Professional Documents
Culture Documents
PRESSURISED POOR LIGHTING / NEW PERSONNEL / CONFINED SPACE SIMULTANEOUS ADVERSE BIOLOGICAL HAZARDOUS
EQUIPMENT VISIBILITY FIRST TIMER OPERATIONS WEATHER HAZARD SUBSTANCE
Recovery
Rescue plan to
include manual
descend
Recovery
Local plan to be
* Refer to “PCSB available in the event
Portable Electrical of any incident
Equipment & involving radioactive
Temporary Installation sources
Guideline”
Hazards, Control & Recovery Prompters
Control Control Control Control Electrical: Control Escape routes / Consideration has been
Hearing protection Proper PPE required Excavation Plan Waste classification Earthing Equipment in congestion given to:
(single / double) Restricted access to available (e.g. hazardous Capacitor / condition Emergency response who else could be
Sound barriers to be Authorised personnel Refer confined space waste, domestic equipment residual Pre-use check equipment location hurt
erected if required only requirement if > waste) energy removed identified how could they be
Access & egress
Equipment to be Conduct work in 1.5m Safe Battery bank isolated Emergency response hurt
Safe proximity to live
shutdown (if compliance with PTW, Consider impact on handling/designated equipment adequate and the controls to
Pneumatic pressure: process equipment
practical) Certificate & Emergency storage area and in working be implemented will
Depressurise / vents Safe proximity to live condition
“Low noise” tools to Procedures Evacuation routes Safe transportation – address these
Thermal & pressure cables / equipment
be used if possible Precaution to be and site access manifest, proper Rescue plan hazards
containers, labelling, relief devices Ensure safe walkways
Rotate personnel to confirmed by ACP / Underground service Emergency Alarm & if in doubt, stop
etc. Hydraulics: for pedestrian traffic,
minimize exposure AP for work in identified and Shutdown locations work and reassess
clearly marked and
time proximity of live marked Clinical wastes - refer Depressurise static Nearest telephone Do not be afraid to
signed
equipment Barricade the area to Medic system point and numbers ask
Use Banksman to
Check earthing and provide signage Wear correct PPE for High level auto known
control vehicle
requirements have Access and egress materials being blowdown system Consider use of walkie
movements
been put in place handles Liquid pressure. 10M talkie for critical
Proper placement for Audible alarms to
Barricade the area equipment and Use barriers and height =1BG @ atm activities
alert other personnel
and provide signage machinery especially signs as required pressure Drill exercise
of their movements,
for slope excavations Use waste card / Mechanical: particularly if
Work require Excavations free MSDS available Install choke / reversing
isolation: from water ; provide secured objects to Consider use of High
Isolations to be drainage system Recovery prevent moving Visibility tabards for
performed by ACP / Equipment and spoil objects from personnel involved in
Clean up equipment /
AP if required at least 1.5m away gradient the activity
materials on site
Ensure voltage test is from edge of open Clamp / release VEC and/or ROC if
conducted or local excavations and spring compression / required
START / STOP button trenches tension
Base plate required
used to confirm Monitoring of ground Chemical: for outriggers
isolation prior to work & slope movement Pyrophoric material –
starting Slope protection prevent from drying
Recovery
system provided ; out
excavation > 3m, Access and egress
Exothermic reaction
slope protection – maintain
system shall be acceptable
endorsed by PE temperature level
Electrostatic/
Electromagnetic:
* Refer to “PCSB Use earthing strap
Excavation Guideline”
Structure and
column:
Earthing of pipe rack
and column