419286 2271/VPCP dated
23 Phước Hải WF Wind 97.5 Ninh Thuan the site; 11o25.9'N 10/4/2009 approved dated 09/12/2011 by
E-mail:info@buimgroup.org 108o59.2'E; Ninh Thuan PPC;
www.vietnamwind.com into PDP VI master
10/2008- (owned by plan.
MoIT/WB); 6.3 m/s
on 3-year average
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

For details: Approved for survey


TEL: +86 18016419286 via Document Approved into
24 Phuoc Huu SF Solar 50 Ninh Thuan Approved Y Y
E-mail:info@buimgroup.org 153/UBND dated master plan
www.vietnamwind.com 16/1/2017 by PPC

For details: Approved for survey Waiting Decsion 1998/QD-


TEL: +86 18016419286 via Document 219 UBND dated
25 Song Giang SF Solar 60 Khanh Hoa Y
E-mail:info@buimgroup.org UBND dated Submitted the 12/7/2016 approved
www.vietnamwind.com 15/3/2016 application to MoIT on IC

For details:
TEL: +86 18016419286 Approved for survey Approved for master Approved for
26 Hong Phong No. 1 SF Solar 250 Binh Thuan Y
E-mail:info@buimgroup.org plan in 2/2018 principal IC in 7/2017
www.vietnamwind.com

For details:
TEL: +86 18016419286
27 Kieu Thi No. 1 SF Solar 50 Khanh Hoa Approved for survey
E-mail:info@buimgroup.org
www.vietnamwind.com
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Waiting
For details:
TEL: +86 18016419286
28 Kieu Thi No. 2 SF Solar 100 Binh Thuan Approved for survey Submitted the
E-mail:info@buimgroup.org application to MoIT
www.vietnamwind.com for approval

Document
4986/UBND dated
29/11/2013 by PPC
and Document Decision 3521 MOIT
408/UBND dated dated 22/4/2014
27/1/2014 approved approved on master
For details: for survey. plan; IC No.
TEL: +86 18016419286
29 Nhon Hoi WF Wind 61.1 Binh Dinh 352023000211 dated Y
E-mail:info@buimgroup.org Wind speed: 6.5 m/s PPC Request 670 02/6/2014
www.vietnamwind.com at 80 m, but the dated 28/2/2014 to
wind mast at bottom MOIT for approval
of mountain, so wind into master plan.
speed will be higher
on the top of
mountain

For details:
TEL: +86 18016419286
30 Monsoon WF Wind 800 Laos Approved Approved Y Y
E-mail:info@buimgroup.org
www.vietnamwind.com
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

For details:
TEL: +86 18016419286
31 Tra Vinh WF Wind 48 Tra Vinh Approved Approved Approved in 2017 Y Y
E-mail:info@buimgroup.org
www.vietnamwind.com
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Document 1818
UBND dated
10/9/2001 approved
for survey
For details:
TEL: +86 18016419286 Wind mast: 01 mast Approved IC No. 35221000066 Y
32 Phuong Mai 1 WF Wind 30 Binh Dinh Y
E-mail:info@buimgroup.org installed since 2013 dated 26/10/2009
www.vietnamwind.com and having 01 year
data but missing
data in Oct, Nov and
Dec due to be failed
sensors

Wind mast: 01 mast


For details: installed since 2013
TEL: +86 18016419286 by Phuong Mai 1 and Y IC No. 35321000013 Y
33 Phuong Mai 3 WF Wind 21 Binh Dinh Y
E-mail:info@buimgroup.org having 01 year data dated 24/8/2007
www.vietnamwind.com but missing data in
Oct, Nov and Dec
due to be failed
sensors

For details: Y
TEL: +86 18016419286
34 Cau Dat WF Wind 34 Lam Dong Y Y
E-mail:info@buimgroup.org Wind mast in
www.vietnamwind.com operation
Approval of survey Approval of Master Investment Geotechnical data Topography Map
No. Project Type MW Location Developer (Pre-FS) Plan Certificate (y/n) (1/500)

Document 3874
UBND dated
20/8/2013 approved
for survey by PPC
For details: Decision 2395 dated
TEL: +86 18016419286 Wind speed: 6.4 m/s 10/6/2015 by MOIT Just re-new in
35 Hanbaram WF Wind 117.3 Ninh Thuan E-mail:info@buimgroup.org at 80m using a wind approved on master 2/2018
www.vietnamwind.com mast reference plan
(Trung Nam wind
project) nearby; their
own wind campaign
since last April 2017

For details: Decision 2574/QD Decsion 214/QD


TEL: +86 18016419286 dated 23/4/2013 by dated 13/6/2016 by
36 Phuoc Huu WF Wind 30 Ninh Thuan Y Y
E-mail:info@buimgroup.org MOIT for master PPC
www.vietnamwind.com plan
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

73 ha;
Explaination on
landuse in reserved
forest via Document
518 PPC requested
DoIT
Y Y Under preperation Y
Resolution 69 NQ-
HDND dated 11 Dec
2017 included the
project into landuse
plans for 2018

110kV single-line 60 ha on salted field


(01km) connecting in the 1st phase;
into the 110kV
Y substation of Ho Under preperation 156.5 ha on salted
Phong Solar No.9; field in the 2nd
TBA 22/110kV phase
2x25MVA substation;

