You are on page 1of 2

L71620 Troubleshooting

5.4.10.7 Troubleshooting after Z52 Battery Fault Alarm

It is required to replace the battery which is used for backup of the NC parameters stored in NC
control unit and the machining program.

DANGER

Be sure to turn off the main breaker of the machine before starting the work.
Failure to do so will result in death or serious personal injury from electric shock.

Note

Be sure to complete replacement work within 30 minutes after powering off the NC unit.
If the new battery is not connected within 30 minutes, the backup data will be lost.

Procedure

1. Turn off the main breaker of the machine according to the procedure in section <5.1
Turning On/Off the Power> in the Operator's Manual, then open the door of the right side
electric device box and verify the location of NC control unit.

NC control unit

5-47
L71620 Troubleshooting

2. Make sure that LEDs and 7-segment indicators on NC control unit are unlit.

7-segment

LED

3. Pull the right side of the front cover of the NC control unit toward you, and open the front
cover.

Front cover

BAT connector
Battery holder

Connector coming from battery

Battery

4. Remove the connector coming from the battery out from the BAT connector on the NC
control unit. Then, take the battery out of the battery holder.

5. Put the new battery into the battery holder. Then connect the connector coming from the
battery to the BAT connector on the NC control unit.

6. Close the front cover of the NC control unit. Confirm that the cover is securely caught to the
claw and click sound is heard.

7. Close the right side door of the electric device box.

Continous battery backup time: 45,000 hours (at ordinary temperature. Shortened by the
temperature deviation)
Useful life of battery: Approx. 5 years from manufactured date
Battery for replacement: Q6BAT BK0-C10811H03 (made by Mitsubishi Electric)

5-48

You might also like