Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 1 of 40      
 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 2 of 40      
 

Purpose 

               This Document is intended as an installation  guide for deploying Siae equipment ALS series model 
ALCpus2 into customer ‘s network. It is not intended as installation instruction for any civil works 
and intended  to follow on from previous installation guides. 

Intended Audience 

               The document is intended for all field staff that will be involved in Siae microwave deployment 

Pre Installation 

               Prior to installation any new link the contractor will be required a completed Scope of Works 
documents “SOW” . The SOW document contains all the information for the installation, 
commissioning and integration of the new equipments. The SOW contains the following 
information 

Link parameters 

Link frequencies 

Proposed License details 

Network Element IP addresses 

IDU installation location 

DC  Power Supply terminations 

ODU installation location 

IF cable routing 

Installation brief ( How the installation will be done, any arrangement of existing equipment, 

Antenna mounting  installation) 

Integration brief ( How the integration of the network element will be completed, Outage 

Requirements of each circuit) 

System Architecture ALS series – ALCplus2 

Siae Microwave link ALS series model ALCplus2  is consist of  2 main equipments which is IDU 

(Indoor Unit) and ODU ( Outdoor Unit) 

Indoor Unit of ALCplus2 have 2 main types  

1.ALCplus2 IDU ‐18xE1 +4xGE + 2xSTM‐1 +Nodal Bus 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 3 of 40      
 

  1  2  3  4  5 6 7 

 
8  1 9 10
 

Figure 1. ALCplus 2 IDU – 18xE1 + 4xGE + 2xSTM‐1 + Nodal Bus 

1. TMN‐access (ETH, USB‐B, RS232) 
2. ETH payload 10/100/1000 RJ45 FE/GE 
3. STM‐1 payload  With SFP modules 
4. 2xE1 payload 
o Traffic 
o Sync Input/Output (G703/ 2 MHz clock or HDB3 AIS) 
o Traffic + EOC (G704 framing) 
5. CAT6 proprietary expansion Bus Traffic 
6. nxE1 payload on SCSI connectors (120/75 ohm) 
7. Power Supply 
8. ETH payload with optical GE  SFP modules  
9. Alarm IN/OUT 
10.IDU‐ODU cables interfaces 
 

2.ALCplus2 IDU ‐34xE1 + 4xGE + 2xSTM‐1 
1  2  3 4  6 7 

8 1  9 10  

          Figure 2.ALCplus2 – 34xE1 + 4xGE + 2xSTM‐1 

10. TMN‐access (ETH, USB‐B, RS232) 
11. ETH payload 10/100/1000 RJ45 FE/GE 
12. STM‐1 payload  With SFP modules 
13. 2xE1 payload 
o Traffic 
o Sync Input/Output (G703/ 2 MHz clock or HDB3 AIS) 
o Traffic + EOC (G704 framing) 
14. CAT6 proprietary expansion Bus Traffic 
15. nxE1 payload on SCSI connectors (120/75 ohm) 
16. Power Supply 
17. ETH payload with optical GE  SFP modules  
18. Alarm IN/OUT 
10.          IDU‐ODU cables interfaces 
 
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 4 of 40      
 

Installation of IDU unit 

The AlCplus 2 IDU shall be install inside the standard 19 inch rack  which be required for the spacing 
on rack equal 1RU. 

42 U

DC Distribution Rectifier , DC Distribution and On/Off Breaker

SIAE ALCplus 2 IDU


IDU 1 RU

E1 Main Distribution Frame


E1 Wiring Connection Panel 

19 Inch Rack Front View


 

Figure 3.IDU Rack installation 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 5 of 40      
 

ALCplus 2 ODU Unit 

ASN ODU : supports all modulation schemes (4/8/16/32/64/128/256 QAM) and all capacity from 8 
Mbit/s to 400 Mbit/s. ASN ODU doesn’t require any hardware change if configured  frequency 
reuse (independence from XPIC functionality ) and compatible with all type of IDU. This model 
provides up to 20 dB ATPC. 

Please note that ASN ODU version without the Isolator will not be performed for the functionality 
of RF Loop back. 

AS ODU: supports all modulation schemes (4/8/16/32/64/128/256 QAM) and all capacity from 8 
Mbit/s to 400 Mbit/s. ASN ODU doesn’t require any hardware change if configured  frequency 
reuse (independence from XPIC functionality ) and compatible with all type of IDU. This model 
provides up to 40 dB ATPC.  

