The ITA Young Members’ Magazine

Issue 3 2017

Industry Innovation
from ITAtech
Extending the
São Paulo Metro

ITAYM’s Global
Network Grows

A Week in the Life of


a TBM Engineer

Breakthrough 1
Greatness
The Herrenknecht EPB shield S-900 (Ø 15.87 m) is
currently the largest tunnel boring machine in
Europe. It will soon be ready to bore the 7,528 meter
long Santa Lucia Tunnel in the Apennines.

Together
More than 225 kilometers of high-class
road tunnels have been built globally,
using cutting-edge Herrenknecht
tunnelling technologies.

Contractor: Client:
Pavimental S.p.A. (Gruppo Atlantia) Autostrade per l’italia S.p.A.

Pioneering Underground Technologies

www.herrenknecht.com
2 Breakthrough
Welcome to ‘Breakthrough’
Dear Tunnellers,
On behalf of the ITAYM Steering Board it is a great pleasure to present
the third edition of Breakthrough magazine. Breakthrough is the official
magazine of the International Tunnelling and Underground Space
Association’s (ITA) Young Members Group (ITAYM) and is made by and for
people who work in the tunnelling industry.
A career in tunnelling presents a great opportunity to work in a
competence driven and highly dedicated global environment. This
manifests itself in the great diversity of people we meet on work sites and
conferences around the world.
This unique industry will become more important than ever in the coming
years and I strongly believe that the key to solving several of our society’s
current and future challenges can be found underground. This has been
highlighted recently by a series of tweets written in frustration over the
traffic situation in Los Angeles. These tweets have ultimately resulted in a
new tunnelling company and a global focus on tunnelling in social media.
I will not spend too much space on Elon Musk’s entrance into the
tunnelling world, but no matter if he will revolutionize tunnelling or not,
he is helping our industry and the rest of the society to see how great the
potential of tunnelling is.

Musk is also illustrating that great technological developments are


needed to satisfy the global society’s future needs from the tunnelling
industry. In that regard, I am certain his entrance into the industry will
work as a catalyst for technological developments that will introduce
countless opportunities for young tunnelling professionals in the future.
In this developing tunnelling world we believe that building relations
across nations and projects is more important than ever. It is therefore
with great pleasure we see a high level of activity within the ITAYM and
its member nation groups. Since last year we have, among other things,
increased our social media presence, introduced quarterly Breakthrough
e-newsletters, hosted a very successful regional ITAYM event in
Switzerland, and seen several new member nations getting involved.
Lastly, I have the great pleasure of welcoming you to Norway and Bergen
for the World Tunnel Conference 2017. The Norwegian tunnelling society
and the ITA have been working very hard to make sure you will have a
Front Cover great experience in Bergen. The ITAYM will be hosting several events and
Tobias Andersson, TBM
we look forward to see you there!
Construction Manager for the
Skanska/Strabag Joint Venture, Keep tunnelling!
inspects the cutterhead of a 9.3m
diameter Tunnel Boring Machine
(TBM) that is currently mining the
second tube of the Ulriken Tunnel,
in Bergen, Norway. It is the first rail
tunnel to be excavated using a TBM
in Norway’s history (see p28). Sindre Log
Photo by Jan M Lillebø.
Chair ITAYM

Breakthrough 3
Contributing to Breakthrough
If you would like to get involved in Breakthrough magazine
by contributing an article, or suggesting potential content
for future editions, we would be delighted to hear from you!
Please feel free to contact Breakthrough’s editorial team or
the ITAYM Young Members Committee (details below).

Note to YM Member Nations


All national Young Member (YM) groups are encouraged to
get involved in Breakthrough magazine – we rely on your
input. Please remember to document your country’s YM
activities and take plenty of good quality photos at any YM
events throughout the year so we can make the most of
your reports in the next edition!

Editor
Amanda Foley
amanda@tunnellingjournal.com
Tel: +44 (0) 7973 158 065

Contributing Editor
Kristina Smith
kristinasmith.editorial@gmail.com
Tel: + 44 (0) 7833 230 853

Sales Manager
Daniel Lee-Billinghurst
daniel@tunnellingjournal.com
Tel: +44 (0) 7818 422 712

Art Editor
Mike Hooker
Technical Illustrator
Pete Beach

Brought to you by the publishers of

ITA-AITES Secretariat
c/o EPFL GC D 1 402 (Bât. GC)
Station 18 CH - 1015 Lausanne, Switzerland TGS Media Ltd. The Old Library, Webster House
Dudley Road, Tunbridge Wells, Kent, TN1 1LE United Kingdom
Tel: + 33 69 587 13 85 Fax: + 41 21 693 41 53 Tel: +44 (0) 1892 522585 www.tunnellingjournal.com
E-mail: itaym@ita-aites.org Website: www.ita-aites.org

Breakthrough is endorsed by the ITA The publishers, authors, associations, and groups mentioned cannot accept
liability for errors or omissions. All rights reserved. No part of this publication
may be reproduced in any form without prior permission of the copyright holder,
application for which should be made to the publisher, TGS Media Ltd. ISSN
Breakthrough (Print) ISSN 2059-1241, Breakthrough (Online) ISSN 2059-125X.

4 Breakthrough
Meet the ITAYM Board
The governing structure of the International Tunnelling and Underground Space Association’s
(ITA) Young Members Group (ITAYM) is a Steering Board made up of Chair, Vice-Chair, and a
number of representatives selected by members of the Group. The Chair and the Vice-Chair are
subject to the approval of the ITA General Assembly. Steering Board members are elected for
alternating periods to ensure continuity of the group. The mandate is for two years.
Sindre is a dedicated tunneller that thinks Giuseppe graduated in 2005 and subsequently
underground solutions can solve a lot of society’s got his Masters in Geotechnical Engineering
future challenges. After gaining his Masters in at Sapienza University of Rome, Italy. While
Civil Engineering from the Norwegian University working with Geodata Engineering in Turin,
of Science and Technology (NTNU), Sindre started he also gained the ITA-AITES Masters in
working for the TBM Manufacturer The Robbins Tunnelling at the Politecnico di Torino.
Sindre Log Company. Having spent his first years with Robbins Giuseppe
He is founder and President of the Young
Chair travelling to TBM projects around the world, he is Gaspari Member groups of the Italian Geotechnical
now working more from the office on geological related topics and Association (AGI) and of the Italian Tunnelling Association
market development, but still gets the chance to go to sites and (SIG) and plays an active role representing and boosting young
conferences around the world from time to time. members on the board of the Ontario chapter of the Tunnelling
Sindre has been involved in committee work for the Norwegian Association of Canada (TAC). Giuseppe is a passionate traveller
tunnelling society for the last decade and has been heavily involved and is addicted to a number of different sports.
in the foundation of both the Norwegian Young Members group and
the ITAYM. Log is currently also a part of the organising committee
for the World Tunnel Congress (WTC) 2017. Joanne gained her Bachelors in Civil
Sindre is fond of outdoor activities such as skiing, fishing and Engineering at University College London.
football, but spends most of his free time running/climbing/playing She has been working for London Bridge
football/drinking coffee while hanging around in playgrounds, Associates since 2012 and is now an Assistant
woods, or fields trying to keep one of the future generation of Project Manager on the Thames Tideway
tunnellers happy. Project. Joanne was chair of the British
Joanne
Tunnelling Society Young Members in 2013/14.
Sui When Joanne is not eating, she is a
Lasse graduated with a Masters in Building keen traveller and enjoys spending time keeping active
Technology from the Technical University of (snowboarding, skiing, water skiing, scuba diving etc!).
Denmark in 2012. From 2012-2016 he worked as
a Design Engineer on the Fehmanbelt Fixed Link
project and since 2016 he has been employed Doris graduated in 2012 at the Faculty of
as a Tunnel Engineer for Rambøll in Denmark. Civil and Geodetic Engineering, in Ljubljana,
Lasse
Before his Masters degree, Lasse worked for Slovenia. After completing her Masters degree,
Vester Danish contractor E. Pihl & Søn AS on construction she started working as a Tunnelling and
projects in the Copenhagen area. Geotechnical Engineer at Elea iC, a member
Lasse is currently the Chair of the Danish Tunnelling Society’s of the iC group of companies. In the past
Young Members Committee and is heavily involved in his national
Doris five years, she has gained experience from
tunnelling organisation. Outside of work he is a bit of a foodie, and Frank projects in Slovenia, Austria and the UK. Doris
enjoys cooking for family and friends. He also spends as much time is an active member of the Slovenian Society for Underground
outdoors hiking or trekking as he can. Structures, and is the founder and Chair of the Slovenian Young
Members group. In her free time, she likes spending time in
the company of her friends and family. She also loves to travel,
Nichole Boultbee completed her Bachelors explore new places and other cultures.
and Masters degrees in the Earth Sciences
department at Simon Fraser University, in BC,
Canada, in 2005, and has been working for Golder Senthil gained his Bachelors in Civil
Associates ever since. She has experience in Engineering and a Masters in Geotechnical
engineering investigation, design and construction Engineering from the Indian Institute of
Nichole
for projects in Canada, Australia, and Chile. Technology and TU Dresden, Germany. He was
Boultbee She is registered as a professional geoscientist awarded the ITA’s ITACET Scholarship to pursue
(P.Geo) with the Association of Professional Engineers and a Masters in Tunnelling at the Politecnico
Geoscientists of British Columbia (APEGBC), and is on the Board
Senthil
di Torino, Italy, and is currently a Sr. Tunnel
of Directors of the Tunnelling Association of Canada (TAC) as a Nath Engineer at Geoconsult, in Singapore. Senthil’s
representative for Young Members. She loves her dogs, Kevin and career is divided between India, Singapore and Indonesia. He is
Emma, who grew up in her office and now spend most of their an active member of his local tunnelling society (TUCSS). Senthil
time waiting for her to come home and chill out with them. is a passionate photographer, blogger and loves to travel.

Breakthrough 5
MSc Tunnelling and
Underground Space
Do you want to gain specialist knowledge
setting you apart from other civil engineers?
Expand your career opportunities in a booming
global industry where suitably trained engineers
are in high demand.

You will learn from internationally


recognised academics and This MSc degree can be
industry experts on a course undertaken one year full-time
uniquely developed in partnership or two years part-time.
with the British Tunnelling Society.
We will give you state-of-the-art Our MSc modules can also be
knowledge, understanding and purchased individually as a
skills to design and build the Continuing Professional
underground infrastructure of Development (CPD) course, ideal
the future.
for those in full time employment.
This degree is accredited as
meeting the requirements for School of Engineering
Modules
Further Learning for Chartered University of Warwick Coventry CV4 7AL
Engineer (CEng) status, if you have
+44 (0)24 7652 2046
already acquired an accredited - Communication and Leadership
- Construction Management eng-pgadmissions@warwick.ac.uk
CEng (Partial) BEng (Hons)
undergraduate first degree. - Finite Elements for Tunnelling warwick.ac.uk/tunnelling
- Geological Investigation and
Our distinctive course format Ground Characterisation Accrediting Endorsed by
institution
means that approximately 20% of - Health, Safety and Environmental
teaching is delivered by guest Considerations
lecturers from industry, ensuring - Project
that the content remains relevant. - Rock Mechanics
Recognising commitment to advancing
Specialist subjects and case - Tunnel Design women’s careers in STEMM (Science,
studies are also presented by - Underground Construction Technology, Engineering, Mathematics
and Medicine) academia.
experts with first-hand experience. Methods
Images courtesy of UnPS

6 Breakthrough
Contents...
08 ITAYM’s Global Network Grows Further
Breakthrough speaks to ITAYM Chair, Sindre Log, and Vice 30 ITA Tunnelling Awards 2017
The ITA is preparing for the third annual Tunnelling Awards
Chair, Lasse Vester, to find out about this year’s activities. ceremony, which will take place in Paris, this November.

10 #WorldTunnelDay
The ITAYM launches a global endeavour to celebrate the
tunnelling industry and promote it to a wider audience.
31 Breakthrough’s Book Club
We take a look at some of the ITAYM Board’s favourite
books and a series of practical rock engineering videos.

12 Extending São Paulo Metro’s Line 5


Design Engineer, Stefania Stefanizzi, describes some of the
key challenges faced on São Paulo’s latest Metro extension.
32 Industry Innovation
When you are building space beneath the world’s busiest
cities, ‘new’ can be a scary word – ITAtech is here to help.

16 ITA Young Member’s National News


Find out more about the initiatives and networking activities
of young tunnelling groups around the world.
34 Alpine Adventure
ITA Young Members from more than 10 different countries
gathered for the first Regional Networking Event this May.

20 How to Set up your own Member Nation


The ITAYM’s quick-fire guide on how to build a professional 36 Working with Big Data
Software Engineer, Patrick Schmiedeke, explains how he
network with other young tunnellers in your country. got drawn into the world of underground construction.

22 Photo Competition
Help us show the varied and engaging world of underground 38 5 from Five
We spoke to five tunnellers who attended five institutions
construction by taking part in our photography competition. that offer specialist degrees to find out where they are now.

24 Leading the Way


The ITA-AITES’ Executive Council (ExCo) has a big mission: 43 Dates & Events
Keep your calendar up to date with Breakthrough’s guide to
to explain to the world what tunnels can do for society. the years’ top tunnelling conferences and exhibitions.

26 How the ITA is Structured


Breakthrough’s visual guide to the various ITA Committees 45 Dubai Welcomes you to WTC 2018
A great conference, stunning beaches and desert activities
and Working Groups and how they come together. are just some of the reasons to attend WTC 2018, in Dubai.

