GEODETIC ENGINEERS OF THE PHILIPPINES, INC.

PRC Accredited National Organization No. 013-1975


No. 43 Mariveles St., Sta. Mesa Heights, Quezon City
Tel. No. 353-65-49 /Email Address: nationalgep.1975@gmail.com

GEODETIC ENGINEERING SERVICES RATES

I. PERSONNEL, EQUIPMENT AND RENTAL COSTS

A. Salary/Wages of Geodetic Engineer and Personnel for Office (Monthly) and


Field/Project (Net Daily Rates)

Although base on DBM’s Manual of Position and Compensations, the monthly rates or salary grades
used here are adjusted higher than what is normally stated in the Manual since this will be used by
private practitioners.

Monthly Field/Project Rates


Level/Position* Rates/ Daily
Job Rates Billing Total
(Professional Geodetic Office NEDA Allowance
Level (PHP) Rate Amount
Engineers) Base Multiplier (PHP)
(PHP) (1 month = (PHP) (PHP)
30 days)
Geodetic Engineer
27 62,670.00 2,089.00 3.0 6,267 2,000.00 8,267.00
Project Director (GE-PD)
Sr. Geodetic Engineer
26 Project Manager (SGE- 58,028.00 1,934.00 2.8 5,802 1,000.00 6,802.00
PM)
Geodetic Engineer
25 53,730.00 1,791.00 2.8 5,015 1,000.00 6,015.00
Project Manager (GE-PM)
Geodetic Engineer V
24 49,750.00 1,658.00 2.7 4,642 1,000.00 5,642.00
(Survey Party Chief)
Geodetic Engineer IV
22 (Senior Supervising 42,652.00 1,422.00 2.6 3,697 700.00 4,397.00
Geodetic Engineer)
Geodetic Engineer III
20 (Supervising Geodetic 36,567.00 1,219.00 2.6 3,169 600.00 3,769.00
Engineer)
Geodetic Engineer II
18 (Project Geodetic 31,351.00 1,045.00 2.5 2,613 500.00 3,113.00
Engineer)
Geodetic Engineer I
14 (Entry Level/Newly Board 23,044.00 768.00 2.5 1,920 400.00 2,320.00
Passer)

*Note: Above Rates for Geodetic Engineers are applicable to Large Survey Corporation or Project
Management Office. Kindly refer to Policy Guidelines on Salary and Wages for Start-ups, Sole
Proprietors or Small Survey Companies.
Field/Project Rates
Monthly
Daily
Level/Position Rates/
Job Rates Billing Total
(Non-Licensed Office NEDA Allowance
Level (PHP) Rate Amount
Geodetic Engineer) Base Multiplier (PHP)
(PHP) (1 month = (PHP) (PHP)
30 days)
Sr. Survey
Cartographer
14 (Engineering Graduate 23,044.00 768.00 2.5 1,920 400.00 2,320.00
or with appropriate
training and experience)
Assistant Geodetic
Engineer
12 19,940.00 665.00 2.2 1,463 400.00 1,863.00
(Geodetic Engineering
Graduate)
Sr. Survey CAD/GIS
Operator
10 (Engineering Graduate 17,255.00 575.00 2.2 1,265 300.00 1,565.00
or with appropriate
training and experience)
Geodetic Engineering
Technician/
Instrument Man
10 17,255.00 575.00 2.2 1,265 300.00 1,565.00
(Engineering Graduate
with appropriate training
and experience)
CAD/GIS Operator
(4yrs College Graduate
8 14,931.00 498.00 2.0 996 200.00 1,196.00
with appropriate training
and experience)

Survey Researcher
8 14,931.00 498.00 2.0 996 200.00 1,196.00
(4yrs College Graduate)

Geodetic Engineering
Trainee
8 (4th- 5th year Geodetic 14,931.00 498.00 1.8 896 200.00 1,096.00
Engineering Students/
OJTs)
Geodetic Engineering
8 Aide (Chainmen, 14,931.00 498.00 1.8 896 200.00 1,096.00
Rodmen)
7 Driver (Field Based) 13,890.00 463.00 1.5 695 200.00 895.00

