SPECIFICATION FOR THE DESIGN AND MANUFACTURE OF SITE BUILT, VERTICAL, CYLINDRICAL,
FLAT-BOTTOMED, ABOVE GROUND, WELDED, STEEL TANKS FOR THE STORAGE OF LIQUIDS AT
AMBIENT TEMPERATURE AND ABOVE
READING CHECKLISTS
1 of 4
13.5 Nozzle loads 17.4 Welders and welding operators
13.6 Flush type clean-out doors and water approval
draw-off sumps 17.5 Production control test plates
13.7 Nozzle welding details 18 Welding
13.8 Flange drilling 18.1 General
13.9 Post-weld heat treatment of nozzles 18.2 Welding sequences
13.10 Heating and/or cooling systems 18.3 Welding of bottoms
14 Insulation 18.4 Welding of shell to bottom
15 Shop fabrication of tank components 18.5 Welding of shell
15.1 General 18.6 Welding of roof
15.2 Reception and identification of 18.7 Temporary welds
materials 18.8 Atmospheric conditions
15.3 Handling and storage of materials 18.9 Preheating
15.4 Material markings 18.10 Post-weld heat treatment
15.5 Plate preparation and tolerances 18.11 Repair welding
15.6 Preparation of nozzle components 19 Testing and inspection
15.7 Plate forming and tolerances 19.1 General
15.8 Openings 19.2 Qualification of NDT personnel
15.9 Welding 19.3 Test procedures
15.10 Surface condition 19.4 Type of inspections and examinations
16 Site erection and tolerances 19.5 Vacuum box test
16.1 General 19.6 Penetrant test
16.2 Foundations 19.7 Magnetic particle examination
16.3 Anchor points 19.8 Soap bubble examination
16.4 Handling and storage 19.9 Radiographic examination
16.5 Rectification of parts damaged during 19.10 Ultrasonic examination
transportation and handling 19.11 Acceptance criteria
16.6 Bottom plates 19.12 Dimensional check
16.7 Shell to bottom, and shell 19.13 Hydrostatic and pneumatic tests
16.8 Fixed roofs 19.14 Empty checks
16.9 Nozzles 19.15 Accessories
16.10 External attachments 20 Documentation and name-plate
16.11 Internal attachments 20.1 Information to be supplied by the
16.12 Temporary attachments purchaser
17 Approval of welding procedures and 20.2 Name-plate
welders
17.1 General Annex A Information and requirements to be
17.2 Welding procedure approval documented
17.3 Welding Procedure Approval Record A.1 Information to be supplied by the
(WPAR) purchaser
2 of 4
A.2 Information agreed between the Annex E Requirements for rim seals for
purchaser and the manufacturer floating roofs
A.3 Information to be supplied by the E.1 General
manufacturer E.2 Design
A.4 Information to be supplied by the steel E.3 Seal types
manufacturer E.4 Weather shields
A.5 Information to be agreed between the E.5 Application and technical details of rim
steel manufacturer and the tank seals
manufacturer E.6 Installation
A.6 Information to be agreed between the Annex F Selection of carbon and carbon
purchaser and the cover supplier manganese steel plate to alternative
A.7 Information to be agreed between the specifications to those in 6.1
tank manufacturer and the cover F.1 Alternative national standards
supplier 121 F.2 General
A.8 Information to be supplied by the cover F.3 Chemical composition
supplier F.4 Mechanical properties
Annex B Operational and safety F.5 Impact testing
considerations for storage tanks and Annex G Recommendations for seismic
storage installations provisions for storage tanks
B.1 General G.1 General
B.2 Tank type G.2 Design loads
B.3 Health, safety and environmental G.3 Resistance to overturning
considerations G.4 Shell compression
B.4 Attachments to tanks for safety or G.5 Anchorage of tanks
firefighting facilities G.6 Piping
Annex C Requirements for floating covers G.7 Sloshing height
C.1 General Annex H Recommendations for other types of
C.2 Types of floating covers tank bottoms (double bottoms, elevated
C.3 Design and construction requirements bottoms etc.)
C.4 Installation H.1 Non-fully supported bottoms
C.5 Documentation H.2 Double bottoms
Annex D Requirements for floating roofs H.3 Elevated or beam supported tanks
D.1 Generals H.4 Leak test
D.2 Roof types Annex I Recommendations for tank
D.3 Design foundations
D.4 Prefabrication in the workshop I.1 General
D.5 Marking, packing, handling, transport I.2 Soil Investigation
D.6 Assembly I.3 Foundation design
D.7 Welding I.4 Types of foundations
D.8 Inspection and testing
3 of 4
Annex J Example calculations of stiffening O.3 Combined water draw-off and clean-
rings (wind girders) out sump
J.1 General Annex P Heating and/or cooling systems
J.2 Section moduli P.1 General
J.3 Worked examples of design of P.2 Heat transfer fluid
secondary stiffening rings (wind girders) P.3 Type of heating or cooling devices
J.4 Example 1 P.4 Installation
J.5 Example 2 Annex Q Recommendations for the design
Annex K Design rules for tanks with frangible and application of insulation
roof to shell joints Q.1 General
K.1 General Q.2 Design considerations
K.2 Construction Q.3 Mechanical support arrangement
K.3 Materials Q.4 Design details
K.4 Design rules Q.5 Corrosion protection
Annex L Requirements for venting systems Q.6 Insulation
L.1 General Q.7 Cladding
L.2 Types of vents and valves Q.8 Securing insulation materials
L.3 Calculation of maximum flow rates for Q.9 Fire hazard
normal outbreathing and inbreathing Annex R Surface finish
L.4 Calculation of maximum flow rates for R.1 Internal surfaces in contact with the
emergency pressure venting product
L.5 Emergency vacuum venting R.2 External surfaces
L.6 Testing venting devices
L.7 Manufacturers documentation and
marking of venting devices
Annex M Tank anchorages
M.1 General
M.2 Holding down strap
M.3 Holding down bolt with individual chair
M.4 Holding down bolt with continuous
support ring
Annex N Weld details for the connection
of mounting
N.1 Set-through mountings
N.2 Set-on mountings
N.3 Studded pad connections
Annex O Flush-type clean-out doors and
water draw-off sumps
O.1 Flush-type clean-out doors
O.2 Water-draw-off sumps
4 of 4