28 A Week in the Life


TBM Construction Manager, Tobias Andersson, documents 46 3D Vision
Engineering Geologist, Jonas Weil, describes his work with
a busy week at work on Bergen’s Ulriken Tunnel, in Norway. 3D printing and how this technology can benefit the industry.

Breakthrough 7
ITAYM’s Global Network
Grows Further social media and we will begin to reach
In the space of three years, the ITA Young Members the critical mass we are aiming for.”
group has grown from a few willing young engineers to a This increased social media presence
was highlighted in December, when the
burgeoning international network of young professionals British Tunnelling Society Young Member
that reaches around the globe. Breakthrough’s editor, (BTS Young Members) held their second
#TunnelDayUK social media event, which
Amanda Foley, speaks to ITAYM Chair, Sindre Log, and Vice aims to generate interest in tunnelling
Chair, Lasse Vester, about this year’s activities and where projects currently being undertaken in
the UK and to promote the tunnelling
the organisation is headed. industry (and its many professions) to
people of all ages. The Australasian
Since it’s official establishment at the Francisco – including 40 civil engineering Tunnelling Society’s (ATS) Young Members,
Brazilian World Tunnel Congress (WTC), students who were the recipients of a joined in on the action, holding their first
in 2014, the International Tunnelling and conference scholarship initiative organised #TunnelDayOz; the Canadian and Italian
Underground Space Association’s (ITA) by the USA tunnelling association’s Young Young Members also got involved, as did
Young Members group (ITAYM) has gone Members (UCA of SME Young Members). many companies and project teams. The
from strength to strength, becoming a The General Meeting began with ITAYM re-tweeted and re-posted many of
burgeoning global networking platform presentations by ITAYM Steering Board the photos and messages, acting as a hub
for young tunnelling professionals. More members on aims, objectives, promotion to bring all these events together. This
than 35 Young Member Nations have now and future plans. The Chair and Vice-Chair has prompted the ITAYM to launch the
been recruited into the group’s ranks and roles on the ITAYM Steering Board were #WorldTunnelDay event (see p10) and it is
many of these were represented in person formally passed on to Norway (Sindre Log) hoped that many more YM Nation groups
at the second ITAYM General Meeting, and Denmark (Lasse Vester), respectively, will get involved this December.
at the 2016 WTC in San Francisco, last and three new Steering Board members The ITAYM has released its first
summer. Somewhere in the region of 120 were also elected, with representatives ‘Webinar’ via its YouTube channel and
young tunnellers attended the Congress, from the UK (Joanne Sui), Italy (Giuseppe future Webinars are planned for the
all gathering for a highly-successful Maria Gaspari) and Slovenia (Doris Frank) coming year, which will be organised in
networking reception in downtown San joining the Board. A short workshop was cooperation with the ITA’s Committee on
also held at the meeting, with attendees Education & Training (ITACET).
breaking off into smaller groups to identify
what they wanted from the ITAYM and what
the goals for the coming year should be.

Lines of Communication
“One of the main objectives set out in
San Francisco, was to build on our social
media presence and increase our use
of digital mediums to open the lines of
communication between Young Member
“We’re still here to assist nations,” says Sindre. As a result, the
ITAYM has become much more active
in establishing young on twitter and LinkedIn and has also “There are a lot of great
member groups, but our introduced a facebook page. “There are a initiatives being carried
lot of YM Member Nations with their own
focus will now be more social media presence, such as Canada, out by Young Member
on developing a global Norway, Sweden, and of course the British Nations, that experience
[who are now in their ninth year],” says
network for the existing Lasse, “and we are starting to have that needs to be exchanged
young member nations.” interaction, because we see a lot of re- via the ITAYM Network.”
posts and posts on each other’s pages.
Lasse Vester, ITAYM Vice-Chair Now we need to increase awareness and Sindre Log, ITAYM Chair
to encourage more groups to get active on

8 Breakthrough
“We’ve also established a quarterly tunnellers come together from more than training course on Soft and Challenging
‘Breakthrough e-Newsletter’ and highly 10 different countries to take part in a two- Mixed Ground Conditions,” says Sindre.
encourage people to sign up for this on the day event at the Hagerbach Test Facility, “This is the first time that the course has
www.tunnellingjournal.com website,’ says in Switzerland. The event’s success is been supported by the Young Members,
Sindre, “this combined with the increased apparent and the ITAYM is very keen to and I think we have a great programme
social media presence, is enabling us to encourage and support similar initiatives. set up.” There is the ITAYM morning run,
communicate much more effectively.” “Our role is to make people aware of the which will take place on Monday, June 12,
Proof of this improved communication opportunities and to provide assistance, at 06:30am and the WTC morning run on
manifested itself in the level of attendance be it in helping to arrange speakers for Wednesday, June 14, at 7:00am, which
achieved at the ITAYM’s first Regional an event, setting up project tours, or even take in the sights of Bergen. The ITAYM
Event, which was organised by members providing budget assistance by helping to Social Event is on the Monday, at 7:00pm,
of the recently established Swiss, Austrian set up sponsors,” says Sindre. at the Ole Bull Scene, after which there is
and Slovenian Young Members groups As for the upcoming WTC, in Bergen, a free concert. Last, but not least, is the
and supported and promoted by the Norway, this June, a host of events are General Meeting on Wednesday morning.
ITAYM (see p34). The event saw 45 young planned. “First of all, we have the ITACET Look forward to seeing you there!

Breakthrough 9
#WorldTunnelDay
December 4 is the Feast Day of Saint Barbara, the patron class tunnelling projects currently
being undertaken across the globe and
saint of tunnellers and miners and all others who work to promote the industry (and its many
with explosives, who venerate her due to her association in professions) to students and also members
of the general public. The day will become
legend with lightning. an annual event held on the first Thursday
in December, due to its proximity of the
According to the legend, Barbara lived in dinners on tunnel sites in Italy, Spain and Feast Day of Saint Barbara.
the third century near Istanbul, Turkey, Greece, and parties around the world from As part of the day we are will be running
and was the only daughter of Dioscuros, Australia, to the UK and Canada. a social media event on twitter using the
a wealthy and influential pagan who Prompted by the highly successful hashtags #WorldTunnelDay and #Tunnels.
sought to keep her from the influences #TunnelDayUK social media event (see We would like as many people, project
of the outside world by locking her in a p18), the ITA Young Members are now teams, companies and organisations as
tower. She eventually escaped and when launching #WorldTunnelDay, which will possible to tweet and re-tweet inspiring
she declared herself a Christian was take place on Thursday 7th December images, messages and news (historical
denounced by her father and handed over 2017. The aim of the day is to generate or current) using the hashtags and get it
to the authorities. interest in the great number of world trending on twitter!
According to later versions of the
legend, during her escape Barbara took A few things that YM Member Nations can do to support
refuge with the silver miners of Laurium #WorldTunnelDay:
in Greece, but on leaving the mine shaft
she was captured and condemned to n Get support from your Member Nation Committee
death. Her father himself carried out her
n Create a poster and a press release to promote the event
beheading but was struck dead by a bolt of
lightning as punishment for his monstrous n Circulate these to members of your national tunnelling organisation
crime. Barbara’s tomb later became a site n Organise events for the day and get as many people on board as possible
of miracles. n Photos, video clips and messages on twitter, Instagram and facebook
December 4th celebrations are marked using #WorldTunnelDay and #ITAYM
around the world, with different traditions
n Spread the word about tunnelling and underground construction
taking place in different countries; a day-
off for certain mines and tunnel projects n Have a great time!
in Germany and France, masses and

10 Breakthrough
UNDERGROUND
AND UNDERWATER
(RAMBOLL TUNNELS
ARE EVERYWHERE)
See more at ramboll.com/tunnels

WITH 13,000 ENGINEERS, DESIGNERS AND CONSULTANTS ACROSS 35 COUNTRIES, WE CREATE SUSTAINABLE
SOLUTIONS WITHIN BUILDINGS, TRANSPORT, PLANNING & URBAN DESIGN, WATER, ENVIRONMENT & HEALTH,
ENERGY, OIL & GAS AND MANAGEMENT CONSULTING.
Breakthrough 11
Extending São Paulo Metro’s
Line 5
São Paulo Metro’s Line 5
Extension is due to open to
the public this December.
Stefania Stefanizzi, a Civil
Engineer at Geodata SpA
– the firm responsible for
the design and construction
management of the project
– outlines key features of
the design and some of the
challenges faced on this
Aerial view of the completed Brooklin Station
major metro extension.
Despite having a well-established the SPMR, extending the line from Largo centre of São Paulo by about an hour. The
transportation network, the subway Treze to Chacara Klabin, thereby linking construction of the project is divided into
system in the São Paulo Metropolitan the very busy Santo Amaro area to the 7 Construction Lots. These encompass
Region (SPMR) remains comparatively expanding city centre. The extension will about 11km of line, 10 stations, 10 shafts
small for one of the largest metropolitan also enable transfers to Line 1 (Blue) at for ventilation and evacuation, 1 shaft at
areas in the world. Passenger density per Santa Cruz station and Line 2 (Green) at the train depot, 2 construction shafts (one
kilometre of line is one of the highest in Chácara Klabin station. With the new link for the launch of the two tunnel boring
the world, particularly at peak-hours, due operational, Line 5 will greatly enhance machines (TBMs) that will excavate the
to the limited reach of the system. accessibility within important employment twin-tube single track portion of the line;
São Paulo Metro’s existing Line 5 areas, as well as health and education and another for the arrival of the two
corridor, which runs from Capão Redondo facilities for a very large population who TBMs and for the launch of a third TBM for
to Largo Treze (see map), has been in at present only have access via road- the single tube-double track section), and
operation since 2002. Its extension will based transportation, reducing the travel a train depot with an area of 176,000m2.
have a significant impact on mobility within times from the city’s South Zone to the The construction of the Line 5 extension

Excavation of Chakara Klabin Station below


Excavation of Chakara Klabin Station Excavation of the Hospital São Paulo sStation the existing operational Line 2 station

12 Breakthrough
Brasilándia
Bandeirantes Tucuruvi

Dutra
Palmeiras-
Água Branca Barra Funda Tiquatira

O República Penha
SC Luz Tatuapé
SA Brás Corinthians-Itaquera
O Sé
Vila Madalena
São Joaquim Anália Franco
Pinheiros Cidade Lider
Consolação
Butantã Faria
Lima Brigadeiro Paraíso
São Paulo-Morumbi Ana Rosa
Hospital São Paulo
AACD-Servidor Chácara Klabin Vila Prudente Hospital
Vila Sônia Tamanduateí
Moema Santa Cidada
Eucaliptos Cruz Tiradentes
Taboão da Serra
ULO
Campo Belo SÃ
OC PA
DO AE O
SU TA Ã
Brooklin
L S
Borba Gato SA

NO
Vila das Belezas Giovanni L 1 - Blue
Line
Gronchi N
Alto da Boa Vista Jabaquara LLine 2 - Green
Campo Limpo
Adolfo Pinheiro LLine 2 - Green (In planning/construction)

T
O
Capão Redondo Santo Amaro Largo Treze LLine 3 - Red

AN
Parque Santo Dias
LLine 4 - Yellow
DI LLine 4 - Yellow (Under construction)

DRÉ
São José AD
ULO LLine 4 - Yellow (Planned construction)
PA E
O LLine 5 - Lilac
Jardim Ângela Ã
M

S LLine 5 - Lilac (In planning/construction)


A

LLine 6 - Orange (In planning)


LLine 15 - White (In planning)
LLine 17 - Gold (In planning)
Estrada dos Alvarengas LLine 18 - Bronze (In planning)

came after a highly-publicized accident known as Lava Jato (“Car Wash”) that inflow; (2) the Tertiary sediments
that occurred during the construction of has deeply affected Brazil’s construction subdivided into two units, the Resende
Pinheiros station, on Line 4, in January, sector. formation, an alternation of a low sandy
2007, when a large part of the site grey clay, and grey and yellow silty sand,
access tunnel collapsed, opening an Geology generally little argillaceous, and the São
80m diameter crater that resulted in The regional geology of the São Paulo Paulo formation, that corresponds to
seven fatalities. This accident provided sedimentary basin can be summarised the meandering fluvial system deposits
a harsh lesson for the entire tunnelling in terms of three major geological units: of the Tertiary Period (Paleocene)
community underlining the inherent need (1) The Precambrian bedrock composed of the Taubaté group, composed of
to apply a rigorous and systematic risk of granitic-gneiss and residual soils sandstone, sometimes conglomeratic and
management approach. Following the with different levels of weathering, that characterized by graded variations in both
Pinheiros accident, the owner of the line, decreases from the top to the bottom, vertical and horizontal permeability; (3)
Companhia do Metropolitano de São Paulo where the weathered part is greatly the Quaternary sedimentary deposits of
(CMSP), decided to assign the application associated with water circulation and unconsolidated sands, organic clay and
of Risk Management principles for the peat (with potential high settlements).
Line 5 Extension to the so-called ATO The groundwater table is generally
(Acompanhamento Tecnico de Obra, i.e. slightly below the ground surface.
technical follow-up by the Designer) within Multilevel aquifers exist, separated by the
the contract documents. impermeable clayey layers.
Construction on the Line 5 Extension
began at the end of 2011, in parallel with Stations
the design, and three stations are due to go Different construction methods have been
into operation this July (Alto da Boa Vista, used for the 10 stations on the line: the
Borba Gato and Brooklin). The remaining ‘cut and cover’ method (with a bottom-
stations will be operational by the end up configuration), mined underground
of this year, except for the Campo Belo stations excavated using the NATM
station, which is expected at the beginning method, and multi-secant pile large
of 2018. The Line 5 Extension has been diameter shafts. The platforms have a
completed despite the corruption scandal Model of the Hospital São Paulo Station length of 136m, with a variable depth of