Document 4654
UBND dated
16/11/2017 by PPC
on requesting PM for
approved the project
overlapping with
Titan master plan;

measuring the land


use and application
for including into
Y Y Y Y Y Waiting for approval master plan by
consulting firm (long
wait for approval
from MoIT for
provincial solar
master plan); PPC
confirmed on
landuse to MoIT's
request based on
Document 4020
dated 11 Oct 2017;
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

110kV single-line
(01km) connecting
into the 110kV
substation of Hong 320ha for survey
Phong Solar No.9;
TBA 22/110kV
2x25MVA substation

Connecting into the


220kV through the
project site which 500ha (most part of
was grounbreaking a area is semi-
few weeks ago; After submerged)
2020, connecting
into the 500kV

A new 22/110kV
substaion build,
1x40MVA; new
110kV double-lines Prepared FS study by Signed the land
Power Engineering
Y (2x0.7km), Y Y Y Y contract with the
Consulting Company
AC240mm2 owner
No. 3 (EVN PECC3)
connecting into the
existing 110kV Đại
Ninh - Sông Bình;

110kV double-lines
(17km) connecting Prepared FS study by
into the grid 110kV Already made the
Y the private PCC5
Đại Ninh - Phan Rí; payment for land
Consulting firm
TBA 22/110kV;
1x63MVA
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

Y 83 ha

Y (need to approve
Y Y Y Y Y Y Y for adjustment when 523 ha (Survey) Y
selecting the WT)
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

110kV double-lines
(07km) connecting FS study done by
into the 110kV 65 ha (bought almost
Y German ILF
Lương Sơn - Phan the landuse)
consulting
Thiết; TBA 22/110kV
2x25MVA substation

Connecting directly CJR will join with


into the existing PECC3 for FS study;
110kV line through CJR will be
the site; or other responsible for
alternative: energy production 37 ha
connecting to the estimation and
110kV substations designing the layout;
which is 13km far
away Signed contract with
EVN PECC3 to do;
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

CJR will join with


PECC3 for FS study;
CJR will be
responsible for
energy production 50 ha/86ha
estimation and
designing the layout;

Signed contract with


EVN PECC3 to do;

CJR will join with


PECC3 for FS study;
CJR will be
responsible for
energy production 26 ha/86ha
estimation and
designing the layout;

Signed contract with


EVN PECC3 to do;
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

Approved by MoI in Preparing Technical


Y (CJR doing a depth Design for approval;
Feb 2018
study as requested Y 65 ha under land
Y Y Y Y Y
for 10, 25, 50, 100 MoIT approved for clearance
CJR supported in FS basic design in
years) study 2/2018
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

2350 ha for survey

Y Y Y Y Y Y Y Y Y 73.5 ha (bought)
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

194 ha area
Connecting into the FS study done by impacting to many
existing 110kV ACSR Vietnam Applied
Y Basic design households and
300 Ninh Phuoc - Technical Co. Ltd revoked project by
Phan Ri, 4km (VATEC) consulting local Gov. in 3/2018

70 ha
FS study done by
Approved for grid- Vietnam Applied Included in landuse
Y connection (12km Basic design
Technical Co. Ltd for 2018 via
transmission line) (VATEC) consulting Resolution 69 dated
11 Dec 2017;

FS study done by
Vietnam Applied
Y Basic design 75 ha
Technical Co. Ltd
(VATEC) consulting
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

340 ha overland and


3,600 ha overwater

500ha

620 ha for survey


(plan to use 17ha)

980 ha for survey (50


ha for use);

overlapping with
Titan mining by
Vinacomin JSC of
Ninh Thuan and
Quang Thuận One-
member Ltd. Co;
Document No.
2271/VPCP-KTN
dated Jan. 10, 2009
(Government Office)
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

Y Y Y Y Y Y Y Y Y 100 ha

70 ha

PPC Document 9331


Y Under preperation dated 18/11/2016
directs DONRE/DOIT
on landuse clearance

Y Under preperation 350 ha

70 ha
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

120 ha

1228 ha survey;

Connecting into the Decision 305 QD-


existing Nhon Hoi UBND dated
110kV substation, 18/2/2011 on
500m from the inclusion the project
project site into landuse master
plan of Nhon Hoi
Economic Zone

Y (conducted by
Under preparation Vestas)
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

Y Under preperation Y
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

Agreement signed Decision 358/QD- 141.8 ha


dated 24/2/2012. Document 302/TD- Decision 398/QD- CTUBND dated Decision 50/GPXD
BQL dated 25/2/2011 by PPC 50-year Contract for
PCCC dated dated 26/8/2011 by
Document 1775 27/7/2010 by Binh 21/3/2011 by approved for Land Lease No. 1248
dated 17/11/2010 by Y Y Y Y Management Board
Dinh Public Security of Binh Dinh Board
Management Detailed dated 11/8/2011 by of Binh Dinh
Binh Dinh Power Construction Master Management Board
Department Economic Zone
Company approved Economic Zone Plan with 1/500 of Binh Dinh
for grid-connection scale Economic Zone

Decision 1591/QD-
BQL dated
28/12/2008 by Nhon 140 ha
Hoi Economical Zone
Agreement signed Management Board
Y Y Y Y Y Y 50-year Contract for Y
dated 6/2/2013 approved for landlease dated
Detailed 22/3/2011
Construction Master
Plan with 1/500
scale

