As per clause 2504.2.2 the material to be used for filter media satisfying the
following requirements has been selected.
Filter – 1 (Sand)
S.No. Criteria Specifications Remarks
2–(Agg.10 mm)
METHODOLOGY
The base to back filled shall be cleaned of there is any extraneous material to
its length and width and it should be marked to the lines and length as per
GFC drawing.
The Trimming of Embankment slopes to the angle of repose of the back fill
material as shown in GFC drawings.
STEP – 2
The coarse material i.e. Filter – 2 shall be packed up to specified thickness &
width followed by filling of filter – 2 granular materials of specified
thickness & width.
STEP – 3
The above procedure will be repeated till it reaches the level of GSB bottom.
Granular material shall be laid adjacently layer by layer to the filter media
and it should be compacted at optimum moisture content (OMC) by means
of plate compactor or vibrator roller as decided by the Engineer.
QUALITY CONTROL
Quality control for the above work shall be as per table 900-3 MORTH
Specifications. Material shall be checked before commencing of the work.
FILTER MEDIA DESIGN
FOR FILLING AROUND ABUTMENTS AND WING WALLS
As per clause 2504.2.2 of MORTH back fill material shall not be an organic
soil or highly plastic clay having plasticity index and Liquid Limits are not
more 20 and 40 respectively.
In view of the above requirements of the back fill material , the Borrow area
soil located at km. 176+500 (RHS) lead 2.0 km. from NH- 8 (Borrow Area
No. – 19) was proposed as a back fill material and test was carried as per the
specification, the results obtained are as follows.
Filter Media
The material will consist of sand, gravel, crusher stone or coarse dust as per
clause 2504.2.2 of MORTH the material used for filter media shall satisfy
the following criteria.
D 15 : The size of the sieve which allows 15% by wt. Through it: 0.077 mm
D 50 : The size of the sieve which allows 50% by wt. Through it: 0.11 mm
D 85 : The size of the sieve which allows 85% by wt. Through it: 0.16 mm
D 15 : The size of the sieve which allows 15% by wt. Through it: 0.32 mm
D 50 : The size of the sieve which allows 50% by wt. Through it: 0.70 mm
D 85 : The size of the sieve which allows 85% by wt. Through it: 2.80 mm
D 15 : The size of the sieve which allows 15% by wt. Through it: 6.0 mm
D 50 : The size of the sieve which allows 50% by wt. Through it: 8.0 mm
OBSERVED VALUE