Breakthrough 13
21m to 49m, depending on the station type. with the application of tendons. The execution sequence was outlined using
The design of the large mined caverns levelling points on the existing subway a plastic diaphragm wall (without steel
of the underground stations, with station showed negligible settlements. reinforcement and using concrete with a
excavation areas of more than 250m2 – The iconic Brooklin Station has won low resistence) excavated with claim shell
in the densely populated context of the an award from the Brazilian ABECE along the entire perimeter of the shafts;
city of São Paulo – in soil and under the association (Associação Brasilieira de lowering of the water table outside the
groundwater table, was a challenge. To Engegnharia e Consultoria Estrutural). It shafts; excavation of the primary shaft;
model the intersections between different was created by excavating five interlocking construction of the shaft’s secondary lining
parts of the station, complex design secant pile shafts, each with an external and struts; providing support during the
tools were utilised – largely operating in diameter of about 36m, resulting in a total excavation of the following shafts, which
the Building Information Management station length of about 140m and a depth would be built in the same way.
(BIM) environment, combining 2D and of about 27m. Due to special constraints Analysing the preliminary design with
3D numerical models with flow analysis, at the station site (polluted multilevel a risk analysis approach some potential
sensitivity and parametric analysis – to aquifers, limited space for the construction hazards were identified (settlements on
define the impact at the surface and on site, interferences at the surface) at the the surface due to the external drainage,
existing structures, as well as the potential design stage we were challenged to find a instability at the bottom of the excavation
risks and the relative countermeasures reliable solution, compatible with the tight with possible rupture, interference of
to be applied. The combination of the construction schedule. the drainage basin with the existing
design with a rational interpretation of According to the preliminary design polluted area located not far from the site,
the results from monitoring and in- of the station (projeto básico), the possible deviation from the verticality of
situ measurements permitted a real- the diaphragm wall with water-tightness
time integration of the design and the of the diaphragm not guaranteed and
construction, ensuring the maximum level potential reduction of the internal lining
of safety during excavation and minimizing thickness) and an alternative approach
settlement-induced damage. was recommended by Geodata.
The design of Chakara Klabin According to the results of the Risk
station has been extremely interesting, Analysis, it was decided that lowering of
characterised by its transfer with Metro the groundwater table should be avoided
Line 2 (Green). The general layout of the and the diaphragm wall should be
station includes the construction of a substituted with a structural diaphragm
circular 30m diameter access shaft and wall with steel reinforced concrete,
the excavation of the main tunnel with executed using a hydromill, excavating
a section of about 270m2 for a length of all the shafts simultaneously; and at the
about 62m. The excavation was performed same time installing the struts, located in
with Line 2 still in operation, in the zone the permanent position as defined by the
below the existing station, protected by a architectural layout.
diaphragm wall that was executed during Construction of the station following the
the construction of the previous line and proposed solution began in August 2012
reinforced during the actual excavation Under the dome at Brooklin Station and in October 2013, i.e. after only a year,
the excavation had reached its designed
depth and the concrete base slab had been
poured, just in time for the two TBMs to
enter and pass through the station.
According to the instrumentation data,
the overall behaviour of the structure
was in line with expectations, providing
a high level of safety of the works.
The implemented solution, compared
to the original one, brought with it an
incremental cost increase of about 10-
15%, but also a significant gain in the
execution time of about six months with
respect to the contract schedule.
The configuration of multi-secant large
diameter shafts had already been applied
on the other lines of the São Paulo Metro
(Luz station with three adjoining shafts
for the line 4) but at Brooklin station it
Multi-secant large diameter shafts at Brooklin Station was the first time that all the shafts were
excavated simultaneously.

14 Breakthrough
TBMs and Train Depot the civil works, the electrical & mechanical
One of the distinctions of the Metro works, the various systems and the real-
Line 5 Extension is the simultaneous time responses from construction.
operation of three TBMs in the city. This is Another key factor for success was the
a first in the history of São Paulo Metro’s strong commitment of the people involved.
construction. In the first approximately Indeed, more than 250 professionals,
5.5km stretch, from the shaft Conde de Itù from Geodata’s São Paulo office and Turin
to the shaft Bandeirantes, two TBMs with headquarters, worked together with
an excavation diameter of 6.9m worked in dedication and enthusiasm, interacting
parallel. In the second section, from the daily with the Client, Companhia do
shaft Bandeirantes to the shaft Dionisio da Metropolitano de São Paulo, and with all
Costa, for approximately the same tunnel the Contractors. All parties came together,
length (5.5km), a TBM with an excavation sharing their combined experience and
diameter of 10.6m was deployed. merging the Italian and the Brazilian
The concept of iterative design through cultures to reach a common goal: the View of the segmental tunnel lining
the use of a Plan for Advance of Tunnel success of the project.
(PAT) was largely used in the excavation
of the running tunnel with TBMs. The
data from the TBMs, from monitoring,
to geology and hydrogeology, were all
collected in real-time and stored in
and processed using the system GDMS
(developed by Geodata), in order to
determine the need for adapting the
– earth pressure balance (EPB) – face
support pressure operational ranges
defined at the design level or by the TBM’s
operational parameters.
No less interesting has been the design
of the train depot, which covers an area of
176,000m2.

Working Group
The design success of a complex Metro
project like the Line 5 Extension was
achieved through a multidisciplinary
approach, rigorously managing (through
The 176,000m2 Patio Guido Caloi Train Depot
the use of BIM) design interfaces among

Stefania Stefanizzi works as Civil


Engineer for Geodata SpA, which was
appointed in 2011 – with Geodata
Geoengenharia do Brazil – through
international tender, to undertake
the Detailed Design and Construction
Supervision of all 7 Construction Lots
of the Line 5 Extension. She holds
a PhD in Geotechnical Engineering
from the Polytechnic of Turin, Italy, in
collaboration with the Geomechanical
Research Center of Sudbury, Canada.
Working for Geodata, she has gained
worldwide experience on rail, road and
metro tunnels, especially in Russia and
South America. She had a crucial role
in the delivery of the design for the Line
5 Extension, following and coordinating
the comprehensive production of more
than 15,000 documents.

Breakthrough 15
YM MEMBER NATION NEWS

Italian YM’s Set their Sights on Naples 2019

After a year of informal associations sharing similar to the point that a session delegation plans to show-up in
coordination between the interests, such as the Italian was specifically dedicated to Bergen for the WTC 2017.
younger crowd within the Italian Geotechnical Association tunnelling and a meeting was The Italian Tunnelling Society
Tunnelling Association (SIG) (AGI), was an important part held during the conference will continue its support of
during conferences, courses of SIG-YM’s initial activities in within the Young Members of the YM Group activities in the
and site visits, an official order to help the group reach the two associations. near future in order to enlarge
Young Members group was a wider audience and to be Finally, regional ITAYM the group in numbers and
established in the fall of 2016. attractive to new members. events, such as the technical capabilities and connect them
The first meeting of the Several SIG-YM presented visit to the Hagerbach Galleries, to other international groups,
SIG-YM Group took place in papers were given during the in Switzerland, were intensively aiming to be ready to lead the
Bologna after the SIG Annual IAGIG (Annual Meeting of Italian promoted and well attended ITAYM gathering in Naples for
Conference/Expotunnel 2016. Young Geotechnical Engineers) by SIG-YM and a fairly good the WTC 2019.
During the kick-off event, Young

An inspiring year for Denmark’s


Members elected Marco Ranieri
and Giuseppe M. Gaspari as
their representatives for the
first three years. Since then,
SIG-YM has begun to plan
Young Members group
activities and establish goals in In Denmark, Young Members
preparation for hosting other have had an inspirational year.
ITA YM Groups at the World They have seen presentations
Tunnel Congress (WTC), in on future projects and had
Naples, in 2019. a lessons-learned session
Subsequent SIG-YM meetings from one of the country’s
have been held at Italian tunnel historic megaprojects. Of all
project sites following site the presentations and site
visits organized by SIG. Young visits the Danish Tunnelling
Members have also begun to Society Young Members group
plan their own events, such (DFTU-YM) have arranged,
as a recent site visit to the job the site visit to the extension project. A very interesting and visit the Swiss Alps as they
site for the new subway line of the Copenhagen Metro, to instructive event! participated in the ITAYM
in Catania, which included a the North Harbour, deserves 2017 was kicked off with a Regional Event to Hagerbach.
tour of the impressive 10.56m to be highlighted. On this large presentation on lessons On the organisational side
diameter EPB-TBM. construction site the Hochtief- learned from the Øresund of things DFTU-YM has now
Young Members are actively Züblin Joint Venture (MetNord Immersed Tube Tunnel. It was established a Facebook page to
taking part in the SIG Working JV) were preparing to launch a very interesting presentation get better interaction between
Groups. SIG-YM also aims their TBM for the 2nd tunnel and a good way of transferring its members. The DFTU-YM
to organise its first “YM- and gave an introduction to knowledge from one generation look forward to many new
workshop” for the fall of 2017. TBM tunnelling in Copenhagen to another. In May, a group of events in the coming year and
Coordination with other and the design considerations 12 Danish young tunnellers hope to participate in future
Young Member groups and behind the TBM chosen for the enjoyed the opportunity to international gatherings!

16 Breakthrough
Auspicious time in Australasia Building on
senior experienced industry
Success in
professionals. The night was
a great success with many
the US
new friendships made across Following last year’s highly
projects and generations. successful World Tunnel
The ATSym continues its Congress (WTC 2016), in San
engagement with universities Francisco, the UCA of SME
across Australia with five visits (Underground Construction
to universities in the last year. Association of the Society
This again is part of a strategy for Mining, Metallurgy &
to improve the visibility of the Exploration) Young Members
industry. The latest event saw are having an active 2017. They
alumni from the University began the year by encouraging
of Sydney return to talk to attendance to the George A
students about opportunities to Fox Conference, in New York,
It is an auspicious time for the to Australia, there is a bit on! travel, learn and grow with the in January, and have been
tunnelling industry in Australia The ATSym held its first tunnelling industry. busy planning several events
with the commencement of Young Member social evening in The ATSym continue to be a for the Rapid Excavation &
the NorthConnex (AU$3bn) August 2016 to help foster the catalyst for change within the Tunnelling Conference (RETC)
and WestConnex (AU$16.8bn) professional network between ATS in pushing the organisation in San Diego, California,
projects, in Sydney. This the current projects that are for change and improvement. this June. At the RETC
on the back of the recent underway. The first social The major achievement in this conference, the UCAYM will
completion of tunnelling on the forms part of the wider strategy space over the last 12 months host a scholarship orientation
NorthWest Metro (AU$8.3bn) from ATS and the ATSym to is the scoping, planning for students who have won
and the soon to be opened increase the visibility of the and delivery of a revitalised bursaries to attend the event,
Waterview Project (NZ$1.4bn), ATS brand and the broader website for the society. The as well as the ever-popular
in Auckland. As far as new tunnelling community. The Young Members continue to Annual UCAYM Networking
projects there is the recently ATSym are looking to ensure be active and involved in ATS Event. The UCAYM continues
awarded WestGate Project that the best and brightest are activities including being key to develop close relationships
(AU$5.5bn), in Melbourne, and looking to build a tunnel rather members of the upcoming with colleges and universities
the imminent Sydney City Metro than a high rise or bridge. ATS Conference. This is the with strong tunnelling, mining,
(AU$11.5bn) and Melbourne The night was attended by peak industry event that draws and geotechnical engineering
Metro (AU$10.8bn) tender tunnellers young and old with together the best designers, courses to increase the visibility
award announcements. So if undergraduates, graduates, contractors, suppliers and key of the industry.
you are looking for work, head young engineers and more clients under one roof.