Y Y Y Y Y Y Y
Grid Connection Metering Agreement SCADA/EMS Protective Relay Fire Preventation & EIA (y/n) Approval of FS Study Approval of
Hydrologic Study Land Status (ha) Building Permit (y/n)
Agreement Agreement Agreement Fighting Agreement Technical Design

Connecting into
110kV Thap Cham Under preperation 850.13 ha
substation

10.8ha (9.1 ha rice


field)
Agreement No. Land clearance in
10/2016/EVN dated progress;
25/10/2016; Y Y Y Y Y Y Y Already included into
110kV Thap Cham - landuse plan for
Ninh Phuoc line 2018 via Resolution
69 dated 11 Dec
2017
Financing Status PPA (y/n)
Financing Status PPA (y/n)
Financing Status PPA (y/n)

Gamesa wants to
bring their financial Y
company into this
project
Financing Status PPA (y/n)

Total investment
cost: 696 billion VND
Financing Status PPA (y/n)
Financing Status PPA (y/n)

In negotiation with
the banks

Joint venture with AC


Energy/ Ayala Group
(Phillipines)
Financing Status PPA (y/n)

Developer has a big


debt in real estate
and hydropower;
they are now selling
and a Singaporean
Equis developer is
negotiating

Total invesment cost:


2,400 billion VND
Financing Status PPA (y/n)

Total invesment cost:


2,400 billion VND
Financing Status PPA (y/n)

Total investment:
699 billion VND
Financing Status PPA (y/n)

Investment cost:
1,550 billion VND

Document
4024/EVN dated
23/9/2016
approved the
pricipal
Agreement on
buying the
electricity
Financing Status PPA (y/n)
Financing Status PPA (y/n)

Hollan Climate
Investor One joint
venture with Korean
Woojin developer
Financing Status PPA (y/n)

Difficulty in financial PPA No.


11/2012/HD
arrangement signed 11/2012

PPA No.
173/2012/HD
signed
17/1/2012

Difficulty in financial
arrangement
Financing Status PPA (y/n)

Decision
2830/EVN dated
Difficulty in financial 12/7/2016
approved on the
arrangement principal
Agreement to
buy electricity
TỔNG HỢP CÁC DỰ ÁN ĐIỆN

Ký NMĐG Bạc Liêu Phase


Thông số chính/Main
STT hiệu/Sym Đơn vị/Unit 1/Bac Lieu Power Plant
specification bol Phase 1

Công ty TNHH Xây dựng -


Thương mại và Du lịch
1 Chủ đầu tư/Investor Công Lý/ Construction -
Trade and Tourism Co. Ltd.

Địa điểm xây dựng/Building Tỉnh Bạc Liêu/Bac Lieu


2 site Province
3 Loại dự án/Project type Near-shore
4 Loại tuabin/Turbine type Hộp số/Gear

Nhà cung cấp tuabin/Turbine


5 GE
supplier
Đường kính cánh/Wing
6 m 80
diameter
7 Chiều cao cột/Column height m 82
8 Số tuabin/Number of turbines 62
9 Công suất/Capacity Nlm MWp 99.2
Công xuất 1 tuabin/Capacity of
10 Ntb MWp 1.6
1 turbine
Điện lượng năm/Electricity E0
11 106 Kwh 320
amount year
Diện tích đất khảo sát/Land
12 ha 1300
area surveyed
Diện tích đất xây dựng/Area of
13 ha
construction land
Tổng mức đầu tư/total 103
14 5217
investment triệu/million
15 Năm xây dựng/Year Built 9/9/2010
Năm hoàn thành/Year
16 2013
completed
103triệu(million
17 Suất đầu tư/Investment rate 52.59
)/MWp
18 Thời gian thi công (tháng)
19 TVTK
20 TVTT
21 TVGS
TỔNG HỢP CÁC DỰ ÁN ĐIỆN GIÓ Ở VIỆT NAM/GENERAL OF WIND POWER PROJECTS IN VIETNAM

NMĐG Tuy NMĐG Phú NMĐG Hướng Linh NMĐG Đầm Nại NMĐG Đầm Nại
Phong/Tuy Phong Lạc/Phu Lac 2/Huong Linh 2 Power GĐ1/Dam Nai Power GĐ2/Dam Nai Power
Thermal Power Thermal Power Plant Plant Phase 1 Plant Phase 2
Plant Plant

Công ty Cổ phần Công ty Cổ phần


Năng lượng Tái tạo Phong Điện Thuận Công ty Cổ phần Tân Vòng tròn xanh PTELtd&TSV Đầu tư và phát
Hoàn Cầu/Tan Hoan
(REVN)/Renewable Bình/Thuan Binh triển/blue circle PTE Ltd & TSV Investment
Cau Joint Stock
Energy Joint Stock Wind Power Joint and development
Company
Company Stock Company

Tỉnh Bình Thuận Tỉnh Bình Thuận Tỉnh Quảng Trị Tỉnh Ninh Thuận
On-shore On-shore On-shore On-shore On-shore
Hộp số/Gear Hộp số/Gear Hộp số/Gear Hộp số/Gear Hộp số/Gear