7 Laborer (local hired)** 13,890.00 463.00 1.5 695 200.00 895.00

**may vary depending on local minimum wage rate in project site


B. Equipment Rentals/Costs

Daily
Rates
NEDA
Equipment (PHP) Total Amount (PHP)
Multiplier
(1 month =
30 days)
Total Station w/ Accessories
(standard package)
• Extra prism/range pole with spirit
3,500.00 1.0 3,500.00
level
• Extra Battery (Instrument/Radios)
• Mini prism and mini range pole
GPS – Single Frequency Pair 7,500.00 1.0 7,500.00
GPS – Dual Frequency Pair 15,000.00 1.0 15,000.00
Echo Sounder 10,000.00 1.0 10,000.00
Precise Level/ Rotating Level
2,500.00 1.0 2,500.00
– Digital or Analog
Automatic Level – Digital or Analog 1,000.00 1.0 1,000.00

Details of NEDA
Advanced Equipment** Total Amount (PHP)
Costs (PHP) Multiplier

Unmanned Aerial Vehicle (UAV) 100,000/ flight 1.0 100,000/ flight

Drone (vertical takeoff) 5,000/hour 1.0 5,000/hour

Terrestrial Laser Scanner (TLS) 20,000/ station 1.0 20,000/ station

Mobile Mapping Scanner / LiDAR 10,000/kilometer 1.0 10,000/kilometer

Ground Penetrating Radar (GPR) 150,000/day 1.0 150,000/day

** covers acquisition of data only


C. Other Project Costs and Rentals

Items Rates/Costs/Computations

Survey Vehicle Rental/Cost Php3,000.00 / day

Boat Rental/Cost Php5,000.00 / day

Project Office Rental/Cost Php30,000.00/ month

Field Office/ Staff Quarters


Php20,000.00/ month
Rental/Cost

Travel Cost (Sea, Land & plane) x days of travel


Mobilization/ Demobilization Cost plus Survey Party/s’ Billing Rates or
10% of the Project Cost whichever is higher

Supplies (Monuments, Stakes etc) 10% of Project Cost


Miscellaneous Expenses/ Clearing
5% of Labor Cost
Cost
Contingency 5% of Total Project Cost

Taxes 12% VAT and other government taxes

Profit 20% of Total Project Cost

Area with Peace and Order 10% of Total Project Cost (Hazard Pay) & additional
Problems 10% of Contract Price (Security Pay)
II. RELOCATION/ ORIGINAL/ RE-SURVEY / VERIFICATION SURVEYS

A. Relocation Survey per Lot/ Title

Areas in
0 10 20 30 40 50 60
hectares
< 0.5 20,000
0.5-1.0 30,000 109,000 178,000 238,000 291,000 336,000 385,000
2 38,000 116,000 184,000 244,000 296,000 341,000 389,000
3 46,000 123,000 190,000 250,000 301,000 346,000 393,000
4 54,000 130,000 196,000 256,000 306,000 351,000 397,000
5 62,000 137,000 202,000 256,000 306,000 356,000 401,000
6 70,000 144,000 208,000 262,000 311,000 361,000 405,000
7 78,000 151,000 214,000 268,000 316,000 366,000 409,000
8 86,000 158,000 220,000 274,000 321,000 371,000 413,000
9 94,000 165,000 226,000 280,000 326,000 376,000 417,000
10 102,000 172,000 232,000 286,000 331,000 381,000 421,000

For area in excess of 70 hectares, add Php4,000.00/hectare.