Canada builds Ontario Chapter


Canadian Young Members from
the TAC (Tunnelling Association
of Canada) recently organised
a kick-off meeting in Toronto to In addition, the UCAYM
start building up the group in hosts free online Webinars
Ontario with local activities and every month that comprise a
events. TAC-YM also hosted 31 variety of topics including case
University of British Columbia studies, recently completed
students at the Boulder Creek or current projects, ongoing
Hydro Project. They got to see industry research, and
a portion of the tunnel, the professional development.
powerhouse and a look up in to For additional details and to
the turbines from the tailrace. view their free upcoming and
The students also got to learn archived Webinars, please visit
how to read the tunnel design the UCAYM website: http://
drawing package. community.smenet.org/ucaym

Breakthrough 17
YM MEMBER NATION NEWS

BTS Young Members Enter a visit to the Institution of Civil


Engineers, to help inspire the

Ninth Year Stronger Than Ever


next generation.
In March, the BTSYM held
their 4th Annual conference in
The British Tunnelling Society London. The day was chaired
Young Members (BTSYM) have by BTSYM Chair Emma Hale
had a busy year. The group (pictured below)with 12 young
welcomed in a new committee members presenting their
in November 2016, with Emma projects and experience,
Hale (Mott MacDonald) taking sharing their knowledge
over as Chair, David Brock with others in the industry.
(Atkins) as Secretary, Nick Presentations were given by
McCrossan (Mott MacDonald) Consultant and Contractor
as Media Chair, Sam Huckle young members on topics
(Balfour Beatty) as Professional from ‘applying BIM to major
Development Chair and Gerard projects’ to ‘traditional
Quigg (Cowi UK) as Schools & timbered hand excavation’
Universities Chair. and ‘seismic behaviour of
This marked the start of the tunnels in urban environments’
9th year of the group. Since to ‘Røssåga hydroelectric
then, they have celebrated project in Norway’. Joanne Sui
the 2nd “National Tunnelling projects, work and products, London Academy as part of and Sindre Log also gave an
Day” on 1st December by as well as our committee and their enrichment programme update on the ITAYM activities
holding a school event with members showcasing their and has received excellent to the 90 attendees on the
a TBM naming competition, roles and experience. The feedback. The pack was day. The full day event was
a site visit to the Northern group is already planning their started a number of years sponsored by BAM Nuttall as
Line Extension, a contracts 2017 event with a focus on ago and has been developed the gold sponsors, London
workshop, a Christmas getting the industry visible to over the years by running Bridge Associates and Bekaert
themed social and a boat trip the general public, whilst also some of the sessions within Maccaferri as silver sponsors
along the Tideway project looking forward to working with schools and universities as and Mott MacDonald, Cowi
route. They also once again other national groups to deliver they were developed. The and Gall Zeidler as bronze
ran their online social media #WorldTunnelDay. ‘Teacher’s Pack’ is a resource sponsors. The day concluded
campaign using #TunnelDayUK One of the key aims of the that will be available online in some networking over
achieving a reach of 2.5 BTSYM this year is to be in a for teachers to download and canapés and drinks where
million. Numerous clients, position to launch its ‘Teachers run within their schools. It the attendees continued their
contractors, consultants and Pack’ in 2018. The full pack is will consist of material for five discussion on what the future
suppliers got on board and currently being trialled at the lessons that can be carried out holds. Throughout the day the
posted about their latest independently by the school. Slido application was used to
The pack includes sessions encourage the engagement
on design considerations, of the attendees, giving them
tunnelling techniques and the opportunity to record their
geology. This will allow our comments and questions
schools and universities as the presentations were
branch to have a far wider given. This generated a far
reach than we can currently more interactive environment
achieve with our membership between the speakers and the
base and is being supported audience and the BTSYM will
by the Institution of Civil be looking to run this again
Engineers. As part of this trial at future events. The BTSYM
the BTSYM has also committed conference is open to all under
to providing additional sessions 35 and very much welcomes
to give the students a feel for those from overseas to come
the industry by taking them and present! For details or to
on a site visit to Northern Line register your interest for 2018
Extension, apprenticeship please contact Emma.Hale@
presentations by Tideway and mottmac.com

18 Breakthrough
AFTES off to a Flying BYM Swings into Action
Start in France in Sweden
The ITAYM are proud to (conference held every
announce the first meeting of quarter); Young Members in
the French Young Members, each AFTES Working Group
at the Paris at Maison des (AFTES recommendations);
Ponts et Chaussées, in Paris, participation in AFTES
France, this April. Several site visits; organisation of
initiatives have been launched informal meetings between
since then, both to involve Young Members; participation
more young professionals in international events
in AFTES (Association organised for Young Members
Française des Tunnels et such as the YPTDP initiative
Espace Souterrain / French and ITAYM Regional events.
Association for Tunnels The aim of this group is Since the 2016 World Tunnel per year, in addition to a few
and Underground Space) also to generate new ideas Congress (WTC), in San smaller events. The purpose is
events and activities and to and encourage innovation in Francisco, Sweden has to enable members to connect,
share knowledge between Tunnels and Underground established its own national exchange experiences and
generations, including Space by involving Young Young Member-group, called develop the network. These
participation in the “Mardis Members into the AFTES BYM. The initial goal was to events may be lectures or
de l’AFTES” organisation organisation. gather 70 members within study visits combined with a
two years, a goal that was networking activity. The first
actually reached within just event arranged by BYM was
a month. Today, BYM has a study visit to the Forsmark
approximately 135 members, Nuclear Power Plant, in
who communicate through November 2016. During the
the Facebook page “Svenska two-day trip, 25 delegates
Berggruppen för Yngre listened to interesting lectures
Medlemmar” where everyone and got an insight into the
is welcome to post or invite to nuclear power plant operation,
different events. including the underground
BYM has set a goal of repository strategy for spent
arranging one or two big events fuel and other radioactive
material. Furthermore, a
workshop was arranged to
Growing Network in Greece identify members’ expectations
and wishes regarding the Young
Founded in 2014, the Greek Member group’s future.
Young Members are keeping The Swedish Rock
busy with their group within Construction Committee, the
the GTS (Greek Tunnelling National Member and the
Society). The main goal of Swedish Secretariat for the
the group is to increase the ITA-AITES, is going through an
awareness of the tunnelling exciting change and will become
industry among young Swedish Rock Engineering
professionals by creating a Association. As part of this
strong network among its change, BYM will become an
members. Its 50 members are official, permanent working
mainly civil, mining, survey now responsible for directing to collaborating and getting group within the association.
engineers and geologists and organising events and involved with other Young This will help the group develop
with primary expertise in lectures. The YMG-GTS group Member Tunnelling Groups and increase its capacity
underground works and is now seeking new ideas worldwide, get in touch with further. For example, BYM is
tunnelling projects. A steering for upcoming events and them through their official now looking into the possibility
board of 10 members is workshops and is always open email: ymg.gts@gmail.com of a mentoring programme.

Breakthrough 19
How to set-up a Young Members group
Contact your Member Visit www.ita-aites.org to
Nation and ask if a check if your country is a
Young Members Group Member Nation of the ITA
already exists

YES NO
Join up!

NO Send an email to
secretariat@ita-aites.org
to see how your country
Work with officials to see if could become an ITA
it is possible to set one up Member Nation

SETTING UP A YM GROUP
1. 2. 3.

Arrange a gathering for those that


are interested in contributing.
Discuss what people would like
to get out of the Young Members
group, how to organise yourselves,
Use your own network! Invite your etc. There are no requirements
Contact your national tunnelling friends and colleagues to help for form or content – it is up to
association about the idea of establish the group, spread the yourselves and your Member Nation
establishing a Young Members group. word, and get publicity. officials to decide what you want.

6. 5. 4.

Set up a kick-off event where you


The ITAYM Group can assist with
Work with your Member Nation invite as many people as possible.
by-laws or give examples from other
on how to organize the board Invite an interesting speaker or give a
countries. Cooperate with the ITAYM
and the aims and objectives of presentation on a high profile project to
Group to get contacts internationally.
your group, prepare a simple set attract people. Encourage participants
Contact Breakthrough magazine of by-laws and start working to to get involved. Organise a social
to spread the word about your new organize events and bring young function afterwards to encourage
group and to promote your activities! members together. networking within the group.

YOU NOW HAVE YOURSELF A YOUNG MEMBERS GROUP – ENJOY!

20 Breakthrough
DSI Supplies Safety

Reliable Ground Support

You can count on our System Solutions


Customized for your challenging tunneling projects!

Visit us at
WTC 2017
Main Hall, Booth #27

www.dsi-tunneling.com
Breakthrough 21
Photo Competition
55

This year Breakthrough is launching an annual


photo competition open to all young tunnelling
professionals. Whether you are a budding
photographer or just like to take snaps on your
compact camera or smartphone, we want you to
share your best pictures with us!

Help us to show off the varied and


interesting world of tunnelling
and underground construction
by entering your photos into our
annual Photography Competition,
sponsored by Bekaert Maccaferri
Underground Solutions.

To be in with a chance of winning, make sure


you send us eye-catching images that relate
to tunnelling or underground construction. If
you’ve captured something inspiring, beautiful,
fascinating, intriguing, amusing, or possibly all
of these things, we want to see it!
KOD E100SW

The winning photograph will feature on the


cover of Breakthrough’s 2018 edition, as well as
websites, newsletters, Breakthrough’s Flickr
site, social media and more – there will also
be a special prize from our sponsor Bekaert
Maccaferri Underground Solutions.
Throughout the year the entries will be hosted
on Breakthrough’s Fickr page (https://www.
flickr.com/people/breakthrough_magazine/)
and will be judged by members of the ITA YM
Steering Board and Breakthrough’s editorial
team prior to the next issue of the magazine.
54

22 Breakthrough
KOD E100SW

The rules are as follows:


n Photographs should be submitted by email to amanda@tunnellingjournal.
com or using a free large file transfer service such as Dropbox.
n Please include a caption to explain your picture.
n There is no limit to the number of photographs that you may enter. If
you are not certain whether your photograph will win or you are trying to
choose between several possible entries, then please just enter them all
and let the judges decide.
n Ideally the photograph should be of good print quality, but if it is available
only as a web quality image then please still enter.
n Make no assumptions about the photograph we are seeking, because the
winning photograph could be of a: laboratory, project team, computer
simulation, tunnel breakthrough, engineers in the field, miners in a
mantrip, etc. If it’s an interesting image, we want to see it!
n Photographers retain full copyright of their images, but in submitting an
entry give the ITA-AITES, ITAYM and Breakthrough the right to use that
image for marketing and communications purposes.

Sponsored by

Breakthrough 23
Leading the Way
The ITA’s Executive Council (ExCo) has a big mission: to this stretch of road has more than twice the
average number of accidents for Brazilian
explain to the world what tunnels can do for society in roads.
a world that’s changing fast. ITA-AITES’s mission is to give engineers
and society the information and tools they
need to make more informed decisions
When Tarcisio Celestino, the president hillside and then back down the other side. about roads like this one. And the
of the International Tunnelling and “The engineers had a choice of building a Executive Council’s job is to set out how the
Underground Space Association (ITA- 4km tunnel through the hill or a 6.2km at- Association should go about doing that.
AITES) wants to spend a day at the beach grade road over it. Why did they make this There’s a lack of knowledge about
he sometimes travels along the coast of bad decision to go over the top?” he asks. tunnels, even among experienced
Sao Paulo State on road SP-55. Brazil’s Celestino has calculated that over the civil engineers. The perception is that
shoreline there is beautiful with small road’s 40-year life a tunnel would have constructing tunnels is a high-risk activity;
beaches and islands. saved US$1.2 billion in operational costs and many owners and their advisers
There’s one part of this road that alone, as vehicles use more fuel going up a don’t understand how to select and pay
Celestino finds particularly frustrating: a 6% gradient than travelling on the flat. And contractors so that they get the best
section where it zig-zags up a 320m-high there would have been far fewer accidents: outcome.
ITA-AITES’ challenge is intensified
because of the changes that are happening
in the world, which are increasing our need
for underground space. Populations are
migrating to cities and we are facing the
impacts of climate change.

“In my view, one of the industry’s key


challenges is how it can continuously
improve its capacity to deliver
underground solutions that meet the
demands of our time,”
Alexandre Gomes, ITA-AITES Vice President

24 Breakthrough
“In my view, one of the industry’s key then clients can significantly decrease
challenges is how it can continuously the unpredictability that some tunnelling
improve its capacity to deliver underground projects experience,” says Celestino. “It’s
solutions that meet the demands of our not just about awarding the contract to the
time,” says ITA-AITES vice president contractor who offers the lowest price:
Alexandre Gomes, who points out that we often this means the client ends up paying
have built more major tunnel projects in the much more in the end because of delays
last two decades than we did in the last 100 and claims.”
years. “This implies that we need to keep The committees are focussed on different
improving not only our technologies and aspects of the industry: ITACUS which
knowledge but also how we plan, develop interacts with urban and regional planners;
and implement the projects.” ITACET which focusses on knowledge
In other words, ITA-AITES must change transfer and sharing; ITAtech which aims
fast. And that’s where young people come to collect and spread information about
in, says Ruth Haug, ITA-AITES’ other emerging and developing technology (see
vice president: “My friends and I on the page 32): and ITA-COSUF which aims to
Executive Council have been working for improve the operational safety of tunnels
quite a while; we need young members on Members of the Executive Committee and to make them more viable solutions.
board to help us to change faster. We need Haug predicts that in this era of YouTube
to adapt to the world we are working in, with FIDIC, the International Federation of and TED Talks, there will be changes in
not least the way we communicate – that’s Consulting Engineers, one of the world’s the way working groups and committees
a very important aspect of having a young most respected providers of construction spread information. “Sometimes knowledge
members’ group.” contracts, to create guidance on contractual passes around faster through discussion
practices for tunnels. This should be and presentations rather than through
New strategy completed in time for the World Tunnelling written reports, although we definitely
The 12 members of the Executive Council Congress, in Bergen, this June. need both,” she says. “That’s one of our
are elected from among representatives of “These guidelines are important challenges and something young members
the 74 member nations that make up ITA- because if contracts are set up properly, could help us with.”
AITES. Each comes from a different country.
Meeting face-to-face around five times a We Spoke to:
year, with many more virtual meetings and
sub-committee meetings, the Executive Tarcisio Celestino, president of ITA-AITES
Council moves from country to country. Leader of the Geotechnical Engineering Group for the Themag
Recently the meeting was held in Myanmar, Engenharia, São Paulo, Brazil and Professor of Underground
one of the newest of the ITA-AITES member Works & Rock Mechanics at the University of São Paulo, São
nations. Often the country hosting the Carlos Engineering School.
meeting will make the most of their visiting
“I wish I had known how to design tunnels when I was much
tunnelling experts, organising a conference
younger. If you are studying a civil engineering degree now and
for them to speak at and meetings with
tunnelling is not part of your course, find out about tunnels.”
local decision-makers.
Much of the Council’s work over the
Ruth Haug, vice president of ITA-AITES
past 12 months has been spent setting
Construction Manager for New Roads (Nye Veier), which is a
out the ITA-AITES’ strategy for the next
construction and rehabilitation program for the Kjørholt and
two years. The focus areas within the new
Bamble tunnels; past president of the Norwegian Tunnelling
strategic plan are all centred on better
Society.
communication and knowledge sharing:
between the different member nations, with “To get a good grasp of the industry, get out there and meet other
students, with industry and with the public. people: older engineers, people from other walks of life, get
An important task over the next two years involved. Tunnelling works need good teamwork. Communicate
will be to re-examine how the ITA-AITES’ and listen to the experience around you.”
Working Groups and Committees operate.
If the Executive Council is the head of the Alexandre Gomes, vice president of ITA-AITES
ITA-AITES then the Working Groups make Chief Technical Principal, Tunnels and Underground for SMEC, a
up its body and the four Committees are its member of the Surbana Jurong Group
arms and legs.
“Whatever area you choose, the most important thing to
The Working Groups investigate areas
understand is that you will always need a lot of patience,
of technical interest or concern and
persistence and dedication to have success and gratification in
provide reports which are referred to
your career.”
and used widely. For instance, WG 3,
Contractual Practices, has joined forces