Fuhrlaender Vestas Vestas Gamesa

77 98 114 114
85 95
20 12 15 2 12
30 24 30 6 30
1.5 2 2 2.625 2.625

85 59 122.34 11.2 110

1500 400

9.4

820 1100 1400 264.5 1380

2008 2015 2015 2017


2011 2016 2017 2017 2018

27.33 45.83 46.67 44.08 46.00

17.00
Fichtner
NMĐG Tây NMĐG Mũi
Nguyên/Central Dinh/Mui Dinh
MĐG Trung Nam/Trung Nam Hydropower Plant
Highlands Thermal Thermal Power
Power Plant Plant

EAB Newenergy
Trugn Nam Group HBRE GmbH

Tỉnh Ninh Thuận Tỉnh Đăk Lăk Tỉnh Ninh Thuận


On-shore On-shore On-shore
Không hộp số/No Không hộp số/No
Hộp số/Gear
gearbox gearbox

Enercon GE Enercon

114 103
98
45 112 16
90 280 37.6
2.0 2.5 2.35

286 100

900

3965 13000 1472

2016 2018
2019 2019

44.06 46.43 39.15


No. project Name Investors Status

1 Bình Thuận 1 (Tuy Phong) REVN - Vietnam Renewable Energy JSC OP

2 Phú Lạc wind farm EVN - Phong điện Thuận Bình OP

3 Mũi Dinh EAB - Germany OP

4 Phú Quý wind power plant PV Power OP

5 Bạc Liêu (phase I, II) Cong Ly Construction-Trade-Tourism Ltd. OP

6 Đầm Nại (phase I) Blue Circle +TSV Vietnam OP

7 Đầm Nại (phase II) Blue Circle +TSV Vietnam OP

8 Điện gió Hướng Linh 2 Tân Hoàn Cầu OP

9 Công ty CP Điện Gió Trung Nam


Trung Nam Ninh Thuan phase 1 OP
(Trungnam Wind Power)

10 Công ty CP Điện Gió Trung Nam


Trung Nam Ninh Thuan phase 2 UC
(Trungnam Wind Power)

11 Điện gió Hướng Linh 1 Tân Hoàn Cầu UC

12 Điện gió Hướng Linh 3 Hướng Linh 3 JSC (Tân Hoàn Cầu) AP

13 Đại Phong wind farm AC Energy+Blue Circle UC

14 Bạc Liêu (phase III) CP Super Wind Energy Công Lý 1 UC

15 Lai Hòa wind farm (phase I) CP Super Wind Energy Công Lý 1 UC

16 Lạc Hòa wind farm Hoàng Sơn Energy UC

17 Hòa Đông wind farm Hoàng Sơn Energy UC

18 HBRE Tây Nguyên (phase I) HBRE Wind Power Solution UC

19 Central wind power JSC (belongs to


Phương Mai 3 wind power plant UC
PC3)
20 Cầu Đất wind power plant Đại Dương RE JSC UC

21 Climate Investor One and Samtan (South


Trà Vinh 1 UC
Korea)
22 CP Năng lượng châu Á và Tập đoàn
Duyên Hải wind farm UC
Uniso (South Korea)
23 Khai Long wind farm CP Super Wind Energy Công Lý 1 GB

24 Bình Đại (phase I) TTC-Mekong Wind JSC GB

25 HBRE An Thọ (Phú Yên) Super Energy Corporation AP

26 HBRE Chư Prông (Gia Lai) Super Energy Corporation AP

Công ty Cổ phần Tập đoàn đầu tư xây


27 Soc Trang 2 dựng Cường Thịnh Thi liên doanh với AP
Super Energy Group Limited

28 Sóc Trăng 3 TNHH BanPu - Thailand AP

29 Tổng Công ty Cổ phần Thương mại Xây


Soc Trang 4 AP
dựng
30 Sóc Trăng 5 (Lạc Hòa 1) Vĩnh Châu - TDC AP

31 Soc Trang 6 Công ty TNHH Năng lượng tái tạo AP

32 Soc Trang 7 Công ty TNHH Xuân Cầu AP

33 Công ty TNHH năng lượng tái sinh Trác


Soc Trang 8 AP
Việt
34 Soc Trang 11 Công ty TNHH Xuân Thiện Yên Bái AP

35 Soc Trang 13 Công ty Cổ phần Tập đoàn Hà Đô AP

36 Soc Trang 16 Công ty TNHH Envision Energy AP

37 Soc Trang 21 Công ty Nexif Energy Hydro B.V AP

38 Hòa Thắng 1.2 Vietracimex AP

39 Hiệp Thạnh -Trà Vinh Janakuasa Pte LTD (Singapore) AP


40 Trà Vinh 2 AP
41 Trà Vinh 3 Ecotech Trà Vinh AP

42 PV Power - IMPSA wind power plant PV Power - IMPSA AP

43 Saigon-Binh Thuan power investment


Saigon - Binh Thuan wind power plant AP
JSC
44 Binh Thuan wind power plant 1 Vietnam Renewable Energy JSC AP

45 Phước Hữu wind power plant EAB Viet Wind power AP


46 Hưng Tín Ltd. Co. AP

47 Phương Mai 1 wind power plant Phuong Mai wind power JSC AP

48 Phương Mai 2 wind power plant GGP Corp. (Germany) AP


49 Gia Lai wind power plant Highland wind power JSC AP
50 Bach Long Vi island wind power plant National Youth Union AP

51 Adani Phuoc Minh Wind Power Ltd.


Phước Minh wind farm AP
(Adani+TVS)

