LOTUS CONSTRUCTION MANAGEMENT CONSULTANTS (PVT) LTD

PROJECT TITLE :

CHECKLIST FOR TRIAL MIX (Concrete) LCMC/CL/TM/11/150

Date : IR/WIR No : Descipline : Structural Sheet : 1 of 1

Concrete grade Design slump at site


Design slump at site Approval for mix design
Mix design number

ACCURACY OF MEASURING INSTRUMENT


Calibration Report of Measuring Device

Fine aggregate Cement


Coarse Aggregate Water
Admixture Additives

QUALITY OF MATERIALS
Approval for source Site condition
CEMENT Surface Condition
COARSE AGGREGATE MC Checked
FINE AGGREGATE Moisture Coarse Agg
WATER content Fine Agg
ADMIXTURE

MEASUREMENTS
CEMENT kg Design Modified 1 Modified 2
COARSE AGGREGATE kg
FINE AGGREGATE kg
WATER kg
ADMIXTURE 1 ml
ADMIXTURE 2 ml

MIXING PROCEDURE

Truck No Mixing Time Batched Time Slump (mm) Flow Atmo. Tem Con. Tem

Remarks

………………………….. …………………..
Checked by Date