CHECK LIST of Steel


Identification
Structure Acc
Erection
Rej
ept

Reviewing of the material approval

Checking of concrete foundation


release for steel erection

Assembling of the Steel Structures

ect

N/A

KHABAT THERMAL POWER PLANT


UNITS 1 &2 PROJECT 132Kv AIR
INSULATED SWITCHGEAR
Signature
Rev: 0
Comments
Page
No:1 of 1
Subcontr
GAM
Job No:
actor
A

a. Screw and Nut Types


b. Convenience to Detail Project
(After Assembly)
4

Lifting and Erection

a. Checking of lifting plan


b. Torque Level of the Nuts
5

Final Inspection

a. Touch-up
b. Visual check
6

Grouting Work

Release steel structure for


equipment erection

SIGN OFF AS ACCEPTED


SIEMENS

GAMA

POSCO

Employer

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

POSC
O