GSR for Fire Station

Given Data- GSR

Ablution Tank

Size-18.6m x 5m x 3.0m

Fck = 25 N/mm2

fy = 500 N/mm2

𝜎𝑐𝑏𝑐 = 8.5 Mpa


…………For M25 (IS 456 Annex – B, Table No. 21)

𝜎𝑠𝑡 = 190 Mpa


…………For fe500 (IS 456 Annex – B, Table No. 22)
280
m = = 10.98
3𝜎𝑐𝑏𝑐

𝑚𝜎𝑐𝑏𝑐
k = = 0.33
𝑚𝜎𝑐𝑏𝑐 + 𝜎𝑠𝑡

𝑘
j = 1 - = 0.89
3

1
R = 𝜎 . k. j = 1.2482
2 𝑐𝑏𝑐

A} Design of long walls:-

a) Tank empty with pressure of saturated soil from outside


1− 𝑠𝑖𝑛30
Ka = = 0.333
1+ 𝑠𝑖𝑛30

𝛾 = 17 kN/m3

𝛾 ′ = 17 – 9.81 ……. (𝛾𝑤 =9.81 KN/m3)

= 7.19 kN/m3

𝑃𝑎 = 𝐾𝑎 𝛾′ 𝐻 + 𝛾𝑤 𝐻

= 35329.83 N/m2
3 3
Max. B.M at base = 35329.83 x 𝑥3
2

= 52994.745 N-m
= 52.9 x 106 N-mm
𝑀
d= √1000𝑅 = 206.04 mm
Provide a total of T = 230 mm d = 230-
35=195 mm
52.9 𝑥 106
Ast =190 𝑥 0.89 𝑥 195 = 1604.26 mm2

201.1
Spacing = 𝑥 1000 = 125mm
1604.26
Provide 16 mm Tor @ 125 mm c/c throughout of long
wall.

0.1(𝑇−100)
Distribution steel = 0.3 − = 0.262%
(450−100)
230𝑥1000
Ast = 0.262 x = 602.6mm2
100
Area on each face = 301.3mm2
1000𝑥 113.1
Spacing of 10mm Ø = = 260mm
301.3

Provide T 10 mm Ø @ 175 mm c/c

1000 𝑥 78.54
Actual Ast provided = 2 x = 897.6 mm2
175

0.1(230−100)
Mini % = 0.3 – = 0.262%
(450−100)

230
Mini Ast = (0.262 x 𝑥 1000)
100

= 602.6 mm2

b} Direct Compression on long walls

At h = 1m >(H/4) above base of short walls

𝑃𝑎 = 𝐾𝑎 𝛾′ (𝐻 − ℎ) + 𝛾𝑤 (𝐻 − ℎ)

𝑃𝑎 = 0.33 𝑥 7190 (3 − 1) + 9810(3 − 1)

= 24365.4 N/m2

Direct compression on long walls is given by

PLc = pa x B/2

pa x 5/2= 60913.5 N

Astreq = 60913.5/190 = 320 mm2

Distribution Steel provided will be sufficient.

b}Tank full with water and no earth fill outside.


P= 𝛾𝑤 H = 9810 x 3.0 x1 = 28449 N/m2

M = P x (H/2) x (H/3) = 44.145 x 106 N-mm


𝑀
Ast = = 1695 mm2
𝜎𝑠𝑡 𝑥 𝑗 𝑥 𝑑

201.1
Using 16 mm; Spacing = x 1000 = 125mm
1695

Provide 16 mm Ø @ 125 mm c/c at inside face.

 Direct Tension on long walls

P = 9810 x (2.9 - 1) = 18639 N/m2 at 1m above base.

PL = p x B/2

PL = 49050 x (5/2) = 46597.5 N

Astreq = 46597.5 /190 = 245.25 mm2

Distribution Steel provided will be sufficient to take


direct tension.

C} Tank empty with pressure of saturated soil from outside

 Design of short walls


i. Top portion

The bottom portion of 1m (> H/4) acts as a cantilever, while


remaining 1.9 m acts as slab supported on long walls.

At h=1m (> H/4) above base of short wall


𝑃𝑎 = 𝐾𝑎 𝛾′ (𝐻 − ℎ) + 𝛾𝑤 (𝐻 − ℎ)

= 23147.13 N/m

23147.13 x (52 )
M fix(at support) = (wx L2)/12 = 12

= 48223.1875 N-m

M (at center) = (w x L2)/8 - Mfix

= 24111.59 N-m

D = (230- (25+16+6))

= 183mm
48223.1875 𝑥 1000
Ast (at support) = = 1558.33 mm2
190 𝑥 0.89 𝑥 183
201.1
Using 16 mm Ø; S= x 1000 = 129.04 mm
1558.33

Provide 16 mm Ø @ 125 mm c/c at outer face at 1m below top.

