You are on page 1of 1

Owner: Lucky Electric Power Company Limited Consultant: FICHTNER GMBH & CO KG Contractor:SEPCOIII ELECTRIC POWER CONSTRUCTION

CORPORATION., LTD.

INSPECTION REPORT FOR DUCT LEAK TEST


Department Report No. Rev

Area Drawing No. Location

Test Medium Test Duration Start Time Finish Time

System Observation for leak Result


S/N Section of duct Type of duct Remark
name if any
Accept Reject

Note: 1.Light test for Duct leakage is the most common test.
2.Prepare a good movable lighting source and turn on in the duct & move it so you are sure that every angle is ok.

11111113.Wind pressure test can be used for duct and joint also after erection.
Issued By Sub-contractor SEPCOⅢ Consultant

Signature

Name

Date