AMA COMPUTER UNIVERSITY

Project Name PROPOSED EXTERIOR REPAINTING & GLASS FACADE CLEANING AT AMACC FAIRVIEW
Location Regalado Highway, Novaliches, Quezon City, Metro Manila
Date

ITE MATERIALS COST LABOR + EQUIPMENT COST


M DESCRIPTION QTY UNIT UNIT COST TOTAL AMOUNT
NO.
UNIT COST TOTAL COST UNIT COST TOTAL COST

I. GENERAL REQUIREMENTS
1. Mobilization / Demobilizaton 1.00 lot - - - - - -
2. All necessary Permits and Clearances
2.1 Building Permits and Clearances 1.00 lot - - - - - Not Applicable
2.2 Locational Clearances and Other Local Government
1.00 lot - - - - - Not Applicable
Permit and Clearances
2.3 Occupancy Permits 1.00 lot - - - - - Not Applicable
2.4 Cerificate of Electrical Inspection (CEI) 1.00 lot - - - - - Not Applicable
2.5 Mechanical Permits 1.00 lot - - - - - Not Applicable
2.6 Fire Safety Permits / Fire Safety Inspection Certificate
1.00 lot - - - - - Not Applicable
(FSIC)
2.7 Sanitary / Plumbing Permits 1.00 lot - - - - - Not Applicable
3. Bonds and Insurances
3.1 Performance Bonds (30%) 1.00 lot - - - - - -
3.2 Surety Bonds (30%) 1.00 lot - - - - - -
3.3 Contractors All risk Insurance (100% CARI) 1.00 lot - - - - - -
4. Temporary Facilities (Temfacil produced by contractor) 1.00 lot - - - - - -
5. Temporary Tapping of Water and Power Connection (Using
1.00 lot - - - - - -
Sub-Meter)
6. Sanitation, Security, safety Signage and Paraphernalia 1.00 lot - - - - - -
7. Complete Sets of Plan / Blue Print and As-Built Plan 1.00 lot - - - - - Not Applicable
8. Material Testing, Soil Exploration and Testing / Field Density
1.00 lot - - - - - Not Applicable
Test / Bore Hole

sub-total of general requirements - - -


II. SITE PREPARATION WORKS
1. Survey, Setting-out and Lay-out
1.1 Exterior Surface Area 2457.12 sq.m - - - - - -
2. Site Preparation, Site Clearing, Paint Scapper with
Scafolding Set-up & Flatforms, Removal of Existing Paint &
Water Proofing as specified
2.1 Exterior Painting Works
a.) Front Elevation 320.40 sq.m - - - - - -
b.) Right Side Elevation 461.79 sq.m - - - - - -
c.) Left Side Elevation 394.86 sq.m - - - - - -
d.) Rear Elevation 773.48 sq.m - - - - - -
e.) Concrete Ledges 369.00 sq.m - - - - - -
f.) Exterior Parapet Wall 137.58 sq.m - - - - - -
3. Hauling and Disposal of Debris and other Unwanted
122.86 cu.m - - - - - -
Materials
4. Scaffolding / Flatforms / Gondola Rental 1.00 lot - - - - - -
sub-total of site preparation works - - -
III. ARCHITECTURAL WORKS
1. Painting Works
1.1 Painting Works of Exterior Wall Finishes to include
surface preparation with 2 coatings in accordance with the
manufacturer's instruction (use AMA Approved color
scheme or approved equal)
a.) Front Elevation 320.40 sq.m - - - - - -
b.) Right Side Elevation 461.79 sq.m - - - - - -
c.) Left Side Elevation 394.86 sq.m - - - - - -
d.) Rear Elevation 773.48 sq.m - - - - - -
e.) Concrete Ledges 369.00 sq.m - - - - - -
f.) Exterior Parapet Wall 137.58 sq.m - - - - - -
1.2 Refurbishing / Re-Grouting / Re-Sealant / Re-Caulking /
Cleaning / Scrubing of Façade (Aluminum Composite
Panels & Glass Panel)
a.) Aluminum Composite Panels Cladding 158.72 sq.m - - - - - -
b.) All Glass Windows (Exterior & Interior) 494.19 sq.m - - - - - -
sub-total of architectural finishes - - -
VI. OTHERS / SUNDRIES

1. Allow for any items which the contractor requires payment


to comply in all respect with the provisions of the relevant
conditions of contract, particular specifications and drawings
which are not in the rates contained in the Bill of
Quantities,Details of each item shall be inserted below:

1.1. General (please specify) 1.00 lot - - - - - -

sub-total of others / sundries - - -


- - -

AMOUNT IN WORDS

SUMMARY
Note: I. GENERAL REQUIREMENTS -
a. Total Floor Area (Fifth Floor Slab) = 645.75 sq.m II. SITE PREPARATION WORKS -
b. Total Floor Area (Roof Deck) = 123.06 sq.m III. ARCHITECTURAL WORKS -
c. Total Surface Area (Parapet Wall and the likes) = 270.10 sq.m VI. OTHERS / SUNDRIES -
d. Total Area to be Repainted = 2457.12 sq.m TOTAL -