Hazards, Control & Recovery Prompters

PRESSURISED POOR LIGHTING / NEW PERSONNEL / CONFINED SPACE SIMULTANEOUS ADVERSE BIOLOGICAL HAZARDOUS
EQUIPMENT VISIBILITY FIRST TIMER OPERATIONS WEATHER HAZARD SUBSTANCE

Control Control Control Control Control Control Control Control


 Purged of  Additional suitable  Induction / training  Maintain Entrant  SISO approved &  Stop / postpone until  Complete Health Risk  Tank / vessel drained
hydrocarbons / rated lighting (e.g. provided Register communicated weather improves for Assessment & purged of
hazardous flood light)  “Green Hat”  Standby person  R&R understood all activities  Specialized PPE contaminants
substances  Stop / postpone until implementation  Controls are in place  MSDS available at
 Complete Confined  Referral &  Consult Industrial
 S/D & Depressurized visibility improves  Direct Supervision Space Certificate compliance with for work with Hygienist / Medic if work site &
 System drained/vent  Ex Helmet lamp SIMOPS matrix and potential impact due required implement controls
 Mentor / coach /  Confirm condition of
(incl. dead legs) MOPO to visibility, rain,  Health Risk
buddy assigned entry is met – gas  Ensure any required
lighting or other Assessment
 Energy Isolation &  Work group notified test, lighting,  Adjacent work inoculations are
LOTO ventilation parties informed  Proper PPE current completed
appropriate to the  Asbestos control plan
 Safety devices in  Compliance with CSE  Defer / postpone
weather condition
correct position Safe Work Practices conflicting work Recovery  Handling and
(e.g. physical fitness, activities  Work rotation Disposal Plan, e.g.
 Specialized PPE
checklist, signage)  Loose objects are mercury, H2S,
Recovery Recovery
removed or tied down specialised container
 Access & escape  Access & escape Recovery
Recovery  Aware of wind effects  Decontamination
 Combined drill
on carried objects facility if required
 Rescue Plan exercise conducted
 Ensure proper PPE is
 Drill exercise  Adequate Life Saving
Recovery available at worksite
verification Appliances (LSA)
 Water for personal  Barriers and signs in
 Access & escape
dehydration place
 Sufficient ration  Personal gas monitor
* Refer to “PCSB * Refer to “PCSB if required
Confined Space Entry Simultaneous  Proper PPE
appropriate to the  Designated storage
Procedure” Operations Guideline”
weather condition area – refer to
reactivity matrix
Recovery
 MSDS available at
work site
 Decontamination
facility if required
 Access and escape
Hazards, Control & Recovery Prompters

WORKING AT WORKING AT WORKING AT WORKING AT WORKING


HEIGHT - HEIGHT - HEIGHT - POTENTIAL
HEIGHT - AT HEIGHT POTENTIAL
LADDER SCAFFOLDING SUSPENDED DROPPED LIFTING
MOBILE WORK - ON ROOF SPILLS
WORKING OBJECTS OPERATIONS
PLATFORM
PLATFORM

