Professional Documents
Culture Documents
Tadmur -Seyana
SIGNATURE :
NAME :
DATE :
* By signing this Commissioning sheet, the contractor/installer certifies that the installation is based on Daikin Standard installation and practice. Daikin reserves the right
to void warranty in case there is any discrepancy on the information
* Field Electrical Safety components such as ELCB/RCCB are responsibility of the installer and should be installed to avoid risk of fire or human injury.