INPUT DATA
1 Slab Number S1
2 Concrete Grade fck = 25 N/mm2
3 Steel Grade fy = 500 N/mm2
4 Short Span Lx Lx = 4.07 M
5 Long Span Ly Ly = 6.01 M
6 Thickness of Slab T= 150 mm
7 Cover to reinforcement Cc = 25 mm
8 Live Load 4.00 kN/m2
9 Finish Load 1.10 kN/m2
Internal Panels:
10 Type of Slab Panel
Laod Calculation
1 Self weight of slab Sw = 3.75 kN/m2
2 Live Load LL = 4.00 kN/m2
3 Finish Load FL = 1.10 kN/m2
4 Misc Load ML = 0.00 kN/m2
5 Total Factored Load L= 13.28 kN/m2

DESIGN
Ratio of Long Span to short span Ly/Lx = 1.5 5
Co eff BM k pt Ast Dia Spacing d Provided Ast
Span X 0.041 9.01 0.626 0.148 180.0 10 300 120 T10@150 523.6
Span Y 0.024 5.27 0.428 0.100 180.0 8 279 111 T8@150 335.1
Support X 0.053 11.65 0.796 0.190 230.1 8 218 121 T8@150 335.1
Support Y 0.032 7.03 0.551 0.130 180.0 8 279 113 T8@150 335.1

Check depth for Max Bending Moment 58.11 mm


Min Effective Depth Provided 111.00 mm
Min Ast required 0.12% 180.00 mm2
DEFLECTION CHECK
Reinforcement provided at Mid Span X 523.6 mm2
Stress in reinforcement Fs 99.69
Percentage of Reinforcement provided 0.436 %
Modification Factor 2.000
Permisible L/d 52.00
Actual L/d 33.91 OK
Depth required for Deflection control 78.25 OK

//////////////////////////////////////////////////////////////////////////////
T8@150
/////////////////////////////////////////////////////////

/////////////////////////////////////////////////////////

T8@150 T8@150
0

T8@150
T10@150
T8@150

/////////////////////////////////////////////////////////////////////////////// `

Quantity Summary
Concrete quantity 3.979 Cum
Reinforcement quantity 277.20 kgs
kg/cum 69.66
Project Toll building Job ref.

Calc. by Date Check by Date


VS Jul-19 AK Jul-19
Ref. Calculations Output
DESIGN OF ROOF SLAB
INPUT DATA
1 Slab Number S2
2 Concrete Grade fck = 25 N/mm2
3 Steel Grade fy = 500 N/mm2
4 Short Span Lx Lx = 4.07 M
5 Long Span Ly Ly = 6.40 M
6 Thickness of Slab T= 150 mm
7 Cover to reinforcement Cc = 25 mm
8 Live Load 4.00 kN/m2
9 Finish Load 1.10 kN/m2
Two adjacent edge
10 Type of Slab Panel discontinuous
Laod Calculation
1 Self weight of slab Sw = 3.75 kN/m2
2 Live Load LL = 4.00 kN/m2
3 Finish Load FL = 1.10 kN/m2
4 Misc Load ML = 0.00 kN/m2
5 Total Factored Load L= 13.28 kN/m2
DESIGN
Ratio of Long Span to short span Ly/Lx = 1.75 17
Co eff BM k pt Ast Dia Spacing d Provided Ast
Span X 0.063 13.85 0.962 0.232 278.2 10 282 120 T10@150 523.6
Span Y 0.035 7.69 0.636 0.151 180.0 10 300 110 T10@150 523.6
Support X 0.084 18.46 1.282 0.315 377.6 10 207 120 T10@100 785.4
Support Y 0.047 10.33 0.854 0.205 225.1 10 300 110 T10@100 785.4

Check depth for Max Bending Moment 73.15 mm


Min Effective Depth Provided 110.00 mm
Min Ast required 0.12% 180.00 mm2
DEFLECTION CHECK
Reinforcement provided at Mid Span X 523.6 mm2
Stress in reinforcement Fs 154.10
Percentage of Reinforcement provided 0.436 %
Modification Factor 2.000
Permisible L/d 46.00
Actual L/d 33.91 OK
Depth required for Deflection control 88.46 OK

//////////////////////////////////////////////////////////////////////////////
T10@100
/////////////////////////////////////////////////////////

T10@100 T10@150
0

T10@150
T10@150
T10@150

Quantity Summary
Concrete quantity 4.226 Cum
Reinforcement quantity 361.91 kgs
kg/cum 85.63
Project Toll building Job ref.