Item
Land Use Rate Remarks
No.
Add 50% to the above
1. Residential
costs
Add 150% to the
2. Commercial
above costs
Add 120% to the
3. Industrial
above costs
4. Agricultural Same as above costs Including fishponds
Including educational, charitable
5. Institutional Same as above costs
institutions
Including military & mineral
6. Government Reservations Same as above costs reservations, national and natural
parks
Add 50% to the above
7. Foreshore Lands
costs
Add 50% to the above Including mangrove areas,
8. Forestlands
costs marshlands & watershed
Add 50% to the above
9. Protected Areas
costs
Add 50% to the above
10. Ancestral Domains/Lands
costs
Add 150% to the
11. Mixed Use
above costs

This does not include verification and approval fees. Subject to government taxes such as 12%
VAT.

B. Original Survey per Lot/ Re-Survey per Lot/ Title


Areas in
0 10 20 30 40 50 60
hectares
< 0.5 40,000
0.5-1.0 60,000 218,000 356,000 476,000 582,000 672,000 770,000
2 76,000 232,000 368,000 488,000 592,000 682,000 778,000
3 92,000 246,000 380,000 500,000 602,000 692,000 786,000
4 108,000 260,000 392,000 512,000 612,000 702,000 794,000
5 124,000 274,000 404,000 512,000 612,000 712,000 802,000
6 140,000 288,000 416,000 524,000 622,000 722,000 810,000
7 156,000 302,000 428,000 536,000 632,000 732,000 818,000
8 172,000 316,000 440,000 548,000 642,000 742,000 826,000
9 188,000 330,000 452,000 560,000 652,000 752,000 834,000
10 204,000 344,000 464,000 572,000 662,000 762,000 842,000

For area in excess of 70 hectares, add Php8,000.00/hectare.

Item
Land Use Rate Remarks
No.
1. Residential Add 50% to the above costs
2. Commercial Add 150% to the above costs
3. Industrial Add 120% to the above costs
4. Agricultural Same as above costs Including fishponds
Including educational, charitable
5. Institutional Same as above costs
institutions
Including military & mineral
6. Government Reservations Same as above costs reservations, national and natural
parks
7. Foreshore Lands Add 50% to the above costs
Including mangrove areas,
8. Forestlands Add 50% to the above costs
marshlands & watershed
9. Protected Areas Add 50% to the above costs
10. Ancestral Domains/Lands Add 50% to the above costs
11. Mixed Use Add 150% to the above costs

This does not include verification and approval fees. Subject to government taxes such as 12%
VAT.
C. Verification Survey per Lot/ Title

Areas in
0 10 20 30 40 50 60
hectares
< 0.5 50,000
0.5-1.0 75,000 272,500 445,000 595,000 727,500 840,000 962,500
2 95,000 290,000 460,000 610,000 740,000 852,500 972,500
3 115,000 307,500 475,000 625,000 752,500 865,000 982,500
4 135,000 325,000 490,000 640,000 765,000 877,500 992,500

5 155,000 342,500 505,000 640,000 765,000 890,000 1,002,500


6 175,000 360,000 520,000 655,000 777,500 902,500 1,012,500
7 195,000 377,500 535,000 670,000 790,000 915,000 1,022,500
8 215,000 395,000 550,000 685,000 802,500 927,500 1,032,500
9 235,000 412,500 565,000 700,000 815,000 940,000 1,042,500
10 255,000 430,000 580,000 715,000 827,500 952,500 1,052,500

For area in excess of 70 hectares, add Php10,000.00/hectare.

Item
Land Use Rate Remarks
No.
1. Residential Add 50% to the above costs
2. Commercial Add 150% to the above costs
3. Industrial Add 120% to the above costs
4. Agricultural Same as above costs Including fishponds
Including educational, charitable
5. Institutional Same as above costs
institutions
Including military & mineral
6. Government Reservations Same as above costs reservations, national and natural
parks
7. Foreshore Lands Add 50% to the above costs
Including mangrove areas,
8. Forestlands Add 50% to the above costs
marshlands & watershed
9. Protected Areas Add 50% to the above costs
10. Ancestral Domains/Lands Add 50% to the above costs
11. Mixed Use Add 150% to the above costs

This does not include verification and approval fees. Subject to government taxes such as
12% VAT.