Figure 4. ASN ODU  

Figure 5.AS ODU 

Installation of ODU unit 
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 6 of 40      
 

The ALCplus 2 ODU can be installing  variety of ODU configurations and this is the following 
common  configurations. 

1+0 Configuration with Integrated Antenna 

1+0 Configuration with Separated Antenna 

1+1 Configuration with Integrated Antenna 

1+1 Configuration with Separated Antenna 

1+0 Configuration with Integrated Antenna 

Siae 1+0 with integrated antenna, the Dish mounts  directly onto the pole mount bracket, the ODU 
mounts directly onto the back of the Pole mounting bracket. 

                                Figure 6. ODU 1+0 with Integrated Antenna 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 7 of 40      
 

                           Vertical Polarization                                Horizontal Polarization 

Figure 7. ODU 1+0 with Integrated antenna and Polarization installation. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 8 of 40      
 

1+0 Configuration with Separated Antenna 

Step 1 : Install Antenna sliding strip onto antenna pole mounting. 

Figure 8. Ant‐sliding Strip 

Step 2: Install support bracket. 

Figure 9. Bracket installation 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 9 of 40      
 

Step 3: Install the ODU mounting bracket. 

 Figure 10. ODU  Mounting Bracket 

Step 4: There are 3 possible installation scenarios for mounting the ODU mounting bracket onto the 
support bracket, depending on the orientation of the antenna to be connected to the  ODU 
mounting bracket can be installed to the left, right or straight on. 

Figure 11.Direction to install the ODU mounting bracket 

Step 5: Install Wave Guide onto the Brass wave guide flange. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 10 of 40   
   
 

Figure 12. Wave Guide install to ODU mounting Flange 

Step 6: install ODU onto the Mounting Bracket is straight forward but can be easily installed 
incorrectly if the wrong installation method is used, there are three items that need to be aligned 
correctly for the installation procedure to work, first the Brass Wave Guide Flange needs to be 
installed in the Vertically position , then the reference tooth and the Raised weldment must also 
line up, please see picture below. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 11 of 40   
   
 

    

               Rotate ODU Clockwise                                                               Final Position ODU Correctly 

                  Figure 13. ODU mounting into the Bracket as Vertical  Polarization  Position 

             

 Please note that on the correctly installed ODU handle will always face down and toward to left hand side 
.Checking if the Polarization be mounted as a Wrong Position then it will be the “Cross Wave Guide” the 
receive level at the far end will be ‐30 dB lower than the calculated level. 

                      Figure 14. Shown the ODU mounting Correctly and Incorrectly Position 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 12 of 40   
   
 

1+1 Configuration with Separated Antenna 

Siae 1+1 Separated Antenna solution , use 2xODUs connected to the RF Hybrid Branching (RF 
Power Slitter) and Mount directly onto the RF Flexible Wave Guide which other side of Flexible 
Wave Guide mount onto the back of single polarization Antenna Dish. 

Figure 15. RF Hybrid Branching  

Please note that the Flange Type of the RF Hybrid Branching will be different depending on 
Frequency Range. At the Figure 15. shown RF Hybrid branching for 6GHz. 

Wage Guide Installation 

When ODU and RF Hybrid Branching need to be installed with separate antenna .Extra care should 
be taken when installing the Flexible Wave Guide, this is because the RF integrity of the flexible 
wave guide can be easily compromised incorrectly. Below is an Flexible wave guide minimum E 
plane and H plane bending.    Figure 15.1 Shown the example Flexible Wave Guide Bending Value. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 13 of 40   
   
 

Figure 15.2 : Details of RF Hybrid Branching Unit for mounting 2xODUs 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 14 of 40   
   
 

Figure 16. Shown 2xODUs mounting onto the RF Hybrid Branching 

ODU 1 (Main) mounting to RT1 side and ODU 2 (Standby) mounting to RT2 side for radio 
configuration as 1+1 Hot Standby. 

Figure 16.1: Shown reverse viewed 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 15 of 40   
   
 

Figure 17. Rear side ODU mounting for configuration as 1+1 or 2(1+0) 

Please note that incase to installed ODU as 2x(1+0) ,always ensure that the “A” ODU installed at the 
Left hand side and the “B” ODU installed at the Right hand side when view from the rear. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 16 of 40   
   
 

       Figure 18. 1+1 ODU completed install to RF Hybrid Branching  and Flexible Wave Guide 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 17 of 40   
   
 

Flexible Wave Guide Support ( Optional) 

When the Flexible Wave Guide is installed at the High Position on Tower and facing with the strong 
wind ,The Flexible Wave Guide must be properly supported by using a threaded rod wave guide 
support system with the correct sized wave guide rubber boot. 