Control Control Control Control Control Control Control Control


 Inspected, tagged  Inspected and tagged  Equipment inspected Non-motorised  Fragile materials  Erect restricted areas  Check lifting  Drain equipment &
and free from defects by certified inspectors and certified  Equipment inspected identified / signs / barriers equipment condition identify dead legs
 Securely tied off and  Guardrail, toeboard &  Barricade area below and certified  Two crawling boards below / certification  Potential spill
at correct angle baseplate installed  Wear safety harness  Firm surface level or roof ladders  Use container to raise  Lifts over live locations identified &
 Maintain correct  Wear safety harness with double lanyards, provided tools to the work process equipment spill trays installed
 Outdoor – height <3x
points of contact with double lanyards, absorber and hook platform minimized (low points / dead
base dimension
when ascending / absorber and hook at at approved anchor  Toeboard installed on  Lifting radius clear of legs)
 Indoor - height <3.5x Recovery
descending suitable point for point scaffold / platform unauthorized  Emergency Response
base dimension  Emergency Response
 Place on stable working > 2m  Dry run/site  Consider use of personnel team briefed about
 Wheel brake engaged Plan
surface, do not work  > 40m height, PE to assessment to protective matting  Lifting plan in place activity
before used
off two steps of the design & approve ensure no contact and or netting  Only trained and  Proper PPE is
ladders with surrounding  No overhead required
 Consider impact on  Lanyards to be fitted competent personnel
equipment obstruction / * Refer “PCSB Safe
 Aluminium ladders flame detectors, gas to tools and secured involved in lifting  MSDS available at
electrical hazards Working At Height
shall not be used in detectors and deluge  Consider impact on to users or workplace activities work site &
Zone 0 & Zone 1 system flame detectors, gas Motorised Guideline” implement control
 Use of tools pouch  Banksman shall not
 Reinforced metals detector and deluge  Equipment inspected be involved in load
ladders shall not be system and certified handling
Recovery Recovery
used in the vicinity of  Emergency switch or  Load manifest
 Access & escape  Spill clean-up
live electrical Recovery two sets of control
ladder  Weather & visibility equipment &
equipment  Operated by
 Emergency Response suitable for lifting materials available
Plan to include competent person activities
* Refer “PCSB Safe  Emergency Response
* Refer “PCSB Safe manual descend  Within safe workload plan reviewed and
Working At Height
Working At Height  Wear safety harness available
Guideline”
Guideline” & hook at approved
* Refer “PCSB Safe
Working At Height anchor point
Guideline”  Outriggers fully
extended before used
 Dry run/site
assessment – no
contact with
surrounding
equipment
 No overhead
obstruction &
electrical hazards

Recovery
 Rescue plan to
include manual
descend

* Refer “PCSB Safe


Working At Height
Guideline”
Hazards, Control & Recovery Prompters

COLD/HEAT PORTABLE MOVING / ROTATING MANUAL EQUIPMENT / VIBRATING SLIPS / TRIPS /


RADIATION
HAZARD ELECTRICAL EQUIPMENT HANDLING TOOLS EQUIPMENT FALLS
HAZARD
EQUIPMENT &
INSTALLATION
Control Control Control Control Control Control Control Control
 Proper PPE required  Temporary equipment  Restrict access  Machinery guards and  Identify load’s  Equipment &Tools  Use appropriate PPE  Keep worksite clear
 Install barrier to and installation barriers / signs personnel barriers to weight inspected  Monitor impact on of trip hazards
prevent contact suitably rated,  Notify personnel who be installed  Posture, lifting &  Tools not modified process equipment  Ensure cables and
inspected and tagged may be affected. PA  Loose clothing or stability technique hoses are placed
 Work rotation  Protective guards in  Noise controls will be
 Operating procedures announcement equipment to be  Physical capability place implemented overhead whenever
 Consider use of
/ instructions before start of work secured including no. of possible
Personnel Protective  Use appropriate PPE  Rotate personnel to
provided  NORM controls  Hair to be safely people  Clean up spills
Insulation (PPI)  Intrinsically safe minimize exposure
 Meet the hazardous  RPS / RPO to control secured  Use mechanical time  Barricaded opening /
area classification  Insulated tools for
any activities  Jewellery to be devices whenever  Use low vibration holes with proper
Recovery requirement electrical activities
involving radiation removed possible tools whenever is signage
 Specialised recovery  Protect lead (Pb) from hazards  Lanyards fitted if
 Vibration monitoring  Consider route, possible  Footwear in good
materials (e.g. impact / damage working at height
 Local plan to be  Check compatibility of lighting, surface and condition with
thermal blanket,  Discard damaged
 Position lead (Pb) in a available in the event disc and grinder environmental adequate grip
thermal bath) tools / equipment
safe position of any incident conditions  Maintain
 Prevent fan from wind
 Equipment fitted with involving radioactive  Avoid repeated housekeeping
milling
circuit breaker sources actions and twisting throughout working
 Equipment properly  Workforce exposure motions period
insulated and earthed to be monitored  Ensure sufficient rest  Use anti-slip
using dosimeters or periods are taken materials at potential
 Specific work location
badges slip area
hazards (e.g. open
space, confined  Consider doing the
space) work during odd
hours
 Ensure source
Recovery
container is in good
 Proper PPE condition