At midsapn; Ast = (1/2) x 1558.33 = 779 mm2

Mini. Ast = 602.6 mm2 As found earlier


113.1
Spacing = X 1000 = 145.18 mm
779

Provide 12 mm Ø @ 125mm c/c at inner face.

ii. Bottom portion

Bottom 1m will behave as cantilever.

Intensity of earth pressure at bottom = 𝑃𝑎 = 𝐾𝑎 𝛾′ 𝐻 + 𝛾𝑤 𝐻 =


35329.83 N/m2
1
M = ( 𝑥 35329.83𝑥 1) x (1/3)
2

= 5888.305 N-m
5888.305 𝑥 1000
Ast = = 178.57 mm2 = 150 mm2
190 𝑥 0.89 𝑥 195

Mini Steel is 0.262% = 602.35mm2


113.1
Spacing = x 1000 = 187.71 mm
602.5

Provide 12mm Ø @ 175 mm c/c at outer face for complete


height.

 Direct compression on short walls :-

End portion of long walls pushes short walls due to earth


pressure and magnitude is

Pbc = pa x 1m = 23147.13 N

D} Tank full with water and no earth fill from outside

i. Top portion:-

Bottom portion of h = 1m (> H/4) act as a cantilever while


remaiming 1.9m acts as a slab supported on long walls.

p = W (H – h) = 9810 (3 -1) = 19620 N/m2

M fix (at support) = (p x B2)/12 = 40875 N-m


M (at center) = (p x B2)/24 = 20437.5 N-m

Direct tension in short wall, due to water pressure on end 1m


width of long walls is;

PB = w (H-h) = 35414.1 N

Effective depth for horizontal steel = 185mm

x = d – (T/2) = 70mm

At the inside face;


M – PB .x
Ast1 =
𝜎𝑠𝑡 .𝑗 .𝑑

38831.25x1000– 18639 x 70
= 190 𝑋 0.89 𝑋 185

= 1199.56 mm2
𝑃𝑏
Ast2 = = 98.1 mm2 ≈ 260 mm2
𝜎𝑠𝑡

Total = 1199.56 + 98.1 = 1297.66 mm2


490.87
Using 16 mm Ø; S = x 1000 = 154.97 mm
3565

Provide 16 mm Ø @ 150 mm c/c at inner face.

At the outside face;


𝑀𝑐 −𝑃𝐵 .𝑥
Ast1 = = 585.50 mm2
𝜎𝑠𝑡 .𝑗 .𝑑

𝑃𝐵
Ast2 = = 98.1 mm2 ≈ 260 mm2
𝜎𝑠𝑡

Total = 585 + 260 = 845 mm2

Mini.Ast = 1205 mm2

Provide 16mm Ø @ 150mm c/c at outer face for complete


height.

ii. Bottom Portion

The bottom 1m will bend as cantilever

P (at bottom) = 𝛾𝑤 𝐻 = 28449 N/m2


1 1
M = (2x 28449x1) x = 4741.5 N-m
3

4741.5 𝑥 1000
Ast = = 143.8 mm2
190 𝑥 0.89 𝑥 195
But Mini. % of steel = 0.2% = 1205 mm2
201.1
Spacing = x 1000 = 166.88 mm
1205

Provide 16 mm Ø @ 150 mm c/c at outer face for complete


height.
Summary: (Short walls)

i. Horizontal reinforcement at inner face

For lateral pressure horizontal reinforcement required is 12mm


Ø @ 175 c/c in mid-span.

For water pressure, horizontal reinforcement required is 12mm


Ø @ 175 mm c/c at ends.

Hence provide greater of two;

Thus, provide 12 mm Ø @ 175 mm c/c at inner face for full


height.

ii. Horizontal reinforcement at outer face:-

For lateral earth pressure horizontal reinforcement required


is 12mm Ø @ 175 mm c/c at support.

For water pressure horizontal reinforcement required is 1mm Ø


@ 175mm c/c at mid-span.

Thus, provide 12 mm Ø @ 175 mm c/c.

iii. Vertical reinforcement at inner face;

Provide 16 mm Ø @ 125 mm c/c at inner face for complete height

iv. Vertical reinforcement at outer face;

Provide 16 mm Ø @ 125 mm c/c at outside face for complete


height.

Summary: (Long walls)

i. Vertical reinforcement at outer face;

For lateral pressure of earth in vertical direction

Provide 16mm Ø @ 125mm c/c for complete height.

ii. Vertical reinforcement at inner face;

For water pressure in vertical direction

Provide 16mm Ø @ 125m c/c for complete height.

iii. Horizontal reinforcement ;

For outer and inner face provide 12mm Ø @ 175 mm c/c.