Breakthrough 25
How the ITA-AITES is Structured
74 Member Nations of the ITA-AITES

ITA Executive Council (ExCo)

ITAYM
ITACET Training
Foundation Courses

e IT
itte ing on Atec
mm rain Ne h
o &T w C
Te
n
ca C

om nolo
du ET

ch
tio

Working Groups

m i g ie s
on E A-C

tte
Research
IT

e
Contractual Practices
Health & Safety
Maintenance & Repair
Seismic Effects
Immersed & Floating Tunnels
Use of Sprayed Concrete
Information Modelling in Tunnelling (est. 2017)
Mechanized Tunnelling
l i ti e n a l

Underground Works & Environment


Long Tunnels at Great Depth
io
I T A e rg r

d F per at

Conventional Tunnelling
Und

Urban Problems, Underground Solutions


CU ou

nO

Lifetime Cycle Asset Management


ac i
SC n

eo

m
tte
o

d m it t
i
un

m
ro

m g
Sp ee F C o d er
ac o OS U of Un
eU n IT A-C ty
se S af e

Meetings, Events Publictions, Reports Working with


& Training Courses & Guidance other organizations

Website & Media Outreach to World Tunnel


Newsletters Outreach Decision Congress
Makers

26 Breakthrough
Breakthrough 27
A week in my life
Tobias Andersson is a mechanical engineer working as a TBM Construction Monday
Manager for the Skanska/Strabag Joint Venture on the second tube of the
5:00am, the alarm goes on my
Ulriken Tunnel in Bergen, Norway – the first rail tunnel excavated with a TBM phone. A short sleep, but time
in Norwegian history. Tobias has over 10 years of experience with TBM projects for some breakfast, before I
in Sweden and Norway. He worked on the challenging and notorious Hallandsås take the train to the airport
and head to site. The flight
project in south of Sweden; and was a part of bringing TBMs back to Norway was planned at 08:00am, but
on the Røssåga Hydropower Project, close to the artic circle, where challenges unfortunately it is delayed
such as karstic ground conditions with high water inflow, very hard rock by 20 minutes. Anyway, a
bit more time to go through
conditions of up to 300MPa and a very low degree of fracturing were faced. emails and prepare some
topics for the shift meeting
with the tunnel crew
Sunday that start tonight.
After a refreshing
5:50am, my kid wakes me powernap on the plane, I
up...”Daddy, daddy. Tractor, arrive on site at 10:30am
tractor!” Both of us rush out of ready for one of the
bed to look through the window. busiest days of the week.
He was right, a tractor is slowly It starts with a
passing our house this sunny management meeting,
early-summer morning, in the where we go through
south of Sweden. The tractor the latest health and
made his morning, for me its safety topics, then the
time to get ready to leave for a production status for the
meeting in Oslo, the capital of whole project, upcoming
Norway, with my last project activities, manpower
team. Bag packed, kiss my and economy. Then time
girlfriend and son goodbye. for a typical Norwegian
Ohh, I hate goodbyes, seeing construction lunch, a
the kid pushing his head against sandwich. Same every day,
the window and waving, as but with some variations like
he would like to follow me, type of cheese or sausage.
while I slowly drive away to the The afternoon is dedicated
airport. As a Swede, working to office work, summarising
with TBM tunnels means travel for days every week. The one the weekly production and
and staying away from home hour drive to the airport goes amount of executed work,
quite quickly. I make a phone from the last project. This which need to be handed over
call to the TBM superintendent exercise is often forgotten or to the Client for acceptance
to update myself on the latest not prioritised, but it is a very before the end of the day.
information from site. The client good tool to become better and At 6:00pm the new shift
had ordered probe drilling due improve ourselves. crew arrive and I take some
to a possible water bearing We end the day with dinner time to go through this week’s
zone, but was not found at a restaurant in the harbor, health and safety topics,
during probe drilling and feeling the still chilly early- production related information
excavation had resumed. summer breeze coming in from and then, as they all jump
Arriving at the office the ocean, watching ice hockey onto the train and head into
in Oslo at 13:00, it’s and seeing Sweden after a the tunnel, I wish them a good
nice to meet up with four long, tight and good game, beat shift. Myself, I call it a night,
old colleagues and bosses, Canada in world cup final. Then passing by the site restaurant
“Daddy, daddy. to discuss lessons learned I head back to the hotel with a to grab some food before
Tractor, tractor!” and summarise experiences good feeling of victory. going to my room at the camp.

28 Breakthrough
Tuesday
5:30am, I jump out of
bed, eager to go to work.
Today we will inspect the
cutterhead at the front of
the Tunnel Boring Machine
(TBM) in order determine if
we have a need for additional
maintenance or not. After
a shaky trip through the
tunnel in the manrider train,
c t i o n o f the Office w
we reach the TBM, where the
Insp e d ork - Goin
day shift guys are full of jokes
and laughs. We perform the
cutterhea weekly p g through
roductio
inspection. The cutterhead
n reports
looks to be in a good shape
even though we just passed a He is usually not on site, but night’s production was with
blocky quartzite zone and there today after several tests at the high advance rates on the TBM back home before the kid goes
is no need for any immediate batching plant, we are running and low advance pressure, so I to bed for the night.
action. I spend some time on a new shotcrete recipe where decided to go together with the
the machine to talk to the guys, more crushed stone is used site geologist into the TBM to Thursday
see the work ongoing, and best instead of only natural sand. If inspect the rock mass. We find
of all hear the alarm sound on it’s a success it will be a good some clay infill and fractured Always one of the good days,
the conveyor belt as it warns environmental improvement. rock that calls for some extra travelling back home. But
us that it’s starting up. Then, a I spend the afternoon in a rock support, like additional first I get together with the
few seconds later, the hydraulic construction meeting with bolts and wire mesh. Before project management team,
pumps start and rumbling the Client and thereafter an leaving the tunnel we mark we have to make plans for the
sounds from the cutterhead internal TBM meeting with our up some areas to take rock activities that will follow the
and vibrations through the TBM TBM superintendents. samples that later will be TBM breakthrough. Many new
start, as the machine begins sent to a laboratory for testing activities will come in parallel
to break rock again. A great Wednesday to determine the rock mass with the TBM dismantling: drill
feeling seeing the muck being properties. and blast works for the cross
hauled out on the belt, now we I arrive at the office at 6:00am Leaving the tunnel, I am passages, water and frost
are making tunnel. and need coffee. A local street faced with a blue sky and the protection and concrete works.
Leaving the tunnel, I meet up racing team used the road and sun shining in my eyes, which All of these need equipment
with the quality engineer from parking areas nearby for their doesn’t happen that often as and resources. After a couple of
the shotcrete supplier, who is activities during the night giving Bergen is one of the rainiest hours discussion, brainstorming
just about to do some slump me a sleepless night. I open places in Europe. So to use and decisions, we are on the
and spread test on the last my mailbox to read the opportunity of the good way to having it all organised.
delivery. and answer emails weather, I decide to make During the final hours of the
and handle the most a safety inspection of the day, I work on my presentation
recent invoices –and yard area together with the for the upcoming World Tunnel
again some detective safety representative on shift, Conference, in Bergen, were I
work to find out who who also works as a crane will present a case study from
ordered what and operator. During the inspection the site. Looking forward for
whether we have we find some areas to improve this big event that its hosted in
received the parts on especially around the Bergen, close to our site.
we got invoiced storage of the slings and 4:00pm and time to catch
for. But a quick shackles for the crane. my flight and head home
phone call to The afternoon goes to for the weekend!
the mechanical documentation works and
superintendent short small meetings around
solved the the documentation and
case about follow up of the
the spray production.
membrane I end the day at

est
that was 7:30pm in order

s p r e ad t invoiced. to have time


and Last for a video call
Slump shotcrete
on Breakthrough 29
AWARDS 2017
November 15, 2017 | Paris, France

FOCUSED Following two successful events in Switzerland and in

FORWARD
Singapore, the International Tunnelling and Underground
Space Association is preparing for the third annual ITA
Tunnelling Awards, which will take place on the 15th of
November, 2017 – alongside the AFTES Conference in Paris,
France, which runs from the 13th to the 16th of November –
SUPPORTING YOUNG TUNNELERS and is calling for candidates to apply.
The awards are designed to identify and celebrate
From education to worldwide opportunities outstanding achievement in tunnelling and underground
in the field, Robbins is committed to hiring space development, and promote recognition of the industry’s
remarkable contributions to engineering and society.
young engineers that will become the
Judged by a panel of industry experts (including ITAYM Chair
next generation of industry experts.
Sindre Log) the ITA Tunnelling Awards shine a spotlight on the
We’re focused forward, on creating individuals, companies, and project owners behind the very
multi-generational teams that can learn best projects and innovations. Entries from every corner of the
world are welcome in the following categories:
from one another to create and operate
the world’s foremost tunnel boring Major Project of the Year - more than €500 million
machines and related equipment. Tunnelling Project of the Year - between €50 million
and €500 million
Project of the Year - up to €50 million
LEARN ABOUT OUR OPPORTUNITIES Technical Project Innovation of the Year
therobbinscompany.com Technical Product/Equipment Innovation of the Year
Sustainability Initiative of the Year
Innovative Underground Space Concept of the Year
Young Tunneller of the Year

Nominations for the nine award categories, including Young


Tunneller of the Year, should be submitted by June 30, 2017,
through the ITA’s dedicated Awards website:
RELIABLE | RESPONSIVE
https://awards.ita-aites.org
Or follow the ITA Tunnelling Awards on twitter @itaAward

30 Breakthrough
Book Club
Breakthrough takes a look at some of the ITAYM Steering

2
Board’s favourite books and a series of practical rock
engineering videos that are available to download for free.

workers available in the industry. Immersed Tunnels


2017 is the 10th anniversary of the Richard Lunniss & Jonathan Baber
publication of “Mechanized Tunneling in Immersed tunnels have been around
Urban Areas” – written and peer reviewed for more than a century but remain
by leading ITA members – which is a a relatively unknown form of tunnel
collection of reported experiences and construction. For waterway crossings

1 lessons learned, the relevance of which


remains extremely valuable today.
I had the pleasure of adopting this as a
handbook during my Masters in Tunnelling
they are an effective alternative to
bored tunnels and bridges, particularly
in shallower waters, soft alluvial
soils, and earthquake-prone areas.
Mechanized Tunnelling in Urban Areas and TBMs to prepare for some of my Successful implementation requires
Edited by: Vittorio Guglielmetti, Piergiorgio exams and it also provided guidance in a thorough understanding of a wide
Grasso, Ashraf Mahtab, Shulin Xu my professional work at the beginning variety of civil engineering disciplines
It’s no news to anyone that mechanized of my career as a design engineer of and construction techniques. Immersed
tunnelling in urban areas is one of the underground structures. Tunnels brings together in one volume
most challenging forms of heavy-civil This book is for me quintessential to all aspects of immersed tunnels from
construction or that the need for public the tunnelling industry, as it really gives initial feasibility and planning, through
infrastructures is constantly growing the reader a clear understanding of how design and construction, to operation
in our cities. However, with the current a TBM tunnelling project is a result of and maintenance.“This is a brilliant
rate of rapid global urbanization, the different types of technical expertise, introduction and thorough run-through
tunnelling industry is being pushed to ranging from mechanical to electrical, of the complexities of immersed tube
expand its technological limits, while on from geotechnical to structural without tunnels,” says Lasse Vester.
the other hand increasing demand for ignoring the financial, legal, contractual
skilled contractors and consultants can and safety aspects of our exciting HOEK’S CORNER
often collide with the limited number profession as Tunnel Engineers.
Practical Rock Engineering Videos
of experienced engineers and trained Review by Giuseppe Gaspari

If you are a young


engineering graduate,
Tragically, two of the divers that went
your civil engineering
down the 10-mile long tunnel to remove degree may have
the plugs would die that day and three included a few courses
others would barely escape the pitch- in soil mechanics and
black airless atmosphere. That fatal engineering geology
disaster marks the starting point of and an introductory course in rock
mechanics. But this may not be sufficient