52 Thương Tín Power company


Phước Dân wind power plant AP
(Sacomreal)

53 Nhơn Hội wind power plant SÀI GÒN- BÌNH ĐỊNH Energy JSC. AP

54 Công Hải wind power plant GRETA INC (Canada) AP

55 An Phong wind power plant Thuan Phong Energy Development JSC AP

56 Phước Nam Enfinity Ninh Thuận wind


Enfinity Ninh Thuận Ltd., Co. AP
power plant

57 Global Energy Investment and


Phước Thành wind power plant AP
Consultantcy

58 ASIA RENEWABLE ENERGY


Thuận Nhiên Phong wind power plant AP
CORPORATION

59 UPC - Quảng Bình 1,2,3,4 UPC Renewables Asia AP

60 Hướng Phùng 1 EVNGENCO2 UC

61 Hướng Phùng 3 Hướng Phùng wind power Ltd. Co. UC

62 Hướng Phùng 2 Việt Ren JSC UC

63 Hướng Hiệp 1 Tân Hoàn Cầu JSC AP

64 Điện gió Gelex 1, 2, 3 Quảng Trị Gelex Energy company AP


65 Hướng Hóa 1 Licogi 16 AP

66 EVNGENCO2 (BQL Thủy Điện Sông


Hướng Sơn 2 AP
Bung 2)

67 Kê Gà offshore wind farm Enterprize Energy AP

68 Đăk Pơ wind farm Mirat Energy + HLP AP


69 Mang Yang wind farm Mirat Energy + HLP AP

70 Công ty cổ phần Năng lượng Pacific -


Thái Hòa wind farm AP
Bình Thuận

71 Công ty cổ phần Năng lượng Pacific -


Thái Phong wind farm AP
Bình Thuận

72 Win Energy Chiến Thắng Chinh Thang Wind Power Ltd. AP

73 Đông Hải 1 Bắc Phương Energy JSC UC

74 Hòa Bình 1 Công ty Phương Anh UC


Date Investm PPA
Capacit Investment Provinc
Location Approve ent Signed
y (MW) (Million $) e
d Licence Date

Tuy Phong district, Bình Binh


30 45
Thuận province Thuan
xã Phú Lạc, huyện Tuy Binh
24 40
Phong, tỉnh Bình Thuận Thuan
xã Phước Dinh, huyện
Ninh
37,6 57 Thuận Nam, tỉnh Ninh
Thuan
Thuận
Phú Quý island district, Binh
6 15
Bình Thuận province Thuan
xã Vĩnh Trạch Đông, thành
99,2 260 Bac Lieu
phố Bạc Liêu
xã Bắc Sơn, huyện Thuận Ninh
7,8 15
Bắc, Ninh Thuận Thuan
xã Bắc Sơn, huyện Thuận Ninh
30 60
Bắc, Ninh Thuận Thuan
huyện Hướng Hóa, tỉnh Quang
30 63
Quảng Trị Tri
Lợi Hải, Bắc Phong, Thuận
Ninh
40 Bắc district, Ninh Thuận
Thuan
province
Lợi Hải, Bắc Phong, Thuận
Ninh
64 Bắc district, Ninh Thuận
Thuan
province
huyện Hướng Hóa, tỉnh Quang
30 63
Quảng Trị Tri
huyện Hướng Hóa, tỉnh Quang ### 4/9/2019
30 65
Quảng Trị Tri

xã Thiện Nghiệp và phường


40 92
Mũi Né, TP. Phan Thiết

xã Vĩnh Trạch Đông, thành


142 370 Bac Lieu
phố Bạc Liêu
Xã Lai Hòa, huyện Vĩnh Soc
30 76
Châu, Sóc Trăng Trang
Xã Lạc Hòa, huyện Vĩnh Soc ###
30 76
Châu, Sóc Trăng Trang
Xã Hòa Đông, Vĩnh Châu, Soc ###
30 76
Sóc Trăng Trang
xã Đliê Yang, huyện Ea
28,8 Dak Lak
H’leo, Đắk Lắk
Nhơn Hội economic zone, Binh
21 $40 Million
Quy Nhơn, Bình Định Dinh
$57 million (phase xã Xuân Trường và Trạm Lam
50
I) Hành, TP Đà Lạt Dong
xã Trường Long Hòa và
48 120 Dân Thành, thị xã Duyên
Hải, tỉnh Trà Vinh
xã Đông Hải, huyện Duyên
48,3
Hải, tỉnh Trà Vinh
xã Đất Mũi, Ngọc Hiển, Cà
100 250 Ca Mau 6/6/2018 ###
Mau
xã Thừa Đức, huyện Bình ###
30 65 Ben Tre
Đại, tỉnh Bến Tre
xã An Thọ, An Hiệp và An
200 270 Lĩnh huyện Tuy An, Phú Phu Yen ### 1/1/2018
Yên
xã Ia Băng và Ia Phìn, ###
50 Gia Lai
huyện Chư Prông, Gia Lai

