PMVM/PSRE/PSRE GYM/ RPE FORM

ACTIVITY
SL.NO PROJECT
Mechanical

Sanitary fixtures and accessories

1 PMV ( VILLA A) Water Filters at Roof


AC Thermostat Installation
Startup and Running of AC and Exhaust fans
Startup and Running of booster pumps
Diffuser installation for wet area

Sanitary fixtures and accessories

2 PMV ( MAJLIS)
Water Filters at Roof
AC Thermostat Installation
Startup and Running of AC and Exhaust fans
Startup and Running of booster pumps
3 PMV (MAIN PUMPROOM) Main Pump connection @ GRP Tank
Sewage drainage main line connection
4 PMV (LANDSCAPE)
Main water meter Cabinet
Santary fixtures and accessories
AC Grills and diffusers
Relocation of Water tank and Pump Connection
5 PSRE Centralised Water heater @ Roof
AC Thermostat Installation
Startup and Running of AC and Exhaust fans
Startup and Running of booster pumps
Water chiller @ Roof
AC Grills and diffusers
Santary fixtures and accessories
6 PSRE GYM
AC Thermostat Installation
Startup and Running of AC and Exhaust fans
Startup and Running of booster pumps
7 PSRE GYM (Landscape) Sewage and Rainwater piping connection to existing
manhole and soakaway
Package Unit Connection & Duct Installation @ Roof
8 FORMAL NEW MAJLIS
AC diffusers
Package Unit Connection & Duct Installation @ Roof
9 OFFICE & WAITING AREA
AC diffusers
E GYM/ RPE FORMAL MAJLIS ,OFFICE & WAITING AREA
ACTIVITY
Electrical
FFICE & WAITING AREA
Remarks

1.Flooring clearance for Villa A & C not ready - Flooring Ongoing.


2.Flush tank Push button(21- Nos),Ptrap (wash basin - 27 Nos) , Biddet trap - 21
Nos ,angle valve 1/2" x 1/2" , flexible hose 1/2" x 1/2"
waiting for the material delivery
Waiting for the clearance from Pentagram
After Installation of Thermostats and avaliability of temporary power
After the temporary power
waiting for the material delivery
1.Wash basin (Ptrap- 16Nos) , Biddet trap- 2Nos ,wash basin(angle valve 1/2" x 1/2" ,
.flexible hose 1/2" x 1/2") need to provide by pentagram
2.Ablution mixer to be changed - 3Nos

waiting for the material delivery


Waiting for the clearance from Pentagram
After Installation of Thermostats and avaliability of temporary power
After the temporary power
Waiting for the delivery of pipe fittings
Finalised piping to the last manhole near by Guard room (Only balance to make connection
for the existing ashgal manhole @ Asphalt infront of guard room )
Completed
Prior to final clearance from Pentagram
Waiting for the material Delivery
Ongoing
Waiting for the material Delivery
Waiting for the clearance from Pentagram
After Installation of Thermostats and avaliability of temporary power
After the temporary power
Waiting for the material Delivery
Installation will Start by 26-03-2019
Prior to final clearance from Pentagram
Waiting for the clearance from Pentagram
After Installation of Thermostats and avaliability of temporary power
After the temporary power
Excavation completed ,waiting for the Manhole Installation by Pentagram

Waiting for the delivery of sound attenuators and duct fittings


Waiting for the material Delivery
Waiting for the delivery of sound attenuators and duct fittings
Waiting for the material Delivery
Sanitary Fixtures and acc
Sl.No Building Floor Areas WC angle valve 1/2" wc Hose WC Hose Bidet
spray

BATHROOM 107 1 No. 1 No. 1 No. 1 No.


BATHROOM 104 1 No. 1 No. 1 No. 1 No.
Ground floor WASHROOM 122 1 No. 1 No. 1 No. 1 No.
BATHROOM 116
1 Villa A (Maid Room)
1 No. 1 No. 1 No.
BATHROOM 208 1 No. 1 No. 1 No. 1 No.
BATHROOM 202 1 No. 1 No. 1 No. 1 No.
First floor
BATHROOM 217 1 No. 1 No. 1 No. 1 No.
BATHROOM 214 1 No. 1 No. 1 No. 1 No.
BATHROOM 107 1 No. 1 No. 1 No. 1 No.
BATHROOM 104 1 No. 1 No. 1 No. 1 No.
Ground floor WASHROOM 122 1 No. 1 No. 1 No. 1 No.
BATHROOM 116
(Maid Room)
2 Villa B 1 No. 1 No. 1 No.
BATHROOM 208 1 No. 1 No. 1 No. 1 No.
BATHROOM 202 1 No. 1 No. 1 No. 1 No.
First floor
BATHROOM 217 1 No. 1 No. 1 No. 1 No.
BATHROOM 214 1 No. 1 No. 1 No. 1 No.
BATHROOM 107 1 No. 1 No. 1 No. 1 No.
BATHROOM 104 1 No. 1 No. 1 No. 1 No.
Ground floor WASHROOM 122 1 No. 1 No. 1 No. 1 No.
BATHROOM 116
3 Villa C (Maid Room)
1 No. 1 No. 1 No.
BATHROOM 208 1 No. 1 No. 1 No. 1 No.
BATHROOM 202 1 No. 1 No. 1 No. 1 No.
First floor
BATHROOM 217 1 No. 1 No. 1 No. 1 No.
BATHROOM 214 1 No. 1 No. 1 No. 1 No.
WASH AREA 104 4 Nos 4 Nos 4 Nos
Ground floor WASH AREA 112
ABLUTION AREA
4 MAJLIS
BATHROOM 210 1 No. 1 No. 1 No. 1 No.
First floor TOILET 211 1 No. 1 No. 1 No.
TOILET 206 1 No. 1 No. 1 No. 1 No.