Php 5,000.00 per Court Appearance.


III. SUBDIVISION SURVEYS

A. Residential Subdivision Projects

NO. OF LOTS FEES

2 to 4 Php20,000 plus Php8,500/lot In excess of 2 lots

5 to 9 Php45,500 plus Php7,000/lot In excess of 5 lots

10 to 19 Php80,500 plus Php5,000/lot In excess of 10 lots

20 to 29 Php120,500 plus Php4,800/lot In excess of 20 lots

30 to 39 Php178,500 plus Php4,300/lot In excess of 30 lots

40 to 49 Php221,500 plus Php3,800/lot In excess of 40 lots

50 to 99 Php259,500 plus Php3,300/lot In excess of 50 lots

100 to 199 Php424,500 plus Php2,800/lot In excess of 100 lots

200 to 299 Php704,500 plus Php2,600/lot In excess of 200 lots

300 to 399 Php964,500 plus Php2,400/lot In excess of 300 lots

400 to 499 Php1,204,500 plus Php2,200/lot In excess of 400 lots

500 to 999 Php1,424,500 plus Php2,000/lot In excess of 500 lots

1000 & up Php2,424,500 plus Php1,400/lot In excess of 1000 lots

The above costs do not include the inspection, verification and approval fees; and subject to
government taxes such as 12% VAT.

The required activities prior to subdivision are as follows:

1. Technical Research
2. Relocation/Verification Survey
3. As-built Survey, if necessary
B. Agricultural Subdivision Projects

NO. OF
FEES
HECTAREs
1 to 3 Php15,000 plus Php4,500 in excess of 3 hectare
3 to 10 Php46,000 plus Php4,000 in excess of 10 hectares
10 to 20 Php86,000 plus Php3,500 in excess of 20 hectares
20 to 30 Php121,000 plus Php3,000 in excess of 30 hectares
30 to 40 Php151,000 plus Php2,500 in excess of 40 hectares
50 to 100 Php276,000 plus Php2,000 in excess of 50 hectares
100 & up Php276,000 plus Php2,000 in excess of 100 hectares

The above costs do not include the inspection, verification and approval fees; and subject to
government taxes such as 12% VAT.

The required activities prior to subdivision are as follows:

1. Technical Research
2. Relocation/Verification Survey
3. As-built Survey, if necessary

C. Private and Government Institutional Subdivision Projects

NO. OF
FEES
LOTS
1 to 9 Php70,000 plus Php6,500 in excess of 2 hectare
10 to 19 Php135,000 plus Php6,000 in excess of 10 hectares
20 to 29 Php195,000 plus Php5,500 in excess of 20 hectares
30 to 39 Php250,000 plus Php5,000 in excess of 30 hectares
40 to 49 Php300,000 plus Php4,500 in excess of 40 hectares
50 to 99 Php545,000 plus Php4,000 in excess of 50 hectares
100 & up Php545,000 plus Php3,500 in excess of 100 hectares

The above costs do not include the inspection, verification and approval fees; and subject to
government taxes such as 12% VAT.

The required activities prior to subdivision are as follows:

1. Technical Research
2. Relocation/Verification Survey
3. Structural Survey, if necessary
4. As-built Survey, if necessary
IV. ENGINEERING SURVEYS

A. Topographic Surveys

Cost per Hectare


Contour
Interval First 1 hectare Succeeding up Succeeding up In excess to 20
or less to 10 hectares to 20 hectares hectares
0.5 meter Php50,000 Php30,000 Php20,000 Php15,000
1.0 meter Php45,000 Php25,000 Php15,000 Php10,000
2.0 meter Php40,000 Php20,000 Php10,000 Php8,000
5.0 meter Php35,000 Php15,000 Php8,000 Php6,000

For Slope over 18%, add 50% of the Total Cost. Subject to government taxes such as 12% VAT.

Relocation Survey and Technical Research Required.