3
Neil Swidey’s “Trapped Under the Sea”
a dramatic examination of the world of to provide the background you need to
commercial diving and the risks that understand the complexities of tunnel
accompany major tunnelling projects. design and construction. Typically, these
skills are learned “on the job” but there
Swidey, a reporter with The Boston
is a little help available from a series of
Trapped Under the Sea Globe, weaves the histories of the divers
videos on the practical aspects of rock
Neil Swidey with explanations of the engineering engineering. Dr Evert Hoek, a retired
On July 21, 1999, five commercial divers complexities of the project and the roles geotechnical engineer who has worked
entered the Deer Island Outfall Tunnel; a of construction companies, governmental as a leading professor and consulting
key element of the multi billion dollar feat agencies, and others in the tragedy. engineer for the past 50 years, has
of modern engineering that cleaned up “This reads like a tunnelling version of prepared a number of 30-minute videos
the infamously polluted Boston Harbor. the Perfect Storm and offers valuable that are available for free download on
The tunnel was virtually complete, save lessons for anyone involved in a the Internet. Visit Hoek’s Corner here:
for the removal of plugs that prevented major infrastructure project,” says https://www.rocscience.com/learning/
the tunnel flooding during construction. Breakthrough’s editor Amanda Foley. hoek-s-corner/lecture-series

Breakthrough 31
Industry Innovation
other committees in that companies
When you’re creating space beneath the world’s have to pay to belong to it. It is a way
busiest cities, the word ‘new’ can be a scary one for manufacturers and suppliers to
support the work of ITA and at the same
– which is where ITAtech comes in. time make their voices heard in the
international tunnelling community and
address some of the knowledge gaps that
Innovation and how to do more of it is a AITES), is to answer that question. they come across every day when bidding
common theme for many big infrastructure “Our goal is to promote new or state-of- for contracts or advising their customers.
programmes around the world. The the-art technologies and methods for the When ITAtech was set up in 2012, there
aspiration is to build things better, faster, sustainable development of underground was some scepticism that competing
cheaper by doing things differently. space,” says Pauli Arenram, who chairs suppliers would be able to sit down in
There’s a huge problem here though too. ITAtech’s steering board. ITAtech does this the same room, share information and
It’s often very difficult for infrastructure by developing and publishing guidelines discuss issues constructively. After all,
owners and developers to take the risk of that deal with aspects such as terminology, these are firms who are fighting each
doing something new: if something goes how to write specifications, design issues other every day to win work out in the
wrong the results could be catastrophic. and construction techniques. commercial world.
The worst case scenario could be that lives Speed is important for ITAtech. They Some topics have caused more heated
are lost, the best case is that money is are addressing questions that people are debates than others, but largely things
wasted, and that’s often money from the asking now, so the sooner they can provide have gone well and differences of opinion
public purse. information to help inform decision- have been accommodated. ITAtech’s
The question that every owner or adviser making, the better. “We publish guidelines, various Activity Groups (AGs) have
would ask when considering a technology not regulations,” continues Arenram. “The produced a total of eight guides, with more
or method they haven’t worked with before idea is to inform people of all the available on the way. “I think that is a good output,”
is this: who’s used it before and how did knowledge around a subject at that time.
it go? The purpose of ITAtech, one of the We can and do revise the guidelines as
committees of the International Tunnelling more information is available.”
and Underground Space Association (ITA- ITAtech is different from ITA-AITES’

32 Breakthrough
says Arenram who has chaired the board Here’s a taster of some of the topics that ITAtech has
for the last two years, “Although I would
like us to do more.” tackled or is tackling in a bid to spread information
“One of our biggest challenges is that about new technology faster:
everybody has their day jobs and it can be
difficult for people to make time to do the Sprayed waterproofing membranes
work,” says Lok Home, who heads up the The traditional way to waterproof tunnels is
AG on Excavation and who was one of the by lining them with plastic sheeting and this
driving forces behind ITAtech’s formation. is still the best solution in some situations. A
Both Home and Arenram would like newer approach is to spray on waterproofing
to see more involvement from young membranes that can work well where
members in ITAtech’s activity groups – complicated geometries are involved and the
although that does require their employing amount of water coming in is not too high.
companies to be supporters or prime
sponsors of ITAtech. “Young spirit is This was the subject of one of the first
inspiring,” says Arenram. guidance documents ITAtech published. The
“Companies should identify their guidance explains when sprayed waterproofing
ambitious young people and get them membranes can be used, how they impact on
involved,” advises Lok Home. the design of the tunnel lining, and what the
Arenram also plans to sit down with technical issues are.
representatives from the ITA Young
Members group and ask them to identify Remote monitoring
topics for which ITAtech guidance would be Did you know that the hundreds and thousands
useful. “Young people can be very skilled of pictures taken by satellites can be processed
and they often come up with new ways to to show how ground levels have changed
look at things.” over time? This technology is called Satellite
Radar Interferometry and allows us to see how
We spoke to: the ground has moved historically and how
underground construction is impacting on it
today.

Satellite Radar Interferometry was one of three


remote monitoring technologies covered in an
ITAtech guidance document.

Fibre-reinforced segments
Steel reinforcement bars are the traditional way
Pauli Arenram - Chair of ITAtech of strengthening the concrete segments that are
Steering Board. Vice President Business used to line tunnels as tunnel boring machines
Development, Mining & Rock Excavation construct them. More recently steel fibres have
Technique, Atlas Copco Rock Drills been used to reinforce them.
“Do not hide your new ideas, but work ITAtech guidance on this subject looks at
hard with a long-term goal of making your how fibre-reinforced segments should be
visions come true.” designed and also touches on fibres made from
emerging fibre materials such as plastics or
macrosynthetics.

TBM Pilots
When TBMs are boring under densely developed
cities, it is very important that the ground above
the tunnel being created does not subside. For
this reason Earth Pressure Balance Machines
Lok Home - ITAtech Steering Board, (EPBMs) – which use pressure to support the
Chair of Excavation Activity Group. Chief excavation – are used.
Executive, The Robbins Company
However, just as important as the machine is
“When it comes to careers for the young the person driving it. One of the outputs ITAtech
and ambitious there are two ‘cool’ places is currently developing, in conjunction with the
to go: into Space or Underground. A lot Colorado School of Mines, is a training and
goes on ‘Down Under’ and we don’t mean certification course of EPBM pilots.
Australia.”

Breakthrough 33
Alpine Adventure
ITA Young Members from more than 10 different countries gathered for a highly
successful first regional networking event, in Switzerland, this May.

On a sunny Thursday in May, test facility is truly a fascinating


45 young tunnellers from more underground world twisting
than 10 different countries with galleries, caverns, testing
met in front of the Post Hotel, areas, laboratories and
in Sargans, Switzerland. The training rooms that provide
purpose was to participate in ideal conditions for research,
the first ever ITAYM Regional development, testing and 1:1
Event. The participants experiments. The visit here
came from many different started with a tour of the
destinations varying from different exhibition and test
Sweden in the North to Italy caverns. The test facility was
in the South. The group from founded in 1970 as a research
Slovenia looked a bit bleary- and development facility for
eyed when we met at 1 o’clock tunnel construction. It was
as they had been up very early inspiring presentation of the friendships were made among initially focused on testing drill
that morning to drive all the way Challenges of Underground the participants. People were and explosives technology, but
to Switzerland. Caverns followed by a actually so swallowed up in over the years it grew, and with
The next 1½ days were presentation of the challenges conversation that they almost the opening of the building
dedicated to tunnelling and and solutions associated with forgot the dinner was ready to materials test laboratory in
kicked off with a guided tour fire safety in tunnels given by be served in the next room. 1984 the range of services were
around the historic iron mine Bianca Taferner from Promat. A lovely four-course local expanded and today covers
Gonzen Bergwerk, where With two presentations dinner was served in the all aspects of underground
the historical development and a tour around a historic underground restaurant of the mining, including excavation
of mining in the region was mine the technical part of the mine. A perfect setting for a and development, sealing and
presented. A great way to set first day was over and it was young tunnellers event! installations, and operational
the scene for the following day time to start networking on aspects such as safety. The
with presentations on many a more casual basis. In the Day two facility has, amongst other
different aspects of tunnelling. entrance area of the Gonzen Friday morning at 7:45am, a things, its own concrete
After the tour of the mine, the Bergwerk the hosts had bus picked up the participants laboratory, fire test areas and
first two technical presentations prepared drinks and snacks for to take them to Versuchstollen even includes a restaurant and
were given. Felix Amberg from all the young tunnellers and it Hagerbach (VSH) – the a shooting range. Indeed a very
Amberg Group gave a very did not take long before new Hagerbach Test Facility. The versatile use of the caverns.

34 Breakthrough
After the tour around the then picked up and taken to that light the trip to Hagerbach
facility Jürg Schlumpf of Schollberg Underground Quarry was a fantastic success! The
Sika gave a very interesting and the group that had been programme was packed with
presentation on concrete there returned to Hagerbach. technical presentations and
durability. This was followed Schollberg Underground the participants were very
by Michael Hermann from Quarry is a mine where stone, interested in getting to know
VSH presenting the fire primarily used for coarse each other and network across
resistance testing laboratory aggregate in concrete, is nationalities.
and the participants were extracted. In order to minimise The event was arranged by
then shown an ongoing fire costs for rock support the Jasmin Amberg and Bianca
test of a concrete sample with caverns were excavated using Taferner from the Swiss and
polypropylene fibres added to the room and pillar method Austrian YM groups and Doris
enhance fire resistance. in three levels. It was very Frank and Lasse Vester from
After a delicious lunch, inspiring to see an innovative the ITAYM Steering Board.
the technical programme use of tunnelling and mining The participation fee for each
continued, but now the techniques for an industry that person was €50 in and it would
participants were divided into is usually seen above ground. not have been possible to keep
two groups, where one stayed After the tour in Schollberg the participation cost so low if it
in Hagerbach and the other the group returned to had not been for our sponsors.
was transported to Schollberg Hagerbach, where a surprise day before and enjoyed a A great thank you to Amberg
Underground Quarry. waited for them. The fantastic well-deserved meal. It was Group, The Robbins Company,
The group staying in hosts of VSH had prepared a amazing to see how fast Sika, Promat, Pini Swiss
Hagerbach were given a test explosion in the gallery relationships are built through Engineers, Elkuch-Bator, the
presentation by Amberg Loglay for the Young Members group. sharing experiences and Swiss Tunnelling Society and
of the new digital developments For many of the participants having a common enthusiasm ITA Young Members.
and Construction Site 4.0. this was the first time they had for technical challenges. A special thank you to the
After this Michael Lierau from witnessed a live explosion and The main objective of the ITA hosts at the Versuchstollen
Elkuch gave a presentation and felt the ground shaking below Young Members is to provide a Hagerbach and especially Felix
demonstration of safety doors their feet. technical network and platform Amberg, who had invited us
and their use in tunnels with The group returned to the for young professionals and and made this fantastic visit
a pressure difference between Hotel Post where they had students in the tunnelling and possible. Thank you – we had a
different tubes. This group was all met for the first time the underground space industry. In blast!

Breakthrough 35
BigData
Managing and analysing information
“Data may be the most valuable source of information in tunnelling
– Make sure it is handled properly.”
Patrick Schmiedeke is a software engineer performance. Analysis on excavated
working for Babendererde Engineers, an sections aims to improve TBM performance
engineering and consulting company that and the interaction of the machine with the
specialises in mechanised tunnelling, ground and the environment. Data available
specifically in tunnelling involving tunnel from numerous sources and the possibility
boring machines (TBMs). to combine various parameters is a source
of valuable information that is the basis for
As computer scientists are not trained the analysis.
in constructing tunnels, people may Additionally, the frequency at which the
wonder how a computer scientist ended data is gathered has increased a lot. On
up in a civil engineering office. During the one hand, it was necessary, and on the
my computer science studies, I never other hand it became possible, as storage
planned or imagined that I would end up space became much more cost-efficient
working in the tunnelling industry. But and the computational power of the
when it became time for me to write my automation systems in the TBMs improved.
thesis, I was looking for a traineeship at a While monitoring real-time data, it is
company in my neighbourhood. During my possible to miss certain negative or positive
first days at the company I quickly realised following project completion for reporting, events between recordings, if the duration
that I had entered a really interesting claims management and damage analysis. of the logging interval is too long. Therefore
workplace full of variety. Not only had I With every new development in the the intervals have been significantly
found an interesting topic for my thesis, tunnelling sector we have to adjust our reduced. Recent approaches show, that
my traineeship also gave me insight into a system to new aspects and to the request in future intervals of less than 1 second
completely new field. of our customers. may be necessary. This will lead to
We developed a software system called In my daily work, I receive more and future challenges on both
TPC (Tunnelling Process Control) to more requests to implement a wide sides, the
manage and analyse the data collected number of data sources and increased data
during tunnel construction. The need for its volumes into our software. What started
development was due to the insufficiency out with a few sensor data and manual
of data management with MS Excel. Our inputs has become a complex system
civil engineers had reached the limit of to access and analyse information
what could be done with Excel in terms of of machine data, geotechnical
data capacity, collaborative access, data monitoring data, manual
protection and security. data, tidal information,
Our software system can be used in user inputs, etc. We
all stages of a tunnelling project; prior compare and analyse
to excavation by storing and managing data from various
structural reference measurements, sources to improve and
during excavation for cost control, QC / optimise operational
QM, risk assessment, incident analysis and procedure and

