You are on page 1of 2

24x7 Powerline CUSTOMER CARE CENTRE/CORRESPONDENCE

BILL OF SUPPLY RESIDENTIAL ADDRESS/INTERNAL GRIEVANCE REDRESSAL CELL


(IGRC)
We’re
DESMOND NEREUS CABRAL
54 CABRAL HSE 1ST FLR,
19122 listening. E-4, MIDC, Andheri (E), Mumbai 400 093 Fax: 3009 4200

TANK PAKHADI SAHAR VLG, For power SMS POWER <9 digit account no.> to www.adanielectricity.com
interruption, 7065313030 from any mobile no. helpdesk.mumbaielectricity@adani.com
ANDHERI EAST.
complaint or Give us a missed call on 1800 532 9998 Join us on,
restoration from your registered mobile no.
MUMBAI 400099 status For other queries:WhatsApp on
Mobile No 98******57 9022 81 3030 (8am to 8pm)

Email Id ca****ds@yahoo.com
Bill No. 100668490221 Bill Date 04-12-2019 Cycle No. 14
Connected Load in kW 0.32
Bill Distribution No. SOUTH CENTRAL/SCZ3- Type of Supply SINGLE
PAN MIDC/14/548/040/040/001 PHASE
GSTIN
This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.

To update your email Id and mobile no.,call us on 19122


YOUR CURRENT CONSUMPTION

ACCOUNT NO Tariff Meter Multiplying Energy consumption Energy Fixed


number Factor charge charge
152729259 (MF) Present Previous Consumption (`) (`)
reading reading (Unit kWh)
LT I (B) RS0964 1 9780.00 9548.00 232.00 1094.64 105.00
1051
BILL MONTH
NOV-19
TOTAL 232 1094.64 105.00

DUE DATE
25.12.2019 Tentative meter reading date for your DEC-19 bill is 31-
TRACK YOUR CONSUMPTION (UNITS) ●

12-2019.
● Please check/update your PAN number by visiting
nearest Customer Care Center or email to

IMPORTANT MESSAGE
helpdesk.mumbaielectricity@adani.com with copies of
660 FEB-19 230 PAN for verification.
MAR-19 212
APR-19 224
MAY-19 160

DUE AMOUNT JUN-19


JUL-19
3
64

` 2060.00* AUG-19
SEP-19
178
183
OCT-19 262
Earn Points on E-payments/Cashless
NEW Payments. Please login to 232 -
Adani Electricity Mobile App NOV-19 JAN-18
to view/ redeem points
( Electric Smiles) earned. Refer to Important Message

DISCOUNTED BILL AMOUNT


Round sum bill payable (after discount
of ` :17.23) on or before discount
date 11-12-2019 ` 2040.00

LATE PAYMENT BILL AMOUNT


Round sum bill payable (including
DPC of ` :25.74) after due
date 25.12.2019 ` 2080.00 #
*Refers only to current bill amount. Previous balance is
payable immediately.
#Payable until one month after due date, there after
interest applicable as per MERC tariff order.

Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY For Advertisement please contact on
ORDER NO. CSD/183/2019/4980 dated 22.10.2019 info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP

If paying by cheque, please remember:


● Cheque should be Account payee of local clearing and not post-dated

● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:152729259

● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.

14/548/040
b/f :6.77
0152729259100002060251220190000208000000204011122019 040/001/R02
Round Sum payable: ` 2060.00 Discounted Amount(Round sum): ` 2040.00 Amount after due date (Round sum): ` 2080.00
NOV-19 152729259 /1/ Due date: 25.12.2019 Discount date: 11-12-2019
HOW YOUR BILL WAS CALCULATED Rate `
0152729259100002060251220190000208000000204011122019

Electrical Energy ( HSN Code 27160000)