Proposed additional activities with topographic surveys:


• Connection to National Bench Mark - MSL
• Structural / As-built Survey, if necessary
• Tree Tagging and Geo-tagging

B. Structural/Facilities/Utilities Surveys

Structures/
Details of Costing
Facilities/ Utilities
Php2,000 per structure (footprint only) regardless of dimension
1. For Residential,
for a minimum of 20 structures;
Commercial &
Industrial Above
plus Php1,500 per structure regardless of dimension in excess
Ground Facilities
of 20 structures.
2. For Residential,
Commercial &
Php500,000 per hectare using Ground Penetrating Radar (GPR).
Industrial Below
Ground Utilities
3. Trees including
Php500 per tree including information on diameter and other details.
information
Php3,000 per bore hole/ test pit for a minimum of 5 points;
4. Bore Hole/
plus the cost of verification of boundaries and of the
Test Pit
mobilization/demobilization.
Php5,000 per pier location;
5. Pier Locations plus the cost of project control establishment and of the
mobilization/demobilization.

Subject to government taxes such as 12% VAT.


C. Route Surveys (Road, Transmission Lines, Pipelines & Railway)

Cost per Kilometer in Php


Activities Detailed
Feasibility Study
Engineering Survey
50m interval
20m interval
Road Survey
40,000 25,000
Centerline Alignment
Parcellary Survey*
Rural Area w/ LMS approval/ 30m 180,000 180,000
ROW limit
Vertical Control/ Profile
30,000 15,000
Leveling
Cross-Section
15-25m on each side of the 40,000 20,000
centerline at
Road Survey + Vertical Control
/ Profile Leveling + Cross- 80,000 40,000
Section (Service Package/KM)

*For Parcellary Survey of Urban Area, add 20% of the Total Cost

Survey Details of Costing

Php100,000 for the first site;


plus Php80,000 per site for succeeding sites up to 5 sites;
plus Php70,000 per site for succeeding sites up to 20 sites.
Bridge Site/
For river survey and new alignment such as inside forest, the
Water Crossing
cost for clearing shall be added
Survey
For a maximum 50m river width.

Not including establishment of Horizontal and Vertical Control.

Above Surveys are subject to government taxes such as 12% VAT.

D. Hydrographic Surveys
Cost per Hectare
Depth-Curve
First One (1) Succeeding Succeeding Succeeding In excess
Interval
hectare or up to 10 up to 20 up to 50 to 20
less hectares hectares hectares hectares

1.0 meter Php50,000 Php45,000 Php40,000 Php35,000 Php30,000

Subject to government taxes such as 12% VAT.

E. Establishment of Geodetic and Project Control Points

S Activity Details of Costing


uEstablishment of Php20,000 per point inclusive of monument placement as
bGeodetic Control Points per NAMRIA Standards
j
eEstablishment of Project Php15,000 per point inclusive of monument placement
c Control Points
t
to government taxes such as 12% VAT.

F. Vertical Control/ Differential Levelling

Php10,000.00 per kilometer . This is subject to government taxes such as 12% VAT.

V. OTHER SURVEY SERVICES

A. Mineral Land Surveys

Activity Details of Costing


General Mineral Php200,000 per Meridional block up to 5 Blocks;
land Survey plus Php150,000 per Meridional block for succeeding blocks
Mineral land
Php300,000 per Meridional block
Survey for Coal

Note that One (1) Meridional block is equivalent to approximately 81 hectares.

For other mining survey fees, the MGEI approved rates shall apply. The above costs do not include
the cost of relocation survey and verification and approval fees; and subject to government taxes
such as 12% VAT.

B. Memorial Park

Php360.00 per lot or 1% of the selling cost, whichever is higher. Subject to government taxes
such as 12% VAT.
C. Consulting Services

Type of Service Costing


Php5,000 per court appearance;
Court Appearance
plus transportation expenses
Joint Survey as Client Observer Php5,000 per day of Survey;
Legal (For third party Surveys/ DENR Survey) plus transportation expenses
Joint Survey with Own Survey Team Php20,000 per day of Survey;
(A Survey Team = Instrument man & two (2) inclusive of mobilization/
Survey Aides) demobilization costs
Php1,000 per hour (office based)
Minimum of four (4) hours
Consultation Fee (per meeting) If outside office, add
transportation & representation
Regular expenses
Retainer for a Survey Team
(A Survey Team = Instrument man & two (2) Refer to Item I-A, I-B & I-C.
Survey Aides)

All are subject to government taxes such as 12% VAT.