                               Figure 19.Shown the Flexible Wave Guide Support system. 

1+1 Configuration with Integrated Antenna 

Siae 1+1 Integrated Antenna solution , use 2xODUs connected to the RF Hybrid Branching (RF 
Power Slitter) , Mount directly  onto the back of single polarization Antenna Dish. 

                      Figure 20.Polarization on back of Dish – Single Pol. 

 
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 18 of 40   
   
 

        

   

                         Figure 21.1+1 RF Hybrid Branching Unit for installing to Integrated Antenna 
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 19 of 40   
   
 

Step1 : Mount the RF Hybrid Branching Direct to the Back end of Antenna 

                       

                             

                                                  Figure 22. Install the Hybrid to Antenna 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 20 of 40   
   
 

Step 2: Mount the ODU onto the RF Hybrid Branching 

                               

                                                Figure 23.ODU Completely Installation 

Please note that the Polarization   between the RF Hybrid Branching and Antenna must be the same  

Grounding  system 

1.Groudning IDU 

2.Grounding ODU 

3.Grounding IF Cable 

4.Grounding Surge Suppressor  

Grounding IDU   

Use the Siae grounding Kit provide with the IDU to make an Earth Grounding cable from the Siae IDU 
chassis  mount stud to the vertical earth bar (Green Line)  which is installed inside the 19 inch rack. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 21 of 40   
   
 

Siae IDU Grounding Point 

Inside  Rack Grounding 
B

SIAE IDU

                                              Figure 24. Grounding IDU 

Siae Grounding Kit , contains 

‐1m 6mm.Grounding Cable 

‐2x 6mm. blade connectors 

‐ 2x Heat Shirk pieces 

‐1x6mm/M6 Crimp Lug 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 22 of 40   
   
 

Grounding ODU 

Every ODU installed into the Microwave Radio Network will need to be connected to a Lightening 
Grounding system .A minimum 25mm Grounding cable to be run to the closest Lightening Bar or Grounding 
structure. If there is no available lightening protection grounding bar  the ODU can be grounded to the 
structure, either using a angle tower adaptor or bolted directly to the structure, all grounding connection 
will have electrical bonding plate applied and all paint/grease removed from the contact point. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 23 of 40   
   
 

With the variety of tower configurations 

Within the Mobile network, it is sometime 

Impossible to grounding the IF cable at the 

Top of the Tower/Monoploe, if this is the 

Situation then it is permitted  to leave this 

Grounding connection off. 

                             Figure 25. The ODU and Tower Grounding Structure 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 24 of 40   
   
 

                               Figure 26. ODU Grounding Point 

                      

                          Figure 27. SIae ODU Grounding Kit ,Contians 

‐ 2m 25mm  Grounding Calbe 

‐ 2x25mm/M8 Lug 

‐ 2x Heat Shrink pieces 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 25 of 40   
   
 

Grounding IF Cable 

All coaxial IF cables installed into the Microwave Radio Network will  be required to be connected the 
grounding . Both PDH or SDH or IP Radio will follow this standard. There are 2 types  of the IF cable that will 
be usually used for the PDH and SDH which is LDF4‐50 and LMR400 , for the standard grounding kit for this 
2 cables is UEK 1 for LMR400 and UEK2 for LDF4‐50. 

Figure 28. Grounding kit UEK2 for LDF4‐50 

UEK1 and UEK2 Universal Earth Kit cable sizing 

                              

                                                              Figure 29. Installed of UEK2 Kit 
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 26 of 40   
   
 

Grounding Surge Suppressor (Option) 

The Grounding of Surge Suppressor may be required to be installed  at the Site that need strongly 
Lightening protection. The Lightening surge suppressor will be installed outside the equipment shelter or 
room as see below diagram. 

                                        Figure 30.Grounding Surge Suppressor installation Diagram 

DC Power Connection 

DC cable type 

              Black or White 2 core electrical flex is is to be used between the RIM and DC power supply, 
normally the color code for DC is Black & Blue, (Black ) +ve connected to the buss bar ,(Blue) –ve 
terminated to MCB ( Main Circuit Breaker), Any color conductors can be used but they need to have the 
correct color heat shrink applied to the exposed ends to hide the incorrect color , example black heat shrink 
over brown color conductor. 