36 Breakthrough
TPC (Tunnelling Process
Control) manages and
analyses all data in the
process of the tunnel
construction.

automation system of the TBM and the Nowadays papers are full of
software systems working with the data. catchphrases like industry 4.0, big data
Apart from real-time data monitoring or digitization of the manufacturing
and analysis another main aspect lies sector. But years ago, companies in the
in quality control and management. mechanized tunnelling sector had already
Many different people are involved in started to go digital by creating their own
the tunnel construction process, from software to collect, combine and analyse
the TBM pilot that must keep the TBM traditional and digital data sources.
aligned and operate it within the designed Industry 4.0 can be defined as the next
parameters, to the QC engineers that big step in automation and data exchange
verify these parameters and create the in the manufacturing sector. It surrounds
relevant reports on various procedures. cyber-physical systems, Internet of things
The reporting and documentation of the and cloud computing. Industry 4.0 is driven
tunnelling process will always be a major by four developments: the impressive rise
aspect of the construction process. In the of data storage, computational power
daily routine, our system sends emails carefully. This will always be a challenge. and connectivity; new systems human-
with attached report pdfs automatically. Another security concern results from machine interactions like touch interfaces;
In attempt to reduce mail traffic and to the introduction of the Building Information development of analysis and business-
centralize reporting, we work together Modelling (BIM) process for all participants intelligence capabilities; and the rise of
with cloud based storage companies to involved in public tunnel construction additive manufacturing like 3D printing,
offer automated storage of reports in cloud work in various countries. BIM represents which transfers digital instructions to the
drives. This results in multiple benefits, all the information on a project – before, physical world.
such as central storage, access control, during and after construction. The output In the not-too distant future, these new
security and mobile availability. of this process is the Building Information technologies will be used in the tunnelling
The fast pace of modern life, operational Model, which illustrates the components industry. Augmented Reality devices like
procedure and decision-making results of the building in digital form. As it is google glass will form the first step into
in the need for quick and reliable access necessary for all participants to cooperate having information available on heads-
to data and information. Mobile devices, and coordinate their work based on the up displays during tunnel inspections.
such as laptops, smartphones and tablets, same digital model during the construction This would make work easier and reduce
have become an essential part of our daily process; from the planning phase to failures in the process. But maybe it won’t
life. Data protection and security is one of demolition, the aspect of data security and be necessary to walk into the actual tunnel
the main concerns in this development as data protection during the project will be for inspection. There might be a virtual
users tend to handle devices and data less extremely important. reality digital tunnel to walk through.

Breakthrough 37
Aspiring tunnellers can get a head start on their peers by studying one of the
specialist undergraduate or postgraduate tunnelling degrees around the world.
Breakthrough spoke to five young tunnellers to ask them why they chose the
course they did and where it has taken them. Kristina Smith reports...
years in the Norwegian Tunnelling
Technical challenges, Society and has worked to establish
young tunnellers’ organisations in
massive machines and Norway and internationally. He is
some of the world’s currently chair of the ITA Young Members
most unusual locations group – and heads up the editorial board
for this magazine.
Sindre Log, General Manager, “I get very enthusiastic about things
Robbins Norway and want to get engaged,” he says. “I see
the tunnelling industry as something that
Masters’ degree in Civil Engineering at can help solve a lot of society’s problems
the Norwegian University of Science and and we need to tell the rest of society
Technology (NTNU) about that. I sincerely believe that this is
one of the best industries to work in.”
Sindre Log is a self-confessed nerd and 17- and 19-inch cutters,” he says. “I also Log points out that while many young
lover of big machines. “When I first saw a carried out an analysis of the job site, engineers in Norway aspire to work in
TBM I thought: ‘that’s crazy and awesome cutter wear and penetration depths.” the oil and gas industry, tunnelling offers
and I want to do it’.” The thesis project lead to a job offer far more opportunities. “If you work
So he has found the right role and a first posting in Germany before hard in this industry, you will be properly
with tunnel boring machine (TBM) Robbins opened up its new office in rewarded,” he says. “That isn’t always the
manufacturer Robbins, providing Norway where Log is based now. From case in other industries.
geotechnical expertise to projects around there he literally travels around the
the world. Log also heads up the firms’ world – China, South America, Vietnam, I think tunnels will be
business in Scandinavia, bidding to Malaysia, US, Europe - visiting all a big part of the future.
supply machines to projects there. Robbins’ rock jobs to look at the geology
It’s good for young people
Log followed in the footsteps of and solve problems.
his father and older sister, both of “I love travelling and with this job you to get involved now
whom studied civil engineering at the get to visit places that you wouldn’t see because a lot of things are
Norwegian University of Science and as a tourist,” he says. “I still enjoy that going to happen and they
Technology (NTNU) in their home town of part of the job, although it’s a little bit
Trondheim. “If you want to do a Masters different now that I have a young family.”
will have a chance to be
thesis in engineering, that’s the place you Log has also been involved for many part of that.
go,” says Log.
One of the highlights of Log’s five-
year course was a trip to China just
before the Olympics. He also began to
get seriously interested in the detailed
workings of TBMs there: the university
has a huge TBM-testing laboratory where
Log worked part-time as a research
assistant, learning first-hand about rock
behaviour and TBM performance.
Log made contact with Robbins’
Chief Executive Lok Home when he was
preparing to work on his thesis. “Lok sent
me to India for three months to study
the use of 20-inch cutters compared to

38 Breakthrough
existence of the tunnelling industry – as
well as the basics of how to plan and run
a project.
Returning to his home country, Eng
started work on his first project with
contractor MMC Gamuda on Line 1 of the
Klang Valley MRT. Initially, he worked on
the tender, helping to prepare paperwork,
plan the site set up and how to launch
the machine, look at the procurement
strategy, manpower and plant needed. “It
was a very steep learning curve,” he says.
Once MMC Gamuda had won the
contract, Eng worked as a Shift Engineer
Young Tunneller of the with one of the ten TBMs, on 12-hour
Year – on a mission to shifts, working six days on and three off
change lives and alternating between blocks of day
shift and night shift. “You have to work
Derek Eng, Assistant Manager (Tunnel), hard and you have to get your hands
MMC Gamuda dirty,” says Eng. “You cannot expect to
be a manager without knowing what’s
Bachelor’s degree in Civil Engineering happening down there.”
at Universiti Sains Malaysia; Project Eng is now working on Line 2 of the
Management certificate at Hochschule MRT and has been promoted to Assistant
Bremen Manager. “My new role involves managing
people. That’s what I really like doing; I am
“What we do on earth is all about quite extrovert,” he says. “This role means
changing lives and engineering is life- I will get to meet a lot of people and learn
changing,” says Derek Eng, Assistant from them, working with external parties
Manager (Tunnel) for MMC Gamuda on on interfacing works.”
the Klang Valley Mass Rapid Transport The message that Eng tries to convey
(MRT) project in Kuala Lumpur, Malaysia. at Universiti Sains Malaysia. “I always to school children through his outreach
Eng was awarded the International thought I wanted to be a builder because work with MMC Gamuda is that a career
Tunnelling and Underground Space I wanted to give something to my nation. in tunnelling makes a positive impact on
Association’s (ITA-AITES) Young Tunneller I’ve always been awestruck by structures the world.
of the Year in 2016, and after half an like the twin towers or suspension “You will be creating structures that
hour in conversation with him it’s easy to bridges and I wanted to know how they last for 100 or 200 years, something that
understand why. Passionate and modest work and how they are created.” will contribute to society,” he says. “But
in equal measure, Eng wants to make Since tunnelling projects are rare in you have to be mentally and emotionally
a positive impact on society through Malaysia, Eng didn’t think about going prepared because it will not be a smooth
his work, learning from those around underground until he went to Germany to journey; there will be ups and downs and
him and encouraging school leavers to study Project Management, an extended you have to be willing to move around to
consider engineering too. programme offered during his bachelors different countries. That’s the best way to
Eng chose to study civil engineering degree. There he learnt about the learn.”

Breakthrough 39
being part of a bigger picture,” says
My Power is Sui. “Tideway is cleaning up the River
Construction Thames and making London a better
place.” As a Londoner born, bred and
Joanne Sui, Tunnel Engineer, educated, Tideway will have a very direct
London Bridge Associates impact on Sui’s local environment.
Sui has chaired the British Tunnelling
Bachelors degree in Civil Engineering at Society’s Young Members and currently
University College London sits on the Steering Committee for
the International Tunnelling and
It’s safe to say that few tunnel engineers Underground Space Association’s
have appeared in cosmetic company (ITA-AITES’) young members’ group.
advertising. But London Bridge “It’s about promoting tunnelling and
Associates’ Joanne Sui has; she was encouraging other people,” says Sui. “It’s
selected for Lancôme’s ‘My Shade good to be able to pass on some of what
of Power’ campaign, which featured I’ve learned to other people.”
influential women of all ages from a Her advice for those at the beginning
variety of professions. of their career is to look for lessons
Lancôme’s researchers had found Sui, learned everywhere: “You can learn
whose photo was captioned ‘My Power from every situation, whether positive
is Construction’, because of her success or negative,” she says. “Every day is
in several awards schemes. She was a learning day. Don’t be afraid to ask
one of Management Today’s 35 women questions.”
under 35, shortlisted for the First Women Her current role is on London’s The best thing about my
Awards and highly commended in the super sewer project Tideway, working
Asian Women Awards. as a Construction Engineer on one job is being part of a bigger
Sui was drawn to a civil engineering of the sites. Employed on the client picture. Tideway is cleaning
degree at University College London side, her current tasks include up the River Thames and
because of the subjects she enjoyed at assurance, checking health and safety,
school. “I quite liked physics and maths programming and cost planning.
making London a better
and learning how things worked so I “The best thing about my job is place.
ended up doing an engineering degree,”
she says.
Like many people who work in
tunnelling, she came to the industry by
chance. “I had a look around at what
projects were underway and applied for
a placement with Morgan Sindall on the
Kings Cross Station upgrade,” says Sui.
“Tunnelling is not an obvious career
choice because people don’t know about
it. I didn’t realise when I was at university
what a community there was in the
tunnelling industry.”
Sui has worked on a number of
high profile UK projects including
the Lee Tunnel, Silvertown, Hinckley
power station and the HS2 feasibility
study. Following a secondment from
contractor Morgan Sindall to designer
Mott MacDonald, she spent a six-month
sabbatical travelling around southeast
Asia before taking up her current
position with London Bridge Associates.

40 Breakthrough
World-wide experience
to fast-forward career
Giuseppe Maria Gaspari, Tunnel Design
Lead and General Manager, Geodata
Engineering – Canada branch

Bachelors in Civil Engineering and


Masters in Geotechnical Engineering at
the Sapienza University of Rome; Masters
in Tunnelling & Tunnel Boring Machines at
the Politecnico di Torino

Since Giuseppe Gaspari graduated he has


made it his mission to work in as many
different countries as possible.
“That was one of the goals I set for
myself,” he says. “After getting some
of the best education in the world, I
wanted to go abroad to see how the
industry was developing outside Italy.
It’s a way to boost your experience and
accelerate your career, facing real-time Engineering, which had strong contracts; coordinating designs for pre-
trouble shooting at job sites and working connections with his university and cast segmental lining tunnel projects in
on design solutions with owners and tutors. After a year, Geodata selected India, recruiting and training engineers
contractors face-to-face.” Gaspari to attend Turin Polytechnic’s for the office there; and interim project
Now based in Toronto, heading up specialist Masters course in Tunnelling management for the Bangalore Metro
Geodata’s North American business, and Tunnel Boring Machines (TBM). project.
Gaspari has worked on tunnelling sites “The best thing about the course Gaspari’s latest challenge sees
in Istanbul, Bangalore, Singapore, was its connection to the industry,” him combining technical work with
Europe and Canada. “It has helped me says Gaspari. “We got to meet board management and commercial duties. “I
to understand that different cultures members of the ITA, as well as the wanted to have experience in America as
apply technologies and skills differently,” technical directors from all the TBM that was missing; I had worked mostly in
he says. “The way you build a tunnel in manufacturers, the main consulting Europe and Asia. The Americas market is
India is different from the way you build firms, contractors and geologists. It very interesting and challenging.”
in Canada or Singapore; constraints, meant that we saw multiple sides to a Heavily committed to young members’
available technologies and risk problem: how to plan, how to design, how groups in Italy, Canada and the ITA-
perception are not the same.” to build and how to maintain.” AITES, Gaspari firmly believes that the
Having studied a BSc in Civil The practical course at Turin perfectly next generation can help accelerate the
Engineering and an MSc in Geotechnical complimented the more academic industry’s take-up of new technologies
Engineering at the Sapienza University studies that Gaspari had completed in such as 3D mapping, drones, robotic
of Rome, Gaspari was faced with a Rome. “You need both,” he says. “The inspections and virtual modelling.
decision between going on to study important thing is to analyse yourself
a PhD or starting work. “The Italian and find out where the gaps in your You have to learn
tunnelling industry was booming at the experience are. I see a lot of people from everyone and teach
time. We were building high-speed train studying because there is no work. You
lines connecting the North and South of shouldn’t just study for study’s sake.”
everyone. The industry can
Europe, we were designing the longest Gaspari’s roles with Geodata have only grow if we all share
Alpine tunnels to unify Europe, and included designing underground caverns our knowledge, share our
several companies were starting to work for the Istanbul Kadikoy-Kartal Metro
mistakes and learn from
abroad.” Line, coordinating the design of earth
Gaspari chose to start work with retaining and stabilising structures for them so that we can go
consulting engineering firm Geodata one of Singapore’s Eastern Regional Line further, faster.