Calc. by Date Check by Date


VS Jul-19 AK Jul-19
Ref. Calculations Output
DESIGN OF ROOF SLAB
INPUT DATA
1 Slab Number S3
2 Concrete Grade fck = 25 N/mm2
3 Steel Grade fy = 500 N/mm2
4 Short Span Lx Lx = 4.061 M
5 Long Span Ly Ly = 6.014 M
6 Thickness of Slab T= 150 mm
7 Cover to reinforcement Cc = 25 mm
8 Live Load 4.00 kN/m2
9 Finish Load 1.10 kN/m2
One long edge discontinuous
10 Type of Slab Panel
Laod Calculation
1 Self weight of slab Sw = 3.75 kN/m2
2 Live Load LL = 4.00 kN/m2
3 Finish Load FL = 1.10 kN/m2
4 Misc Load ML = 0.00 kN/m2
5 Total Factored Load L= 13.28 kN/m2
DESIGN
Ratio of Long Span to short span Ly/Lx = 1.50 13
Co eff BM k pt Ast Dia Spacing d Provided Ast
Span X 0.051 11.17 0.775 0.185 222.2 10 300 120 T10@150 523.6
Span Y 0.028 6.13 0.507 0.119 180.0 10 300 110 T10@150 523.6
Support X 0.067 14.67 1.002 0.242 292.9 8 171 121 T8@100 502.7
Support Y 0.037 8.10 0.634 0.150 180.0 8 279 113 T8@100 502.7

Check depth for Max Bending Moment 65.20 mm


Min Effective Depth Provided 110.00 mm
Min Ast required 0.12% 180.00 mm2
DEFLECTION CHECK
Reinforcement provided at Mid Span X 523.6 mm2
Stress in reinforcement Fs 123.05
Percentage of Reinforcement provided 0.436 %
Modification Factor 2.000
Permisible L/d 46.00
Actual L/d 33.84 OK
Depth required for Deflection control 88.28 OK

//////////////////////////////////////////////////////////////////////////////
T8@100

`
/////////////////////////////////////////////////////////

/////////////////////////////////////////////////////////

T8@100 T8@100
0

T10@150
T10@150
T10@150

Quantity Summary
Concrete quantity 3.972 Cum
Reinforcement quantity 329.35 kgs
kg/cum 82.93
Project Toll building Job ref.

Calc. by Date Check by Date


VS Jul-19 AK Jul-19
Ref. Calculations Output
DESIGN OF ROOF SLAB
INPUT DATA MUMTY
1 Slab Number S4
2 Concrete Grade fck = 25 N/mm2
3 Steel Grade fy = 500 N/mm2
4 Short Span Lx Lx = 3.000 M
5 Long Span Ly Ly = 6.014 M
6 Thickness of Slab T= 125 mm
7 Cover to reinforcement Cc = 25 mm
8 Live Load 4.00 kN/m2
9 Finish Load 1.10 kN/m2
Four edge discontinuous
10 Type of Slab Panel
Laod Calculation
1 Self weight of slab Sw = 3.13 kN/m2
2 Live Load LL = 4.00 kN/m2
3 Finish Load FL = 1.10 kN/m2
4 Misc Load ML = 0.00 kN/m2
5 Total Factored Load L= 12.34 kN/m2
DESIGN
Ratio of Long Span to short span Ly/Lx = 2.01 37
Co eff BM k pt Ast Dia Spacing d Provided Ast
Span X 0.107 11.88 1.316 0.324 307.5 10 255 95 T10@150 523.6
Span Y 0.056 6.22 0.861 0.206 175.4 10 300 85 T10@150 523.6

Check depth for Max Bending Moment 58.68 mm


Min Effective Depth Provided 85.00 mm
Min Ast required 0.12% 150.00 mm2
DEFLECTION CHECK
Reinforcement provided at Mid Span X 523.6 mm2
Stress in reinforcement Fs 170.32
Percentage of Reinforcement provided 0.551 %
Modification Factor 1.635
Permisible L/d 32.69
Actual L/d 31.58 OK
Depth required for Deflection control 91.76 OK
T10@150

T10@150 T10@150
0

T10@150
T10@150
T10@150

Quantity Summary
Concrete quantity 2.486 Cum
Reinforcement quantity 195.30 kgs
kg/cum 78.57