DIVISION 9 : FINISHES

SECTION 09100 : METAL FRAMING SYSTEM

PART 1 - GENERAL

1.1. GENERAL REQUIREMENTS

Work of this Section, as shown or specified, shall be in accordance with the require ments of
the whole set of the Contract Documents.

1.2 SCOPE OF WORK

A. Provision of material and installation of non- load bearing metal framing system, complete and
as required.

B. Section Included :

1. Metal stud framing systems for interior non- load bearing gypsum board partitions.
2. Metal furring systems for interior non- load bearing gypsum board furred assemblies.
3. Metal framing systems for interior suspended acoustic ceiling, gypsum board, metal ceiling
and offits.
4. Metal framing system for Aluminium Composite Panel.
5. Framing accessories
6. Metal framing system for GRC Panel

C. Related Sections :

1. Section 09260 - Gypsum Board Systems.


2. Section 09510 - Acoustical Ceilings

1.3 REFERENCES

A. American Society for Testing and Materials (ASTM) :

1. A525- 83 General Requirements for Steel Sheet, Zinc- Coated (Galvanized) by


the Hot- Dip Process.
2. C635- 83 Metal Suspension Systems for Acoustical Tile and Lay in Panel Ceilings
3. C645- 83 Non- Load (Axial) Bearing Steel Studs, Runners (Track), and Rigid Furring
Channels for Screw Application of Gypsum Board. Building Partitions.
4. E119- 83 Fire Tests of Building Construction and Materials.

1.4 SYSTEM REQUIREMENTS

A. Structural Requirements : Interior suspended ceilings and soffits : suspended ceiling


and soffits shall maintain a deflection of not more than 1/360 L ( distance between supports).

B. Fire Resistance Ratings : Where assemblies with fire ratings are indicated, provide
materials and installations which are identical with those or applicable assemblies tested in
accordance with ASTM E119 by testing laboratories acceptable to authorities having
jurisdiction.

C. Acoustic Ratings : Where assemblies with sound ratings are indicated, provide materials
and installations tested by manufacturer in accordance with ASTM E90.

1.5 SUBMITTALS

A. Shop Drawing : Submit manufacturer's working drawing prior to installation for Engineer's
approval.

PT ANGGARA ARCHITEAM OFFICE TOWER 2 CWJ 1 S09100 - 1


1.6 PRE- INSTALLATION CONFERENCE

A. Conduct pre- installation conference with other related work and Construction Manager.

B. Require attendance of metal support systems installer and installers of related work. Review
installation procedures and coordination with related work.

1.7 DELIVERY, STORAGE AND HANDLING

A. Deliver to project site promptly without undue exposure to weather.

B. Store in dry ventilated space off ground.

C. Protect materials from soiling, rusting and damage.

PART 2 - PRODUCTS

2.1. WALL AND PARTITION FRAMING MATERIALS

A. General :

1. Studs, runners and furring channels shall comply with ASTM C645.
2. Hot dip galvanize in accordance with SII - 0293 - 80 minimum coating 18 micron.

B. Studs :

1. Roll formed "C" shaped channels.


2. Gauge as indicated, or minimum 0.6 mm if not indicated.
3. Size as indicated on drawings (stud width 75 mm).

C. Runners: Provide size & type recommended by stud manufacturer for floor and ceiling support
of studs, and for vertical abutment of framing to other work. Top and bottom width 76 mm.

D. Furring Channels : Hat- shaped, 21 mm high, 0.6 mm.

E. Acceptable product ex BRS, MMJ or equal approved.

2.2. CEILING AND SOFFIT FRAMING MATERIALS

A. Attachment Devices :
1. General : Size devices for 5 times loads imposed by completed system.

2. Hanger anchorage devices : Screw, clips, bolts, insert or other devices applicable to
indicated method of structural anchorage for ceiling hangers and whose suitability for use
intended has been proven through standard construction practices or by certified test
data.

B. Hangers: Wire, rod or rigid steel, for maximum ceiling area and loads to be supported

C. Framing - Channel and Cross Furring System :


1. Main runners: Cold- rolled steel channels, complying with ASTM C645, with a minimum
weight of 250 kg/0.3 meter, 50 mm in size.

PT ANGGARA ARCHITEAM OFFICE TOWER 2 CWJ 1 S09100 - 2


2. Furring channels: Hat- shaped, 0.6 mm, 21 mm high.

3. Resilient furring channels: Where indicated as "resilient", provide 12 mm high, 0.6 mm


specially shaped furring channel designed to reduce sound transmission.

4. Furring anchorages : 1.6 mm galvanized wire ties, or wire- type clips, bolts, nails or
screws as recommended by furring manufacturer.

D. Acceptable product & manufacturer: Ex. BMS, MMJ or equal approved.

2.3. ACCESSORIES

A. Backer Plates : 150 mm wide x 1.6 mm steel sheet, galvanized in accordance with SII 0293 -
80, length as required, fastened to studs or furring for attachment of surface mounted fittings
and accessories.

B. Fasteners : Types and sizes recommended by framing manufacturer for substrates and
applications indicated.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine support systems and adjacent construction for conditions that will adversely affect
execution. Do not proceed until unsatisfactory conditions are corrected. Beginning of
execution will constitute acceptance of existing conditions.
3.2 PREPARATION

A. Coordinate sizes and locations of surface mounted accessories and equipment which require
backer plates. Install additional studs for attachment of backer plates in the correct locations to
receive surface mounted accessories as indicated or as recommended by the accessory
manufacturer.

