1. The document compares the operating costs of a water-cooled screw chiller versus an air-cooled screw chiller over a 1-year period for cooling a 384.8TR load.
2. It finds that the water-cooled chiller saves over 643,000 kWh in electricity and over 54 million rupees in water consumption costs compared to the air-cooled chiller.
3. However, the water-cooled chiller has higher installation costs due to additional components like cooling towers. The payback period for the lower operating costs of the water-cooled chiller versus its higher capital costs is calculated to be 3.22 years.
1. The document compares the operating costs of a water-cooled screw chiller versus an air-cooled screw chiller over a 1-year period for cooling a 384.8TR load.
2. It finds that the water-cooled chiller saves over 643,000 kWh in electricity and over 54 million rupees in water consumption costs compared to the air-cooled chiller.
3. However, the water-cooled chiller has higher installation costs due to additional components like cooling towers. The payback period for the lower operating costs of the water-cooled chiller versus its higher capital costs is calculated to be 3.22 years.
1. The document compares the operating costs of a water-cooled screw chiller versus an air-cooled screw chiller over a 1-year period for cooling a 384.8TR load.
2. It finds that the water-cooled chiller saves over 643,000 kWh in electricity and over 54 million rupees in water consumption costs compared to the air-cooled chiller.
3. However, the water-cooled chiller has higher installation costs due to additional components like cooling towers. The payback period for the lower operating costs of the water-cooled chiller versus its higher capital costs is calculated to be 3.22 years.
PAY BACK CALCULATION -Water Cooled V/S Air Cooled Screw Chiller
Load in IKW/TR of IKW/TR of Screw Saving in
Power Load in 380 Power No. of No of Hrs 384.8 TR WC 384.8 TR WC chiller with 108 TR KWhr. Per consumption of TR AC screw consumption of Month working of Screw Chiller Screw chiller (90%) loading and Month Recip Chiller in chiller with Screw Chiller in days (a) Operation with 90% with 90% 10% extra power WC/AC Screw KW hr 90% loading KW hr loading loading cons. chiller a b c d e= axbxcxd f g h= axbxfxg i= e-h Apr 30 20 346 0.5636 117112 342 0.8557 175590 58478 May 30 20 346 0.5636 117112 342 0.8557 175590 58478 Jun 30 20 346 0.5636 117112 342 0.8557 175590 58478 July 30 20 346 0.5636 117112 342 0.8557 175590 58478 Aug 30 20 346 0.5636 117112 342 0.8557 175590 58478 Sep 30 20 346 0.5636 117112 342 0.8557 175590 58478 Oct 30 20 346 0.5636 117112 342 0.8557 175590 58478 Nov 30 20 346 0.5636 117112 342 0.8557 175590 58478 Dec 30 20 346 0.5636 117112 342 0.8557 175590 58478 Jan 30 20 346 0.5636 117112 342 0.8557 175590 58478 Feb 30 20 346 0.5636 117112 342 0.8557 175590 58478 a. Saving per annum In Kwhr 1288227.28 1931486.04 643258.76 b. Cost of Power per unit in Rs 6.00 6.0 6.00 c. Saving per annum In Rs 7729363.70 11588916.24 3859552.54 d. Savings of AMC charges for one year 615680 760000 144320.00 e. SAVINGS -Electricity & AMC - A 8345043.699 12348916.24 4003872.54 f. Water Consuption per Year (KL) 30098.71872 0 -30098.72 g. Cost of Water per KL in Rs 180 180 180 h. Saving -Water Consuption - B 5417769.37 0 -5417769.37 i. Net Operational Saving (WC/AC Screw Chiller)- -1413896.83 A+B (Eectricity+AMC+Water Consuption) Cost Break Up Detail Water Cooled Air Cooled j. Cost of Screw Chiller 4200000.00 5200000.00 1000000.00 k. Cost of Cooling tower, Pumps, Valve pipe etc. 1650000.00 0.00 -1650000.00 l. Total Cost of Chiller With Ancelerries Items 5850000.00 5200000.00 -650000.00 Total Pay Back Time of Blue star Make Air cooled Chiller in Years -3.22