Contractor:SEPCOIII Owner:Lucky Electric Power Consultant:FICHTNER GMBH

ELECTRIC POWER Company Limited & CO KG


CONSTRUCTION
CORPORATION., LTD.

CHECKLIST FOR CONNECTION BOLTS


ITP No. Form No.

Location Page No.

SN Description Result Remarks

1 Check type of bolts, nuts and washers

2 Check correctness of installation direction

3 Check match between bolts and bolt holes

4 Check quantity of bolts, nuts and washers

5 Check condition of bolts, nuts and wahsers

Check the stick-out amount of bolts extends beyond the outside surface
6 of nut.
Check the turn-of-nut match marks to ensure the bolts have been
7 tightened

8 Check the torque value of final tightening


Note:

Issued Sub-contractor Contractor Consultant/Owner

Singnature

Name

Designation

Date

Result Instruction: √-Accept ×-Reject Or fill your comments