Fixed Charge 105.00
Wheeling charge 364.24
Regulatory asset charge 62.24
Energy Charge 1094.64
Fuel Adjustment Charge (FAC)# (Refer Your Tariff 97.05
Structure below)
Government electricity duty 16.00 % 275.71
Maharashtra Govt. tax on sale of electricity 26.04 p/unit 60.41
Current month's bill amount (A) 2059.29
Others 0.00
Delayed Payment Charge on previous month's bill 0.00
Digital Payment Discount 4.94 Cr
Interest on arrears 0.00
Adjustments 0.00
Net Other Charges in current bill (B) 4.94 Cr
Current Month charges (A+B) 2054.35
Previous month's bill amount 2356.77
Payment received upto 25.11.2019 2350.00
Prompt Payment Discount 0.00
Net previous balance(C) 6.77
Total bill amount(A+B+C) 2061.12
Amount deferred 0.00
#FAC is being included in your monthly charges in accordance with MERC (MYT 3rd Amendment) Regulations, 2014 dated 8th
May 2014. Please refer to “your tariff structure” below.
For Correspondence Address kindly refer the Front Page Customer Care Centre address.
AEML CIN U74999GJ2008PLC107256

Regd. Office: Adani Electricity Mumbai Ltd.


Adani House, 56, Shrimali Society, Nr. Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat 380009

ROUND SUM KEEP A WATCH TO MANAGE YOUR ENERGY CONSUMPTION


PAYABLE Your tariff structure (Effective from 01.04.2019)
WITH THIS BILL 2060.00 Tariff Tariff slabs Fixed Charge Energy Charge Wheeling charges RA charge FAC rate
Paise/unit
LT I (B):LT- `/month `/unit `/unit `/unit NOV-19
Your security deposit 4540.00 Residential
(SD) with us 0-100 65 3.00 1.57 0.20 29.15
101-300 105 6.02 1.57 0.32 51.44
Your unpaid security
deposit (SD) 301-500 105 7.15 1.57 0.36 57.49
> 500(balance 130 8.90 1.57 0.46 67.23
Meter reading date units)
30-11-2019
Previous meter reading date *Above fixed charges are for single phase connections.Fixed charge of Rs 130 per month will be levied on residential consumers
01-11-2019
PAN

availing 3 phase supply.Additional Fixed charge of Rs 130 per 10kW load or part thereof above 10kW load shall be payable.

As per Electricity Supply Code, you can also opt for your own meter Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2015/CR 21/NGR-1 of 13-04-2015. Tax on Sale of Electricity as per
(adhering to BIS standards) Govt. of Maharashtra Notification No.VVK-2018/CR-161/Energy-1 of 26-12-2018
AADCD0086F

NOTE Now you can earn a high interest rate of up to 10.05% per annum on
your Adani Electricity Security Deposit*
• To pay online, visit www.adanielectricity.com
• Cash payment limited to `20,000 or bill amount whichever is lower *Interest on Security Deposit comprises SBI MCLR rate as on
• Adani Electricity counter timings: 1st April for one year + 150 Basis Points(8.55% + 1.50%).
9:30 a.m. to 12.30 p.m. and 1.30 p.m. to 5.05 p.m For FY 2019-20,it is 10.05%
• Get 7% interest on VDS (reducing balance)
GSTN

If paying by cheque, please remember Power theft results in power tariff hike - Report them
• Cheque payment subject to realization, any dishonored cheque will Honest citizens bear the cost of power stolen by unauthorized elements.
- Result in payment of bills by DD for subsequent 6 months If you spot an electrical theft, please report on 19122.
27AADCD0086F1ZW

- Attract a penal amount of `250 per bill

Consumer Grievance Redressal Forum (CGRF) • Switch Off all your appliances when stepping out of home.
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at
ENERGY
CONSERVATION TIPS
• If using multi-bulb fixture,switch to low-wattage bulbs.
Adani Electricity, 1st Floor, Devidas Lane,
Off SVP Road, Near Devidas Lane Telephone • Keep your ACs on 24*C, preferably in 'Dry' Mode.
Exchange, Borivali West, Mumbai 400 103

T 3009 4247 PLEASE REMEMBER


E Consumerforum.Mumbaielectricity@adani.com Using electricity connection for purposes other than that provided for is a tariff violation and may lead to

W cgrf.adanielectricity.com disconnection/penal action as per law.

Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.

Please quote your account no.152729259in all your correspondence.

------------------------------------------------------------------------------------------------------------------------------------

You might also like