Soc ###
Trang

Soc
Trang
Soc ###
Trang
Soc
30
Trang
Soc ###
Trang
Soc ###
Trang
Soc ###
Trang
Soc ###
Trang
Soc ###
Trang
Soc ###
Trang
Soc ###
Trang
xã Hòa Thắng và thị trấn
Binh ###
100 Chợ Lầu (huyện Bắc Bình,
Thuan
tỉnh Bình Thuận)
thị xã Duyên Hải, tỉnh Trà 8/1/2018
78 150 Tra Vinh
Vinh
Tra Vinh
Tra Vinh
Hòa Thắng commnue, Bắc
$2.35 billion (in 5 Binh
600 Bình district, Bình Thuận
years) Thuan
province
Bắc Bình district, Bình Binh
200
Thuận province Thuan
Tuy Phong district, Bình Binh
120 $45 million
Thuận province Thuan
Phước Hữu commune,
Ninh
50 VND1500 billion Ninh Phước district, Ninh
Thuan
Thuận province
xã Phước Hữu, huyện Ninh Ninh
30 ###
Phước, Ninh Thuận Thuan
Nhơn Hội economic zone, Binh
30 VND880 billion
Quy Nhơn, Bình Định Dinh
Nhơn Hội economic zone, Binh
200
Quy Nhơn, Bình Định Dinh
40,5 VND1500 billion Pleiku, Gia Lai Gia Lai
Bạch Long Vĩ island, Hải Hai
0,414 VND34 billion
Phòng province Phong
xã Phước Minh, Phước Ninh
27,3
Ninh tỉnh Ninh Thuận Thuan
Phước Hậu, Phước Thái,
Phước Hữu communes and
Ninh
50 1290VND billion Phước Dân town
Thuan
Ninh Phước district, Ninh
Thuận province.
Phú Hậu village, Cát Chánh
Binh
27 527 VND billion commune
Dinh
Phù Cát district
Công Hải commune, Thuận
Ninh
66 VND 1190 billion Bắc district, Ninh Thuận
Thuan
province
An Hải, Phước Hải and
Phước Dinh communes, Ninh
180 VND6537 billion
Thuận Nam district, Ninh Thuan
Thuan province
Phước Nam, Phước Minh,
VND5200 billion Phước Ninh, Thuận Nam Ninh
125
($250 million) province and Phước Hải, Thuan
Ninh Phước province
Phước Thành commune,
Ninh
18 Bác Ái district, Ninh Thuận
Thuan
province
Hòa Thắng commune, Bắc
Binh
50 Bình district, Bình Thuận
Thuan
province
Quang
120 Lệ Thủy, Quảng Bình
Binh
thôn Hướng Độ, xã Hướng
Quang
30 56 Phùng, huyện Hướng Hoá, 6/1/2017
Tri
Quảng Trị
xã Hướng Phùng, huyện Quang
30
Hướng Hóa, Quảng Trị Tri
thôn Doa Cũ, xã Hướng
Quang
20 Phùng, huyện Hướng Hóa, ###
Tri
Quảng Trị
xã Hướng Hiệp, huyện Quang
30 60
Đakrông, tỉnh Quảng Trị Tri
xã Hướng Linh và Hướng
Quang
90 160 Hiệp, huyện Đakrông, ### ###
Tri
Quảng Trị
xã Hướng Lộc, A Túc và A
Quang
64 Dơi, huyện Hướng Hóa,
Tri
tỉnh Quảng Trị
xã Hướng Sơn, huyện Quang
30
Hướng Hóa, Quảng Trị Tri
xã Tân Thành, huyện Hàm
Binh
600 Thuận Nam, tỉnh Bình
Thuan
Thuận
200 huyện Đăk Pơ, tỉnh Gia Lai Gia Lai
huyện Mang Yang, tỉnh Gia
200 Gia Lai
Lai
xã Hòa Thắng, huyện Bắc Binh
83
Bình, tỉnh Bình Thuận Thuan
xã Chí Công, Hòa Minh và
Binh
53 Phong Phú, huyện Tuy
Thuan
Phong, tỉnh Bình Thuận
huyện Thuận Nam và Ninh Ninh
50 84
Phước, Ninh Thuận Thuan
Long Điền Đông, huyện
50 108 Bac Lieu ###
Đông Hải, tỉnh Bạc Liêu
Xã Vĩnh Hậu, Huyện Hoà
300
Bình, Tỉnh Bạc Liêu
Constru
Expecte
ction Actual
d COD Note
Start COD
date
Date

Fuhrländer turbines

### ### funded by KfW, 12x2MW Vestas turbines

30/0/201
### Enercon turbines E-103 EP02 2.35MW. First turbine erected in August/2018
6

Dec-12 Vestas turbines 3x2MW

62 x 16 GE (1.6-82.5) turbines

### ### 16x 2,625 MW Gamesa turbines. gđ 1: TC 22kV trạm Ninh Hải,

### gđ 2: transit 110kV Tháp Chàm - Ninh Hải (AC300, 0,9km)

15x2 MW Vestas turbines

ENERCON turbines, Siemens Inverter

ENERCON turbines, Siemens Inverter

15x2 MW Vestas turbines

Jun-19 Dec-20 DZ110 mạch kép, dây dẫn ACSR300, dài khoảng 10,2km vào thanh cái 110kV trạm