DC cable size 

            1.5 sqmm minimum for dc cable run’s less than 10m , for cable run over 10 m ,2.5 sqmm cable to be 
installed. 

Circuit Breakers 

            Normally most of Mobile Operator require different standard of this MCB , but there is a main 
supplier in the market , which is Merlin Gerin “C” Curve MCB ,only to be installed into 19 Inch rack DC 
Distribution, second supplier is Moellor “C” Curve MCB only to be installed inside the Eltek DC Distribution , 
Other type can be used but not required much by the Mobile Operator. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 27 of 40   
   
 

 1+0 Modular/Compact  Link MCB rating 6A or 10A 

1+1 Modular link MCB Link  rating 2x6A or 10A 

1+0 XPIC Modular /Compact link MCB rating 6A or 10A 

1+1 XPIC Modular/Compact link MCB rating 2x6A or 10A 

When the Protected link is to be installed , the installer must ensure that the A leg DC MCB and B leg DC 
MCB are not located right  beside each other, put as much as separation as possible between them, this is 
used as protection against accidentally leaning or dropping tools on to the DC Distribution panel and both 
DC feeds are switches off. 

DC Connection 

                Equipment end of the Flex cable must be soldered into the DC connector pins , making sure  not 
stray copper strands are present that could in the future short out to the case. MCB/Grounding end, each 
end of the exposed flex cable , black and blue need to be crimped into a ferrel of the correct size, these 
ends are then  inserted into the MCB (Bule) –ve and Black +ve into the buss bar. 

RIM DC Power connector 

               Input Voltage Range 40.8‐57.6 Vdc (Positive Ground) , Each RIM card Is protected internally by 3A 
125V very fast blow Fuse, Note this not soldered and  field replacement. 

Figure 31.DC Connector from the front view 

Figure 32. DC Connector and Completed Connector 

           
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 28 of 40   
   
 

Link Commissioning 

                The Link commissioning engineer must be familiar with Siae SCT/LCT or WebLCT software and how 
to set up the Siae ALCplus2 .The Link commissioning  are required as the following 

1. Pan and Tilt antenna for the Maximum Receive Signal Level 

2. Ensure the  Receive Level meets the specified level in the Link calculation sheet 

3. If specified level is not achieved +/‐ 3dB variation from the value in a link calculation are acceptable 

Link Commissioning  Pan & Tilt adjustment for integrated antenna solution please also refer to the 
manufacture installation instructions. 

Link Commissioning RSSI 

Below is the a graph of received signal RSSI which is plotted against voltage, this voltage  reading  is taken 
from ODU’s  BNC connector. An analogue 0‐3 volt Multi Meter is recommended for taking these 
instruments as it is response time quicker than a digital multi meter (DMM) and easier to get the peak 

receive level. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 29 of 40   
   
 

r  

                            Figure 33. Detected Voltage Versus the RF Receive Level  

Field Engineer  can  also monitor the RX level by monitor at the screen of  software WeBLCT 

Please note that Maximum Receive Level of ALCplus 2 must not strong over than ‐20 dBm to avoid the 
situation of RX saturate. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 30 of 40   
   
 

                                                        Figure 34  RX Level monitor by WebLCT  

SNR must 
be at lest 
33.6 dB to 
operating  
modulation 
at 256QAM 

For operating the Link as Adaptive Modulation (ACM) the Modulation  from 4QM to  256QAM  of  link 
will shift up or Shift down depending on the Receive  SNR ( Signal to Noise Ratio) . 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 31 of 40   
   
 

Link Configuration 

After commissioning the link and meets the Maximum Receive Level or meets the value that specified in 
Link calculation, then engineer must set up the Mian configuration of the link which are , 

1. Frequency Channel 

2. Modulation  

3. Channel Bandwidth 

4. TX Power 

5. Capacity 

Frequency Channel Setting 

Connect to the IDU at LCT (USB port) by using the program WebLCT , then selected  the menu Radio  Brach 
1A , if the configuration is 1+1 Hot Standby when adjust the frequency at the Mian Radio ( 1A) then the 
Standby Radio ( 2A) will follow automatically, but if the configuration is 1+1 Frequency Diversity , then the 
software WebLCT will be required to set up Frequency Channel of Radio 1 A and Radio 2A and must be 
Different Channel otherwise the software will warning and not allow user to apply the configuration. 

Currently Operating  

TX/RX Frequency 
range and Ch. 