E} Design of top slab:-

5 m x 18.69 m

L/B > 2 ………..( one way slab)

Assuming 20cm thick with finishes

Self-wt. = 0.2 x1 x 25000 x 1 = 5000 N/m2

Live load = 2000 N/m2

Total = 7000 N/m2

M = (w x B2)/8 = 21875 N-m

21875 𝑥 1000
d = √1.2482 𝑥 1000 = 132.38 mm

Provide overall thickness of 200 mm and cover of 25mm and


12mm Ø

d = 200 – 25 - 6 =169 mm
21875 𝑥 1000
Ast = = 765 mm2
190 𝑥 0.89 𝑥 119

113.1
Spacing of 10 mm Ø @ = x1000 = 140 mm
765

Provide 12 mm Ø 140 mm c/c


200−100
Distribution steel = 0.3-0.1[450−100] = 0.271%

200𝑥1000
Astdist = 0.271 x = 542 mm2
100

Astdist = 542 mm2


78.54
Spacing of 10 mm Ø = 𝑥1000 = 154.9mm
542

Provide 10 mm Ø 150mm c/c

Considering the effect of moving vehicles, provide the


reinforcement as double jail i.e bottom face and top face
steel.

F} Design of bottom slab:-

If there were no sub-soil only nominal reinforcement would be


required. However because of saturated sub soil there will be
uplift pressure on bottom slab.
H1= 2.9 + Bottom slab Thk. = 3 +0.3 =3.3

pu = w. H = 9810 x 3.3 = 32373 N/m2

a) Check for floatation

pu = pu x B x L

= 32373 x 5 x 18.6

= 3.01 x 106

Total downward force consists of wt of tank

Assume 300 mm thick slab

Wt. of wall = 0.23 x (5 + 5 + 18.69 +18.69 ) x 3 x 25000

= 814.2 x103 N

Wt. of roof slab and finishes = 0.2 x 5 x 18.69 x 25000

= 468.25 x 103 N

Wt. of base slab = 18.69 x 5 x 0.3 x 25000

= 700.87 x 103 N

Total = 790.06 x 103 + 468.25 x103 + 700.87 x103

= 1.98 x 106 N

Since this is less than floatation force, hence need to


provide projections in vertical walls.

A F.O.S of @ 1.1 is needed

Design base slab as one way slab

Upward water pressure = 31392 N/m2

self wt. = 1*1*0.3*25000

=7500 N/m2

Net upward pressure = 31392 - 7500 = 23892 N/m2

Wt. of wall /m run = 0.23 * 3 * 1 * 25000

= 17250 N/m

Wt. of roof slab = 0.2 * (2.5 +0.23)*1*25000 = 13650 N

Wt. of earth on projection = 17000 * 3 * 1 *0.5= 25500 N/m


Net unbalanced force/m run = 31392*(6.46*1) –
2(17250+25500+13650) = 89,992.32

Reaction on each wall = 89,992.32/2 =44996.16 N

pa= 𝐾𝑎 𝛾′ 𝐻 + 𝛾𝑤 𝐻 = 36548.1 N/m2

Pa = 36548.1 x 3/2 = 54822.15 N/m

Acts at (3/3 + 0.3 ) = 1.3 m above bottom of base slab

B.M at edge of cantilever portion -

= 23892 x 0.52/2 + 54822.15 x 1.3 – 51000 x 0.52/2

= 67.880 x 103 N-m

B.M at center of span –

= (23892/2 x 6.462/2)+(54822.15 x 1.3)-((17250 + 25500 +13650)


x 5.23/2)-(51000 x 0.5 (6.46/2 –0.25)

= 97.054 x 103 N-m

97054∗1000
d = √1.2482∗1000 = 278 mm

D = 350 mm, cover = 50mm

d=300 mm
97054∗1000
Ast = = 1913.14mm2
190∗0.89∗300

314.1
Spacing of 20mm Ø = 𝑥1000 = 164.18mm
1913.14

Provide 20mm Ø @ 150 mm c/c at bottom face


67880∗1000
For top face, Ast = = 1338.06mm2
190∗0.89∗300

201.1
Spacing of 16 mm Ø = 𝑥1000 = 150mm
1338

Provide 16 mm Ø @ 150 mm c/c at Top face


300−100
Dist. Steel = 0.3 – 0.1[450−100] = 0.242%

Ast = 0.242*(1000/100)*300 = 726 mm2

Area of steel on each face = (726/2) = 363 mm2

Provide 12 mm Ø @ 200 mm c/c.