AC Energy accounts for over 62% of the economic ownership including its 50% dire

CP Super Wind Energy Công Lý 1 = Cong Ly + Thai Investor

### 15x2MW units. Phase II 30MW, phase III 38

EPC: IBS, 108x2.4MW GE turbines

### thg 9-
2020

### thg 9-
2020 12 Vestas turbines
### Delayed. Changed investors from Cong Ly to JV Cong Ly+Super Wind Energy (Tha

###

http://www.devi-renewable.com/2019/03/super-energy-corp-mua-2-du-den-gio-hbre.htm

http://www.devi-renewable.com/2019/03/super-energy-corp-mua-2-du-den-gio-hbre.htm

### thg 12-


2020 Metmast installed, FS underway

6/1/2019

2020-
Transit 110kV Lương Sơn-Hòa Thắng-Mũi Né, dây ACSR240, dài 11km
2022
Delayed in land clearance

Đang xin điều chỉnh PA đấu nối lên 110kV, chuyển tiếp Phước Sơn - Nhơn Hội (AC

2019- Transit 110kV Ninh Phước - Phan Rí (AC300, 1km)


Q1-2019
2020 (Adani 80%, TVS 20%). Total capacity registered 48,3MW

2/7/2018 first met Local authority

Quarter
### Dự án được xây dựng các hạng mục chính, với 10 tháp đỡ tua bin cao 110m, mỗi t
II/2021

###Quarter II/2021

###Quarter II/2021

### thg 10-


2021 Equity Hướng Phùng wind power JSC 20%
xây dựng dường dây 220kV mạch kép dài khoảng 20km từ nhà máy đấu nối vào th

Nhà máy điện gió Hướng Sơn 2 dự kiến đấu nối vào hệ thống điện quốc gia với ph

2023 Pre-FS underway

http://www.devi-renewable.com/2019/04/mirat-energy-ky-hop-tac-phat-trien-hai.html
http://www.devi-renewable.com/2019/04/mirat-energy-ky-hop-tac-phat-trien-hai.html

Metmast installed

Metmast installed

2019 2020 Transit 110kV Tháp Chàm - Ninh Phước (ACSR 300, 0,1km)

Apr-19 Q2-2021 12 turbines; trạm biến áp nâng áp 22/110kV - 1x63MVA; đường dây 110kV đấu nối
ed in August/2018

vào thanh cái 110kV trạm 220kV Lao Bảo

ship including its 50% direct voting stake. Project completion of the first phase is expected in the First Half of 2020, in time fo
+Super Wind Energy (Thailand)

mua-2-du-den-gio-hbre.html

mua-2-du-den-gio-hbre.html

240, dài 11km


ước Sơn - Nhơn Hội (AC240-5km)

ỡ tua bin cao 110m, mỗi tháp cho 1 tua bin 3,63MW; trạm biến áp nâng 0,69/22kV-4.300kVA và mạng điện 22kV nội bộ; trạm
ừ nhà máy đấu nối vào thanh cái 220kV Trạm biến áp 220kV Lao Bảo; xây dựng sân phân phối 220kV nhà máy điện gió 2x

ống điện quốc gia với phương án xây dựng 1 trạm biến áp 22/110kV tại Nhà máy điện gió Hướng Sơn 2; xây dựng đường

-tac-phat-trien-hai.html
-tac-phat-trien-hai.html

ường dây 110kV đấu nối nhà máy với đường 110kV Hòa Bình – Đông Hải
irst Half of 2020, in time for the new wind feed-in-tariff deadline of November 2021.
ạng điện 22kV nội bộ; trạm biến áp Hướng Phùng 1 22/110kV-1x40MVA; đường dây 110kV dài khoảng 21,5km từ TBA Hướ
20kV nhà máy điện gió 2x80MVA; mở rộng 2 ngăn lộ tại thanh cái 220kV Trạm biến áp 220kV Lao Bảo để đấu nối các mạc

g Sơn 2; xây dựng đường dây mạch đơn, dây ACSR-185 chiều dài khoảng 6km; xây dựng mới 01 ngăn lộ 110kV tại trạm 11
hoảng 21,5km từ TBA Hướng Phùng 1 về TBA 220kV Lao Bảo; hệ thống đường thi công quản lý vận hành, khu phụ trợ phụ
o Bảo để đấu nối các mạch đường dây từ nhà máy

1 ngăn lộ 110kV tại trạm 110kV Hướng Phùng 1.


vận hành, khu phụ trợ phục vụ thi công; nhà quản lý vận hành.
Project Size Tuabin
No Province Location Status
Name (MW) (MW)
UPC-Le
1 Quang Binh Le Thuy district 50
Thuy
UPC-Quang
2 Quang Binh Le Thuy district 250
Binh
3 Dam Nai 1 Ninh Thuan Thuan Bac district 7.8 2.5 Existing
Under
4 Dam Nai 2 Ninh Thuan Thuan Bac district 30 2.6
construction
5 Dam Nai 2 Ninh Thuan Thuan Bac district 67.2
6 Ke Ga Binh Thuan Off-shore 600
7 Vinh Chau 1 Soc Trang Tran De district 860 Approved
8 Vinh Chau 2 Soc Trang Tran De district 295 Approved
9 Vinh Chau 3 Soc Trang Tran De district 325 Approved
Cong Ly Soc Under
10 Soc Trang Tran De district 30
Trang 1 construction
Cong Ly Soc
11 Soc Trang Tran De district 30 Approved
Trang 2
Cong Ly Soc
12 Soc Trang Tran De district 38 Approved
Trang 3