B. Elimination of backer plates or direct attachment of accessories or equipment to studs will not
be allowed.

C. Coordinate installation of concealed blocking and furring required for carpentry and millwork.

3.3 INSTALLATION, GENERAL

A. Install metal support systems in accordance with requirements of manufacturer or these


specifications.

B. Tolerances: Do not exceed 3 mm in 2640 mm variation from plumb or level in any exposed
line of surface. Shim as required to comply with specified tolerances.

3.4 STUD AND RUNNER INSTALLATION

A. Stud Spacing : 400 mm o.c for typical wall construction, except opening and unless
otherwise indicated.

B. Runner Tracks :
1. Provide continuous tracks sized to match studs.
2. Align runner tracks accurately to partition layout at both floor and ceiling.
3. Secure runner tracks as recommended by stud manufacturer for floor and ceiling

PT ANGGARA ARCHITEAM OFFICE TOWER 2 CWJ 1 S09100 - 3


construction involved, except do not exceed 600 mm o.c. spacing for fasteners.
4. Provide fasteners at corners and ends of runner tracks.

C. Where non fire rated partitions abut ceiling or deck construction or vertical structural
elements, provide slip or cushion type joint between partition and structure as recommended by
stud manufacturer to prevent transfer of structural loads or movements to partitions. At fire
rated partitions, only cushion type joint is acceptable

D. Terminate top of partition at structure above ceiling construction, unless otherwise indicated.

E. Brace partitions which are terminated at suspended ceilings to structure above as indicated, or
if not indicated, in accordance with stud manufacturer's instructions.

F. Use full length studs vertically positioned between runner tracks. If splicing is required due to
partition height, splice studs nesting with a minimum lap of 200 mm and fasten laps with a
minimum of 2 screws through each flange.

G. Friction fit studs to runner tracks by positioning and rotating into place. Provide positive
attachment to runner tracks at partition corners and intersections, and adjacent to openings
using self tapping screws or stud clinching tool on both flanges of stud.

H. Align and plumb partition framing accurately according to partition lay out.

I. Door Framing :

1. Provide two 0.6 mm studs at each jamb and one additional stud not more than 150 mm
from jamb studs; or provide one 1.2 mm stud adjacent to each jamb.
2. Provide runner track and typical studs above door openings with studs spaced not more
than 600 mm.
3. At welded frames with fixed anchor clips, secure stud reinforcing to jamb anchors clips
with not less than two self tapping screws per clip.

J. Additional Framing :

1. Provide additional studs and framing to support inside corners, partition


inter sections, outside corners, termination of partitions, both sides of control joints, at
openings and cut- outs and to support built- in anchorage and attachment devices for
other work.

2. Locate studs no more than 50 mm from all abutting partition, partition corners and other
construction. Start typical partition studs 150 mm either side of stud reinforcing or frames.

3. Electrical outlets and similar penetrations are to be installed in locations indicated. Provide
additional blocking and straps for proper locations; do not mount on "nearest" stud.

3.5. WALL FURRING INSTALLATION

A. Install metal furring where indicated and where gypsum board finishes are scheduled or
indicated over concrete or masonry substrates.

B. Install furring channels either vertically or horizontally.

C. Space furring at maximum of 400 mm o.c. and attach to substrate with fasteners at 600 mm
o.c. staggered through alternate wing flanges.

D. Install furring channel within 600 mm of floor line and ceiling line.

E. Install corner furring channels in a similar manner.

3.6. CHASE WALL INSTALLATION

PT ANGGARA ARCHITEAM OFFICE TOWER 2 CWJ 1 S09100 - 4


A. Align parallel rows of floor and ceiling runners according to partition layout.

B. Position steel studs vertically in runners, with flanges in same direction and with studs on
opposite sides of chase directly across from each other.

C. Cross Bracing:

1. Provide cross bracing using sections of gypsum board 300 mm high by chase wall width.
2. Space cross bracing 1200 mm o.c. vertically and attach to stud web with minimum of six
screws per brace.
3. At Contractor's option, 62.5 mm studs may be used in lieu of gypsum board.

3.6. SUSPENDED CEILING AND SOFFIT INSTALLATION

A. Provide attachments and hangers from structural support above, spaced on a grid of 600 mm
by 600 mm.

B. Furnish hanger anchors and similar devices to other trades for installation well in advance of
time needed for coordination with other work.

C. Secure hangers or rods as required to structural support by connecting directly to structure


where possible, otherwise connect to inserts, clips or other anchorage devices or fasteners as
indicated.

D. Framing Attachment : Runner Channel and Furring Framing : Attach runner channels to wire
hangers by tying. Attach furring channels to runner channels with wire ties or wire clips.

E. Space main runners at maximum 120 cm o.c.; furring members at maximum 600 mm o.c.,
unless otherwise indicated.

F. Provide additional framing to fulfill structural requirements and for support at recessed fixtures
and similar items.

3.7 ADJUSTING

A. Adjust and align metal framing to properly receive final finishes in accordance with required
tolerances.

3.8 PROTECTION

A. Protect metal framing so that it will be without any evidence of damage which would be
detrimental to finished work.

3.9 GUARANTEE

The Contractor shall furnish guarantee during the Maintenance Period to the Employer as per
requirement of the Contract.

END OF SECTION 09100