QUOTATION

ISO 9001;2015
You’re Ref: Enquiry through mail.
Our Ref: SNE/2020
Date: 17/02/2020
To,
Mahavir Institute Of Science And Technology, Hyderabad, Telangana,
India
Email: ranga.an1950@gmail.com
Mobile: +(91)-7095156929
Sub: Quotation for supply of: GAS TURBINE TEST RIG

Respected Sir,
We acknowledge with thanks the receipt of your above cited enquiry and are pleased to quote
our most technically & competitive prices as follows.
SL. Particulars / Equipments Qty Basic price
No. in Rs

1 GAS TURBINE TEST RIG (LABORATORY SCALE) 01 RS,16,76,650/-


model :-GTTR7729
make:-S N E
specifications of gas turbine
The Gas Turbine test rig will have at least the following units

1. Turbocharger Assembly: Composed of centrifugal


compressor (in light alloy) and turbine (in cast iron) with the
following features: operating at maximum compression ratio of
about 2 : 1. operating at a speed of approx. 30,000 to 50,000 r.p.m

2. Combustion Chamber : Shall consist of an external


chamber and a flame tube mounted inside it. The combustion
chamber will have such designed that there is even distribution of
heat and there are no overheating points. The turbine which starts
compressor will be a centrifugal machine with 75 mm dia.

3. Power Turbine Group: The Rotor assembly of the


turbine will be perfectly balanced and will have arrangement for
continuous lubrication. The larger turbine will attain a
maximum speed of 2,000 to 23,000 r.p.m and the turbine power
will be transmitted to the alternator by the means of toothed belt
having transmission ration of 1 : 4.28 producing approx. 1.kW at
3,300 rpm.

4. Fuel System: The Turbine will be able to work on Propane


or L.P.G or kerosene oil or LDO.
The following will also be required with the Gas Turbine set up
• U shaped manometer to measure turbine air consumption.
• Air filter
• Tacho meters to measure the speed of turbo compressor
unit, rotating speed of power
turbine.
• Gas flow rate regulation valve and Gas flow meter to
measure gas flow rate measurement.
• Spark plug
• Auxiliary Starting fan
• Oil tank 20 ltr capacity
• Water/oil heat exchanger
• Digital ammeter and voltmeter
• 2 Nos digital temperature indicators with 3 reading each, 6
nos pressure gauges.
• Complete digital electronic instrumentation for control
and measurement of power
absorbed by the alternator.

• Gas exhaust duct, wheeled frame with mimic diagram


panel
Apart from the above, system will have control devices for
control and operation of fan, pump, gas pressure, gas flow,
turbine braking etc.

The system will have the following also

• Oil cooler system


• Oil pump
• Oil heat exchanger
• Starting fan
• Gas exhaust
• Oil filter

Major Parameter
Gas Generation Turbine R.P.M: Working range 30000 to
50000
Power Turbine R.P.M: Operating range 2000 to 23000
Generator R.P.M: Operating range 330 to 3300
Alternator Power Output (Max. at 3300 rpm): 1.0 K.W.
The system will be supplied with automatic safety device
to prevent over speeding.
The unit will have an automatic closed circuit pressurized
lubrication system along with
tube nest oil cooler for cooling the oil.

The unit will have at least the following safety measures


o Luminous Intermitants signals, near the critical
temperature.
o Automatic / Manual regulation of cooling water.
o Luminous signal for gas solenoid valve operation.

The gas turbine should be capable of conducting the


following experiments

o Study of a Joule-Brayton cycle


o Study on a reduced scale of a plant for the production of
electrical energy by a gas turbine
o Study of the starting procedure of a gas turbine
o Measurement of the air flow input as a function of the
speed of the turbocharger
o Pressure and temperature in the combustion chamber as a
function of the speed of the turbocharger
o Calculation of the specific consumption as a function of
the speed of the turbocharger
o Calculation of the output power as a function of the speed
of the power turbine
o Determination of the power output with different input
parameters.
o Safety systems in the operation of a gas turbine. Power
supply: 440 V + 10%, 3 phase

TERMS & CONDITIONS:


• Prices Quoted are EX _WORKS Bangalore.
• Freight Charges Extra.
• packing and forward extra charges
• GST @ 18% extra.
• Entry Tax / Octroi Charges extra at actual.
• Payment: 50 % advance along with the order, 40% Against Performa
invoice & 10% after Demo at Site.
• Installation Charges Extra.
• Payments should be made by DD in company’s favour, payable at
Bangalore.
• Delivery within 15-18 weeks from the date of purchase order along with
the advance.
• Warrantee 12 months from the date of Installation.
• Validity 60 days from the date of Quotation.