D. Titling Service/ Property Registration Fees

For 1 to 4 Lots, the approximate fee is Php20,000.00. Otherwise, the approximate fee is 50% of
the total subdivision cost.

Titling fees also applies to NHA projects. Subject to government taxes such as 12% VAT.

E. Certification of Geodetic Engineer for CAAP’s Height Limitation and Height


Clearance Permit Applications

Structure Details of Costing


Php30,000 per corner minimum of four (4) points/corners of a
Buildings building.;
plus Php25,000 per succeeding corner
Fence Php 25,000 per corner minimum of four (4) corners
Tower Antenna
Php120,000 per center of the antenna
(self‐supported or not)
Series of Electrical
Php25,000 per Posts/Pylons minimum of five (5) posts/pylons
Post/Pylons

Subject to government taxes such as 12% VAT. Services and documents to be rendered and
prepared by a Geodetic Engineer:

For Application for Height Limitation:

a. Geodetic Coordinates (WGS-84 Datum) and True Ground Elevation in meters above mean
sea level / Orthometric Height of the site (point/s of the proposed structure nearest to the runway).
If the data is from the GPS, the height will be referred with the application of the EGM2008 geoid
model.

b. Copy of Reference Elevation - AMSL / Orthometric Height from known control station of Bureau
of Coast and Geodetic Survey (BCGS) / National Mapping and Resource Information Authority
(NAMRIA).

c. Copy of Horizontal Control Reference using WGS-84 Coordinates - Latitude/Longitude from


known control station of BCGS/NAMRIA.

d. Location Plan with Vicinity Map, indicating the Geodetic Position and Elevation of the proposed
site, signed and sealed by a Geodetic Engineer.

e. Copy of the original field notes, traverse computations and GPS processing notes
including raw data (total station data should be in ASCI format and RINEX format in GPS),
signed and sealed by a Geodetic Engineer.

In addition, if the proposed site is within the two (2)-km radius of the nearest runway end, indicate
the true ground elevation at the nearest point of the runway and the distances

For Height Clearance Permit Application:

a. Elevation Plan of the Proposed Structure (Note: If in case, the proposed structure is to be
installed/constructed atop of an existing structure, include the height of the existing structure).

b. All Requirements for Application for Height Limitation

F. Cartography / Mapping Services

1. UAV Mapping Services

Php 3,000 per hectare minimum of 100 hectares includes processing. Subject to
government taxes such as 12% VAT.

2. Mobile and Static Laser Mapping Services

Activity Details of Costing


Static Laser Services Php100,000 per point, includes processing
Mobile Laser Services Php50,000 per kilometer, includes processing

Subject to government taxes such as 12% VAT.

3. Location Plan with Vicinity Map

Type of Plan Costing


Residential Php5,000.00 per plan/sheet
Agricultural Php7,500.00 per plan/sheet
Industrial/ Commercial Php10,000.00 per plan/sheet
Not for titling. This is subject to government taxes such as 12% VAT.
4. Digitized Map/Raster Data

Type of Map Costing


Low Density Php70,000.00 per Map sheet/Raster
Moderately Density Php150,000 per Map sheet/Raster
Highly Density Php250,000.00 per Map sheet/Raster

Output Formats: DWG, DXF (AutoCAD), DGN (InterGraph), GEN (ArcInfo), MDB
(ArcGIS), SHP (ArcView), MIF (MapInfo), TOP (Credo), CSV.

Above costs may increase depending on the condition and load of the rasters/ maps and
the processing requirements.

This is subject to government taxes such as 12% VAT.