Breakthrough 41
Why rock engineering
rocks
Rebecca Karlsson, Team Manager,
Rock Mechanics, WSP

MSc Civil Engineering at the Luleå


University of Technology, Sweden

When Rebecca Karlsson started her five-


year Masters Degree in Civil Engineering
at the Luleå University of Technology,
her plan was to become a structural
engineer. However, after studying rock
engineering courses during her first
year, she was hooked.
“I think rock engineering is interesting
and exciting in a different way to
structural engineering,” says Karlsson.
“Nothing is ever the same, you never
know what you will find underground.
You can’t say that in the same way about
above-ground structures.”
Now Karlsson heads up a team of
engineers based around Sweden for promoted to a leadership position. “I
WSP. “The best thing about my job is enjoy challenges and I’m always looking
the people I work with and collaborate for them, whether in projects or in my
with: the team here in Sweden, clients, own personal development within each
contractors and our colleagues in WSP role,” she says. “WSP is a great company
around the world.” to work for because they can offer a lot
A combination of reputation and of different career paths.”
climate attracted Karlsson to the course With many underground projects
at Luleå, which at the time was a five- coming up in Sweden, one of Karlsson’s
year Masters; now there is the option to biggest challenges is finding enough
study a shorter Bachelors degree only. rock engineers for her team. “
“I chose the university because I had We are really trying to promote this
heard good things about it and it was a career to young people early because
place I had never been to before,” says many don’t even know it exists,” says
Karlsson. “And the chance to ski was Karlsson. “It’s a really interesting market
a big attraction for me: there is a lot of and we will need a lot of competence
snow there.” and resources in the future. The lack
Once on the course, Karlsson found zones in rock tunnels on surrounding of space at ground level means it is
that the accessible style of teaching areas, was also carried out with WSP important to find new possibilities to
combined with many study trips and and she began her first paid role there create space underground and this need
close links with industry was a winning six years ago as an engineer. “My time will only increase with the mega trends
combination. The university’s links with at WSP has been really exciting,” she of urbanisation and globalisation.
business were instrumental in finding says. “I started at a great time because
Karlsson her first role at WSP: she spent there were so many projects starting It’s an interesting time
seven months there on an internship at up.” She has worked on many projects to be in this industry
WSP’s rock engineering department at from wastewater and railway tunnels
WSP’s Stockholm office. to underground carparks and an
because we are just at the
Karlsson’s thesis, which looked at underground bus terminal in Stockholm. beginning of something
the impact of overbreak and damage In February this year, Karlsson was new.

42 Breakthrough
Dates Events
3-7 July 13-15 November
BTS Design & Construction Course 2017 Cutting Edge Conference
University of Warwick, Coventry, UK Seattle, USA
Event website: www.britishtunnelling.org.uk Event website: www.ucaofsmecuttingedge.com
This British Tunnelling Society supported annual five- Organised by the UCA of SME and Tunnelling Journal,
day course provides a comprehensive introduction to all Cutting Edge is an annual conference that hand picks
aspects of tunnelling. speakers to discuss the latest trends and developments in
tunnelling technology.
18-21 September
13-16 November
Tunneling Fundamentals, Practice, and Innovations
Short Course AFTES International Congress “ The Value is
Colorado School of Mines, Denver, USA Underground”
Event website: http://csmspace.com/events/tunneling/ Paris, France
CSM’s annual short course for industry professionals Event website: www.aftes2017.com
provides a comprehensive overview of tunnel planning, The congress will highlight the latent value of underground
design and construction across all applications and all space as a means of developing our living spaces,
geologies. especially if urban planning harnesses it to establish a
symbiosis between ground-level and underground.
25-26 October
13-16 November
UIUA 2017
Wroclaw, Poland World Tunnel Day (#WorldTunnelDay)
Event website: http://uiua.pwr.edu.pl/ International
Organised by the Faculty of Civil Engineering at Wrocław Check out what’s going on with your national tunnelling
University of Science and Technology and the Polish society’s Young Member group on #WorldTunnelDay. If
Tunnelling Group, this two day conference will focus on nothing is planned, get organising! Don’t forget to post
Underground Infrastructure in Urban Areas. photos and messages on twitter! (see page 10 for info)

30 Oct – 01 Nov 20-26 April 2018


16th Australian Tunnelling Conference (ATS2017) WTC 2018
Sydney Harbour, Australia Dubai, UAE
Event website: www.ats2017.com.au Event website: www.wtc2018.ae
This well respected industry gathering, organised by Organised by the Society of Engineers - UAE, the 2018
Engineers Australia and the Australasian Tunnelling World Tunnel Congress and the 44th ITA-AITES General
Society, brings you the best opportunity to hear from Assembly will have the theme: “The Role of Underground
Australasia’s current and future tunnelling projects with a Space in Future Sustainable Cities” (see p45).
content-rich, three-day agenda.
3-9 May 2019
15 November
WTC 2019
ITA Awards 2017 Naples, Italy
Paris, France Event website: www.wtc2019.com
Event website: https://awards.ita-aites.org The 2019 World Tunnel Congress and the 45th ITA-AITES
Judged by a panel of industry experts (including ITAYM General Assembly will be held at the famous “Mostra
Chair Sindre Log) the ITA Tunnelling Awards shine a D’Oltremare”. The Congress theme is “Tunnels and
spotlight on the individuals, companies, and project owners Underground Cities: Engineering and Innovation meet
behind the very best projects and innovations. Archaeology, Architecture and Art”.

Breakthrough 43
innovaTive TunneL engineering

TunneL DeSign

geoTechnicaL engineering

conSTrucTion ManageMenT

inSTruMenTaTion & MoniToring

WaTerproofing & WaTer conTroL

TunneL rehabiLiTaTion

Mining SupporT ServiceS

www.dr-sauer.com

Salzburg | London | Washington | Toronto

44 Breakthrough
WTC – DUBAI 2018 UAE

UAE welcomes you to


WTC 2018 in Dubai
The tunnelling sector in the the most exciting tourist presents the Opera House,
UAE began development many landmarks in Dubai, Burj Alserkal Art District in Al
years ago, and continues Khalifa, the tallest building in Quoz, and Al Fahidi Museum
to achieve milestone after the world. As we still have one that introduces Emirati
milestone, in line with other year on hand to the Congress folklore, such as Al Ayala
industries in the UAE. Mega date, we are studying a and Yolla arts. Visitors will be
projects implemented in line-up of initiatives for field amazed in the Desert safari
the UAE tunnelling industry trips to related sites and where they are introduced to
encompass many world- other activities that will be authentic Arab hospitality,
class accomplishments, announced accordingly. coffee, and sports such as
including Dubai Metro, one falconry and camel riding. On
of the key tunnel projects Why Travel to Dubai? the other hand, Dubai Canal
in the Emirates; and the Dubai - the exotic jewel of and Dubai Marina provide
Hyperloop UAE, an under- the United Arab Emirates; stunning waterfronts, while
construction development that Bordered by deserts and Creek Park boasts great
will link Dubai to Abu Dhabi committed to encouraging beaches, provides stark green scenery suitable for
in 12 minutes. Other ground- young talent to attend and contrasts, from intriguing family and friends gatherings.
breaking underground projects take part in the activities of Islamic culture to the ultra- Visitors should not miss the
have also been implemented the Congress. As an incentive modern, high-tech metropolis opportunity to enjoy amazing
throughout the UAE and have to attend, the congress will of the 21st Century. The city shows at the Dubai Fountain
helped overcome challenges in hold ITACET training courses is a magnificent expression located between the Dubai
transportation, electricity and and awards for best papers. of an incredible vision and an Mall and Burj Khalifa. You
water grids. These and other The congress will also offer uncompromising statement will be introduced in Dubai to
upcoming projects have led discounted prices for attending of success and opportunity... a traditional tale that is still
the UAE to become an ideal sessions and other events, a Dubai has something for being written in the present to
host for the 2018 World Tunnel unique networking opportunity, everyone. shape the future.
Congress in Dubai. Below is a and post-event tours in Dubai. Dubai hosts world class
brief overview of all the reasons Young Emirati talent and resorts, amazing beaches Looking forward to
that make Dubai a fantastic members of the International including Kite Beach and seeing you!
platform to host this event Tunneling and Underground Sunset Beach, a variety We promise you a remarkable
and we encourage you to start Space Association (ITAYM) of water sports, as well visit to Dubai, whether you are
planning your trip to attend this will participate at the event as heritage and cultural going to the beaches, heritage
global congress. in a dedicated platform that destinations, including Saruq sites, cultural destinations,
will attract young tunnelling Al-Hadid Museum Located in or simply attending WTC 2018
Why Attend? professionals from the region Shindagha Heritage District Dubai. See you there!
The UAE Society of Engineers and around the globe. that introduces traditional
and the organizing Committee We are honoured to invite crafts to visitors. For culture On behalf of the organising
of WTC 2018 Dubai are participants to be at one of and art enthusiasts, Dubai committee of WTC 2018 Dubai.

Breakthrough 45
3D Vision
Jonas Weil completed his geology studies
at the Universities of Bochum and Vienna
in 2010. From 2006 to 2011 he gained
experience in geothermal and geotechnical
projects (Geomatrix, Austria) and mining
(Endeavour Mine, Australia). In 2011, he
joined iC-group where he is now involved in
Modelling) in tunnelling and visualising excavation pits or
engineering geology and exploration, with a
underground construction open cut mine geometry. At the
focus on 3D modelling and digitization. enforces the use of such 3D next stage, detailed geological
digital geological models during layer models were printed as
3D-printing is a fast evolving the design and engineering “3D-puzzles”, for example the
technology, fascinating because stages as well as during geological model used in the
it is a tool to materialize things operation and maintenance. planning of the Vienna subway
that used to exist only virtually Traditionally, geological extension, in Austria, conducted
and on computer screens. conditions are presented in by the owner Wiener Linien.
iC group has been using 2D maps and sections, often This was done using a
digital geological 3D-models accompanied by the typical standard Desktop-Printer
for more than 10 years, geologists “hand waving“, with the material PLA (scale
originally from mining and explaining the orientation of is 1:5000 with 10x vertical
exploration projects where structures like faults or layers. exaggeration). Eight different
these applications have been Interactive digital 3D-models geological units where printed
state of the art for a long on a big screen or, even better, separately in different colours,
time. More recently, similar in a show room with hologram and the model is vertically split
software and methods were technology as widely used in the along the alignment so that the
applied to tunnelling and other during construction, and finally petroleum or mining industry, “geological long section” can be
infrastructure projects as well. to the analysis and evaluation of help to make complex geologic viewed in 3D. A second version
Geological 3D-models can be the documented geology after conditions understandable for of this model was produced at
used and are highly valuable construction, especially with all project participants. a 3m length by a company that
in all periods of a project, from respect to possible claims and Analogue geological 3D specialises in the production
the early stage of prognosis court cases. models have a long tradition, of architectural models, and is
and site investigation planning, The introduction of BIM from “sandbox models“ displayed in a visitor centre for
to updating and adjustment (Building Information used in research to detailed the planned subway extension.
“classical” models made of Another application is 3D
wood, ceramic or plastics that printing of complex subsurface
display geological conditions in structures like the ventilation
museums or exhibitions. building shown above, especially
3D-printing is a logical due to the growing use of
application, because it brings Building Information Modelling
the existing virtual models out (BIM), enforcing the design.
of the computer into the real Printed 3D models make
world. It can be seen as the complex geometries of
opposite of survey techniques geological or subsurface
like laser scanning or structures quickly and easily
photogrammetry, that bring the understandable, especially for
“reality“ into the digital model. those who are not so familiar
In iC group, 3D printing with sections and geological
techniques were first used maps, may it be audiences in
for topography models of public relations or decision
infrastructure and mining, makers.

46 Breakthrough
www.ucaofsmecuttingedge.com
Platinum Sponsor

Since 1944, Dragados S.A. has completed over 530 underground projects in 19
countries and on four continents. Utilizing diverse methodologies and all types of
technologies, they have constructed over 857 miles of tunnels, shafts and galleries,
and stations through a variety of geological conditions. All this experience makes
Dragados S.A. a worldwide leader in underground construction.

Gold Sponsors

Silver Sponsors

WIFI Sponsor Lanyard Sponsor

Breakthrough 47
VERSATILITY & VISIBILITY
THE ULTIMATE ALL-AROUNDER
With penetration rates up to 17 percent higher than its predecessors* and a new cabin that
increases visibility by 25 percent while minimizing noise levels, the fully-automated Sandvik DT922i
twin-boom jumbo is engineered to improve your tunneling operations. Developed for versatility,
Sandvik DT922i excavates cross sections up to 125m², including face drilling, bolt-hole drilling and VISIT US AT
long-hole drilling. An intelligent, state-of-the-art control system and Sandvik iSURE® excavation BOOTH 41
management tool help ensure top tunneling quality.

*Test results and calculations are to be considered as results reached under certain and controlled test conditions.
These test results and calculations should not be treated as specifications and Sandvik does not guarantee, warrant
or represent the outcome of test results or calculations in any or all circumstances.

CONSTRUCTION.SANDVIK.COM
48 Breakthrough