TABLE OF CONTENT
2.0 Scope
6.0 Documentation
10.0 Pressurizing
11.0 Dewatering
.Attachment 13.0
2 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
1.0 DATA SHEET
SECTION : from (k.p0.0) to (k.p18.0 KM)
LENGTH : 18.0 KM
VOLUME / KM : 55.6 M3
3 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
2.0 SCOPE ـــت
This scope covers Ras Gara 10 " new oil pipe line hydrostatic test carried out by
- Pressurizing.
- De watering.
5 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
3.0 ـــت
SPECIFICATION & STANDARD
This procedure for hydrostatic test written to meet the requirement for
- Client Specifications
- PETROJET Procedure
6 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
4.0 LIST OF EQUIPMENT & INSTRUMENTS
Petrojet will supply the following equipment& instruments to execute the work:
4.1 EQUIPMENT
- Air Compressor
- Prime Pump
- Filling Pump
- Pressurizing Pump
- Storage Tank
- High Pressure Hoses
4.2 INSTRUMENTS
- No. Of (2) Pressure Gauge
- No. Of (2) Pressure Recorder
- No. Of (2) Temperature Recorder
- Dead Weight Tester.
7 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
5.0 SAFETY PRECAUTION
operation.
8 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
6.0 Documentation
All records for temporary launcher & receiver testing, pipe line cleaning, gauging,
pressurizing and any relevant comments will be completed into "test report" submitted
- After construction of temporary test head it will be filled with fresh water &
tested as one loop for one hour at the same test pressure of the pipe line.
- After the successful test of the temporary test head it will be separated and
- The temporary launcher & receiver will be welded at the two ends of the tested
section.
9 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
Gauging pigs shall be urethane Bi direction pig with gauging plate, with diameter = 90 -
,The gauging plate shall be remarked before launching the gauging pig -
:The remark shall include
Gauging plate diameter وSection No, Date thin Signed by Client Rep. And Petrojet
test engineer
.Client Rep. Shall witness the cleaning and gauging operation -
.and shall signed by Client Rep. and Petrojet test engineer (App. 1)
- The number of pig runs.
.The type of the pig -
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
10/18
0 After gauging had been completed to satisfaction of the client , filling will start
ㄱ The volume required to fill the pipe line will be calculated prior of filling
commencement
ㄴ The filling pump will be connected to the pipe line
ㄷ 20 cubic meter of water will be inserted to the pipe line as flushing water.
ㄹ The filling pig will be launched, and filling will be continued till the pig arrival at
pig receiver then the filling pump will stopped. The line is now completely filled with
water.
ㅁ To ensure that the pipe line is free from the air entrapped, venting will be carried
out several times from launcher and receiver.
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت 11/ 18
10.0 PRESSURIZING
ㅂ Check that the pipe line has been completely back filled
ㅅ Check that all temporary fitting has been removed.
ㅇ Check that all instruments has calibration certificate and approved by the client.
ㅈ Pressure pump and instruments at both ends of pipe line will be connected at safe
distance.
ㅊ All fitting, hoses, and valves used during pressurizing pressure which exceeds the
max test pressure applied on pipe line.
ㅋ All charts which used in recorders will be signed by client representative before
pressurizing commencement.
ㅌ Pressurizing will be commencement at static head pressure.
ㅍ Pressure will raised gradually with suitable rate to prevent sudden stress to pipe
line
ㅎ Pressurizing will be stopped at 80% of test pressure for one hour & visual check
will be carried out.
ㄱ Pressurizing will be commencement again to 100% test pressure.
ㄴ Pressure will be hold for 24 hour
ㄷ Pressure will be beaded gradually to static pressure or as client requirement
ㄹ At the end of the test cycle, all sheets & test certificate will be submitted to client
representative for sign and approval.
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
12/18
ـــت
11.0 DE WATERING
After successful test, the pipe line will be cleaned from test water applying compressed
air and the pig will be pushed through the pipe line using compressed air.
If the valve room is not available for testing with the pipe line it will be pressure tested
separately as a loop for two hour at the same test pressure of the pipe line.
13/ 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
13.0 ATTACHMENTS
PIGGING OPERATION REGISTER
Wall thickness: ………mm Nominal diameter: ………..Inch
.………… :Grade
…… :Section From: …… To
Pig type
Inspected & Location
loaded
Date
Time
Location
Launched Date
Time
Pressure
Location
Received Date
Time
Pressure
Location
Inspected Date
Time
Condition
.Petrojet Test Eng .Client Rep
.Name .Name
Sign Sign
Date Date
Appendix (1)
14/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــت
GAUGE PLATE ACCEPTANCE CERTIFICATE
/ / :Date
:Project
:Client
SECTION ADTA
……………… :From: ………… To
.Length: ……….Km
.Outside diameter: ………..mm
.Internal Diameter: ……… mm
.Wall thickness: …………..mm
..………… :Grade
.Gauge Plate Diameter. : ………..mm
……………: .Gauge Plate Material
.Name .Name
Sign Sign
Date Date
Appendix (3)
15/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ت
CLEANING ـــ
ACCEPTANCE CERTIFICATE
/ / :Date
:Project
:Client
SECTION ADTA
……………… :From: ………… To
.Length: ……….Km
.Outside diameter: ………..mm
.Internal Diameter: ……… mm
.Wall thickness: …………..mm
..………… :Grade
THE ABOVE MENTIONED SECTION HAS BEEN CLEANED
.ACCORDING TO
CLIENT SPESIFICATION.
HYDROTEST PROCEDURE.
SATISFACTION OF CLIENT REP.
.Name .Name
Sign Sign
Date Date
Appendix (2)
16/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
ـــتTEST CERTIFICATE
ACCEPTANCE
/ / :Date
:Project
:Client
: Test Section Data
……… :.Test section No
.……………… :from To: ……………
.………… :Pipe Material Grade Length: ………………
Wall Thickness: ……………….mm Nominal Diameter: ……………Inch
.Name .Name
Sign Sign
Date Date
Appendix (4)
17/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و السإتشارات
CONSULTATIONS CO. الفنية
General Department of Equipment الدإارة العامة للمعدات
……………..
بتـــروجـــ قطاع الخإتبارات
تACCEPTANCE
DEWATERING ـــ CERTIFICATE
:Date
:Project
:Client
SECTION ADTA
……………… :From: ………… To
.Length: ……….Km
.Outside diameter: ……… mm
.Internal diameter: ……… mm
.Wall thickness: ………….mm
..………… :Grade
THE ABOVE MENTIONED SECTION HAS BEEN DEWATERED