AIR CONDITIONER CALCULATION
DEPOT REMAINING BUILDING
INFRASTRUCTURE MAINTENANCE OFFICE
Room name : UTILITY ROOM TELECOM
Room temperature
conditions : 27℃ / RH 60%
Outside air condition : 40℃ / RH 60%
Room size : 3m x 4.1 m x 4.3
Ventilation volume : 52.89 m3 x 3 ACH = 158.67
45.00
1) Room load (sensible heat)
: 60 w x 2 Person = 120
People load
Lighting load : 20 w x 12 m2 = 246
Building load : 60 w x 12 m2 = 738
: 1500 w x 60 % = 1,050
Equipment load
2) Room load (latent heat)
People load : 80 w x 2 Person = 160
3) Fresh air load
Sensible heat : 0.33 w x 158.67 CMH x 13
Latent heat : 833 w x 158.67 CMH x 0.0069
Subtotal 2,314 w x 1.1 (SF 10%) = 2545.4
= 2.5
Load per unit area = 207
1
Room area : 12 m2
Room
mH 52.89 m3
volume :
CMH
L/S
W
W
W
W
℃ = W
kg/kg (DA) = W
# Fresh Air by Natural Grille
W
kW (Total Cooling Capacity)
W/m2
2
AIR CONDITIONER CALCULATION
DEPOT REMAINING BUILDING
WORKSHOP OFFICE
Room name : NEW PANEL ROOM (SERVICE ROOM) - 1st Floor
Room temperature
conditions : 27℃ / RH 60%
Outside air condition : 40℃ / RH 60%
Room size : 1.4 m x 3.8 m x 4.3
Ventilation volume : 22.88 m3 x 3 ACH = 68.63
20.00
1) Room load (sensible heat)
: 60 w x 2 Person = 120
People load
Lighting load : 20 w x 5 m2 = 106
Building load : 60 w x 5 m2 = 319
: 850 w x 100 % = 850
Equipment load
2) Room load (latent heat)
People load : 80 w x 2 Person = 160
3) Fresh air load
Sensible heat : 0.33 w x 68.63 CMH x 13
Latent heat : 833 w x 68.63 CMH x 0.0069
Subtotal 2,244 w x 1.1 (SF 10%) = 2468.9
= 2.5
Load per unit area = 464
3
Room area : 5 m2
Room
mH 22.88 m3
volume :
CMH
L/S
W
W
W
W
℃ = 294 W
kg/kg (DA) = 394 W
# Fresh Air by Intake Fan
W
kW (Total Cooling Capacity)
W/m2
4
AIR CONDITIONER CALCULATION
Room name : NEW SERVER ROOM - 2nd Floor
Room temperature
conditions : 27℃ / RH 60%
Outside air condition : 40℃ / RH 60%
Room size : 1.8 m x 3.7 m x 2.6
Ventilation volume : 17.32 m3 x 3 ACH = 51.95
= 15.00
1) Room load (sensible heat)
: 60 w x 2 Person = 120
People load
Lighting load : 20 w x 7 m2 = 133
Building load : 60 w x 7 m2 = 400
: = 160
Equipment load
2) Room load (latent heat)
People load : 80 w x 2 Person = 160
3) Fresh air load
Sensible heat : 0.33 w x 51.95 CMH x 13
Latent heat : 833 w x 51.95 CMH x 0.0069
Subtotal 1,494 w x 1.1 (SF 10%) = 1643.7
= 1.6
Load per unit area = 247
5
Room area : 7 m2
Room
mH 17.32 m3
volume :
CMH
L/S
W
W
W
W
℃ = 223 W
kg/kg (DA) = 299 W
W
kW (Total Cooling Capacity)
W/m2
6
AIR CONDITIONER CALCULATION
EAST JAKARTA JAPANESE SCHOOL
Room name : MULTIFUNCTION ROOM
Room temperature
conditions : 24℃ / RH 60%
Outside air condition : 35℃ / RH 60%
Room size : 9m x 20 m x 3
Ventilation volume : 540 m3 x 2 ACH = 1080
300.00
1) Room load (sensible heat)
: 60 w x 20 Person = 1,200
People load
Lighting load : 20 w x 180 m2 = 3,600
Building load : 60 w x 180 m2 = 10,800
: w x % = 0
Equipment load
2) Room load (latent heat)
People load : 80 w x 20 Person = 1,600
3) Fresh air load
Sensible heat : 0.33 w x 1,080.00 CMH x 11
Latent heat : 833 w x 1,080.00 CMH x 0.0069
Subtotal 27,328 w x 1.1 (SF 10%) = 30060.7
= 30.1
Load per unit area = 167
= 570
= 600
7
Room area : 180 m2
Room
mH 540 m3
volume :
CMH
L/S
W
W
W
W
℃ = 3,920 W
kg/kg (DA) = 6,208 W
# Fresh Air by Natural Grille
W
kW (Total Cooling Capacity)
W/m2
BTUH/m2
BTUH/m2 (Rounded)