Maintenance Performance Record®

Bulan : APRIL 2015


Start Date :
End Date :
Total Hours :

SCHEDULE
RIG No UNIT MANUFACTURE MODEL SN TOTAL HOURS OPERATION
DOWN TIME

(HOURS) (HOURS) (HOURS)


1 3 4 6 7 8

1 Rig engine 744.00


2 Genset Rig 744.00
3 Mud Pump engine 744.00
4 Pwr swivel engine 744.00
NAMA RIG 5 Drawwork 744.00
6 Accumulator 744.00
7 Crown Block 744.00
8 Travelling block 744.00
9 Hook 744.00
Hatian Ojak
Somonggal
Simanjuntak:
MASUKKAN RENCANA JAM
PERBAIKAN

TOTAL SHUT
UNSCHEDULE STAND BY
DOWN DOWN AVAILABILITY UTILISASI RELIABILITY MTBF MTTR
DOWN TIME TIME
TIME FREQ
(HOURS) (HOURS) (HOURS) (EVENT) (%) (%) (%) (HOURS) (HOURS)
9 10 11 12 13 14 15 16 17

100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -
100% 0% 0% - -

Hatian Ojak Somonggal S


MTBF,MTTR DAN TOTAL RH
BERLAKU UNTUK ROTATING
REMARKS TOTAL RH

18 18

Hatian Ojak Somonggal Simanjuntak:


MTBF,MTTR DAN TOTAL RH HANYA
BERLAKU UNTUK ROTATING EQUIPMENT
Maintenance Performance Record®
Bulan : MEI 2015
Start Date :
End Date :
Total Hours :

SCHEDULE
RIG No UNIT MANUFACTURE MODEL SN TOTAL HOURS OPERATION
DOWN TIME

(HOURS) (HOURS) (HOURS)


1 3 4 6 7 8

NAMA RIG 1 Rig engine 744.00 75.00 -


2 Genset Rig 744.00 744.00 -
3 Mud Pump engine 744.00 294.00 -
4 Pwr swivel engine 744.00 311.00 6.00
5 Drawwork 744.00 742.00 -
6 Accumulator 744.00 480.00 6.00
7 Crown Block 744.00 733.00 6.00
8 Travelling block 744.00 726.00 -
9 Hook 744.00 744.00 -
Hatian Ojak
Somonggal
Simanjuntak:
MASUKKAN RENCANA JAM
PERBAIKAN

TOTAL SHUT
UNSCHEDULE STAND BY
DOWN DOWN AVAILABILITY UTILISASI RELIABILITY MTBF MTTR
DOWN TIME TIME
TIME FREQ
(HOURS) (HOURS) (HOURS) (EVENT) (%) (%) (%) (HOURS) (HOURS)
9 10 11 12 13 14 15 16 17

- - 669.00 100% 10% 100% 75.00 -


- - - 100% 100% 100% 744.00 -
- - 450.00 100% 40% 100% 294.00 -
- 6.00 427.00 2.00 99% 42% 100% 155.50 3.00
- - 2.00 100% 100% 100% 742.00 -
- 6.00 258.00 1.00 99% 65% 100% 480.00 6.00
- 6.00 5.00 1.00 99% 99% 100% 733.00 6.00
- - 18.00 100% 98% 100% 726.00 -
- - - 100% 100% 100% 744.00 -

Hatian Ojak Somonggal Sim


MTBF,MTTR DAN TOTAL RH H
ROTATING EQUIPMENT
REMARKS TOTAL RH

18 18

Hatian Ojak Somonggal Simanjuntak:


MTBF,MTTR DAN TOTAL RH HANYA BERLAKU UNTUK
ROTATING EQUIPMENT
Maintenance Performance Record®
Bulan : JUNI 2015
Start Date :
End Date :
Total Hours :

SCHEDULE
RIG No UNIT MANUFACTURE MODEL SN TOTAL HOURS OPERATION
DOWN TIME

(HOURS) (HOURS) (HOURS)


1 3 4 6 7 8

NAMA RIG 1 Rig engine 744.00 75.00 -


2 Genset Rig 744.00 744.00 -
3 Mud Pump engine 744.00 294.00 -
4 Pwr swivel engine 744.00 311.00 6.00
5 Drawwork 744.00 742.00 -
6 Accumulator 744.00 480.00 6.00
7 Crown Block 744.00 733.00 6.00
8 Travelling block
9 Hook
Hatian Ojak
Somonggal
Simanjuntak:
MASUKKAN RENCANA JAM
PERBAIKAN

TOTAL SHUT
UNSCHEDULE STAND BY
DOWN DOWN AVAILABILITY UTILISASI RELIABILITY MTBF MTTR
DOWN TIME TIME
TIME FREQ
(HOURS) (HOURS) (HOURS) (EVENT) (%) (%) (%) (HOURS) (HOURS)
9 10 11 12 13 14 15 16 17

- - 669.00 100% 10% 100% 75.00 -


- - - 100% 100% 100% 744.00 -
- - 450.00 100% 40% 100% 294.00 -
- 6.00 427.00 2.00 99% 42% 100% 155.50 3.00
- - 2.00 100% 100% 100% 742.00 -
- 6.00 258.00 1.00 99% 65% 100% 480.00 6.00
- 6.00 5.00 1.00 99% 99% 100% 733.00 6.00

Hatian Ojak Somonggal


MTBF,MTTR DAN TOTAL RH
ROTATING EQUIPMENT
REMARKS TOTAL RH

18 18

Hatian Ojak Somonggal Simanjuntak:


MTBF,MTTR DAN TOTAL RH HANYA BERLAKU UNTUK
ROTATING EQUIPMENT