5. Specialty Map Projects

Maps Costing
• A4 Size/ 8.5” x 11”= Php 1,000.00
with Satellite Image Add Php100.00
Standard Maps
• A3 Size or 11” x 17” = Php 1,500.00
(Map of a particular area at any
with Satellite Image Add Php200.00
scale and standard labeling.
Satellite image can be used for
• A0 Size or 36” x 48” = Php 3,000.00
additional cost)
with Satellite Image Add Php 500.00

• Custom Size = Price is based on size.


Customize Maps
(it may include data Cost of Standard Maps
manipulation and analytical plus Hourly Rate of Survey Cartographer
data)
½ cost of the Standard/Customized Maps.
Electronic Maps
Available file formats are GIF, JPG, PDF, or
(for e-mail only)
TIFF.

The above cost shall prevail provided that the data of area to be mapped is available.

For area with no available map/raster/satellite image, the cost of acquisition and/or
digitization shall be added.

6. Tax Mapping Services

Services Approximate Costing

Survey Team for Tax Mapping


(A Survey Team = Geodetic Php2,500 per hour minimum of 1 hour per
Engineer/ Instrument man & site/property/lot
two (2) Survey Aides)

G. Spatial Information System and Implementation


1. Total Project Cost is composed of Total Cost of Base Mapping Activities plus Total Cost
of SIS Activities:

2. The required Base Mapping Activities prior to SIS Development and Implementation
are:
• Technical Research
• Relocation/Verification Survey
• As-Built Survey
• Structural Survey
• Acquisition of Map Image or Raster
• Digitizing and Encoding of Map Data/Raster Data

3. The SIS Development and Implementation activities and costing are as follows:

SIS Process Costing


System Development
(includes planning, Php 500,000.00 per Information System or
technical research and Purpose (ex. Disaster Risk Assessment
development of GIS System, Tax Mapping System, Real Property
platform base on client’s Assessment System, Crime Detection System)
requirement)
System Implementation
and Customization 30% of the Total SIS Cost
(includes system trial and [or (Cost of System Development / 0.60) x 0.30]
troubleshooting)
System Deployment
and Operations 10% of the Total SIS Cost
(includes implementation [or (Cost of System Development / 0.60) x 0.10]
of final system)

Hourly Rates of Geodetic Engineers/ GIS


Technology Transfer Operators
and Support (includes
• For training - minimum of 40 hours (or
users’ trainings with
five (5) days)
manual and aftersales
support) • For Support - minimum of two (2) hours
per Assistance

4. There is an additional cost for acquisition of GIS Software. Moreover, the above costs
may increase depending on the condition and load of the data, the processing and the
system requirements.

H. Photogrammetry and Remote Sensing/Image Processing


1. Aerial Photography Acquisition and Processing

Type of Map Costing


Php 3,000 per hectare minimum of 100 hectares includes
Aerial Digital Camera processing and printing of Photos.
Subject to government taxes such as 12% VAT
Php 4,000 per hectare minimum of 100 hectares includes,
LiDAR processing and printing of Photos.
Subject to government taxes such as 12% VAT

The required Base Mapping Activities (at additional costs) prior to Aerial Photography
Acquisition:
• Technical Research
• Relocation/Verification Survey
• Flight planning and GCP surveys

Aerial Photo/Image Processing and Mapping (at additional costs) includes:


• Scanning/Digitizing
• Aero-triangulation
• Planimetric mapping
• Digital elevation and terrain modelling (DEM/DTM)
• Map editing
• Digital orthophoto mosaics

Please refer to proposed rates on Satellite Image Processing for minimum costing.

2. Satellite Image Processing

Process Costing
Image Rectification and
Php100,000.00 per Satellite Image
Restoration
Image Enhancement and
Php150,000.00 per Satellite Image
Specialized analysis

Information extraction Refer to Item F.4 or “Digitized Map/Raster Data”

Above Cost does not include acquisition of satellite images. Subject to government
taxes such as 12% VAT