DATE : 30-Jan-20 Working Hours 10 Hours Weather : Sunny Temperature (c):


Manpower Status / Day Equipment Status / Day
Departme
Description Today Remarks Description Today
nt
Project Manager 1 Excavator 4
Accountant 1 Mobile Cranes 50 tn 1
HR 1 Mobile Crane 35tn 1
Admin Officer 1 Mobile Crane 30tn 2
Office Staff (Indirect)

Planning Engineer 1 Mobile Crane 7tn 1


Project Coordinator 1 Truck 7
HSE 1 Excavator hydraulic Breaker 3
Store Keeper 4 Hydraulic drop hammer 1
Drivers 23 Excavator Back Hoe loader 5
Chief + Waiters 6 Bobcat 4
Office boy 11 Steel Roller Compactor 1
Architect 5 Sheep Foot Roller Compactor 1
Interior designer 1 Tyre Roller Compactor 1
Sub Total 57 Cargo Crane 2
Engineers 6 Pickup 5
Technician 9 Van 6
Electrical

Laborer 18 Tractor with Trolly 7


Front End loader 2
Loading Dump Truck 2
Sub Total 33 Flatbed Truck 5
Engineers 9 Generator 550 Kva 1
Supervisor 1 Generator 250 Kva 1
Mechanical

Foreman 2 Fire truck 1


Technician 6 Security Pickup 2
Pipe Fitter 3 Bucket Truck 1
Laborer 23 Lakes Cleaning Machine 1
Sub Total 44 Mini Dump Truck 2tn 1
Engineers 7 Mobile Electric Lift Ladder 2
Supervisor 2 Total Equipment 71
Construction

Foreman 6
Wooden Formworks Techn 10
Rebar Technician 10
Technician 15 Direct Workforce Summary
Laborer 108
Sub Total 158 Description Today
Engineers 7 Engineers 40
Foreman 1 Technician 45
Supervisor
IT

Technician 2 14
Laborer 15 Foreman 16
Sub Total 25 Wooden formworks technicians 10
Engineers 6 Rebar Technician 10
Agricultural

Foreman 2 Carpenter 5
Laborer 32 Laborer 244
Sub Total 40 Automobile Technicain 6
Engineers 1 Automotive Electrician 2
Mechnics workshop

Foreman 2 Tire Repairer ]


Automobile Technicain 6 Mechnics workshop store keeper 1
Automotive Electrician 2 Vehical fuel responsible person 1
Tire Repairer 2 Mobile Crane staff - Laborer 6
Mechnics workshop store 1 Wooden Polisher 5
Vehical fuel responsible p 1 Total Direct Workforce 405
Laborer 19
Sub Total 34
Supervisor 2
Pump stations
Resourses &

Foreman 2
Water

Technician 2
Laborer 15
Water

Pump stat
Resourse
Lakes cleaning machine d 1
Sub Total 22
Engineers 4
Survayer Foreman 3
Laborer 0
Sub Total 7
Technician 5
Sanitar

Laborer 4
y

Total Manpower on Site


Sub Total 9
Mobile Crane staff - Labo 6
Sub Total 6
Supervisor 1
Systems Workshop Mainteneace
Control Carpentry Electrical

Technician 4 448
Laborer 3
Sub Total 8
Carpenter 5
Wooden Polisher 5
Laborer 7
Sub Total 5
Engineers 5
Technician 1
Laborer 3
Sub Total 9
Civil Department
Tomorrow plan
Activity Activity
1- Reinforcement works for lift station ww-42.
2- Formworks for storm water manholes near the field.
3- Manhole csting near building 81-82.
4- Formworks for storm water manhole covers near building 81.
5- Control room of the main water tank roof installation.
6-Main water tank installation
ICT Department
Today works Tomorrow plan
Activity Activity
1- Working on Splice the main FOC for building 53 Progress:100%

2- Working on install CCTV Pole base at road 2,10 Progress 65%

3- Working on install G-pone device at building 70-71-69 Progress:100%

4- Working on install wireless device and data outlet for building 70-71-
69 Progress:90%
5- Working on install fire alarm device and panel at for building 43
Progress:80%
6- Working on install PAVA device and panel for building 43
Progress:70%

7- Working on install main FOC pipelines for building 93 Progress:65%

8- Working on install main FOC pipelines for building 4 Progress:60%


9- Working on install low currents system pipe at building 111 Progress :
75%
10- Working on install UPS for ADN43 Progress:50%

11- Working on excavation for main FOC pipeline for building 136
Progress:50%
12- Working on install main cable tray for low currents system cables at
data center Progress:40%
13- Working on install UDP for UPS for low currents system at building
36-35 Progress:100%
Control System Department
Today works Tomorrow plan
Activity Activity
1- Installation of the control panel of the lift station ww-43
2- Laying pipe for the lift station of the water rain in Training area
NIVERSITY OF IRAQ - BAGHDAD
16
Equipment Status / Day

Remarks

Direct Workforce Summary

Remarks
Total Manpower on Site

Civil Department
Tomorrow plan
Activity

ICT Department
Tomorrow plan
Activity

rol System Department


Tomorrow plan
Activity