13 Bac Lieu 1&2 Bac Lieu Bac Lieu city 99.2 1.6 Existing

Under
14 Bac Lieu 3 Bac Lieu Bac Lieu city 142 2
construction
Huong
15 Quang Tri Huong Hoa district 30 Approved
Phung 1
Huong
16 Quang Tri Huong Hoa district 20 Approved
Phung 2
17 Huong Linh 1 Quang Tri Huong Hoa district 30 2.2 Approved
18 Huong Linh 2 Quang Tri Huong Hoa district 30 2.5 Existing
19 Khai Long 1 Ca Mau Ngoc Hien district 100 Approved
20 Khai Long 2 Ca Mau Ngoc Hien district 100 Approved
21 Khai Long 3 Ca Mau Ngoc Hien district 100 Approved
22 Tan An 1 Ca Mau Ngoc Hien district 25 Approved
23 Tan Thuan Ca Mau Dam Doi district 25 Approved
Phong Dien
24 1 - Binh Binh Thuan Tuy Phong district 120 Approved
Thuan
25 Phu Lac Binh Thuan Tuy Phong district 50 2 Existing
26 Phuoc The Binh Thuan Tuy Phong district 28 Approved
27 Hoa Minh Binh Thuan Tuy Phong district 15 Approved
Phan Ri
28 Binh Thuan Tuy Phong district 30 Approved
Thanh
Hoa Thang
29 Binh Thuan Bac Binh district 85.5 Approved
1.1
Hoa Thang
30 Binh Thuan Bac Binh district 30 Approved
1.2
Hoa Thang
31 Binh Thuan Bac Binh district 20 Approved
1.3
32 Hoa Thang 2 Binh Thuan Bac Binh district 40 Approved
Thuan Nhien
33 Binh Thuan Bac Binh district 32 Approved
Phong
34 Hoa Thang 4 Binh Thuan Bac Binh district 30 Approved
Hong Phong
35 Binh Thuan Bac Binh district 40 Approved
1
Hong Phong
36 Binh Thuan Bac Binh district 20 Approved
2
37 Thien Nghiep Binh Thuan Phan Thiet city 40 Approved
38 Tien Thanh 1 Binh Thuan Phan Thiet city 20 Approved
39 Tien Thanh 2 Binh Thuan Phan Thiet city 15 Approved
40 Tien Thanh 3 Binh Thuan Phan Thiet city 20 Approved
Ham Cuong
41 Binh Thuan Ham Thuan Nam district 15 Approved
1
Ham Cuong
42 Binh Thuan Ham Thuan Nam district 20 Approved
2
43 Ham Kiem 1 Binh Thuan Ham Thuan Nam district 15 Approved
44 Ham Kiem 2 Binh Thuan Ham Thuan Nam district 15 Approved
Gio Ben Tre
45 Ben Tre Thanh Phu district 125 Approved
1
Gio Ben Tre
46 Ben Tre Thanh Phu district 80 Approved
2
Gio Ben Tre
47 Ben Tre Thanh Phu district 140 Approved
3
Gio Ben Tre
48 Ben Tre Thanh Phu district 120 Approved
4
Gio Ben Tre
49 Ben Tre Thanh Phu district 110 Approved
5
Gio Ben Tre
50 Ben Tre Thanh Phu district 15 Approved
6
Gio Ben Tre
51 Ben Tre Ba Tri district 110 Approved
7
Gio Ben Tre
52 Ben Tre Binh Dai district 80 Approved
8
Gio Ben Tre
53 Ben Tre Binh Dai district 140 Approved
9
Gio Ben Tre
54 Ben Tre Binh Dai district 190 Approved
10
Gio Ben Tre
55 Ben Tre Binh Dai district 120 Approved
11
56 V1-1 Tra Vinh Duyen Hai district 48 Approved
57 V1-2 Tra Vinh Duyen Hai district 48 Approved
58 V1-3 Tra Vinh Duyen Hai district 48 Approved
59 V1-4 Tra Vinh Duyen Hai district 48 Approved
60 V1-5 Tra Vinh Duyen Hai district 48 Approved
61 V1-6 Tra Vinh Duyen Hai district 30 Approved
62 Tuy Phong 1 Binh Thuan Tuy Phong district 30 1.5 Existing
63 Tuy Phong 2 Binh Thuan Tuy Phong district 90 Approved
64 Phu Quy Binh Thuan Phu Quy island 6 2 Existing
Phuong Mai
65 Binh Dinh Quy Nhon city 30 2.8 Approved
1
Phuong Mai Under
66 Binh Dinh Quy Nhon city 21 3.5
3 construction
67 Nhon Hoi Binh Dinh Quy Nhon city 61.1 Approved
68 Thái Hòa Binh Thuan 90 Approved
69 Đầm Nại 4 Ninh Thuan 32
70 Trung Nam 90 2 Approved
Supplier

Siemens Gamesa

GE

Vestas

Vestas
Fuhrpaender AG

Vestas
Suzlon

Sieemens
Gamesa

Enercon