Move UP and Down 
arrow to adjust CH. 
Frequency ( 250 KHz 
step) 

                  Figure 35. Frequency Channel Setting on WebLCT 
Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 32 of 40   
   
 

Please note that at the same link the Frequency of Both site (Local &Remote) must be set as the Same 
Channel And on this menu ,field Engineer must be set the sub‐menu as  

‐ Carrier Only  must be “Off” 

‐ RT PSU must be “On” 

‐ TX Transmitter  must be “On” 

Modulation Setting 

Siae ALCplus 2 can be set the modulation  as Fix Modulation (ACM Disable) or Adaptive Modulation (ACM 
Enable). Please also remind that the link ( Local& Remote site) must be set as the same. 

For Fix Mode Modulation ,set ACM Engine as”Disable” and Set TX Power Constant Peak Mode as “Disable” 
also. Then select the modulation as your specified. 

For Adaptive Modulation , set ACM Engine as “Enable” and TX power Constant Peak mode can be set as 
“Disable” then the TX Power Mode will work as “Average” which all modulation scheme from 4QAM to 
256QAM will be have the same TX Power, but if set TX Power Constant Peak mode as “Enable” then the TX 
Power Mode will work as “Peak “  then at each modulation scheme will work as different TX Power ,see 
below  

ACM Engine 
set as 
Disable or 
Enable 

                                    Figure 36.Modulation Mode Setting 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 33 of 40   
   
 

TX Power Constant 
Peak Mode Disable 
and TX Power Mode 
is “Average” and 
Click at View 
Current Config. To 
View TX Power 
Mode at each  

Modulation Level

                 Figure 37.TX Power Constant Peak Mode Setting and TX Power Mode 

  TX Power Mode “Average”

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 34 of 40   
   
 

TX Power 
Constant Peak 
Mode set as 
“Enable” 

                       Figure 38.TX Power Constant Peak Mode setting as “Enable” 

Figure 39. 
TX Power Mode Peak
 

Modulation Level (Upper & Lower) setting 

After the ACM Engine be set as “Enable” user be also set the Upper Modulation ( Highest is 256QAM) and 
Lower Modulation ( Lowest 4QAM) , Example if the highest modulation need only 128QAM and Lowest 
need only 32QAM , then the ACM engine will running Up‐shift and Down –shift only between 
128QAM,64QAm and 32QAM. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 35 of 40   
   
 

Setting 
Upper and 
Lower mod. 

  Figure 40. 

Channel Bandwidth Setting 

Figure 41. 

For setting the Bandwidth and Modulation must be set as the Bandwidth with the Lower Modulation 
,Example if the required Bandwidth is 56 MHz and ACM range is 4QAM to 256QAM then selected the  
relative of Bandwidth and Modulation as 56 MHz‐4QAM.as figure  below. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 36 of 40   
   
 

Figure 42. 

TX Power Setting 

There are 2 mode to set the TX power, which is Manual and Automatic (ATPC) 

 Figure 43. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 37 of 40   
   
 

IF user selected the TX power control mode as Automatic (ATPC) , user also have to set the Threshold of 
Local PRx  High and Low range at least 3 dB different. User also can setting the Range of Minimum TX 
power to relative with the Power Mode “Peak” to make the ACM adjust the TX power suitable at each 
modulation level. This Example set the Max TX Power is 23  dBmand Min TX Power is 22 dBm 

Figure 44. 

Adjust the Min and 
Max of the TX power 
when setting the TX 
power control as ATPC 

  

After completely setting the TX Power Control ,then click at View Current ATPC Power ,To monitor the 
result of setting. 

                                       Figure 45. View  Current ATPC Power. 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 38 of 40   
   
 

Capacity Setting 

1) Setting E1 traffic , Permanent E1 and Extra E1 ,result of setting as figure below. 

Permanent 
E1  setting 
Max is 60E1 

Extra E1 
setting at 
each 
modulation 
level 

Figure 46. 
Maximum  E1 capacity that can be set at each 
  modulation level ( Permanent  +Extra)

 Click at View Current Config. To see the result of setting 

    Figure 47. Show the Table of Ethernet Capacity and  TDM Traffic at Each modulation Level 

Created By Monthien Satantoranin  : Siae Microelettronica South East Asia                                 Page 39 of 40   
   
 

2) Ethernet Capacity will reverse to the Capacity of E1 traffic automatically , if reduce the E1 then its 
will be increase the Ethernet Capacity as shown in figure 47. 