100 % COMPLETED
NO CLEARANCE ( Civil)
No Material in store
Not Applicable
Ongoing and Balance
xtures and accessorries fixing progress - PMVM
B.angle valve Bidet Bidet Trap Shower Shower Shower wash basin Wash basin wash basin
1/2" x 3/8" mixer mixer head Rail set angle valve mixer trap
Faucet 1/2"

1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.


1 No. 1 No. 1 No. 4 Nos 2 Nos 2 Nos
1 No. 1 No. 1 No. 6 Nos 3 Nos 3 Nos

1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.


1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 4 Nos 2 Nos 2 Nos
1 No. 1 No. 1 No. 6 Nos 3 Nos 3 Nos

1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.


1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 4 Nos 2 Nos 2 Nos
1 No. 1 No. 1 No. 6 Nos 3 Nos 3 Nos

1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.


1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No. 1 No.
12 Nos 6 Nos
12 Nos 6 Nos

1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 2 Nos 1 No.


2 Nos 1 No.
1 No. 1 No. 1 No. 2 Nos 1 No.
Bath Tub Mixer Ablution Accessories
Mixer (Tissue holder ,
Towel Ring etc)

1 No.
1 No.

1 No.
1 No.

1 No.
1 No.

1 No.
PMVM/PSRE/PSRE GYM/ RPE FO
ACTIVITY
SL.NO PROJECT
Mechanical
Drainage - Shower drain in maid room
Drainage - Installation of (WC, Bidet ,Ptrap, Bidet trap, Magic pipe
flexible)
Plumbing- Installation of Sanitary Fixtures (Angle valve, mixer ,
1 PMV ( VILLA A) shower head & accessories)
Plumbing- Installation of Water filters
Plumbing- Start up , T & C of Booster pumps
HVAC- Installation of thermostats
HVAC- Start up of AC

2 PMV ( VILLA B)

Drainage - Shower drain in maid room


Drainage - Installation of (WC, Bidet ,Ptrap, Bidet trap, Magic pipe
flexible)
Plumbing- Installation of Sanitary Fixtures (Angle valve, mixer ,
3 PMV ( VILLA C) shower head & accessories)
Plumbing- Installation of Water filters
Plumbing- Start up , T & C of Booster pumps
HVAC- Installation of thermostats
HVAC- Start up of AC

Drainage - Installation of (Ptrap, Bidet trap, Magic pipe flexible)


Plumbing- Installation of Sanitary Fixtures (Angle valves & Flexible
hose)
4 PMVM (MAJLIS)
Plumbing- Installation of Water filters

Plumbing- Start up , T & C of Booster pumps


HVAC- Installation of thermostats
HVAC- Start up of AC
Plumbing - Start up for Pumps
3 PMV (MAIN PUMPROOM)

4 PMV (LANDSCAPE)
4 PMV (LANDSCAPE)

5 PMV (GUARD ROOM)

6 MAJLIS (GUARD ROOM)

5 PSRE

6 PSRE GYM

7 PSRE GYM (Landscape)

8 FORMAL NEW MAJLIS

9 OFFICE & WAITING AREA


GYM/ RPE FORMAL MAJLIS ,OFFICE & WAITING AREA
ACTIVITY
Electrical
Power- 3rd fix pending (prior final painting)
Power- MDB Cable pulling and termination from substation

Light- Wall light , cove light , spot light , light for the Roof

Telephone / Data- 3rd Fix Pending (Final Painting Finish)


TV and Speaker- 3rd fix (Final Painting Finish)
Fire Alarm- smoke detector (Waiting for final finish)

Power- 3rd fix pending (prior final painting)


Power- MDB Cable pulling and termination from substation

Light- Wall light , cove light , spot light , light for the Roof

Telephone / Data- 3rd Fix Pending (Final Painting Finish)


TV and Speaker- 3rd fix (Final Painting Finish)
Fire Alarm- smoke detector (Waiting

Water heater earthlink connection balance


Power- 3rd fix pending (prior final painting)
Power- MDB Cable pulling and termination from substation

Light- Wall light ,chandelieur light, cove light , spot light , light
for the Roof
Telephone / Data- 3rd Fix Pending (Final Painting Finish)
TV and Speaker- 3rd fix (Final Painting Finish)
Fire Alarm- smoke detector (Waiting for final paint finish)
Electrical- Installation of weather proof switches for pumps
Electrical- Installation of
ICE & WAITING AREA
Remarks

Waiting for Final Clearance and pending materials to be delivered

Waiting for Final Clearance and pending materials to be delivered


Waiting for the delivery
After the final finishing.
After the final paint finish.

Waiting for Final Clearance and pending materials to be delivered

Waiting for Final Clearance and pending materials to be delivered


Waiting for the delivery
After the final finishing.
After the final paint finish.

Waiting for Final Clearance and pending materials to be delivered

Waiting for Final Clearance and pending materials to be delivered


Waiting for the delivery
After the final finishing.
After the final paint finish.