INSPECTION AND

PRODUCT TEST STAGE CHARACTERISTIC

SOIL For Gradation Lab test Grain size analysis

Embankment Proctor test Lab test M.D.D

and Sub grade L.L. Value


Atterberg limits Lab test
PI Value

CBR Lab test 4 days soaked CBR value

Deleterious Sulphate content


Lab test
Content (So3)

FIELD DENSITY Field test Degree of compaction

Moisture content test Field test Moisture content test

Free Swell Index Lab.Test Free Swell Index

GSB

Sl.No. PRODUCT TEST STAGE

GRADATION (GSB) Lab.Test

# Sensitivity: LNT Construction Internal Use


GRADATION (DrainageLab.Test

2 G.S.B Moisture content test


Field test
prior to compaction

Proctor test Lab Test


CBR Lab Test

Atterberg Limits Lab Test

Water Absorption Lab Test

Soundness Lab Test

10% Fines Value Lab Test

FIELD DESITY Field Test

Thanks & regards

# Sensitivity: LNT Construction Internal Use


SPECTION AND TEST PLAN OF LABORATORY
INSPECTION SAMPLE
ACCEPTANCE CRITERIA
FREQUENCY SIZE

Should not be OL,OI,OH or Pt


02 test for 3000m3 4.75mm-75mic
class

MDD Not less than 1.52


gm/cc(for embankment) & 1.75
2 test for 3000m3 19mm down
gm/cc (for Subgrade & earthen
shoulder)

Not more than 70


2 test for 3000m3 425 mic down
Not more than 45
1 test for 3000m3 or
closer
Minimum 7.0% 19mm down
As and when required
by the Engineer

Not more than 0.5%


As required by the
by mass Engineer

95% for Embankment up to 6m Minimum one set per


height 1000m2

97% for Embankment


One set per 500m2
exceeding 6m height

97% for sub grade & earthen


One set per 500m2
shoulder
.+1%
of O.M.C One test per 250m3
-2%
Not more than 50% As required by the Engineer

INSPECTION AND TEST PLAN OF LABORATORY


INSPECTION
CHARACTERISTIC ACCEPTANCE CRITERIA
FREQUENCY
Size of A 75.0mm 100 One test per 200m3
53.0mm 80-100
26.5mm 55-90
9.50mm 35-65
4.75mm 25-55
2.36mm 20-40
0.425mm 10-.25

# Sensitivity: LNT Construction Internal Use


0.075mm 03-. 10

Size of A 53.0mm 100 One test per 200m3

26.5mm 50-80
4.75mm 15-35
0.425 0-5
.+1%
Moisture of O.M.C One test per 250m3
-2%

MDD & O - AS Required By the Engineer


4 days so Not less than 30.0 % As required by Engineer
LL Value Not more than 25.0%
One test per 200m3
PI Value Not more than 6.0%
WA % of r Not more than 2.0%
Not less than 12.0% when tested with
sodium sulphate As required by
Loss of we
Engineer
Not less than 18.0% when tested with
magnesium sulphate

10% Fines Min. 50 kN As required by Engineer

Degree ofNot lesss than 98.0% One test per 500m2

# Sensitivity: LNT Construction Internal Use


INSPECTION
REMARKS
METHOD

AS per IS 2720 pt 4

AS per IS 2720 pt 8

AS per IS 2720 pt 5

AS per IS 2720 pt.16

AS per IS 2720 pt 27 or as
per BS:1377

Expansive Clays is
AS per IS 2720 pt 28
not allowed

As per IS 2720 pt2

As Per IS 2720 pt.40

SAMPLE INSPECTION REMARK


SIZE METHOD S

75.0mm-75mic As per IS 2386 pt. 1

Granular
sub-
base for
Flexible
Paveme
nt

# Sensitivity: LNT Construction Internal Use


base for
Flexible
Paveme
nt

Drainag
53.0mm-425mic As per IS 2386 pt. 1
e Layer
below
the Rigid
Paveme
nt

As per IS 2720 pt2

y the Engineer AS per IS 2720 pt 8


22.4mm down As per IS 2720 pt.16

425mic down As per IS 2720 pt.5

As per IS 2386 pt.3

As per IS 2386 pt.5

As per IS 2386 pt. 4


OR
BIS 812 pt.111
As per IS 2720 pt. 28