Recovery
 Local plan to be
* Refer to “PCSB available in the event
Portable Electrical of any incident
Equipment & involving radioactive
Temporary Installation sources
Guideline”
Hazards, Control & Recovery Prompters

HIGH HIGH ENERGY WASTE CLEAN- MOBILE WHAT IF?


EXCAVATIONS STORED ENERGY EMERGENCY
NOISE and / or HIGH UP & EQUIPMENT
- RESPONSE
VOLTAGE DISPOSAL

Control Control Control Control Electrical: Control  Escape routes / Consideration has been
 Hearing protection  Proper PPE required  Excavation Plan  Waste classification  Earthing  Equipment in congestion given to:
(single / double)  Restricted access to available (e.g. hazardous  Capacitor / condition  Emergency response  who else could be
 Sound barriers to be Authorised personnel  Refer confined space waste, domestic equipment residual  Pre-use check equipment location hurt
erected if required only requirement if > waste) energy removed identified  how could they be
 Access & egress
 Equipment to be  Conduct work in 1.5m  Safe  Battery bank isolated  Emergency response hurt
 Safe proximity to live
shutdown (if compliance with PTW,  Consider impact on handling/designated equipment adequate  and the controls to
Pneumatic pressure: process equipment
practical) Certificate & Emergency storage area and in working be implemented will
 Depressurise / vents  Safe proximity to live condition
 “Low noise” tools to Procedures Evacuation routes  Safe transportation – address these
 Thermal & pressure cables / equipment
be used if possible  Precaution to be and site access manifest, proper  Rescue plan hazards
containers, labelling, relief devices  Ensure safe walkways
 Rotate personnel to confirmed by ACP /  Underground service  Emergency Alarm &  if in doubt, stop
etc. Hydraulics: for pedestrian traffic,
minimize exposure AP for work in identified and Shutdown locations work and reassess
clearly marked and
time proximity of live marked  Clinical wastes - refer  Depressurise static  Nearest telephone  Do not be afraid to
signed
equipment  Barricade the area to Medic system point and numbers ask
 Use Banksman to
 Check earthing and provide signage  Wear correct PPE for  High level auto known
control vehicle
requirements have  Access and egress materials being blowdown system  Consider use of walkie
movements
been put in place handles  Liquid pressure. 10M talkie for critical
 Proper placement for  Audible alarms to
 Barricade the area equipment and  Use barriers and height =1BG @ atm activities
alert other personnel
and provide signage machinery especially signs as required pressure  Drill exercise
of their movements,
for slope excavations  Use waste card / Mechanical: particularly if
Work require  Excavations free MSDS available  Install choke / reversing
isolation: from water ; provide secured objects to  Consider use of High
 Isolations to be drainage system Recovery prevent moving Visibility tabards for
performed by ACP /  Equipment and spoil objects from personnel involved in
 Clean up equipment /
AP if required at least 1.5m away gradient the activity
materials on site
 Ensure voltage test is from edge of open  Clamp / release  VEC and/or ROC if
conducted or local excavations and spring compression / required
START / STOP button trenches tension
 Base plate required
used to confirm  Monitoring of ground Chemical: for outriggers
isolation prior to work & slope movement  Pyrophoric material –
starting  Slope protection prevent from drying
Recovery
system provided ; out
excavation > 3m,  Access and egress
 Exothermic reaction
slope protection – maintain
system shall be acceptable
endorsed by PE temperature level
Electrostatic/
Electromagnetic:
* Refer to “PCSB  Use earthing strap
Excavation Guideline”
Structure and
column:
 Earthing of pipe rack
and column